RU2006126830A - Управление по нескольким азимутам вертикальными трещинами, возникающими при гидравлических разрывах в рыхлых или слабосцементированных осадочных породах - Google Patents
Управление по нескольким азимутам вертикальными трещинами, возникающими при гидравлических разрывах в рыхлых или слабосцементированных осадочных породах Download PDFInfo
- Publication number
- RU2006126830A RU2006126830A RU2006126830/03A RU2006126830A RU2006126830A RU 2006126830 A RU2006126830 A RU 2006126830A RU 2006126830/03 A RU2006126830/03 A RU 2006126830/03A RU 2006126830 A RU2006126830 A RU 2006126830A RU 2006126830 A RU2006126830 A RU 2006126830A
- Authority
- RU
- Russia
- Prior art keywords
- formation
- casing
- fracturing fluid
- initiating
- azimuth
- Prior art date
Links
- 239000011435 rock Substances 0.000 title claims 3
- 230000015572 biosynthetic process Effects 0.000 claims 24
- 239000012530 fluid Substances 0.000 claims 20
- 238000000034 method Methods 0.000 claims 15
- 238000002347 injection Methods 0.000 claims 14
- 239000007924 injection Substances 0.000 claims 14
- 230000000977 initiatory effect Effects 0.000 claims 13
- 230000003313 weakening effect Effects 0.000 claims 4
- 238000005086 pumping Methods 0.000 claims 3
- 239000011083 cement mortar Substances 0.000 claims 2
- 238000004519 manufacturing process Methods 0.000 claims 2
- 229920002907 Guar gum Polymers 0.000 claims 1
- 239000007900 aqueous suspension Substances 0.000 claims 1
- 239000004568 cement Substances 0.000 claims 1
- 238000004891 communication Methods 0.000 claims 1
- 238000005553 drilling Methods 0.000 claims 1
- 229960002154 guar gum Drugs 0.000 claims 1
- 235000010417 guar gum Nutrition 0.000 claims 1
- 239000000665 guar gum Substances 0.000 claims 1
- 239000007788 liquid Substances 0.000 claims 1
- 230000002265 prevention Effects 0.000 claims 1
- 238000011084 recovery Methods 0.000 claims 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/25—Methods for stimulating production
- E21B43/26—Methods for stimulating production by forming crevices or fractures
Landscapes
- Life Sciences & Earth Sciences (AREA)
- Engineering & Computer Science (AREA)
- Geology (AREA)
- Mining & Mineral Resources (AREA)
- Physics & Mathematics (AREA)
- Environmental & Geological Engineering (AREA)
- Fluid Mechanics (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)
- Drilling And Exploitation, And Mining Machines And Methods (AREA)
Claims (18)
1. Способ создания нескольких вертикальных трещин гидравлического разрыва, ориентированных по разным азимутам в пласте рыхлых или слабосцементированных осадочных пород, включающий:
а) бурение в пласте буровой скважины на заданную глубину;
b) установку на заданной глубине в буровой скважине нагнетательной обсадной колонны;
c) закачивание в нагнетательную обсадную колонну разрывающей жидкости под давлением разрыва, достаточным для раздвигания нагнетательной обсадной колонны и пласта в первом предпочтительном направлении и инициирования образования первой вертикальной трещины по первому азимуту, ортогональному к первому направлению раздвигания; и
d) дополнительное закачивание разрывающей жидкости в нагнетательную обсадную колонну под давлением разрыва, достаточным для раздвигания нагнетательной обсадной колонны и пласта во втором предпочтительном направлении, отличном от первого предпочтительного направления,
e) предотвращение поступления разрывающей жидкости в первую вертикальную трещину и создание таким образом второй вертикальной трещины по второму азимуту, ортогональному ко второму направлению раздвигания.
2. Способ по п.1, дополнительно включающий:
a) установку нагнетательной обсадной колонны в буровой скважине на заданной глубине, так что между наружной поверхностью обсадной колонны и буровой скважиной имеется кольцевой зазор;
b) заполнение кольцевого зазора цементным раствором, который сцепляется с наружной поверхностью обсадной колонны, причем обсадная колонна имеет несколько инициирующих секций, разделенных линиями ослабления, вследствие чего под действием давления разрыва инициирующие секции разъединяются вдоль линий ослабления.
