PL92758B1 - - Google Patents

Download PDF

Info

Publication number
PL92758B1
PL92758B1 PL17980175A PL17980175A PL92758B1 PL 92758 B1 PL92758 B1 PL 92758B1 PL 17980175 A PL17980175 A PL 17980175A PL 17980175 A PL17980175 A PL 17980175A PL 92758 B1 PL92758 B1 PL 92758B1
Authority
PL
Poland
Prior art keywords
frame
attached
frames
hatch
platforms
Prior art date
Application number
PL17980175A
Other languages
Polish (pl)
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed filed Critical
Priority to PL17980175A priority Critical patent/PL92758B1/pl
Publication of PL92758B1 publication Critical patent/PL92758B1/pl

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Description

Przedmiotem wynalazku jest urzadzenie do zmechanizowanego stawiania obudowy chodnikowej zwlaszcza obudowy lukowej sztywnej lub podatnej w wyrobiskach korytarzowych poziomych lub nachylonych.Urzadzenie przeznaczone jest w szczególnosci do stawiania obudowy chodnikowej w wyrobiskach korytarzowych drazonych kombajnem chodnikowym lub innymi maszynami urabiajacymi.Znane urzadzenie do zmechanizowanego stawiania obudowy chodnikowej to dwa jednolancuchowe przenosniki zgrzeblowe ulozone wzgledem siebie równolegle i w pewnej odleglosci, osadzone przesuwnie za pomoca hydraulicznego cylindra na przejezdnej bramowej ramie. W przedniej czesci bramowej ramy przenosniki sa polaczone platforma, do której jest zamocowany obrotowo podnosny pomost sluzacy do dostawiania stropowych luków obudowy do stropu wyrobiska. Pomost ten jest usytuowany pomiedzy przenosnikami.Ponadto w przedniej czesci bramowej ramy przenosniki polaczone sa dodatkowa belka, do której po obu stronach przenosników sa zamocowane boczne hydrauliczne manipulatory, zaopatrzone w chwytaki ociosowych luków obudowy. W tylnej czesci bramowej ramy natomiast jest zamocowany hydrauliczny podajnik posiadajacy pomost luków obudowy chodnikowej. Podajnik ten sluzy do podawania, przygotowanych na stole montazowym, elementów obudowy na przenosniki, którymi to przenosnikami po ich uruchomieniu prowizorycznie zmontowane odrzwia obudowy lukowej sa przewozone na podnosny pomost, a bramowa rama w tym czasie przesuwa sie w kierunku czola przodka.Po zatrzymaniu bramowej ramy w miejscu stawiania obudowy, odpfna sie luki ociosowe od luków stropowych. Luki stropowe pozostaja na podnosnym pomoscie, a luki ociosowe zostaja osadzone w chwytakach bocznego hydraulicznego manipulatora. Podnosny pomost z osadzonymi na nim lukami stropowymi zostaje uniesiony do stropu za pomoca urzadzenia dzwigajacego. W tym czasie chwytakami hydraulicznego manipulatora dostawia sie luki ociosowe do luków stropowych i laczy sie je w odrzwia obudowy. Dokonuje tego górnik stojacy na pomoscie roboczym zamocowanym do platformy laczacej przenosniki. Nastepnie wykonuje sie wykladke stropu i ociosów, a potrzebne materialy do wykonywania tej czynnosci dostarcza sie w pojemnikach transportera osadzanego na przenosniku.2 92 758 Celem wynalazku jest urzadzenie do zmechanizowania czynnosci zabudowy odslanianych, w miare postepu przodka drazonego kombajnem chodnikowym, stropów i ociosów wyrobisk korytarzowych zarówno poziomych jak i nachylonych. Cel ten osiagnieto urzadzeniem wedlug wynalazku sluzacym do zmechanizowanego stawiania obudowy chodnikowej w wyrobiskach korytarzowych, skladajacym sie z bramowych ram i hydraulicznego podajnika.Urzadzenie wedlug wynalazku ma dwie polaczone ze soba przesuwne po spagu bramowe ramy, a mianowicie rame przednia i rame tylna. Kazda rama jest zlozona z lukowych podpór rozstawionych po obu stronach ociosów wyrobiska korytarzowego. Podpory te przyspagowymi koncami sa polaczone z plozami osadzonymi na spagu a koncami przystropowymi