I I A7 B7 五乂發滤説 !丨本發明係有關於一種具淤泥處理之受泥駁船,尤指— 種適用於水庫疏浚工程之受泥駁船者。 舉縣庫興建之目的,均是為了要在雨季時將雨水累 .積下來^待至雨餘續使用,㈣水庫週邊水土保持木 佳’大里泥沙隨溪流衝人水庫’因而造成現今水庫底下因 於泥之囤積,而使得水庫的儲水量一年比一年減少。例如 曾文水庫自民國62年運作以來,至85年12月所測得累 積1泥量已高達一億零四百四十四萬立方公欠,情況之灰 重程度已達对不容缓的地步,然而若欲將累積之游^清 除’必須先考量下列兩個問題〆 (一)如何挖出淤泥量最大的大壩區域之淤泥? 丨(二)^如何在水資源不可流失且淤泥處理不可造成二 I次污染之限制之條件下,順利處理所挖出之齡泥, |、△使挖泥的料提高,並能超越㈣的素積速度? 、|為%解決第―:項之問題,日本則> 開發株式會社已 成丨力的研發$臟>(混氣式喷射幫.浦)所組合挖泥船,且經 .該公司工程人員會勘確認:水面負100公尺以下可順利達成 ’‘但第二㈣泥的處理方式卻仍無—完美之解決方 :法。;|現今各水庫所採用之淤泥處理方式如下· :丨H)就近填築新,但並非所有水庫附近均有可 容納大量廢土之土地。 二)用排泥管線將職運至海邊填築海埔新生地, 但游泥由管線運送時,必須依賴大量水流帶動, 丨 巧嶋所須之水量越大’若用此方法將會專 Ϊ紙張尺度遒用 +國 } -_-一.I I A7 B7 Wuyan Hair Filter said! 丨 This invention relates to a mud receiving barge with sludge treatment, in particular-a mud receiving barge suitable for reservoir dredging projects. The purpose of the construction of the county reservoir is to accumulate rainwater during the rainy season. It will be accumulated until the rain continues to use. The soil and water conservation around the Luan reservoir is good. Due to the accumulation of mud, the water storage capacity of the reservoir decreases year by year. For example, since the operation of the Zengwen Reservoir in 62 years of the Republic of China, the cumulative amount of mud measured by December 1 to December 1985 has reached 104.44 million cubic cents, and the grayness of the situation has reached an urgent level. However, if you want to clear the accumulated swimming ^ you must first consider the following two questions: (1) How to excavate the silt in the dam area with the largest amount of silt?丨 (二) ^ How to smoothly process the excavated ageing mud under the condition that the water resources cannot be lost and the sludge treatment cannot cause secondary pollution, |, △ can improve the dredging material and surpass the The prime product velocity?, | Is the% to solve the problem of the ―: item, and the Japanese> has developed a powerful R & D $ dirty > (mixed-air jet gang. Pu) combined dredger, and The company's engineering staff will survey and confirm that: the water surface can be reached smoothly below 100 meters '', but there is still no treatment method for the second sludge-the perfect solution: method. ; | The silt treatment methods adopted by various reservoirs today are as follows: 丨 H) Filling new places nearby, but not all reservoirs have land near the reservoir that can hold a lot of waste soil. 2) Use the mud drainage pipeline to transport the job to the seaside to fill the Haipu new land, but when the mud is transported by the pipeline, it must rely on a large amount of water to drive it. 丨 The greater the amount of water required, if you use this method, it will be special. Paper scale use + country} -_- one.
ZZ 之 注 再 I 本 買 裝 訂 線 部 t 央 標 準; 局 η X. 消 費 合 作 社 印 $1 經濟部中央標準局員工消費合作杜印製 法趕 多, 因曰 A7 B7 五丨、發明説_ (二) ! 1乘来庫之水大量流失。 | ! ' 1 (三) 將其作固化處理,但處理場地難尋、處理過程 #時且成本亦高,此種處理方法仍需考量。 (四) 陸上沉澱池方式,將淤泥排入沉澱池後利用靜 態比重差之擠壓效應,將水分及於泥分離,並利 * 用日曬及滲透地層之方法使水分浦失,以達到脫 水的目的’但其先決條件必須於該水庫週邊有足 夠之土地設置沉澱池,且,若淤泥中所含之黏性 '.1 土成分過高時,日曬之方式會使其表面快速硬化, 致使内部之淤泥無法達到脫水之目的」而表面硬 化的結果會使後續之處理更加困難(目前石卩〗水庫 正面臨此問題)。 上述之四種方法中以第四項較適合各水庫使用,敬請 參閱第一圖,挖泥船丨係以一吸泥管u伸入水庫底部2 庫底淤集區14將淤泥抽取上來,並用輪泥管12將淤泥運 七沉殿池13之中,此時比重較輕之水分會滿出沉^ 堤防131而流回水庫之中·,但該處理方式之速度過忾’, 法與|挖泥船的挖泥速度配合,不但拖慢工程之進行又、'、 上淤泥的累積速度,致使水庫中的於泥仍舊越來*’’、 無法逹到清除淤泥之目的,又,淤泥中所含 ^越 曬而蒸發,無法回收利用,平白無故的浪費水資=會 卜發明人有鑑於各水庫之情況日益嚴重, 。 