3. Способ по п.2, в котором разрывающая жидкость раздвигает цементный раствор и пласт, инициируя образование в пласте первой трещины по первой линии ослабления, а после этого разрывающая жидкость раздвигает цементный раствор и пласт, инициируя образование в пласте второй трещины по второй линии ослабления.
4. Способ по п.1, в котором разрывающая жидкость не просачивается из трещины в пласт.
5. Способ по п.1, в котором разрывающая жидкость содержит расклинивающий наполнитель и может переносить его при низких скоростях потока.
6. Способ по п.1, в котором разрывающая жидкость разрушается с минимальным остатком.
7. Способ по п.1, в котором разрывающая жидкость имеет низкий коэффициент трения.
8. Способ по п.1, в котором разрывающая жидкость содержит водную суспензию геля гуаровой смолы.
9. Способ по п.3, в котором обсадная колонна имеет две инициирующие секции с двумя направлениями раздвигания, а первая и вторая линии ослабления ортогональны.
10. Способ по п.3, в котором обсадная колонна имеет три инициирующие секции с тремя направлениями раздвигания.
11. Способ по п.3, в котором обсадная колонна имеет четыре инициирующие секции с четырьмя направлениями раздвигания, причем первая и вторая линии ослабления ортогональны друг другу и третья и четвертая линии ослабления ортогональны друг другу.
12. Способ по п.2, в котором для обеспечения гидравлической связи первой и второй трещин с буровой скважиной после завершения гидравлического разрыва инициирующие секции остаются разъединенными после раздвигания обсадной колонны жидкостью для разрыва.
13. Способ по п.2, в котором жидкость для разрыва содержит расклинивающий наполнитель, а каждая инициирующая секция содержит секции скважинного фильтра, отделяющие расклинивающий наполнитель в трещинах гидравлического разрыва от эксплуатационной буровой скважины, предотвращая тем самым протекание расклинивающего наполнителя обратно в эксплуатационную буровую скважину во время извлечения жидкости.
14. Способ по п.1, дополнительно включающий повторный разрыв каждой ранее введенной трещины.
15. Способ по п.1, в котором раздвигание пласта осуществляют путем первого прорезания в пласте вертикального щелевого отверстия с азимутом первой образованной трещины, закачивания в щелевое отверстие разрывающей жидкости под давлением, достаточным для раздвигания пласта в этом первом предпочтительном направлении и инициирования тем самым образования первой вертикальной трещины с азимутом, ортогональным первому направлению раздвигания; и осуществляемого после закачивания в первую трещину последовательного закачивания разрывающей жидкости во второе и последующие щелевые отверстия, вырезанные в пласте по азимуту требуемых трещин, под давлением разрыва, достаточным для раздвигания пласта во втором и последующих предпочтительных направлениях с азимутом, отличающимся от первого и последующих предпочтительных направлений, с предотвращением поступления жидкости для разрыва в первую и последующие ранее образованные вертикальных трещины, что инициирует образование второй и последующей вертикальной трещины с азимутом, ортогональным второму и последующему направлению раздвигания.
16. Скважина в пласте рыхлых или слабосцементированных осадочных пород, содержащая:
a) буровую скважину, выполненную в пласте на заданную глубину;
b) нагнетательную обсадную колонну в буровой скважине на заданной глубине;
c) источник, предназначенный для закачивания жидкости для разрыва в нагнетательную обсадную колонну под давлением разрыва, достаточным для раздвигания нагнетательной обсадной колонны и пласта в первом предпочтительном направлении и вследствие этого инициирования образования первой вертикальной трещины по первому азимуту, ортогональному первому направлению раздвигания, и раздвигания нагнетательной обсадной колонны и пласта во втором предпочтительном направлении, отличающемся от первого предпочтительного направления, и вследствие этого инициирования образования второй вертикальной трещины по второму азимуту, ортогональному второму направлению раздвигания;
d) несколько инициирующих секций, разделенных линиями ослабления; и
e) несколько каналов внутри инициирующих секций, проходящих поперек линий ослабления и предназначенных для введения разрывающей жидкости с целью раздвигания обсадной колонны и разъединения инициирующих секций по линиям ослабления, причем каналы взаимосвязаны с источником жидкости для разрыва для того, чтобы раздвинуть нагнетательную обсадную колонну и пласт в первом предпочтительном направлении и вследствие этого инициировать образование первой вертикальной трещины по первому азимуту, ортогональному первому направлению раздвигания, и раздвинуть нагнетательную обсадную колонну и пласт во втором предпочтительном направлении, отличающемся от первого, и таким образом инициировать образование второй вертикальной трещины по второму азимуту, ортогональному второму направлению раздвигания.