natomiast sa zamocowane obrotowo do skrzynkowej ramy. Do skrzynkowej ramy urzadzenie ma przytwierdzony w osi bramowych ram dwuteowy tor jezdny oraz symetrycznie zlozone wzgledem tego toru dodatkowe prowadzenia. Na jezdnym torze i dodatkowych prowadzeniach urzadzenie ma wózek z zamocowana na osi pionowej obrotnica. Obrotnica wychylana jest w poziomie za pomoca hydraulicznego cylmdra zamocowanego jednym koncem do wózka, a drugim do obrotnicy! Ponadto do obrotnicy jest zamocowany podajnik posiadajacy dwie platformy usytuowane jedna nad druga. Przesuwne bramowe ramy przednia i tylna sa polaczone ze soba w czesci przystropowej za pomoca jezdnego toru polaczonego przegubowo z jezelnymltorami bramowych ram, a w czesci przyspagowej natomiast plozy bramowych ram, polaczone sa za pomoca'ejegierL Kazda lukowa podpora sklada sie z dwóch czesci, stalej czesci zamocowanej obrotowo do skrzynkowej ramy oraz dostawnej czesci polaczonej z plozami. Do lukowych podpór przedniej bramowej ramy sa przytwierdzone wysiegniki na których sa osadzone wysuwnie robocze pomosty. Do zewnetrznej zas powierzchni lukowych podpór sa zamocowane przesuwnie np. w uchwytach, podtrzymujace belki wystajace poza przednia bramowa rame. Ramy skrzynkowe urzadzenia wedlug wynalazku sa polaczone z poprzeczkami dopasowanymi ksztaltem do zarysu stropowego luku obudowy za pomoca hydraulicznych cylindrów, poprzeczki którymi sa dociskane do stropu wyrobiska korytarzowego w celu uzyskania odpowiedniej stabilnosci urzadzenia pracujacego w wyrobiskach nachylonych.Podajnik transportujacy elementy obudowy do miejsca ich zabudowania ma zamocowane obrotowo do wychylnej obrotnicy ramie i hydrauliczny cylinder. Drugim koncem hydrauliczny cylinder jest zamocowany obrotowo do ramienia, na koncu którego sa zamocowane dwie platformy. Ponadto do platform i ramienia jest zamocowany poziomujacy hydrauliczny cylinder.Przedmiot wynalazku przedstawiono w przykladzie wykonania na rysunku, na którym fig. 1 jest przekrojem podluznym urzadzenia, a fig. 2 jest widokiem urzadzenia z przodu.Urzadzenie do zmechanizowanego stawiania obudowy chodnikowej w wyrobiskach korytarzowych drazonych kombajnem lub innymi maszynami mechanizujacymi drazenie wyrobisk korytarzowych sklada sie z dwóch polaczonych ze soba przesuwnych bramowych ram, a mianowicie przedniej ramy 1 i tylnej ramy 2 oraz zwiazanego z bramowymi ramami 1 i 2, podajnika 11. Bramowe ramy 1 i 2 sa zbudowane z lukowych podpór 3 rozstawionych po obu stronach ociosów wyrobiska. Kazda lukowa podpora 3 jest zlozona z dwóch czesci, stalej czesci 1& oraz dostawnej czesci 16, której dlugosc jest dostosowana do rozmiarów wyrobiska. Podpory 3 sa polaczone obrotowo stala czescia 15 do skrzynkowej ramy 5, a dostawna czescia 16 do osadzonych na spagu plóz 4. Podpory 3 sa polaczone parami, a kazda para ma ksztalt litery V, zas kazda bramowa rama 1 i 2 jest zbudowana z dwóch par polaczonych w ten sposób lukowych podpór 3 rozstawionych przy kazdym ociosie wyrobiska. Do skrzynkowych ram 5, bramowych ram 1 i 2 sa zamocowane jezdne dwuteowe tory 6 oraz dodatkowe prowadzenia 7 rozmieszczone symetrycznie wzgledem toru 6. Na jezdnym torze 6 i w prowadzeniach 7 porusza sie za pomoca wlasnego ciernego napedu na krazkach, jezdny wózek 8. W wózku 8 znajduje sie agregat hydrauliczny zasilajacy wszystkie wystepujace w urzadzeniu hydrauliczne cylindry. Do wózka 8 jest zamocowana wychylnie w plaszczyznie poziomej obrotnica 10. Wychyl obrotnicy 10 uzyskuje sie za pomoca hydraulicznego cylindra 9 zamocowanego jednym koncem do wózka 8, drugim do obrotnicy 10. Do obrotnicy 10 jest zamocowany obrotowo ramieniem 23 i hydraulicznym cylindrem 24, podajnik 11. Hydrauliczny cylinder 24 