從事丨相關工作之經驗及技術,現已研發出—種受二二年 確,加缚處理水庫中之游泥,使挖泥船發揮最高=对二, :, ·. . .......双平 0 !| —I · I —ml —訂 I— n (請先閲讀背面之.注意事項再填寫本頁,> 丨第二圖 第三圖 第四丨圖 第五圖 第六圖 第七圖 第八圖 第九圖 五、發明説明(多)、 月,㈤,係在S提供―種可直接修放於i挖 /匕船附近*茅真雜受泥之受泥駁船。 丨 進月之久鮮的’,係告於择供—種可直接於水庫中 進仃淤泥脫水之受泥駁船厂 ”资t發明之叉一自的,係在於提供—種可完全取代陸上 >儿1池之受泥駁船。 俾使胃審查委貞能確實了解本發明 理及 功效性,兹分別以下列圖示詳細說明如後: 第一圖係為習用之淤泥處理方式示意圖。 係為本發明之正面示意圖。 係為本發明之側面示意圖。 係為本發明之淤泥排出閥門之放大示意圖。 係為本創作之銘質輸送帶之部分放大示圖。 係為本發明之透水網放大示意圖。 係為本發明之另一透水網放大示意圖。 係為本發明之透水管部分放大示意圖。 I------------裝-- .(.請先聞讀背面之注意事項再填寫本頁) 訂. Φ. |線| 經濟部中央標準局員工消費合作社印製 係為本發明之流程圖。 圖號說明: 1 挖泥船 11 吸泥管 12 輪泥管 13 陸上沉澱池 131 堤防 14 庫底淤集區 2 受泥駁船 21 受泥管 211 受泥支管 212 淤泥流量控制閥 22 船殼體 23 污水搶隔板 五 A7 B7 -明説明 24 趣 25 受泥艙 251 淤泥排放閥 252 閥門 253 橡膠碰墊 254 受泥艙外甲板 255 受泥艙橫向隔'艙甲板 256 受泥艙縱向隔艙曱板 ' .... . . 26 ' 透水網 261 透水管: 262 内襯鋼線 263 透水層 264 過濾層丨 265 被覆層 266 透水網棑水管 27 铭質輪送帶 271 側擔板 272 直立鋁質擋板 273 . ' . 淤泥容納室 274 防泥板 Λ : 1 275丨 輪送帶泥水排出門 28 高壓水幫浦 281 抽水管 282 高壓水管 283 面壓水.支管 29 小型混氣式喷射幫浦 291 污水艙抽水管 292 排水管 3 機房 4 操作室 5 船艏 51 淤泥卸載系統 經濟部中央標準局員工消費合作社印製 (請先閱讀背面之注意事項再填寫本頁) 敬請參閱第二圖及第三圖,本發明之受泥駁船2,其 概係以一船殼體22為主,於主曱板之上方設有一受泥管 21,該受泥管21並延伸出各受泥支管211,且於受泥管21 及各受泥支管211間各設有一淤泥流量控制閥212,該船 殼體22内以受泥艙縱向隔艙甲板256、受泥艙橫向隔艙 甲板255及受泥艙外曱板254為分隔,左右各設置數個受 • _· 本紙張尺度適用中國國家板牵(CNS.) A4規格(2丨OX297公釐)—— :—— 7— 〆、 A7 B7 經濟部中央標準局員工消费合作杜印製 五 (^L) Λ — 泥艙’主右愛泥艙25之底部均為互通者,各受苑艙 25之受泥艙外甲餐254及冑泥搶橫向隔驗〒板Μ;與受 泥艙縱向隔轸甲满256之内艙壁均設有透水網.26 6 η 其中’該雙爲數船2.後侧設有一機房3 ,該機房3:;内 設有一高壓水幫浦28,其一端接—抽水管281:延伸至鉍 外f:水面下,另一端則接一高壓水管282並延抻出數支:高 壓+支管283於各受泥艙25之頂部;機房3内另設有一小 型♦氣武喷射幫浦| 29 ,其一端接一排水管292延伸至船 外j而另一端則接二污水艙抽水管291延伸至該污水艙24 之f底部’且於機房3之上方設有一捧作室4。 丨敬請參閱苐西圖及第五圖(並配合第二.圖及第三圖):, 各拿泥艙25之艙底處設有一淤泥排放閥251,該淤泥排 :放閥25:1係由左右各—之閥門252所組成,且該閥門252 丨底备設有一塑質碰墊253,於該淤泥排放閥251下設有一 通過各淤泥艙25之淤泥排放閥251下方之鋁質輸送帶 27,[l因該鋁質輪送帶27之設置係由最内部之淤泥排放 閥2杉底;邺至超出船艏5,而使船艏5處形成一淤泥洩載 I : 1 1 糸統;5丨^且該鋁質輸送帶27之左右兩側各詨有側擋板 2^1 :’於客側擋板271上設有一防泥板274,並於該鋁質 輸送帶27上,等距離位置設有連續環繞於鋁質輪送帶上 之直立鋁質擋板272,並形成一淤泥容納室273。 由該船殼體22内之受泥艙外甲板254及鋁質輪送帶 27之侧擋板271與防泥板274隔置出一污水艙24,且該 污水艙24在與鋁質輸送帶6個蹲之最後端泛麽歷擎努有 -...................... - -.......... ....... ......... · *' 請/ ..先 閲 面 之 注 $ 項 裝 頁 钉 線 本紙浪尺度遍内中國國象標準(CNS ) A4緣格(2丨〇><乃7分釐-) 七 部 中 央 標 準 局 員 工 消 費 合 作 社 印 製 本紙張尺度逋用中S家標準(CpS ) A4規格> ' 八A — A7 B7 五、發明説明(六) 一輸送帶泥水排出門275。 敬請參閱第六圖、第七圖及第八圖,該連永網26概 係由數個透水管261組成,且該透水管261係以一内襯鋼 線262、一透水廣263、一過滤層264及一被覆層265所 構成者(該透水鋼26中之透水管261亦可用平面網狀構造 所替代者),其中,各透水管261下端為排水口,排水方 式分二:一為由下端直接排入污水艙24,如圖六所示;另— 為透水管261所組善之透水管261個體,排水匯集於卞方 之透水網排水管266排出,如第七圖所示。 敬請參閱第九圖,該受泥駁船2之受泥管21與挖泥 船之排泥管連接後’淤泥含水流入受泥管21:後,再導入 受泥支管211,此時由操作室4遙控開啟各淤泥流量控制 閥212,並平衡各搶載量,此時於泥中所含之水分經由各 透水網26排入污水艙24,機房3啟動小型混氣式喷射幫 浦p,利用污水艙抽水管291將污水艙24中之污水排出 船外,此時排水管292將所抽取之污水排出船外,當淤泥 含水量降至百分之三十時,受泥駁船2移至洩泥區並接妥 連:.pt系統,分別開啟各受泥艙25艙底之淤泥排放閥251 之^門252 ’該閥門252開啟時(閥門252底部之橡膠碰 墊丨253與鋁質輸送帶27之防泥板274接觸,避免閥門252 丨之碰損|) ’淤泥落至鋁質輸送帶27上之淤泥容納室273, 丨由每質輸送帶27運至船艏5之游泥泡載系統S1排出,當 受泥駁船2㈣泥處理完畢後,機房3開啟高壓水幫浦 28,利用抽水責281抽取水庫中之水,再導入高壓水管282 -I裝-- (請先聞讀背面之注意事項再填寫本頁 ---?1--------0-----------------:____ . 五、奁 明説明(七~ 内, 經由各南虔水支管283 A7 B7ZZ's Note: I buy the gutter department's central standard; Bureau η X. Consumer Cooperatives printed $ 1. The Central Government Bureau of the Ministry of Economic Affairs' employee consumer cooperation printing method catches up, because it is called A7 B7 Five, invention said _ (two)! 