TW202421902A - 六角網打底工法 - Google Patents

六角網打底工法 Download PDF

Info

Publication number
TW202421902A
TW202421902A TW111145492A TW111145492A TW202421902A TW 202421902 A TW202421902 A TW 202421902A TW 111145492 A TW111145492 A TW 111145492A TW 111145492 A TW111145492 A TW 111145492A TW 202421902 A TW202421902 A TW 202421902A
Authority
TW
Taiwan
Prior art keywords
elastic cement
hexagonal mesh
construction
mesh
construction method
Prior art date
Application number
TW111145492A
Other languages
English (en)
Inventor
林濟民
Original Assignee
林政聿
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 林政聿 filed Critical 林政聿
Priority to TW111145492A priority Critical patent/TW202421902A/zh
Publication of TW202421902A publication Critical patent/TW202421902A/zh

Links

Landscapes

  • Laminated Bodies (AREA)

Abstract

可用於天、地、壁的打底工法。利用尼龍六角網的韌性加上彈性水泥黏著,達到有強度、硬度、平整度及其他優點的施工方式。

Description

六角網打底工法
改善輕質隔間縫隙的平整度
增加牆面的耐振強度及抗震耐力(地震及其他振源)
增加後續工程的黏著強度與成功率
大幅降低材料及工時成本
天然砂石為有限資源,過量開採會造成環境破壞。本工法能減少砂石的使用率至零
玻璃纖維網會造成施工人員肺部及皮膚危害。使用尼龍網來取代玻璃纖維網可以大量減少工作人員的健康維護成本
傳統工法需要使用水,自來水含氯離子,會侵害到水泥強度。本工法完全不使用水,減少水資源的使用
傳統打底工程需要3至7天的待乾。本工法隔日即可繼續施工
傳統打底需要處理施工廢料,本工法廢料量少
傳統打底施工需考量空氣濕度,本工法無需考量
傳統打底層厚度約1至2公分。本工法只需3至5公釐。能減少牆面厚度,增加空間使用。
本發明為減少建築業砂石、水資源之使用。減少施工廢棄物,減少工程人員職業傷害,降低成本及工時之創新工法。
使用任何廠牌之「尼龍六角纖維網布」(網距 5 mm /寬 100 cm×長 50~100 m) 滾著任何廠牌之「彈性水泥」不得加水。
適用時機: 1. 輕質隔間牆(例:石膏板、陶粒板、灌漿水泥板)。 2. 與防水工程一併施工。 3. 與隔音工程一併施工。 4. 天、地、壁三項均可施工。 【圖示簡單說明】
[圖示1]為此工法施工完成圖
材料及工具 1. 任何廠牌之「尼龍六角纖維網布」(網距5 mm/寬 100 cm × 長50~100 m)。 2. 任何廠牌之「彈性水泥」不得加水。 3. 尼龍滾筒刷 (長約24 cm)。 4. 剪刀
工法工序 1. 素地整平,清除表面雜物及突起物。 2. 與接著牆板滾著彈性水泥後,馬上平鋪六角網 (必須完全拉平)。 3. 網布交接面約 5~10 cm。 4. 待彈性水泥初凝後,再滾著一層彈性水泥,即可完成。 5. 隔天即可接續施工。

Claims (5)

  1. 一種施工工法,包含尼龍六角網及彈性水泥。
  2. 如請求項1,其特徵為結合尼龍六角網的韌性與彈性水泥黏著形成達到有強度、硬度、平整度及其他優點的施工方式。
  3. 如請求項1,此工法可適用於天、地、壁三向之牆面。
  4. 如請求項1,此工法改良傳統打底工法,去除傳統打底工法的缺點: 1. 待乾期長,且會因為天氣、環境影響後續工程安排。本工法待乾期為1天。2. 傳統打底層厚度約1至2公分。本工法只需3至5公釐。能減少牆面厚度,增加空間使用。 3. 傳統打底需要處理施工廢料,本工法幾乎無廢料。 4. 天然砂石過量開採會造成環境破壞。本工法能減少砂石的使用率至零。
  5. 如請求項1,此工法之工序: 1. 素地整平,清除表面雜物及突起物。 2. 與接著牆板滾著彈性水泥後,馬上平鋪六角網 (必須完全拉平)。 3. 網布交接面約 5~10 cm。 4. 待彈性水泥初凝後,再滾著一層彈性水泥,即可完成。
TW111145492A 2022-11-28 2022-11-28 六角網打底工法 TW202421902A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
TW111145492A TW202421902A (zh) 2022-11-28 2022-11-28 六角網打底工法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
TW111145492A TW202421902A (zh) 2022-11-28 2022-11-28 六角網打底工法

Publications (1)

Publication Number Publication Date
TW202421902A true TW202421902A (zh) 2024-06-01

Family

ID=92539943

Family Applications (1)

Application Number Title Priority Date Filing Date
TW111145492A TW202421902A (zh) 2022-11-28 2022-11-28 六角網打底工法

Country Status (1)

Country Link
TW (1) TW202421902A (zh)

Similar Documents

Publication Publication Date Title
US3740911A (en) Brick veneer wall construction
CA1231849A (en) Exterior wall
CN104018598B (zh) 一种外墙结构及施工安装方法
CN103938764B (zh) 室内二次轻质隔墙的快速施工方法及该隔墙
JP2017186895A5 (zh)
TW202421902A (zh) 六角網打底工法
CN104790617B (zh) 一种装配式复合板材
US20060123736A1 (en) System and method for filling joints between exterior cement panels
CN102182323A (zh) 低纬度高原蒸压加气砼砌块干法砌筑施工工艺
EP2770130A1 (en) Insulation assembly for the external cladding of buildings
CN211037384U (zh) 一种新型中空pvc内模板隔声墙
CN104179287B (zh) 轻质板墙上粘贴重质饰面材料的方法
CN202248387U (zh) 轻钢龙骨石膏板玻化砖装饰墙体
US2687359A (en) Plasterboard
CN206538891U (zh) 一种岩棉板保温结构
MacDonald Repairing historic flat plaster: walls and ceilings
PL441665A1 (pl) Szablon do tworzenia i odtwarzania przestrzennego układów struktur i okładzin architektonicznych w budownictwie za pomocą mas, tynków i zapraw budowlanych
CN215802402U (zh) 一种新旧墙面防开裂平整构造
CN110565886A (zh) 一种抗空鼓、开裂抹灰石膏结构及其施工方法
CN219528005U (zh) 用于曲面建筑结构的室内保温构造
JPWO2015002133A1 (ja) 型抜発泡材を用いた景観工法及びその型抜発泡材
TWI537457B (zh) 積層殼構及其施工方法
CN104481157B (zh) 外墙蒸压加气混凝土自保温系统同材质热桥处理施工方法
CN211229260U (zh) 一种抗空鼓、开裂抹灰石膏结构
CN208293795U (zh) 一种建筑保温防火墙体