PL87263B1 - - Google Patents

Download PDF

Info

Publication number
PL87263B1
PL87263B1 PL16998574A PL16998574A PL87263B1 PL 87263 B1 PL87263 B1 PL 87263B1 PL 16998574 A PL16998574 A PL 16998574A PL 16998574 A PL16998574 A PL 16998574A PL 87263 B1 PL87263 B1 PL 87263B1
Authority
PL
Poland
Prior art keywords
ceiling
holes
rods
suspended
direct
Prior art date
Application number
PL16998574A
Other languages
Polish (pl)
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed filed Critical
Priority to PL16998574A priority Critical patent/PL87263B1/pl
Publication of PL87263B1 publication Critical patent/PL87263B1/pl

Links

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)

Description

Przedmiotem wynalazku jest sposób zabezpieczania stropu bezposredniego przed opadem do stosowania w kopalniach górnictwa podziemnego.Dotychczas nieznane sa sposoby, które by zapewnialy utrzymanie slabego stropu bezposredniego, zwlaszcza przy mechanicznym urabianiu. Opadajacy strop bezposredni w zaleznosci od grubosci warstwy opadajacej zanieczyszcza urobek, a tym samym znacznie rzutuje na wielkosc wydobycia przez obciazenie transportu i zakladu wzbogacania.Celem wynalazku jest opracowanie sposobu zabezpieczania slabego stropu bezposredniego, który eliminu¬ jac powyzsze wady i niedogodnosci pozwala na uzyskanie czystego urobku. Cel ten osiagnieto dzieki sposobowi zabezpieczania, który wedlug wynalazku polega na tym, ze odwierca sie w korzystnych odleglosciach otwory poziome w czole wyrobiska pod stropem bezposrednim, do których wprowadza sie prety lub rurki zakonczone gwintem, których konce utwierdza sie w otworach srodkiem wklejajacym. Do pretów tych podwiesza sie stropnice korzystnie uksztaltowana z otworami. Poprzez otwory w stropnicy odwierca sie otwory stropowe do zabudowy kotwi na przyklad rozpreznych lub wklejanych. Dla uchwycenia bezposredniego stropu bardzo slabego podwiesza sie siatke, a prety lub rurki z uszczelkami utwierdza sie w otworach na calej ich dlugosci.W celu zapewnienia dobrej wspólpracy wykonanego zabezpieczenia ze stropem zasadniczym nadaje sie pretom poziomym i kotwiom stropowym wstepny naciag. Nastepnie w miare odslaniania stropu zabudowuje sie kolejne stropnice.Sposób wedlug wynalazku mozliwy jest do stosowania praktycznie w kazdych warunkach geologiczno-gór niczych, pozwala wzmocnic strop jeszcze przed odslonieciem. Pozwala na zwiekszenie efektywnosci prac zwiazanych z wybieraniem zloza.Zabezpieczanie slabego stropu bezposredniego pozwala na eliminacje kosztów zwiazanych z wydobyciem i znacznie poprawia warunki bezpieczenstwa pracy.Sposób zabezpieczania stropu wedlug wynalazku przedstawiony jest w przykladzie wykonania na rysunku, na którym, na fig. 1 pokazane jest zabezpieczenie w widoku z przodu n a czolo wyrobiska, fig. 2 — przekrój poprzeczny zabezpieczenia, fig. 3 — faze wstepnego wzmocnienia w przypadku opadniecia stropu w przekroju2 87 263 poprzecznym wyrobiska, fig. 4 - utwierdzone prety lub rurki na calej dlugosci w przekroju poprzecznym wyrobiska.Zabezpieczanie wedlug wynalazku polega na odwierceniu poziomych otworów 1 w czole wyrobiska pod stropem bezposrednim w odleglosciach 0,5-1,5 m i dlugosciach 3-6 m. Do otworów tych wprowadza sie prety 2 lub rurki 3 zakonczone gwintem 4. Konce ich utwierdza sie w otworach srodkiem 5 wklejajacym. Do pretów 2 poziomych podwiesza sie stropnice 6 korzystnie uksztaltowane z otworami 7. Poprzez te otwory odwierca sie otwory 8 w stropie dla zabudowy kotwi 9 na przyklad rozpreznych lub wklejanych. Dla stropu bardzo slabego podwiesza sie siatki a prety 2 lub rurki 3 z uszczelkami 10 utwierdza sie na calej dlugosci.Dla dobrej wspólpracy wykonanego zabezpieczenia ze stropem zasadniczym nadaje sie wstepny naciag pretom 2 poziomym i kotwiom 9. Nastepnie w miare odslaniania stropu zabudowuje sie kolejne stropnice 6.W przypadku