1 multiplied by the water in the library. | '1 (3) It is used for curing treatment, but the processing site is difficult to find, the processing process # is high, and the cost is also high. This processing method still needs to be considered. (4) Onshore sedimentation tank method. After the sludge is discharged into the sedimentation tank, the squeeze effect of the difference in static specific gravity is used to separate the water from the mud, and the water is lost by sun exposure and infiltration of the formation to achieve dehydration. Purpose 'but its prerequisites must have sufficient land around the reservoir to set up a sedimentation tank, and if the viscosity of the silt'.1 is too high, the sun will quickly harden its surface, This makes the internal sludge unable to achieve the purpose of dehydration ", and the result of surface hardening will make subsequent treatment more difficult (currently Shijie reservoir is facing this problem). Among the above four methods, the fourth item is more suitable for the use of various reservoirs. Please refer to the first figure. The dredging vessel 丨 uses a suction pipe u to reach the bottom of the reservoir 2 The silt collection area 14 at the bottom of the reservoir to extract the silt. At the same time, the mud is transported to the seven sinking ponds 13 by the round mud pipe 12. At this time, the lighter weight water will overflow the sink ^ embankment 131 and flow back into the reservoir, but the speed of this treatment method is too high. The coordination of the dredging speed of the dredger not only slows down the progress of the project, but also accumulates the speed of the sludge, resulting in the mud in the reservoir still getting more and more * '', the purpose of removing the sludge cannot be reached, and the silt The ^ contained in it is evaporated and cannot be recycled, and water resources are wasted for no reason = the inventor will consider that the situation of each reservoir is getting worse and worse. The experience and technology of engaging in related work have been developed-a kind of treatment that is bound to handle the mud in the reservoir for two or two years, so that the dredger can play the highest performance = pair two,:, ·. ..... ..Shuangping 0! | —I · I —ml —Order I— n (Please read the note on the back before filling in this page, > 丨 second picture third picture fourth 丨 fifth picture fifth sixth The seventh figure, the eighth figure, the ninth figure, and the fifth description of the invention (multiple), month, and ㈤, are provided in S-a kind of mud-receiving barge that can be directly repaired near the digging / daggering boat.丨 The long-lasting freshness of the moon is due to the choice of supply-a kind of mud-barge factory that can directly enter the silt dewatering in the reservoir "The invention of the fork is based on providing-a kind that can completely replace the land & gt The mud-receiving barge of child 1 pond. So that the stomach examination committee can truly understand the principle and efficacy of the present invention, the following diagrams are described in detail as follows: The first picture is a schematic diagram of the conventional sludge treatment method. The front view of the invention is a side view of the invention. It is an enlarged view of the sludge discharge valve of the invention. An enlarged view of a part of the engraved conveyor belt of this creation. It is an enlarged schematic view of the permeable net of the present invention. It is an enlarged schematic view of another permeable net of the