Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Institutul De Cercetari Metalurgice,RofiledCriticalInstitutul De Cercetari Metalurgice,Ro
Priority to RO124555ApriorityCriticalpatent/RO95719B1/ro
Publication of RO95719A2publicationCriticalpatent/RO95719A2/ro
Publication of RO95719B1publicationCriticalpatent/RO95719B1/ro
Menetelmä ohutseinäisten, yhtenäisinä valmistettavien, onttojen metalliesineiden tuottamiseksi, joita voidaakäyttää painesäiliöihin sekä täten saadut tuotteet.
Pieu de fondation a resistance accrue aux efforts de compression et de traction, tube destine a la formation dudit pieu et procede de realisation dudit pieu.
Metodo per ottenere da un grezzo di fucinatura un semilavorato intestato e forato destinato all'estrusione su una pressa per estrudere tubi e macchina utensile per l'attuazione del metodo