PL84228B1
PL84228B1 PL16019473A PL16019473A PL84228B1 PL 84228 B1 PL84228 B1 PL 84228B1 PL 16019473 A PL16019473 A PL 16019473A PL 16019473 A PL16019473 A PL 16019473A PL 84228 B1 PL84228 B1 PL 84228B1
Authority
PL
Poland
Prior art keywords
collapse
wall
roof
excavation
heading
Prior art date
Application number
PL16019473A
Other languages
Polish (pl)
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed filed Critical
Priority to PL16019473A priority Critical patent/PL84228B1/pl
Publication of PL84228B1 publication Critical patent/PL84228B1/pl

Links

Landscapes

  • Devices Affording Protection Of Roads Or Walls For Sound Insulation (AREA)
  • Excavating Of Shafts Or Tunnels (AREA)

Description

Przedmiotem wynalazku jest sposób zabezpieczenia przed zniszczeniem górniczych wyrobisk chodniko¬ wych przyscianowych w systemie eksploatacji scian z zawalem stropu bez stosowania pasów ochronnych.Dotychczas dla ochrony chodnikowych wyrobisk górniczych przyscianowych podczas eksploatacji scian weglowych z zawalem stropu budowane sa pasy ochronne wykonywane z róznego materialu, jak np. skala plonna, podklady drewniane, kloce betonowe. Zadaniem pasów ochronnych jest przejecie naprezen górotworu istniejacych wokól scianowego wyrobiska eksploatacyjnego, celem zabezpieczenia przyscianowego wyrobiska chodnikowego przed zniszczeniem.Pasy ochronne wykonywane sa wraz z postepem sciany wzdluz wyrobiska chodnikowego w scianie na obszarze bezposrednio przylegajacym do chodnika. Po wykonaniu zawalu w wyrobisku scianowym pas ochronny przejmuje naprezenia wynikajace z powstalego w górotworze sklepienia cisnien. Stan ten powoduje zgniatanie pasów ochronnych a w konsekwencji tego niszczenie obudowy i stopniowe zmniejszanie przekroju wyrobiska chodnikowego. Istnienie strefy naprezen jest niekorzystne dla wyrobiska chodnikowego dotad, dopóty strefa odprezen nie powiekszy sie i jej zasieg nie osiagnie granicznego polozenia. Strefa naprezen przechodzi poza wyrobisko chodnikowe w obszar calizny.Wyzej opisany sposób ochrony wyrobisk chodnikowych przyscianowych posiada te wady, ze wymaga duzej pracochlonnosci i nakladów materialowych na budowanie pasów ochronnych, które i tak w konsekwencji nie zabezpieczaja w dostatecznym stopniu chronionego wyrobiska przed zniszczeniem.Celem wynalazku jest rozwiazanie takiego sposobu ochrony wyrobisk chodnikowych przyscianowych w wyrobiskach eksploatacyjnych z zawalem stropu, który eliminuje wyzej opisane wady i niedogodnosci.Zagadnienie techniczne, które nalezy rozwiazac, polega na takim sposobie kierowania stropem, aby wytworzony rozklad naprezen w górotworze wykluczyl stosowanie pasów ochronnych i niszczenie obudowy w ochronionych wyrobiskach.Istota wynalazku jest sposób zabezpieczenia górniczych wyrobisk chodnikowych przed zniszczeniem przy scianach weglowych eksploatowanych z zawalem stropu, bez stosowania pasów ochronnych przy tych chodni-2 84 228 kach poprzez wywolanie lui. wymuszenie zawalu warstw stropowych na odcinku sciany, w którym dotychczas budowano pasy ochronne. W wyniku wywolania lub wymuszenie zawalu powstaje powiekszona strefa odprezen warstw stropowych obejmujaca swym zasiegiem wyrobisko chodnikowe eliminujac dzialajace nan naprezenia górotworu. Przed wywolaniem lub wymuszeniem zawalu obudowe wyrobiska chodnikowego przyleglego do sciany wzmacnia sie znanymi sposobami.Efektem zastosowania sposobu wedlug wynalazku jest calkowite wyeliminowanie pasów ochronnych i niekorzystnych wplywów cisnienia górotworu na wyrobisko chodnikowe.Sposób wedlug wynalazku pokazano w przykladowym wykonaniu na rysunku, w którym fig. 1 przedsta¬ wia przekrój poprzeczny przez sciane, fig. 2 — przekrój podluzny przez sciane z zawalem zasadniczym, fig. 3- przekrójVodluz{W z poszerzona strefa zawalu.Fig. 1 obrazuje kierunek i nachylenie otworów strzalowych 1 wierconych w stropie eksploatowanej sciany, przy czym Ich najkorzystniejszy zasieg wynosi 1 do 4 m, w zaleznosci od wlasnosci flzyko-mechanlcznych skal stropowych. Fig. 3 obrazuje zawal zasadnlezy 2, oraz odelnek teiany 3, w którym nalezy wymusic dodatkowy zawal 4, eelemjpowlekszenla strefy odprezen warstw stropewyeh i, tak Jak to zaznaezono na fig. 3. Strefa wymuszonego zavalu 4 obejmuje swym zasiegiem ten odcinek sciany, w którym