present invention. It is an enlarged schematic view of the permeable pipe of the present invention. I --- --------- Equipment--. (Please read the precautions on the back before filling in this page) Order. Φ. | Line | Printed by the Consumers' Cooperative of the Central Standards Bureau of the Ministry of Economic Affairs Description of drawing number: 1 Dredger 11 Suction pipe 12 Mud wheel 13 Onshore sedimentation tank 131 Embankment 14 Silt accumulation area 2 Mud barge 21 Mud pipe 211 Mud branch pipe 212 Mud flow control valve 22 Vessel Casing 23 Sewage grab partition five A7 B7-instructions 24 Fun 25 receiving mud tank 251 silt discharge valve 252 valve 253 rubber bumper 254 receiving mud tank outer deck 255 receiving mud tank transverse compartment 'cabin deck 256 receiving mud compartment longitudinal compartment Hatch plate '...... 26' Permeable net 261 Permeable pipe: 262 Lined with steel wire 263 Permeable layer 264 Filter layer 丨 265 Covering layer 266 Permeable net water pipe 27 Ming quality carousel 271 Side stretcher 272 Stand upright Aluminium baffle 273. '. Mud container 274 Mud shield Λ: 1 275 丨 Rotate with mud water discharge door 28 High-pressure water pump 281 Suction pipe 282 High-pressure water pipe 283 Surface pressurized water. Branch pipe 29 Small mixed-air jet pump 291 Sewage tank suction pipe 292 Drain pipe 3 Machine room 4 Operation room 5 Stern 51 Silt unloading system Printed by the Consumer Cooperative of the Central Standards Bureau of the Ministry of Economic Affairs (please read the precautions on the back before filling this page) Please refer to the second and third pictures of the mud barge 2 of the present invention, its outline It is mainly composed of a ship shell 22, and a mud receiving pipe 21 is provided above the main stern plate. The mud receiving pipe 21 extends each mud receiving branch pipe 211, and is between the mud receiving pipe 21 and each mud receiving branch pipe 211. Each of them is provided with a sludge flow control valve 212. The ship's shell 22 is separated by the mud compartment longitudinal compartment deck 256, the mud compartment lateral compartment deck 255, and the mud compartment outboard 254. • _ · This paper size is applicable to China National Board (CNS.) A4 specification (2 丨 OX297 mm) —————— 7— 〆, A7 B7 Employee Cooperative Cooperation of the Central Standards Bureau of the Ministry of Economic Affairs, printed 5 (^ L ) Λ — The bottom of the 'mud tank' main right mud tank 25 is interoperable , Each of the receiving tanks 25 of the mud tank outside a meal 254 and the mud mud grab horizontal partition inspection plate M; and the mud tanks longitudinally separating the full 256 inside the bulkhead is provided with a water-permeable net. 26 6 η where ' The double is a number of ships 2. There is a machine room 3 on the rear side, which is equipped with a high-pressure water pump 28, one end of which is connected to a pumping pipe 281: extending to the outside of bismuth f: below the water surface, and the other end is connected to a The high-pressure water pipe 282 is extended several times: high-pressure + branch pipe 283 is on the top of each mud receiving tank 25; there is also a small air-air jet pump 29 in the engine room 3, one end of which is connected to a drainage pipe 292 to extend outside the ship j and the other end is connected to two sewage tank suction pipes 291 extending to the bottom of f of the sewage tank 24 and a holding chamber 4 is provided above the machine room 3.