Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Криворізький Технічний Університет, Криворожский Технический УниверситетfiledCriticalКриворізький Технічний Університет
Priority to UA95073348ApriorityCriticalpatent/UA22014A/en
Publication of UA22014ApublicationCriticalpatent/UA22014A/en
The invention relates to mining. The method includes rail transportation of rocky opening rock to breakage zone, excavator pouring of rock to breakage zone. Pouring of rocky opening rock to breakage zone is performed in band as support prism on moving base.
UA95073348A1995-07-171995-07-17Method for dump formation in breakage zone
UA22014A
(en)
Improved wedge arrangement + related means for mounting means, base members, + bits, + combinations thereof for mining, road working or earth moving machinery