SU903473A1 - Method of constructing cast-in-place piles - Google Patents

Method of constructing cast-in-place piles Download PDF

Info

Publication number
SU903473A1
SU903473A1 SU792760813A SU2760813A SU903473A1 SU 903473 A1 SU903473 A1 SU 903473A1 SU 792760813 A SU792760813 A SU 792760813A SU 2760813 A SU2760813 A SU 2760813A SU 903473 A1 SU903473 A1 SU 903473A1
Authority
SU
USSR - Soviet Union
Prior art keywords
casing
well
additional pipe
installation
pile
Prior art date
Application number
SU792760813A
Other languages
Russian (ru)
Inventor
Григорий Яковлевич Вильчинский
Original Assignee
За витель
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by За витель filed Critical За витель
Priority to SU792760813A priority Critical patent/SU903473A1/en
Application granted granted Critical
Publication of SU903473A1 publication Critical patent/SU903473A1/en

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Description

54) СПОСОБ ВОЗВЕДЕНИЙ БУРОНАБИВНЫХ СВАР154) METHOD OF CONSTRUCTIONS OF BROUGHABLE SVAR1

Claims (2)

Изобретение относитс  к фундаментостроению , в частности к устройству буронабивных свай. Известен способ устройства буронабивных свай с уширенной п той, включающий бурение скважины, уширение полости при помощи ущирител , установку обсадной трубы и арматурного каркаса, заполнение скважины бетонной смесью с одновременным извлечением обсадной трубы 1. К недостаткам этого способа относ тс  сложность устройства ущирени , ограниченные размеры уширени , отсутствие уплотнени  грунтовой оболочки уширени , возможность обвала ущирени . Наиболее близким по технической суш;ности к изобретению  вл етс  способ возведени  буронабивных свай, включающий образование в грунте скважины до проектной отметки, установку обсадной трубы, укладку бетонной смеси в нижнюю часть скважины, установку трамбовки и создание давлени  на бетонную смесь с образованием ущирени  в зоне п ты сваи, установку арматурного каркаса и заполнение остальной части скважины бетонной смесью с одновременным из.мельчением обсадной трубы 2. Недостатки указанного способа заключаютс  в невозможности достижени  большого уширени  п ты сваи и соответственно недостаточной несущей способности. Цель изобретени  - повыщение несущей способности сваи. Поставленна  цель достигаетс  тем, что согласно способу возведени  буронабивных свай, включающе.му образование в гранте скважины до проектной отметки, установку обсадной трубы, укладку бетонной смеси в нижнюю часть скважины, установку трамбовки и создание давлени  на бетонную смесь с образованием ущирени  в зоне п ты сваи, установку арматурного каркаса и заполнение остальной части скважины бетонной с.месью дл  формировани  ствола с одновременным извлечением обсадной трубы , используют цилиндрическую обсадную трубу с конически.м нижним концом, причем при установке обсадной трубы ее нижний конец располагают с зазором относительно дна забо  скважины, а после установки обсадной трубы в ее полость устанавливают дополнительную трубу, наружный диаметр которой равен внутреннему диаметру меньшего основани  конического конца обсадной трубы, причем трамбовку устанавливают в полости дополнительной трубы без зазора относительно ее стенки и укладку бетонной смеси в нижнюю часть скважины осуществл ют через дополнительную трубу с одновременным пригрузом обсадной трубы, а перед установкой арматурного каркаса дополнительную трубу извлекают. На фиг. 1 изображено бурение скважины до проектной отметки; на фиг. 2 - погружение обсадной и дополнительной труб в скважину и подача части бетоннрй смеси в скважину; на фиг. 3 и 4 - образование уширени  в зоне п ты; на фиг. 5 - узел I на фиг. 4. Способ возведени  буронабивных свай включает образование скважины 1 в грунте до проектной отметки шнековым буром 2, установку обсадной 3 и дополнительной 4 труб, укладку бетонной смеси 5 в нижнюю часть 6 через дополнительную трубу скважины , установку трамбовки 7, закрепленной на дополнительной трубе и создание давлени  на бетонную смесь с образованием уширени  8 в зоне п ты сваи. Причем устанавливают каркас (не показан) и заполн ют остальную часть скважины бетонной смесью дл - формировани  ствола с одновременным извлечением труб 3 и 4. Обсадна  труба 3 выполнена с коническим нижним концом 9. При установке обсадной трубы 3 ее нижний конец 9 располагают с зазором 10 относительно дна забо  11 скважины . Наружный диаметр дополнительной трубы равен внутреннему диаметру меньшего основани  конического конца обсадной трубы. Одновременно с подачей бетонной смеси в нижнюю часть скважины пригружают обсадную трубу укладкой балласта 12, кронштейны 13, жестко прикрепленные к обсадной трубе. Возведение буронабивной сваи осуществл ют следующим образом. Бур т скважину до проектной отметки шнековым буром. В образованную скважину опускают обсадную трубу, не довод  ее нижний конец до усто  скважины, в полость которой устанавливают дополнительную трубу с диаметром в несколько раз меньше диаметра обсадной трубы. В верхней части обсадной трубы жестко прикреплены кронштейны дл  укладки балласта. В верхней части 14 дополнительной трубы устанавливают воронку 15 и из бадьи 16 подают бетонную