Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Донецкий Национальный Технический УниверситетfiledCriticalДонецкий Национальный Технический Университет
Priority to UAA200913566ApriorityCriticalpatent/UA95155C2/en
Publication of UA95155C2publicationCriticalpatent/UA95155C2/en
A method for mine working bolting includes drilling of bore holes in working, installation and fixation of anchor bolts in the holes. Material and diameter of anchor bolt, distance between neighboring anchor bolts, angle of inclination of anchor bolt to surface of rock exposure are chosen in such way that ratio of reduced elasticity modulus of reinforced rock structure to elasticity modulus of bolted rocks is within from 1 to 1.25 inclusively.
UAA200913566A2009-12-252009-12-25Method for mine working bolting
UA95155C2
(en)
Optimization and engineering practice of large-diameter drilling hole-anchoring hole spacing based on stress relief-support reinforcement cooperative effect