budowano pasy ochronne w zasadzie nie Wieksze jak 6 m. Naprezenie wynikajace ze sklepienia cisnien 6 przenoszone sa do calizny weglowej 7.Celem zabezpieczenia wyrobiska chodnikowego 8 przed zasypaniem go odlamkami skaly plonnej - pochodzacej z zawalu 4, obudowe chodnika 9 od strony zawalu 4 opinamy znanymi wykladzinami 10. Ponadto obudowe 9 chodnika wzmacniamy dodatkowym budynkiem 11 skladajacym sie z podciagów ze stojakami. PLThe subject of the invention is a method of protecting against destruction of wall mining pits with a collapse of the roof without the use of protective belts. Until now, protective belts made of various materials, such as e.g. . yield scale, wooden sleepers, concrete blocks. The task of the protective strips is to take over the stress of the rock mass existing around the wall excavation excavation in order to protect the wall excavation from damage. The protection strips are made along with the wall progress along the wall excavation in the area directly adjacent to the sidewalk. After making the fall in the wall excavation, the protective strip takes the stresses resulting from the pressure in the rock vault. This condition causes the crushing of the protective strips and, consequently, the destruction of the lining and the gradual reduction of the cross-section of the heading. The existence of the stress zone is disadvantageous for the heading excavation so far, as long as the relaxation zone will not increase and its range will not reach its limit location. The stress zone passes beyond the heading into the area of the whole area. The above-described method of protection of the longwall headings has the disadvantages that it requires a lot of labor and material costs to build protective belts, which, consequently, do not sufficiently protect the protected excavation against damage. is a solution of such a method of protecting wall headings in the excavation workings with a collapse of the roof, which eliminates the above-described defects and inconveniences. The technical problem to be solved is to control the roof in such a way that the generated stress distribution in the rock mass excludes the use of protective belts and damage to the support The essence of the invention is a method of securing mine headings against destruction at coal walls operated with a collapse of the roof, without the use of protective belts at these chutes by means of ie lui. forcing the collapse of the roof layers on the wall section where protective belts have been built so far. As a result of triggering or forcing the collapse, an enlarged relaxation zone of the roof layers is created, covering the paving excavation with its range, eliminating the nano stresses in the rock mass. Before triggering or forcing a fall, the casing of the heading adjacent to the wall is reinforced by known methods. The result of the application of the method according to the invention is the complete elimination of protective strips and the unfavorable effects of rock mass pressure on the heading. The method according to the invention is shown in the example embodiment in Fig. 1. shows a cross section through a wall, Fig. 2 - a longitudinal section through a wall with a main collapse, Fig. 3 - a longitudinal section of a wall with a widened collapse zone. 1 illustrates the direction and inclination of the arrowslits 1 drilled in the roof of the exploited wall, with their most favorable range being 1 to 4 m, depending on the properties of the mechanical and mechanical roof scales. Fig. 3 shows the collapse of basal 2, and the recess of theian 3, in which an additional collapse 4 must be forced, that the zones of relaxation of the top layers of the roof are to be coated and, as shown in Fig. 3. The forced collapse zone 4 covers the section of the wall in which protection belts were built, in principle, not larger than 6 m. The stress resulting from the pressure vault 6 is transferred to the coal pit 7. The purpose of securing the roadway 8 from being covered with fragments of the fertile scale - from the fall 4, the pavement housing 9 from the side of the fall 4 Wykladzinami 10. Moreover, the casing 9 of the pavement is reinforced with an additional building 11 consisting of beams with stands. PL