смесь литой консистенции. Подачу бетонной смеси производ т из расчета , чтобы некотора  часть дополнительной трубы была незаполненной (например 1 м). В незаполненную часть дополнительной трубы вставл ют поршень 17 (диаметр которого равен диаметру дополнительной трубы). На один из кронштейнов устанавливают копровую установку 18, например с дизель-моЛОТОМ , на другом кронштейне укладывают балласт. Таким образом, производитс  пригруз обсадной трубы и дл  компенсации выталкивающей силы. Далее производ т удары молотом по поршню до тех пор, пока поршень не опуститс  в дополнительную трубу . Забивку прекращают, когда до полного опускани  поршн  остаетс  некоторое рассто ние . Извлекают поршень, устанавливают в дополнительную трубу воронку и засыпают новую порцию бетонной с.меси, включив при этом вибратор. Далее, снова вставл ют поршень и снова производ т удары молотом. Циклы повтор ют до тех пор, пока не получают необходимое уширение п ты и св занное с ним необходимое уплотнение грунтовой оболочки вокруг п ты. Это контролируетс  величиной отказа поршн  при забивке его в дополнительную трубу. Во врем  ударов молотом по поршню бетонна  смесь из дополнительной трубы выталкиваетс  в полость п ты и раздвигает стенки грунтовой оболочки, уплотн   ее. Получив необходимое уширение п ты сваи, извлекают обсадную трубу из скважины, устанавливают армированный каркас и производ т добетонирование сваи до проектной отметки известным способом. Формула изобретени  Способ возведени  буронабивных свай, включающий образование в грунте скважины до проектной отметки, установку обсадной трубы, укладку бетонной смеси в нижнюю часть скважины, установку трамбовки и создание давлени  на бетонную смесь с образованием ущирени  в зоне п ты сваи, установку арматурного каркаса и заполнение остальной части скважины бетонной смесью дл  формировани  ствола с одновременным извлечением обсадной трубы , отличающийс  тем, что, с целью повышени  несушей способности свай, используют цилиндрическую обсадную трубу с коническим нижним концом, причем при установке обсадной трубы ее нижний конец располагают с зазором относительно дна забо  скважины, а после установки обсадной трубы в ее полость устанавливают дополнительную трубу, наружный диаметр которой равен внутреннему диаметру меньшего основани  конического конца обсадной трубы, причем трамбовку устанавливают в полость дополнительной трубы без зазора относительно ее стенки и укладку бетонной смеси в нижнюю часть скважины осуществл ют через дополнительную трубу с одновременным пригрузом обсадной трубы, а перед установкой арматурного каркаса дополнительную трубу извлекают. Источники информации, прин тые во внимание при экспертизе 1.Метелюк Н. С. Сваи и свайные фундаменты (справочное пособие). Киев, «Будивельник , 1977, с. 204, рис. 15.4. The invention relates to foundation engineering, in particular to the installation of bored piles. The known method of arranging bored piles with a broadened heel includes drilling a well, broadening a cavity using a preamer, installing a casing and reinforcement cage, filling the well with a concrete mixture while removing the casing 1. The disadvantages of this method are the complexity of the wrinkle device, the limited dimensions broadening, absence of compaction of the earth envelope; broadening, possibility of collapse of broadening. The closest in terms of technical dryness to the invention is a method for constructing bored piles, including the formation of a well in the ground to the design level, installation of a casing, laying the concrete mix in the lower part of the well, tamping installation and creating pressure on the concrete mix with the formation of an extension in piles of piles, installation of the reinforcement cage and filling the rest of the well with concrete mixture with simultaneous grinding of the casing 2. The disadvantages of this method are the impossibility of achieving The great broadening of the pile pile and, accordingly, insufficient bearing capacity. The purpose of the invention is to increase the bearing capacity of the pile. This goal is achieved in that according to the method of building bored piles, including the formation of a well in a grant to the design level, installation of a casing, laying of the concrete mix in the lower part of the well, installation of tamping and creating pressure on the concrete mix with the formation of extension in the zone of the fifth piles, installing the reinforcement cage and filling the rest of the well with concrete mixture to form the wellbore while simultaneously removing the casing, use a cylindrical casing pipe with conical m bottom the end, and when installing the casing, its lower end is positioned with a gap relative to the bottom of the well, and after installing the casing in its cavity, an additional pipe is installed, the outer diameter of which is equal to the inner diameter of the smaller base of the conical end of the casing, and tamping is installed in the cavity pipes without a gap with respect to its wall and laying of the concrete mixture in the lower part of the well is carried out through an