drugim koncem jest zamocowany do ramienia 23, który jest zaopatrzony w platformy 12 umieszczone jedna nad druga, na których uklada sie elementy obudowy chodnikowej. Dodatkowo do ramienia 23 i platform 12 jest zamocowany poziomujacy hydrauliczny cylinder 25.Ponadto do skrzynkowej ramy 5 laczacej lukowe podpory 3 w czesci przystropowej sa zamocowane hydrauliczne cylindry 20, które drugim swym koncem sa zamocowane do dopasowanej swym ksztaltem do obrysu stropowego luku 22, poprzeczki 21. Za pomoca hydraulicznych cylindrów 20 bramowe ramy 1 i 2 sa rozpierane pomiedzy stropem a spagiem korytarzowych wyrobisk. Bramowe ramy 1 i 2 sa polaczone ze soba w czesci przystropowej za pomoca jezdnego dwuteowego toru 13 polaczonego przegubowo z jezdnymi torami 6 bramowych ram 1 i 2, a w czesci przyspagowej plozy 4 bramowych ram 1 i 2 sa polaczone za pomoca ciegien 14.92 758 3 Urzadzenie wedlug wynalazku ma do lukowych podpór 3 przedniej bramowej ramy 1 przytwierdzone wysiegniki 17, na których sa osadzone wysuwne robocze pomosty 18. Do zewnetrznej natomiast powierzchni lukowych podpór 3 przedniej bramowej ramy 1 ma przytwierdzone przesuwnie w np. uchwytach podtrzymujace belki 19 wystajace w czasie stawiania odrzwi poza bramowa rame 1.Urzadzenie wedlug wynalazku do zmechanizowanego stawiania obudowy chodnikowej, zwlaszcza lukowej podatnej lub sztywnej w wyrobiskach korytarzowych jest przeznaczone do pracy zarówno w wyrobiskach poziomych jak i nachylonych o dowolnych wymiarach poprzecznych.Pierwsza czynnoscia wykonana w zmechanizowanym procesie zabudowy drazonego kombajnem wyrobiska korytarzowego jest dostosowanie rozmiarów lukowych podpór 3, urzadzenia wedlug wynalazku mechanizujacego ten proces, do wymiarów wyrobiska tzn. dobranie odpowiednich dlugosci dostawnych czesci 16 lukowych podpór 3 w zaleznosci od wysokosci wyrobiska i polaczenie ich ze stala czescia 15 lukowych podpór 3. Po wykonaniu tej czynnosci lukowe podpory 3 rozpiera sie tak, aby plozy 4, z którymi sa one polaczone na calej swej dlugosci byly styczne do luków ociosowych co pozwala na prostoliniowe wykonywanie chodnika. Nastepnie urzadzenie wedlug wynalazku przesuwane jest np. kombajnem chodnikowym w poblize przodka. W wyrobiskach nachylonych podczas przesuwania urzadzenie rozpiera sie lekko pomiedzy stropem a spagiem wyrobiska w celu uzyskania przez urzadzenie wiekszej stabilnosci, pelnej sztywnosci konstrukcji oraz bezpieczenstwa pracy.Rozparcie to uzyskuje sie przez dosuniecie do stropowych luków 22 obudowy za pomoca hydraulicznych cylindrów 20, poprzeczek 21 dopasowanych swym ksztaltem do zarysu stropowego luku 22. Podczas drazenia wyrobiska kombajnem w jego czesci poza przodkowej laczy sie elementy luków stropowych w pare luków stropowych 22, na których uklada sie siatki oraz dwie pary luków ociosowych i uklada sie je na górnej platformie 12, podajnika 11. Na dolnej platformie 12 laduje sie materialy pomocnicze do wykladki stropu i ociosów oraz narzedzia do skrecania luków obudowy w odrzwia. Po wykonaniu przez kombajn jednego zabioru podnosi sie za pomoca ramienia 23 i cylindra 24 poziomowane hydraulicznym cylindrem 25, platformy 12 zaladowane materialem do zabudowy wyrobiska. Nastepnie platformy 12 przesuwa sie nad kombajnem za posrednictwem wózka 8 do miejsca stawiania odrzwi obudowy. Równoczesnie wysuwa sie ku przodkowi wyrobiska podtrzymujace belki 19 i robocze pomosty 18, których konce zawiesza sie za pomoca ciegien do luków stropowych wyrobiska.Po przesunieciu podnosnika 11 w zadane miejsce zostaje on wychylony w kierunku jednego z ociosów, a górnik zatrudniony przy zabudowie wyrobiska zsuwa za wysunieta podtrzymujaca belke 19 jedna pare luków ociosowych, a nastepnie