SU75422A1 - Способ восстановлени мостовых опор - Google Patents

Способ восстановлени мостовых опор

Info

Publication number
SU75422A1
SU75422A1 SU356765A SU356765A SU75422A1 SU 75422 A1 SU75422 A1 SU 75422A1 SU 356765 A SU356765 A SU 356765A SU 356765 A SU356765 A SU 356765A SU 75422 A1 SU75422 A1 SU 75422A1
Authority
SU
USSR - Soviet Union
Prior art keywords
formwork
bridge piers
restoring
masonry
tongue
Prior art date
Application number
SU356765A
Other languages
English (en)
Inventor
И.М. Шаповалов
Original Assignee
И.М. Шаповалов
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by И.М. Шаповалов filed Critical И.М. Шаповалов
Priority to SU356765A priority Critical patent/SU75422A1/ru
Application granted granted Critical
Publication of SU75422A1 publication Critical patent/SU75422A1/ru

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Description

Предлагаемый способ восстановлени  взорванных мостовых опор может быть применен к опорам, заложенным на кессонах и имеющим надкессопную опалубку, разрушение которых простираетс  ниже торизоита воды.
Отличительна  особенность изобретени  заключаетс  в том, что вокруг уцелевшей, но поврежденной части опоры, между надкессонной опалубкой и камн ми завала, окружающего опору, забивают щпунтог .ую стенку, затем разбирают поврежденную кладку выще опалубки, уплотн ют щель между щпунтовой стенкой и опалубкой и разбирают поврежденную кладку в пределах опалубки, которую используют вместе со щпунтовой стенкой в качестве ограждени  места работ.
На чертеже показан способ восстановлени  мостовых опор.
Работы по восстановлению опор производ тс  следующим образом.
Вокруг уцелевшей, но поврежденной части опоры забиваетс  (без предварительной расчистки завалов) металлический шпунт / на глубину 1-2 м ниже верха надкессонной опалубки 2. Забивка может быть произведена сваебойным молотом легкого типа (600 кг).
Разборка кладки ведетс  сначала в щпунте с водоотливом, затем iia границе сохранившейс  при взрыве верхней кромки надкессонной опалубки 3 производитс  тампонирование щели между щпунтом и опалубкой при помощи мещковины, бумаги или цементным раствором. Пос аедующа  разборка кладки ведетс  в котловане с оболочкой из надкессонной опалубки старого фундамента, раскрепл емой по мере углублени  обычными креплени ми. После разборки кладки до требуемого техническими уСиТОви ми и проектом уровн  производитс  бетонирование тела подводной части фундамента восстанавливаемой опоры открытым способом при водоотливе, причем стара  иадкессонна  опалубка используетс , требу  дополнительной надстройки лишь в пределах шпунта.
Предлагаемый способ имеет следуюнгие преимущества.
а)Забиваетс  металлический щпунт на 2-3 м дизель-молотками легкого типа (600 кг).
б)Исключаетс  предварительна  трудоемка  подводна  расчистка русла у опоры от завалов дл  устройства щпунтовых перемычек.
SU356765A 1947-05-03 1947-05-03 Способ восстановлени мостовых опор SU75422A1 (ru)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU356765A SU75422A1 (ru) 1947-05-03 1947-05-03 Способ восстановлени мостовых опор

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU356765A SU75422A1 (ru) 1947-05-03 1947-05-03 Способ восстановлени мостовых опор

Related Child Applications (1)

Application Number Title Priority Date Filing Date
SU772528999A Addition SU705651A2 (ru) 1977-10-03 1977-10-03 Стробоскопический преобразователь

Publications (1)

Publication Number Publication Date
SU75422A1 true SU75422A1 (ru) 1948-11-30

Family

ID=48250611

Family Applications (1)

Application Number Title Priority Date Filing Date
SU356765A SU75422A1 (ru) 1947-05-03 1947-05-03 Способ восстановлени мостовых опор

Country Status (1)

Country Link
SU (1) SU75422A1 (ru)

Similar Documents

Publication Publication Date Title
CN108661073A (zh) 一种挡墙结构及其施工方法
CN105040715A (zh) 使用钢板桩做桥梁施工围堰方法
CN209854754U (zh) 一种流砂地层半封闭沉井结构
SU75422A1 (ru) Способ восстановлени мостовых опор
GB732494A (en) Improvements in or relating to concrete and the like piles
KR200232748Y1 (ko) 교량의 구조물 기초 보수공사용 강재 케이슨
RU2162122C2 (ru) Способ понижения уровня грунтовых вод вблизи зданий и сооружений
CN209493914U (zh) 一种高水位条件下施工护脚
GB496581A (en) An improved method of driving tunnels under water or in water-bearing strata
RU2044838C1 (ru) Конструкция усиления свайного фундамента здания, сооружения
SU808603A1 (ru) Способ возведени свайногофуНдАМЕНТА
RU2800444C1 (ru) Способ демонтажа оголовков буронабивных свай
Nash Brickwork
Dobson Foundations and Concrete Works: Containing a Synopsis of the Principal Cases of Foundation Works, with the Usual Modes of Treatment, and Practical Remarks of Footings, Planking, Sand, Concrete, Béton, Pile-driving, Caissons, and Cofferdams
JORDAN STUDENTS'PAPER. FOUNDATION FOR BASEMENT BUILDINGS ADJOINING EXISTING PROPERTY.
SU1525243A1 (ru) Способ разборки строительной перемычки
Follett The Construction of a Cofferdam
Opdycke et al. Discussion on Underpinning Buildings
EXCAVATIONS Rem ANC Qi Pipin
SU138882A1 (ru) Способ возведени подводных фундаментов
JPH0464622A (ja) 軟弱地盤における鋼板コンクリート船基礎工法
SU947296A1 (ru) Способ защиты фундамента сооружений,возводимых на подрабатываемой территории
SU1142580A1 (ru) Способ сооружени чеистой плотины
ANDERSON CONSTRUCTIONAL ENGINEERING WORK IN THE NEW DUNSTON POWER-STATION FOR THE NORTH-EASTERN ELECTRIC SUPPLY COMPANY LTD.(INCLUDES APENDICES AND PLATES AT BACK OF VOLUME).
ZA202311498B (en) A combined construction method of steel trestle, steel working platform and steel sheet pile cofferdam