17. Скважина по п.16, в которой жидкость для разрыва не просачивается из трещины в пласт.
18. Скважина по п.16, в которой жидкость для разрыва содержит расклинивающий наполнитель и может переносить его при низких скоростях потока.
Applications Claiming Priority (2)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| US10/749,131 US6991037B2 (en) | 2003-12-30 | 2003-12-30 | Multiple azimuth control of vertical hydraulic fractures in unconsolidated and weakly cemented sediments |
| US10/749,131 | 2003-12-30 |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| RU2006126830A true RU2006126830A (ru) | 2008-02-10 |
| RU2359115C2 RU2359115C2 (ru) | 2009-06-20 |
Family
ID=34711026
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| RU2006126830/03A RU2359115C2 (ru) | 2003-12-30 | 2004-12-28 | Управление по нескольким азимутам вертикальными трещинами, возникающими при гидравлических разрывах в рыхлых или слабосцементированных осадочных породах |
Country Status (5)
| Country | Link |
|---|---|
| US (1) | US6991037B2 (ru) |
| CN (1) | CN100572747C (ru) |
| CA (1) | CA2543886C (ru) |
| RU (1) | RU2359115C2 (ru) |
| WO (1) | WO2005065334A2 (ru) |
Families Citing this family (44)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CA2455011C (en) * | 2004-01-09 | 2011-04-05 | Suncor Energy Inc. | Bituminous froth inline steam injection processing |
| US7711487B2 (en) * | 2006-10-10 | 2010-05-04 | Halliburton Energy Services, Inc. | Methods for maximizing second fracture length |
| US20070125544A1 (en) * | 2005-12-01 | 2007-06-07 | Halliburton Energy Services, Inc. | Method and apparatus for providing pressure for well treatment operations |
| US7740072B2 (en) * | 2006-10-10 | 2010-06-22 | Halliburton Energy Services, Inc. | Methods and systems for well stimulation using multiple angled fracturing |
| US7946340B2 (en) * | 2005-12-01 | 2011-05-24 | Halliburton Energy Services, Inc. | Method and apparatus for orchestration of fracture placement from a centralized well fluid treatment center |
| US7836949B2 (en) * | 2005-12-01 | 2010-11-23 | Halliburton Energy Services, Inc. | Method and apparatus for controlling the manufacture of well treatment fluid |
| US7841394B2 (en) * | 2005-12-01 | 2010-11-30 | Halliburton Energy Services Inc. | Method and apparatus for centralized well treatment |
| US7748458B2 (en) * | 2006-02-27 | 2010-07-06 | Geosierra Llc | Initiation and propagation control of vertical hydraulic fractures in unconsolidated and weakly cemented sediments |
| US7404441B2 (en) * | 2006-02-27 | 2008-07-29 | Geosierra, Llc | Hydraulic feature initiation and propagation control in unconsolidated and weakly cemented sediments |
| US20070199701A1 (en) * | 2006-02-27 | 2007-08-30 | Grant Hocking | Ehanced hydrocarbon recovery by in situ combustion of oil sand formations |
| US7604054B2 (en) * | 2006-02-27 | 2009-10-20 | Geosierra Llc | Enhanced hydrocarbon recovery by convective heating of oil sand formations |
| US20070199705A1 (en) * | 2006-02-27 | 2007-08-30 | Grant Hocking | Enhanced hydrocarbon recovery by vaporizing solvents in oil sand formations |
| US20070199710A1 (en) * | 2006-02-27 | 2007-08-30 | Grant Hocking | Enhanced hydrocarbon recovery by convective heating of oil sand formations |
| US7591306B2 (en) * | 2006-02-27 | 2009-09-22 | Geosierra Llc | Enhanced hydrocarbon recovery by steam injection of oil sand formations |
| US20070199711A1 (en) * | 2006-02-27 | 2007-08-30 | Grant Hocking | Enhanced hydrocarbon recovery by vaporizing solvents in oil sand formations |