丨 Please refer to the western and fifth pictures (and cooperate with the second. And third pictures): a mud discharge valve 251 is provided at the bottom of each mud tank 25, the mud discharge: discharge valve 25: 1 It is composed of left and right valves 252, and a plastic bumper 253 is provided at the bottom of the valve 252. Under the silt discharge valve 251, there is an aluminum conveyance passing through the sludge discharge valve 251 of each silt tank 25. Belt 27, [1. Because the arrangement of the aluminum conveyor belt 27 is from the innermost silt discharge valve 2 to the bottom of the fir; 邺 to exceed the stern 5 so that a sludge discharge I is formed at 5 sterns I: 1 1 糸5 丨 ^ And the left and right sides of the aluminum conveyor belt 27 have side baffles 2 ^ 1: 'A mud guard 274 is provided on the passenger side baffle 271, and on the aluminum conveyor belt 27 At an equidistant position, an upright aluminum baffle plate 272 continuously surrounding the aluminum belt is formed, and a silt accommodating chamber 273 is formed. A sewage tank 24 is separated from the mudguard outer deck 254 in the hull 22 and the side baffle 271 of the aluminum conveyor belt 27 and the mud guard 274, and the sewage tank 24 is in contact with the aluminum conveyor belt. The last end of the 6 squats is not ...--... .... ......... * 'Please / .. Please read the note above $ Item binding line The paper wave scale throughout the Chinese national standard (CNS) A4 margin (2 丨 〇 > < It is 7 centimeters-) Seven Central Standards Bureau employees 'cooperatives printed this paper in the standard paper size (CpS) A4 specifications >' Eight A — A7 B7 V. Description of the invention (six) a Conveyor mud water discharge door 275. Please refer to the sixth, seventh, and eighth pictures. The Lianyong network 26 is composed of a number of permeable pipes 261, and the permeable pipe 261 is lined with a steel wire 262, a water permeable 263, a The filter layer 264 and a coating layer 265 (the permeable pipe 261 in the permeable steel 26 can also be replaced by a flat mesh structure), in which the lower end of each permeable pipe 261 is a drainage port, and the drainage method is divided into two: one is It is directly discharged into the sewage tank 24 from the lower end, as shown in FIG. 6; In addition, for the permeable pipes 261 of the permeable pipe 261, the drainage is collected and discharged in the rectangular permeable network drainage pipe 266, as shown in the seventh figure. Please refer to the ninth figure. After the mud receiving pipe 21 of the mud receiving barge 2 is connected to the mud discharging pipe of the dredger, the silt water flows into the mud receiving pipe 21 :, and then it is introduced into the mud receiving branch pipe 211. At this time, the operation room 4 Remotely open each sludge flow control valve 212 and balance the load load. At this time, the water contained in the mud is discharged into the sewage tank 24 through the pervious network 26, and the machine room 3 starts a small gas-jet mixing pump p. The sewage tank suction pipe 291 discharges the sewage in the sewage tank 24 out of the ship. At this time, the drainage pipe 