Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Institutul De Cercetare Si ProiectarefiledCriticalInstitutul De Cercetare Si Proiectare
Priority to RO107266ApriorityCriticalpatent/RO84033B1/ro
Publication of RO84033A2publicationCriticalpatent/RO84033A2/fr
Publication of RO84033B1publicationCriticalpatent/RO84033B1/ro
Estructura semi-prefabricada de hormigon armado o pretensado para edificacion, que utiliza el pilar y/o su encofrado para crear una plataforma de trabajo alrededor del pilar que sirva de encofrado y apoyo de las vigas semi-prefabricadas.
Hourdis ou éléments en céramique à pose jointive latéralement formant coffrages céramiques perdus à cellules isolantes pour préfabrication de poutrelles en béton armé, en vue de la construction de planchers économiques et à pose rapide
Prefabbricazione parziale, con getto calcestruzzo di completamento in opera, struttura in cemento armato completa (pilastri e travi) per costruzioni civili