| US7520325B2 (en) * | 2006-02-27 | 2009-04-21 | Geosierra Llc | Enhanced hydrocarbon recovery by in situ combustion of oil sand formations |
| US20070199700A1 (en) * | 2006-02-27 | 2007-08-30 | Grant Hocking | Enhanced hydrocarbon recovery by in situ combustion of oil sand formations |
| US20070199697A1 (en) * | 2006-02-27 | 2007-08-30 | Grant Hocking | Enhanced hydrocarbon recovery by steam injection of oil sand formations |
| US20070199699A1 (en) * | 2006-02-27 | 2007-08-30 | Grant Hocking | Enhanced Hydrocarbon Recovery By Vaporizing Solvents in Oil Sand Formations |
| US7866395B2 (en) * | 2006-02-27 | 2011-01-11 | Geosierra Llc | Hydraulic fracture initiation and propagation control in unconsolidated and weakly cemented sediments |
| US8151874B2 (en) | 2006-02-27 | 2012-04-10 | Halliburton Energy Services, Inc. | Thermal recovery of shallow bitumen through increased permeability inclusions |
| US20070199695A1 (en) * | 2006-02-27 | 2007-08-30 | Grant Hocking | Hydraulic Fracture Initiation and Propagation Control in Unconsolidated and Weakly Cemented Sediments |
| US20070199706A1 (en) * | 2006-02-27 | 2007-08-30 | Grant Hocking | Enhanced hydrocarbon recovery by convective heating of oil sand formations |
| US20070199712A1 (en) * | 2006-02-27 | 2007-08-30 | Grant Hocking | Enhanced hydrocarbon recovery by steam injection of oil sand formations |
| US7325617B2 (en) * | 2006-03-24 | 2008-02-05 | Baker Hughes Incorporated | Frac system without intervention |
| US8874376B2 (en) * | 2006-10-06 | 2014-10-28 | Halliburton Energy Services, Inc. | Methods and systems for well stimulation using multiple angled fracturing |
| US7814978B2 (en) * | 2006-12-14 | 2010-10-19 | Halliburton Energy Services, Inc. | Casing expansion and formation compression for permeability plane orientation |
| US8034061B2 (en) | 2007-07-12 | 2011-10-11 | Aga Medical Corporation | Percutaneous catheter directed intravascular occlusion devices |
| US7647966B2 (en) * | 2007-08-01 | 2010-01-19 | Halliburton Energy Services, Inc. | Method for drainage of heavy oil reservoir via horizontal wellbore |
| US7640982B2 (en) * | 2007-08-01 | 2010-01-05 | Halliburton Energy Services, Inc. | Method of injection plane initiation in a well |
| US7640975B2 (en) * | 2007-08-01 | 2010-01-05 | Halliburton Energy Services, Inc. | Flow control for increased permeability planes in unconsolidated formations |
| US7931082B2 (en) | 2007-10-16 | 2011-04-26 | Halliburton Energy Services Inc., | Method and system for centralized well treatment |
| US7832477B2 (en) * | 2007-12-28 | 2010-11-16 | Halliburton Energy Services, Inc. | Casing deformation and control for inclusion propagation |
| US9051815B2 (en) * | 2009-09-28 | 2015-06-09 | Baker Hughes Incorporated | Apparatus and method for predicting vertical stress fields |
| RU2505670C1 (ru) * | 2009-12-30 | 2014-01-27 | Шлюмберже Текнолоджи Б.В. | Способ управления траекторией трещины гидроразрыва в пластах, содержащих природные трещины |
| CN103348098B (zh) * | 2011-01-20 | 2016-10-05 | 联邦科学与工业研究组织 | 水力压裂 |
| US8955585B2 (en) | 2011-09-27 | 2015-02-17 | Halliburton Energy Services, Inc. | Forming inclusions in selected azimuthal orientations from a casing section |
| RU2507385C1 (ru) * | 2012-07-27 | 2014-02-20 | Открытое акционерное общество "Татнефть" имени В.Д. Шашина | Способ разработки нефтяных месторождений горизонтальными скважинами |