wystapienia opadu stropu bezposredniego od czola sciany nalezy w pierwszej fazie jak to pokazano na fig. 4 zastapic opadnieta warstwe tuleja 11 dystansowa nakladana na kotew slupowa.Przy zblizaniu sie frontem wyrobiska na odleglosc okolo 1 m od konca pretów 2 lub rurek 3 przystepuje sie do odwiercenia kolejnych otworów poziomych i wykonywania czynnosci zwiazanych z ich utwardzaniem. »/»)7}/r#r/f, 7/////;/////,87 263 Prac. Poligraf, lip Pfii. naklad 120+18 CmaAbzl PLThe subject of the invention is a method of securing a direct roof against rainfall for use in underground mining. So far, there are no known methods that would ensure the maintenance of a weak direct roof, especially in mechanical excavation. Depending on the thickness of the falling layer, the sloping roof contaminates the spoil, and thus significantly affects the volume of extraction due to the load of the transport and beneficiation plant. . This aim was achieved thanks to the method of securing, which, according to the invention, consists in drilling at preferred distances horizontal holes in the head of the excavation under the direct roof, into which rods or pipes terminated with a thread are inserted, the ends of which are fixed in the holes with a sticking agent. Roofs, preferably shaped with holes, are suspended to these bars. Ceiling holes are drilled through the holes in the canopy for the installation of, for example, expansion or glued anchors. In order to catch the direct ceiling of a very weak ceiling, a net is suspended, and the rods or tubes with gaskets are fixed in the holes along their entire length. In order to ensure good cooperation of the performed protection with the main ceiling, preliminary tension is applied to the horizontal rods and ceiling anchors. Then, as the ceiling is exposed, additional canopies are built in. The method according to the invention can be used in practically all geological and mining conditions, it allows to strengthen the ceiling before it is exposed. It allows to increase the efficiency of work related to the selection of the deposit. Securing a weak direct ceiling allows for the elimination of costs related to mining and significantly improves work safety conditions. The method of securing the ceiling according to the invention is shown in the example of the implementation in the drawing, in which, in Fig. 1, is shown front view of the protection at the head of the excavation, Fig. 2 - cross-section of the protection, Fig. 3 - initial reinforcement phase in the event of a fall of the roof in the cross-section of the excavation, According to the invention, securing consists in drilling horizontal holes 1 in the face of the excavation under the direct ceiling at a distance of 0.5-1.5 m and a length of 3-6 m. Rods 2 or tubes 3 ended with a thread 4 are inserted into these holes. in the holes with an adhesive. Roof rails 6, preferably shaped with holes 7, are suspended to the horizontal bars 2. Through these holes, holes 8 are drilled in the ceiling for installation of, for example, stretched or glued anchors. For a very weak ceiling, the mesh is suspended and the rods 2 or tubes 3 with gaskets 10 are fixed along the entire length. For good cooperation of the protection made with the main ceiling, preliminary tensioning of 2 horizontal rods and anchors 9 are suitable for exposing the ceiling. In the first phase, as shown in Fig. 4, in the case of a fall of the ceiling, the collapsed layer should be replaced with a spacer sleeve 11 put on a column anchor. When approaching the front of the excavation to a distance of about 1 m from the end of the bars 2 or pipes 3 the next horizontal holes are drilled and the activities related to their hardening performed. »/») 7} / r # r / f, 7 /////; /////, 87 263 Prac. Polygraph, Lip Pfii. Mintage 120 + 18 CmaAbzl PL

Claims (1)