czynnosc ta zostaje powtórzona po wychyleniu podajnika 11 w kierunku drugiego ociosu. Po rozladowaniu luków ociosowych podajnik 11 wraca w swe srodkowe polozenie, a nastepnie platformy 12 z osadzonymi na nich stropowymi lukami 22 zostaja podniesione i docisniete do stropu wyrobiska.Nastepnie górnik stojac na pomoscie roboczym 18 laczy kolejno luki 22 stropowe z ociosowymi w odrzwia obudowy. Kolejnym etapem zabudowy jest wykladka stropu i ociosów materialami dostarczonymi platforma 12 do przodka wyrobiska. Po ustawieniu odrzwi w obrysie wyrobiska podajnik 11 wraca w swe wyjsciowe polozenie. PLThe subject of the invention is a device for the mechanized erection of a roadway support, especially a rigid or flexible hatch support in horizontal or inclined corridor workings. two single-chain conveyors arranged parallel to each other and at a certain distance, slidably mounted by means of a hydraulic cylinder on a mobile gantry frame. In the front part of the gantry frame, the conveyors are connected to a platform, to which a rotating lifting platform is mounted, which serves to add the roof hatchways to the roof of the excavation. This platform is located between the conveyors. In addition, in the front part of the gantry frame, the conveyors are connected to an additional beam, to which, on both sides of the conveyors, side hydraulic manipulators are attached, equipped with grippers for the side hatchways of the housing. In the rear part of the gantry frame, there is a hydraulic feeder with a bridge for the hatchway housing. This feeder is used to feed the casing elements on the conveyors, prepared on the assembly table, which are used by the conveyors to transport the provisionally assembled hatch hatch hatch hatch to the lifting platform, and the gate frame moves towards the face of the face at this time. in the place where the enclosure is to be placed, the wall gaps will separate from the ceiling gaps. The ceiling gaps remain on the lifting platform and the side gaps are seated in the grippers of the side hydraulic manipulator. The lifting platform with the ceiling gaps mounted on it is raised to the ceiling by a lifting device. At this time, the grippers of the hydraulic manipulator connect the side gaps to the ceiling hatches and connect them to the frame of the casing. It is done by the miner standing on a working platform attached to the platform connecting the conveyors. Then, the roof and side walls are lined, and the necessary materials for this activity are delivered in the containers of the conveyor mounted on the conveyor. both horizontal and inclined. This goal was achieved with the device according to the invention for the mechanized erection of the roadway support in the workings of the corridor, consisting of gate frames and a hydraulic feeder. The device according to the invention has two gate frames that are connected to each other, i.e. the front frame and the rear frame. Each frame is made up of hatch supports spaced on both sides of the side of the corridor excavation. These supports with welded ends are connected to the skids mounted on the spag, and with the ceiling ends, they are rotatably attached to the box frame. To the box frame, the device has an I-T track attached to the gate frame axis and additional guides symmetrically arranged in relation to this track. On the running track and additional guides, the device has a trolley with a turntable mounted on the vertical axis. The turntable is tilted horizontally by means of a hydraulic cylinder attached at one end to the trolley and the other end to the turntable! Moreover, a feeder with two platforms situated one above the other is attached to the