Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Luis Manuel Nunes RicardofiledCriticalLuis Manuel Nunes Ricardo
Priority to PT7295381ApriorityCriticalpatent/PT72953B/fr
Publication of PT72953ApublicationCriticalpatent/PT72953A/fr
Publication of PT72953BpublicationCriticalpatent/PT72953B/fr
PT7295381A1981-04-301981-04-30Procede de construction de murs avec des canalisations integrees en utilisant des blocs pre-fabriques fendus lateralement
PT72953B
(fr)
Paroi composite isolante thermiquement et etanche aux fluides elements prefabriques pour la construction de celle-ciet procede de construction de ladite paroi