Claims (2)

Zastrzezenia patentowe 1. Sposób zabezpieczenia górniczych v/yrobisk chodnikowych przyscianowych przed zniszczeniem w syste¬ mie eksploatacji scian z zawalem stropu, znamienny tym, ze w pasie sciany 3 przyleglym do wyrobiska chodnikowego 8 wywoluje sie lub wymusza wysoki zawal 4 warstw stropowych znanymi sposobami.Claims 1. A method of securing mining wall pits against destruction in the system of exploitation of walls with a collapse of the roof, characterized in that in the strip of the wall 3 adjacent to the excavation 8, a high collapse of 4 roof layers is caused or forced by known methods. 2. Sposób wedlug zastrz. 1,znamienny tym, ze przed wywolaniem zawalu w wyrobisku chodniko¬ wym 8 obudowa chodnika 9 od strony zawalu 4 opinana jest wykladzinami i wzmacnia sie ja dodatkowo budynkiem 11 skladajacym sie z podciagów ze stojakami. Prac. Poligraf. UP PRL Naklad 120 + 18 PL2. The method according to claim The structure of claim 1, characterized in that prior to causing a collapse in the heading 8, the casing of the pavement 9 from the side of the collapse 4 is covered with carpets and is additionally reinforced with a building 11 consisting of beams with stands. Wash. Typographer. UP PRL Edition 120 + 18 PL
PL16019473A 1973-01-08 1973-01-08 PL84228B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
PL16019473A PL84228B1 (en) 1973-01-08 1973-01-08

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PL16019473A PL84228B1 (en) 1973-01-08 1973-01-08

Publications (1)

Publication Number Publication Date
PL84228B1 true PL84228B1 (en) 1976-03-31

Family

ID=19961370

Family Applications (1)

Application Number Title Priority Date Filing Date
PL16019473A PL84228B1 (en) 1973-01-08 1973-01-08

Country Status (1)

Country Link
PL (1) PL84228B1 (en)

Similar Documents

Publication Publication Date Title
CN1982649A (en) Mining method
Mikula The influence of geotechnical monitoring on mine design at Mt Charlotte
PL84228B1 (en)
McCreath et al. Survivability of shotcrete near blasts
Shaposhnik et al. Development of technology for filling voids between metal frame support and adjacent rock mass by foam materials
RU2013546C1 (en) Method for protection of reused workings
Ahmad et al. New Austrian tunneling method (NATM) in Himalayan geology: emphasis on execution cycle methodology
Kostyuk et al. Searching for the Optimal Parameters of the Thick Steep Seams ‘Under-Level Development
Bondarenko et al. Maintenance of reusable mine workings during the augering mining of coal seams
Aisenstein et al. Oil storage in dry chalk (southern Israel)-case study
Latilla et al. Shortwall Facebreak Beneath a Dolerite Sill-Learning Points From a Recent Event At Matla Coal Mine
PL151438B1 (en) Method of arranging self-advancing roof support in a longwall inclined drift
SU635239A1 (en) Method of mining mineral thick deposits
PL72913B1 (en)
Sheorey Use of rock classification to estimate roof caving span in oblong workings
RU1802144C (en) Method for protection of working from local inrush of rocks
Geocontrol Fourteen years of experience on rock bolting in Spain
Harkauli et al. Impact Of Field Measurement On Design Of Tunnels And Power House Of Girl Hydro Electric Project In Himachal Pradesh
SU594339A1 (en) Method of protecting undermined structures and natural objects
SU578458A1 (en) Method of mining ore bodies
Chen Time series analysis applied to displacement prediction in NATM: Proc International Symposium on Modern Mining Technology, Taian, October 1988 P315–320. Publ Taian: Shandong Institute of Mining and Technology, 1988
PL144062B1 (en) Method of rebuilding dog headings
Li Stabilization of Highly Stressed Weak And Soft Rocks-Observations, principles And Practice
Limanov et al. Model investigation of manifestation of rock pressure on underground hydraulic structures located in permanently frozen rocks
Bray Control of ground movement at the Geco Mine