turntable. The front and rear sliding gantry frames are connected with each other in the ceiling part by means of a running track articulated with the gate frames, and in the bridge part by the door frame skids, connected with the help of a harness Each arch support consists of two parts, a fixed fixed part swivel to the box frame and the additional part connected with the skids. To the hatch supports of the front gantry frame, extension arms are attached, on which the sliding working platforms are mounted. To the outer surface of the hatch supports, the supports are slidably fixed, e.g. in the handles, supporting beams protruding beyond the front gate frame. The box frames of the device according to the invention are connected to the crossbars that match the shape of the roof hatch of the casing by means of hydraulic cylinders, the crossbars with which they are pressed to the roof of the corridor in order to obtain the appropriate stability of the device working in inclined workings. swivel to a swivel turntable arm and a hydraulic cylinder. The other end of the hydraulic cylinder is pivotally attached to an arm at the end of which two platforms are attached. In addition, a leveling hydraulic cylinder is attached to the platforms and the arm. The subject of the invention is shown in the embodiment in the drawing, in which Fig. 1 is a longitudinal section of the device, and Fig. 2 is a front view of the device. Device for mechanized erection of a paving support in excavated corridors with a shearer or other machines that mechanize the excavation of corridor workings, it consists of two interconnected sliding gate frames, namely the front frame 1 and the rear frame 2, and the feeder 11 connected with the gate frames 1 and 2. The gate frames 1 and 2 are made of arch supports 3 sides of the pit on both sides. Each arch support 3 is composed of two parts, a fixed part 1 & and an additional part 16, the length of which is adapted to the size of the pit. The supports 3 are pivotally connected with the fixed part 15 to the box frame 5, and the add-on part 16 to the slides set on the spag 4. The supports 3 are connected in pairs and each pair is V-shaped, and each gate frame 1 and 2 is made of two pairs 3 hatch supports connected in this way, spaced at each side of the excavation. I-T rails 6 and additional guides 7 arranged symmetrically with respect to the track 6 are attached to the box frames 5, gate frames 1 and 2. On the track 6 and in the tracks 7 it moves with its own friction drive on the pulleys, the trolley 8. In the trolley 8 there is a hydraulic power unit supplying all the hydraulic cylinders in the device. A turntable 10 is pivoted to the trolley 8 in a horizontal plane. Swivel of the turntable 10 is achieved by means of a hydraulic cylinder 9 attached at one end to the trolley 8 and the other end to the turntable 10. An arm 23 and a hydraulic cylinder 24, feeder 11 are pivotally attached to the turntable 10. The hydraulic cylinder 24 is attached at the other end to the arm 23, which is provided with platforms 12 placed one above the other on which the elements of the pavement housing are placed. In addition, a leveling hydraulic cylinder 25 is attached to the arm 23 and the platforms 12. In addition, to the box frame 5 connecting the hatch supports 3, hydraulic cylinders 20 are attached in the ceiling part, which with their other end are attached to the shape of the ceiling hatch 22, crossbar 21. By means of hydraulic cylinders, the 20 gate frames 1 and 2 are stretched between the ceiling and the floor of the corridor workings. The gate frames 1 and 2 are connected with each other in the roof section by means of a