additional pipe with simultaneous loading of the casing, and Ed installing reinforcing cage additional pipe removed. FIG. 1 shows the drilling of a well to the design mark; in fig. 2 - immersing the casing and additional pipes into the well and feeding a part of the concrete mixture into the well; in fig. 3 and 4 — formation of broadening in the zone of the peak; in fig. 5 shows the node I in FIG. 4. The method of construction of bored piles includes the formation of a well 1 in the ground to the design elevation by auger drill 2, the installation of casing 3 and an additional 4 pipes, the laying of concrete mix 5 in the lower part 6 through an additional pipe of the well, a tamper 7 attached to an additional pipe and the creation pressure on the concrete mixture with the formation of broadening 8 in the zone of the pile pile. Moreover, a skeleton (not shown) is installed and the rest of the well is filled with concrete mix to form the barrel while simultaneously removing the pipes 3 and 4. The casing 3 is made with a conical lower end 9. When installing the casing 3, its lower end 9 is positioned with a gap 10 relative to the bottom of the bottom 11 wells. The outer diameter of the additional pipe is equal to the inner diameter of the smaller base of the conical end of the casing. Simultaneously with the flow of the concrete mixture into the lower part of the well, the casing is loaded by laying ballast 12, brackets 13 rigidly attached to the casing. The construction of the bored pile is carried out as follows. Drill a well to the design mark with auger drill. A casing pipe is lowered into the formed well, not bringing its lower end to the wellhead, into the cavity of which an additional pipe with a diameter several times smaller than the diameter of the casing pipe is installed. Brackets for laying ballast are rigidly attached to the top of the casing. In the upper part 14 of the additional pipe, a funnel 15 is installed and from the tub 16 serves a concrete mix of a cast consistency. The concrete mix is supplied in such a way that some of the additional pipe is unfilled (for example, 1 m). A piston 17 (whose diameter is equal to the diameter of the additional pipe) is inserted into the empty part of the additional pipe. A boom installation 18 is installed on one of the brackets, for example, with a diesel engine, a ballast is placed on the other bracket. Thus, a casing load is produced and to compensate for the buoyancy force. Next, a hammer is hit on the piston until the piston is lowered into the additional pipe. The closure is stopped when some distance remains until the piston is fully lowered. The piston is removed, a funnel is installed in the additional pipe, and a new portion of the concrete mixture is poured in, including a vibrator. Next, the piston is re-inserted and hit again with a hammer. The cycles are repeated until the necessary broadening of the heel and the associated tight seal of the earth envelope around the heel are obtained. This is monitored by the failure rate of the piston when plugged into the additional pipe. During hammer blows to the piston, the concrete mixture from the additional pipe is pushed into the heel cavity and pushes against the walls of the soil cover, compacting it. Having obtained the required broadening of the pile pile, the casing is removed from the well, a reinforced skeleton is installed and the pile is concreted to the design level in a known manner. The invention of the method of construction of bored piles, including the formation of a well in the ground to the design mark, installation of a casing, laying of the concrete mix in the lower part of the well, installation of tamping and creating pressure on the concrete mix with the formation of reinforcement in the pile pile area, installation of reinforcing cage and filling the rest of the well concrete mix to form the trunk while removing the casing, characterized in that, in order to increase the bearing capacity of the piles, use cylindrical When the casing is installed, its lower end is placed with a gap relative to the bottom of the borehole, and after the casing is installed in its cavity, an additional pipe is installed, the outer diameter of which is equal to the inner diameter of the smaller base of the conical end of the casing, the tamper is installed in the cavity of an additional pipe with no clearance relative to its wall, and the concrete mix is placed in the lower part of the well through an additional pipe with a single TERM prigruzami casing, and an additional pipe before installation of the reinforcing carcass is removed. Sources of information taken into account in the examination 1. Metelyuk N. S. Piles and pile foundations (reference book). Kiev, “Budivelnik, 1977, p. 204, fig. 15.4. 2.Там же, с. 213, рис. 4.11 (прототип).2. In the same place 213, fig. 4.11 (prototype).
SU792760813A 1979-04-28 1979-04-28 Method of constructing cast-in-place piles SU903473A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU792760813A SU903473A1 (en) 1979-04-28 1979-04-28 Method of constructing cast-in-place piles