| CN102817602B (zh) * | 2012-08-31 | 2015-01-21 | 中国石油天然气股份有限公司 | 聚合物驱油田在线调剖方法与装置 |
| US9714558B2 (en) * | 2014-02-07 | 2017-07-25 | Weatherford Technology Holdings, Llc | Open hole expandable junction |
| CN106437668B (zh) * | 2016-08-31 | 2019-11-01 | 内蒙古仁创沙漠资源利用研究院有限公司 | 一种缝隙导流沉降模拟装置和模拟水力压裂的系统及方法 |
| CN110441214B (zh) * | 2019-08-26 | 2020-09-15 | 中国地质大学(北京) | 煤样裂缝渗透测试装置及其测试方法 |
| CN110984937A (zh) * | 2019-12-23 | 2020-04-10 | 中国石油大学(华东) | 带压裂套管及基于带压裂套管的单井sagd开发方法 |
| CN117146196A (zh) * | 2023-09-13 | 2023-12-01 | 中国黄金集团建设有限公司 | 一种防止充填管道破裂的浆体输送方法及输送管道 |
Family Cites Families (23)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US1789993A (en) * | 1929-08-02 | 1931-01-27 | Switzer Frank | Casing ripper |
| US2178554A (en) | 1938-01-26 | 1939-11-07 | Clifford P Bowie | Well slotter |
| US2178684A (en) * | 1939-01-14 | 1939-11-07 | Gothard Mfg Company | Sign character |
| SU135445A1 (ru) * | 1959-12-23 | 1960-11-30 | Ю.Н. Васильев | Способ гидроразрыва пласта |
| US3225628A (en) * | 1962-02-26 | 1965-12-28 | Warner Lambert Pharmacentical | Turntable drive |
| US3225828A (en) | 1963-06-05 | 1965-12-28 | American Coldset Corp | Downhole vertical slotting tool |
| US4005750A (en) * | 1975-07-01 | 1977-02-01 | The United States Of America As Represented By The United States Energy Research And Development Administration | Method for selectively orienting induced fractures in subterranean earth formations |
| US4119151A (en) * | 1977-02-25 | 1978-10-10 | Homco International, Inc. | Casing slotter |
| US4432078A (en) * | 1979-01-17 | 1984-02-14 | Daniel Silverman | Method and apparatus for fracturing a deep borehole and determining the fracture azimuth |
| US4271696A (en) * | 1979-07-09 | 1981-06-09 | M. D. Wood, Inc. | Method of determining change in subsurface structure due to application of fluid pressure to the earth |
| US4750562A (en) * | 1985-08-30 | 1988-06-14 | Mobil Oil Corporation | Method to divert fractures induced by high impulse fracturing |
| US4683951A (en) * | 1986-05-15 | 1987-08-04 | Atlantic Richfield Company | Chemical flooding and controlled pressure pulse fracturing process for enhanced hydrocarbon recovery from subterranean formations |
| US4977961A (en) * | 1989-08-16 | 1990-12-18 | Chevron Research Company | Method to create parallel vertical fractures in inclined wellbores |
| SU1709078A1 (ru) * | 1989-10-16 | 1992-01-30 | Ленинградский горный институт им.Г.В.Плеханова | Устройство дл гидроразрыва пласта |
| US5002431A (en) * | 1989-12-05 | 1991-03-26 | Marathon Oil Company | Method of forming a horizontal contamination barrier |
| GB2240798A (en) | 1990-02-12 | 1991-08-14 | Shell Int Research | Method and apparatus for perforating a well liner and for fracturing a surrounding formation |
| US5103811A (en) * | 1990-07-09 | 1992-04-14 | Crupi Jr Theodore P | Body part or joint brace |
| US5372195A (en) * | 1993-09-13 | 1994-12-13 | The United States Of America As Represented By The Secretary Of The Interior | Method for directional hydraulic fracturing |
| US5497658A (en) * | 1994-03-25 | 1996-03-12 | Atlantic Richfield Company | Method for fracturing a formation to control sand production |
| US5564499A (en) * | 1995-04-07 | 1996-10-15 | Willis; Roger B. | Method and device for slotting well casing and scoring surrounding rock to facilitate hydraulic fractures |
| US5872424A (en) * | 1997-06-26 | 1999-02-16 | Candescent Technologies Corporation | High voltage compatible spacer coating |