traveling I-track 13 articulated with the running tracks of the 6 gate frames 1 and 2, and in the joint part of the gate frames 4 gate frames 1 and 2 are connected by means of links 14.92 758 3 Device according to of the invention, to the hatch supports 3 of the front gantry frame 1, the booms 17 are attached, on which the extendable working platforms 18 are mounted. To the outer surface of the hatch supports 3 of the front gantry frame 1, the supporting beams 19 are slidably attached to the holders, e.g. gantry frame 1. The device, according to the invention, for the mechanized erection of a roadway support, especially a flexible or rigid hatch in corridor workings, is designed to work in both horizontal and inclined workings of any transverse dimensions. applying the dimensions of the arches of the supports 3, the device according to the invention mechanizing this process, to the dimensions of the excavation, i.e. selecting the appropriate lengths of the additional parts of the 16 arch supports 3 depending on the height of the excavation and joining them with the fixed part of the 15 arch supports 3. After this activity, the arch supports 3 it expands so that the skids 4 with which they are connected are tangent to the side hatches over their entire length, which allows for a rectilinear construction of the pavement. The device according to the invention is then moved, e.g. with a roadheader, close to the face. In workings inclined when moving, the device stretches slightly between the roof and the pit floor in order to obtain greater stability, full rigidity of the structure and work safety. This support is obtained by pushing the casing to the ceiling hatches 22 with the use of hydraulic cylinders 20, crossbars 21 adjusted to their shape to the outline of the roof hatch 22. During the excavation of the excavation with a roadheader, in its part beyond the face, the elements of the roof hatches are joined into a pair of roof hatches 22, on which meshes and two pairs of lateral hatches are arranged and placed on the upper platform 12 of the feeder 11. the lower platform 12 is loaded with auxiliary materials for the ceiling lining and side walls and tools for turning the casing hatches into the doorframe. After the shearer has made one traverse, by means of the arm 23 and the cylinder 24, the platforms are leveled with the hydraulic cylinder 25, the platforms 12 are loaded with the material for the construction of the excavation. The platforms 12 are then moved over the combine via the trolley 8 to the place where the support door is placed. At the same time, the excavation supporting beams 19 and working platforms 18 advances towards the face of the excavation, the ends of which are suspended by means of strings to the roof hatches of the excavation. After moving the lift 11 to a given place, it is tilted towards one of the sides, and the miner working on the construction of the excavation slides it behind pulled out supporting beam 19 one pair of side panels, and then this operation is repeated after the feeder 11 is pivoted towards the other side. After unloading the side hatches, the feeder 11 returns to its central position, and then the platforms 12 with the ceiling hatches 22 are lifted thereon and pressed against the roof of the excavation. Then, the miner, standing on the working platform 18, connects the arches 22 with the ribs in the support frame. The next stage of development is the lining of the ceiling and side walls with the materials delivered to the platform 12 to the face of the excavation. After positioning the support frame in the outline of the excavation, the feeder 11 returns to its original position. PL