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU792760813A SU903473A1 (en) 1979-04-28 1979-04-28 Method of constructing cast-in-place piles

Publications (1)

Publication Number Publication Date
SU903473A1 true SU903473A1 (en) 1982-02-07

Family

ID=20825440

Family Applications (1)

Application Number Title Priority Date Filing Date
SU792760813A SU903473A1 (en) 1979-04-28 1979-04-28 Method of constructing cast-in-place piles

Country Status (1)

Country Link
SU (1) SU903473A1 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5256003A (en) * 1989-12-26 1993-10-26 Konoike Construction Co., Ltd. Method for automatically driving gravel drain piles and execution apparatus therefor
RU2401909C2 (en) * 2008-10-01 2010-10-20 Общество с ограниченной ответственностью Проектно-строительная компания "Фундамент" Device for compaction of soil in bottomhole
RU2492294C1 (en) * 2011-12-27 2013-09-10 Открытое акционерное общество "Волгомост" Pipe concrete pile with reinforced base and method of its erection

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5256003A (en) * 1989-12-26 1993-10-26 Konoike Construction Co., Ltd. Method for automatically driving gravel drain piles and execution apparatus therefor
RU2401909C2 (en) * 2008-10-01 2010-10-20 Общество с ограниченной ответственностью Проектно-строительная компания "Фундамент" Device for compaction of soil in bottomhole
RU2492294C1 (en) * 2011-12-27 2013-09-10 Открытое акционерное общество "Волгомост" Pipe concrete pile with reinforced base and method of its erection

Similar Documents

Publication Publication Date Title
US7326004B2 (en) Apparatus for providing a rammed aggregate pier
US8221034B2 (en) Methods of providing a support column
US9243379B2 (en) Method of providing a support column
US4634316A (en) Compacted deep foundation structure, method of and apparatus for building the same
KR102248187B1 (en) Cast-in-place pile using reinforced grouting and construction method
US2555359A (en) Pile structure and method of making same
CN106930276A (en) The deep hole blasting of rotary digging bored concrete pile and the construction method of conduit rotary digging removing obstacles
CN105019431B (en) Crush and complete alternate steep dip stratified rock masses Large Diameter Super-long Bored Piles construction method
CN104762957B (en) A kind of spiral pore-forming rams the construction method that expands CFG stake
KR100762991B1 (en) Ready-made pile filling method to fill high strength mortar
RU1819309C (en) Method for construction of cast-in-place pile and reinforcing cage of cast-in-place pile
US2317016A (en) Bridge foundation and method of making same
US3269126A (en) Methods for stabilizing and raising foundation structures
RU2058464C1 (en) Method for making foundation
JP2001152448A (en) Construction method of underground concrete structure
US3423944A (en) Method for forming end bearing concrete piles
KR101072215B1 (en) pile constructing method for reinforcing ends and the pile constructed by this
SU1622527A1 (en) Method of erecting pile
CN208415227U (en) A kind of mold-bagged concrete stake
CN113737771B (en) Pipe jacking well opening soil body reinforcing process for soft soil foundation
SU1677180A1 (en) Method of manufacturing reinforced cast-in-place pile
JPH1113070A (en) Method of forming consolidation grouting holes
SU1020519A1 (en) Method of reinforcing foundation of buildings or structures
GB2048999A (en) Improvements relating to the construction of in situ piles
US1665797A (en) Method of excavating and producing foundations