| US6216783B1 (en) | 1998-11-17 | 2001-04-17 | Golder Sierra, Llc | Azimuth control of hydraulic vertical fractures in unconsolidated and weakly cemented soils and sediments |
| US6644406B1 (en) * | 2000-07-31 | 2003-11-11 | Mobil Oil Corporation | Fracturing different levels within a completion interval of a well |
-
2003
- 2003-12-30 US US10/749,131 patent/US6991037B2/en not_active Expired - Fee Related
-
2004
- 2004-12-28 CA CA002543886A patent/CA2543886C/en not_active Expired - Fee Related
- 2004-12-28 CN CNB200480036251XA patent/CN100572747C/zh not_active Expired - Fee Related
- 2004-12-28 RU RU2006126830/03A patent/RU2359115C2/ru not_active IP Right Cessation
- 2004-12-28 WO PCT/US2004/043785 patent/WO2005065334A2/en not_active Ceased
Also Published As
| Publication number | Publication date |
|---|---|
| CN100572747C (zh) | 2009-12-23 |
| WO2005065334A2 (en) | 2005-07-21 |
| CN1890454A (zh) | 2007-01-03 |
| CA2543886A1 (en) | 2005-07-21 |
| US6991037B2 (en) | 2006-01-31 |
| US20050145387A1 (en) | 2005-07-07 |
| WO2005065334B1 (en) | 2005-12-08 |
| CA2543886C (en) | 2009-03-31 |
| WO2005065334A3 (en) | 2005-10-20 |
| RU2359115C2 (ru) | 2009-06-20 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN100572747C (zh) | 不牢固和脆弱粘结的沉积物中的竖直液压裂缝的多方位控制 | |
| CA2675823C (en) | Hydraulic fracture initiation and propagation control in unconsolidated and weakly cemented sediments | |
| RU2375561C2 (ru) | Способ завершения скважины в подземной формации (варианты) | |
| US4917188A (en) | Method for setting well casing using a resin coated particulate | |
| NO335923B1 (no) | Fremgangsmåte for gruspakking av utforede hull over fraktureringstrykket. | |
| RU2439274C1 (ru) | Способ строительства скважины | |
| US9822632B2 (en) | Method of pressure testing a plugged well | |
| CA2884071A1 (en) | Method for transverse fracturing of a subterranean formation | |
| CA2647324A1 (en) | Hydraulic fracture initiation and propagation control in unconsolidated and weakly cemented sediments | |
| RU2539469C1 (ru) | Способ многократного гидравлического разрыва пласта в горизонтальном стволе скважины | |
| RU2591999C1 (ru) | Способ ориентирования трещин гидравлического разрыва в подземном пласте, вскрытом горизонтальными стволами | |
| WO2017083495A1 (en) | Well design to enhance hydrocarbon recovery | |
| RU2171359C1 (ru) | Способ заканчивания горизонтальной скважины | |
| RU2655309C1 (ru) | Способ многократного гидравлического разрыва пласта в горизонтальном стволе скважины | |
| US8490695B2 (en) | Method for drilling and fracture treating multiple wellbores | |
| RU2055172C1 (ru) | Способ гидравлического разрыва пласта | |
| US10876380B2 (en) | Sealing a bore or open annulus | |
| US3674089A (en) | Method for stimulating hydrocarbon-bearing formations | |
| RU2637539C1 (ru) | Способ формирования трещин или разрывов | |
| RU2191886C2 (ru) | Способ изоляции водопроявляющих пластов | |
| RU2320854C1 (ru) | Способ эксплуатации скважины | |
| RU2531074C2 (ru) | Способ организации вертикально-латерального заводнения | |
| US20160290112A1 (en) | Processes for hydraulic fracturing | |
| RU2613403C1 (ru) | Способ гидравлического разрыва пласта в горизонтальном стволе скважины | |
| RU2543004C1 (ru) | Способ кислотного продольно-щелевого гидравлического разрыва низкопроницаемого терригенного коллектора |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| MM4A | The patent is invalid due to non-payment of fees |
Effective date: 20141229 |