Claims (6)

Zastrzezenia patentowe 1. Urzadzenie do zmechanizowanego stawiania obudowy chodnikowej w wyrobiskach korytarzowych skladajace sie z bramowej ramy i hydraulicznego podajnika, znamienne tym, ze ma dwie polaczone ze soba przesuwne bramowe ramy, a mianowicie przednia rame (1) i tylna rame (2) a kazda z ram (1 i 2) jest zlozona z lukowych podpór (3) rozstawionych po obu stronach ociosów wyrobiska i polaczonych plozami (4), a pod stropem wyrobiska podpory (3) sa zamocowane obrotowo do skrzynkowej ramy (5), do której to ramy (5) ma przytwierdzony w osi bramowych ram (1 i 2) dwuteowy jezdny tor (6) oraz symetrycznie ulozone wzgledem toru (6) dodatkowe prowadzenia (7), na którycha ma wózek (8) z zamocowana obrotnica (10), wychylana w poziomie za pomoca hydraulicznego cylindra (9) zamocowanego jednym koncem do wózka (8), a drugim koncem do obrotnicy (10), a podajnik (11) zamocowany do obrotnicy (10) ma platformy (12) usytuowane jedna nad druga, przy czym bramowe ramy (1 i 2) sa polaczone ze soba w czesci przystropowej za pomoca jezdnego toru (13) zamocowanego przegubowo do jezdnych torów (6) bramowych ram (1 i 2) a plozy (4) bramowych ram (1 i 2) sa polaczone ciegnami.Claims 1. Device for the mechanized erection of the roadway support in the workings, consisting of a gantry frame and a hydraulic feeder, characterized by the fact that it has two interconnected sliding gate frames, namely the front frame (1) and the rear frame (2), each frame (1 and 2) is composed of hatch supports (3) spaced on both sides of the sides of the excavation and connected by skids (4), and under the roof of the excavation, the supports (3) are rotatably attached to the box frame (5), to which the frames are (5) has an I-T road (6) fixed in the axis of the gate frames (1 and 2) and additional guides (7) arranged symmetrically in relation to the track (6), on which the trolley (8) with a turntable (10) is mounted, swiveling in horizontally by means of a hydraulic cylinder (9) attached at one end to the trolley (8) and the other end to the turntable (10), and the feeder (11) attached to the turntable (10) has platforms (12) located one above the other, the gate the frames (1 and 2) are connected to each other in the roof section by means of a running track (13) articulated to the running tracks (6) of the gate frames (1 and 2), and the slides (4) of the gate frames (1 and 2) are connected by ties. 2. Urzadzenie, wedlug zastrz. 1,znamienne tym, ze kazda lukowa podpora (3) sklada sie z dwóch czesci, stalej czesci (15) zamocowanej obrotowo do ramy (5) oraz dostawnej czesci (16) polaczonej z plozami (4).4 92 7582. The device, according to claim 4. The method of claim 1, characterized in that each arched support (3) consists of two parts, a fixed part (15) pivotally attached to the frame (5) and an additional part (16) connected to the skids (4). 4 92 758 3. Urzadzenie, wedlug zastrz. 2, znamienne tym, ze do lukowych podpór 43) przedniej bramowej ramy (1) ma przytwierdzone wysiegniki (17), na których ma osadzone wysuwne robocze pomosty (18).3. The device according to claim A device according to claim 2, characterized in that to the hatch supports 43) of the front gantry frame (1), extension arms (17) are fixed, on which extendable working platforms (18) are mounted. 4. Urzadzenie, wedlug zastrz. 3, znamienne tym, ie do zewnetrznej powierzchni lukowych podpór (3) przedniej bramowej ramy (1) ma przytwierdzone przesuwnie podtrzymujace belki (19) wystajace poza bramowa rame (1).4. The device according to claim The method of claim 3, characterized in that the outer surface of the hatch supports (3) of the front gantry frame (1) has slidably attached supporting beams (19) extending beyond the gantry frame (1). 5. Urzadzenie, wedlug zastrz. 49 znamie n-ne tym, ze ramy (5) bramowych ram (1 i 2) ma polaczone hydraulicznymi cylindrami (20) z poprzeczkami (21) dopasowanymi do zarysu stropowego luku (22).5. The device according to claim 49, characterized in that the frame (5) of the gate frames (1 and 2) is connected by hydraulic cylinders (20) with crossbars (21) matching the contour of the ceiling hatch (22). 6. Urzadzenie, wedlug zastrz. 5, znamienne tym, ze podajnik (11) ma zamocowane obrotowo do obrotnicy (10) ramie (23) i hydrauliczny cylinder (24), hydrauliczny cylinder (24) drugim koncem jest zamocowany obrotowo do ramienia (23), a na koncu ramienia (23) ma zamocowane obrotowo platformy (12), ponadto do platform (12) i ramienia (23) ma zamocowany poziomujacy hydrauliczny cylinder (25). Fig. i Fig. 2 Prac. Poligraf. UP PRL naklad 120+18 Cena 45 zl i PL6. A device according to claim 5. The device of claim 5, characterized in that the feeder (11) has a frame (23) pivotally attached to the turntable (10) and a hydraulic cylinder (24), the hydraulic cylinder (24) is pivotally attached to the arm (23) and, at the end of the arm ( 23) has pivotally mounted platforms (12), furthermore a leveling hydraulic cylinder (25) is attached to the platforms (12) and the arm (23). Fig. And Fig. 2 Papers. Typographer. UP PRL, circulation 120 + 18 Price PLN 45 and PL
PL17980175A 1975-04-21 1975-04-21 PL92758B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
PL17980175A PL92758B1 (en) 1975-04-21 1975-04-21