1. Zastrzezenie patentowe Sposób zabezpieczania stropu bezposredniego przed opadem, znamienny tym, ze odwierca sie otwory (1) poziome w korzystnych odleglosciach, pod stropem bezposrednim w czole wyrobiska, do których wprowadza sie prety (2) lub rurki (3) zakonczone gwintem (4), których konce utwierdza sie srodkiem (5) wklejajacym i podwiesza sie stropnice (6) z otworami (7) przez które odwierca sie otwory (8) stropowe do zabudowy kotwi (9) np. rozpreinych lub wklejanych przy czym dla bardzo slabego stropu bezposredniego podwiesza sie siatke a prety (2) poziome lub rurki (3) z uszczelkami (10) utwierdza sie w otworach na calej ich dlugosci, ponadto dla dobrej wspólpracy wykonanego zabezpieczenia ze stropem zasadniczym nadaje sie wstepny naciag pretom (2) i kotwiom (9), nastepnie w miare odslaniania stropu zabudowuje sie kolejne stropnice (6).87 263 y///////////////////////////////////////// Fm. 1 l/M»»* PL1. Patent claim A method of securing the direct ceiling against rainfall, characterized in that horizontal holes (1) are drilled at favorable distances, under the direct ceiling in the head of the excavation, into which rods (2) or tubes (3) terminated with a thread (4) are inserted. ), the ends of which are fixed with a sticking agent (5) and the roof rails (6) with holes (7) are suspended through which holes (8) are drilled for the installation of the anchors (9), e.g. stretched or glued, for a very weak direct ceiling the net is suspended and the horizontal bars (2) or tubes (3) with gaskets (10) are fixed in the holes along their entire length, moreover, for a good cooperation of the protection with the main ceiling, preliminary tensioning of the rods (2) and bolts (9) then, as the ceiling is exposed, another canopy (6) .87 263 y ///////////////////////////////// //////// Fm. 1 l / M »» * PL
PL16998574A 1974-04-01 1974-04-01 PL87263B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
PL16998574A PL87263B1 (en) 1974-04-01 1974-04-01

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PL16998574A PL87263B1 (en) 1974-04-01 1974-04-01

Publications (1)

Publication Number Publication Date
PL87263B1 true PL87263B1 (en) 1976-06-30

Family

ID=19966710

Family Applications (1)

Application Number Title Priority Date Filing Date
PL16998574A PL87263B1 (en) 1974-04-01 1974-04-01

Country Status (1)

Country Link
PL (1) PL87263B1 (en)

Similar Documents

Publication Publication Date Title
CN106523003A (en) Rigid-flexible coupling energy absorbing support technology suitable for deep mining roadway
CN208328952U (en) Side slope Initiative Defence System
CN103615012B (en) Steel construction self-drilling hollow anchor bars reinforces the most wired gear safeguard structure
PL87263B1 (en)
DE3027661C2 (en) Extension of the line to intercept the layers of the slope and to secure the line edge in the stretches of underground mining
CN110566238A (en) Mud rock roof small coal pillar gob-side roadway supporting structure and method thereof
RU97106446A (en) METHOD FOR MOUNTING MINING PRODUCTS WITH WEAK ROCKS OF ROOF ANCHORED FASTENERS
RU2190765C2 (en) Method of dismantling powered cleaning complexes
DE814603C (en) Support arch for lining tunnels, tunnels, routes etc. as a preliminary support frame
RU2047778C1 (en) Anchor
SU1305356A1 (en) Method of supporting mine workings
SU1730459A1 (en) Method of erection of reinforced shotcrete support
CN111379580A (en) Tunnel primary support protection construction method
CN110424984A (en) The construction method of open air trestle mining side slope cave mouth
CN215718815U (en) Anti-blocking device for tunnel primary arch springing bolt hole
CN213837353U (en) Building device with prestressed tendons arranged outside concrete section
CN219137717U (en) Multifunctional combined structure of complex stratum binary structure ultrahigh slope
SU1703824A1 (en) Support for workings
RU2078932C1 (en) Reinforcing roadway support
SU1603016A2 (en) Roof bolt for mine workings
CH338854A (en) Pyramid-shaped frame for avalanche protection
SU1666741A1 (en) Method of construction of near-entrance section of tunnel
SU891950A1 (en) Thrust anchor for roof control in mine workings
SU883477A1 (en) Method of securing mine working while driving them
Singh et al. Central Mining Research Institute, Dhanbad, India