292 discharges the extracted sewage out of the ship. When the water content of the silt drops to 30%, the mud barge 2 moves to the discharge. Mud areas are connected in parallel: the .pt system opens the 252 door 252 of the silt discharge valve 251 of each bilge tank 252 'When the valve 252 is opened (the rubber pad 丨 253 at the bottom of the valve 252 and the aluminum conveyor belt The 27 mud plate 274 contacts to avoid the damage of the valve 252 丨 '' 'The silt falls to the silt accommodating chamber 273 on the aluminum conveyor belt 27, 丨 It is transported from each conveyor belt 27 to the sludge of the ship's bow 5 The system S1 is discharged. After the mud barge 2 has finished the mud treatment, the machine room 3 turns on the high-pressure water pump 28 and uses the pumping responsibility. 281 Extract the water from the reservoir, and then introduce the high-pressure water pipe 282 -I-(Please read the precautions on the back before filling this page ---? 1 -------- 0 ------ -----------: ____. V. Ming Ming's explanation (within 7 ~, through each Nanqian water branch pipe 283 A7 B7
的 艙寧此時各受泥艙25之 〆了 25四週j 熊)U洗檢皮麵士、泰卜、排放閥251均為開啟之相 “污松4之污水LG開啟小型混氣式嗔射幫浦以 其Ψ ’該受泥駁船係為一機動性离 了 A 分齙_性间且可快速強制性 刀離於泥中泥水作用之發明,且又不需佔用土地,而處理 =畢之於泥可㈣卡車祕面贿帶運至海棟 海之=因處理難巾水分不會流失,實域疏:= 工程最適宜之發明。 π <夂 功效:1.可直接停放於挖泥船附近,並直接受泥。 2 ·可直接於水庫内進行脫水動作使淤泥中之水分 不會流失。 3.可完全取代陸上沉澱池之功用,且可循環使用 綜上所述,本發明係一確能達到消除習用缺失之」 且具實用性及產業上利用之發明,又未於申請前公β 陳列展示,合於專利法之規定,援依法向釣局申請發日; 專利,冀貴審查委員詳審後,準予本發明發明專利,? 勝感激。 惟以上所述者’僅為本發明之一較佳實施例而已,? 能以此限定本創作之實施範圍。即凡依本鼙明申請專利| 圍所述均等變化或修飾,皆仍屬本創作專利涵蓋範圍内, :民張尺度適_中國國家榡準(eNS) Α4規格(210X297公妓) jL·At this time, each of the cabins was affected by the mud tank 25, and the bears were around 25. The bears) U cleansing, facial cleaning, discharge valve, 251 are all open. "Sewage of 4 sewage LG opened a small mixed gas injection. Bangpu considers that the barge-receiving barge system is an invention that is mobile and separated from A and can be quickly and compulsorily cut away from the muddy water in the mud, and does not need to occupy land, and treatment = Bizhi Take the bribe of the mud truck to Haidonghai to transport it to the sea = no water will be lost due to the difficulty of handling, and the real area is sparse: = the most suitable invention for the project. Π < 夂 Efficacy: 1. Can be directly parked in the dredging It is near the ship and directly affected by mud. 2 · Dehydration can be performed directly in the reservoir so that the water in the silt will not be lost. 3. It can completely replace the function of the land sedimentation tank and can be recycled. In summary, the present invention is a It is indeed able to achieve the elimination of "absence of customary use." Inventions that are practical and industrially available, have not been publicly displayed before the application, and are in compliance with the provisions of the Patent Law. After detailed review by the members, the invention patent for this invention was granted. Thank you. But the above one is only a preferred embodiment of the present invention. This can limit the scope of implementation of this creation. That is to say, any changes or modifications applied for patents in accordance with this Ming | equivalent are still covered by this creation patent: Min Zhang scale appropriate _ China National Standard (eNS) Α4 specifications (210X297 prostitute) jL ·