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PL17980175A PL92758B1 (en) 1975-04-21 1975-04-21

Publications (1)

Publication Number Publication Date
PL92758B1 true PL92758B1 (en) 1977-04-30

Family

ID=19971795

Family Applications (1)

Application Number Title Priority Date Filing Date
PL17980175A PL92758B1 (en) 1975-04-21 1975-04-21

Country Status (1)

Country Link
PL (1) PL92758B1 (en)

Similar Documents

Publication Publication Date Title
US20170152745A1 (en) Tunnel support installation apparatus
US6729464B2 (en) Mine conveying system
CN113074001B (en) Multifunctional operation rack suitable for tunnel construction
US4589701A (en) Cutting machine
JP2023008536A (en) Mounting device for construction of tunnel and construction method using the same
WO2010057277A1 (en) An apparatus and method for extension of conveyors
CS236464B2 (en) Equipment for underground mines especially for thick seams exploitation
US3107776A (en) Articulating and telescoping conveying system
CN217001889U (en) Existing tunnel defect renovation maintenance train unit
CN207598269U (en) One kind adopts face crossheading circulatory self-moving advance support system and track from shifting system
CN206888989U (en) Rock-gangway bomb-dug bores shipment complete set of equipments
GB2177033A (en) Self-propelled roof drilling and bolting trolley
PL97007B1 (en) DEVICE FOR THE MECHANIZED ESTABLISHING OF A SIDEWAY COVER
SU608965A1 (en) Device for loading rock in mine workings
US3726382A (en) Loading machine
PL104151B1 (en) METHOD AND APPARATUS FOR SUPPLYING AND INSTALLING ROOF SUPPORT SETS IN BIG CROSS-SECTION TUNNEL-LIKE GALLERIES
RU2163970C1 (en) Plough complex, support unit, plough set, plough base, plough drive, short loader, gatehead support, movable manipulator
RU2098632C1 (en) Complex of equipment for repair of mine workings
SU969902A1 (en) Apparatus for erecting roof support over header
SU1017799A1 (en) Roof-supporting and hauling arrangement
SU617603A1 (en) Device for lining tunnels
RU2734177C1 (en) Aggregated mining complex
SU1458602A1 (en) Installation for driving inclined mine workings
SU1114795A1 (en) Unit for constructing tunnel calotte trench
PL103163B3 (en) DEVICE FOR THE MECHANIZED ESTABLISHING OF A SIDEWAY COVER