US20150192003A1 - Method for enhanced oil recovery using cyclic steam stimulation and electromagnetic heating - Google Patents
Method for enhanced oil recovery using cyclic steam stimulation and electromagnetic heating Download PDFInfo
- Publication number
- US20150192003A1 US20150192003A1 US14/583,345 US201414583345A US2015192003A1 US 20150192003 A1 US20150192003 A1 US 20150192003A1 US 201414583345 A US201414583345 A US 201414583345A US 2015192003 A1 US2015192003 A1 US 2015192003A1
- Authority
- US
- United States
- Prior art keywords
- heat
- reservoir
- hydrocarbon
- well
- electromagnetic
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Abandoned
Links
- 238000000034 method Methods 0.000 title claims abstract description 132
- 238000011084 recovery Methods 0.000 title claims abstract description 43
- 238000010438 heat treatment Methods 0.000 title claims abstract description 21
- 238000010794 Cyclic Steam Stimulation Methods 0.000 title abstract description 69
- 229930195733 hydrocarbon Natural products 0.000 claims abstract description 71
- 150000002430 hydrocarbons Chemical class 0.000 claims abstract description 71
- 239000004215 Carbon black (E152) Substances 0.000 claims abstract description 70
- 230000035699 permeability Effects 0.000 claims abstract description 33
- 239000012530 fluid Substances 0.000 claims description 25
- 238000004519 manufacturing process Methods 0.000 claims description 18
- 238000005553 drilling Methods 0.000 claims description 16
- 230000005855 radiation Effects 0.000 claims description 15
- 230000005611 electricity Effects 0.000 claims description 14
- 230000006698 induction Effects 0.000 claims description 14
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims description 14
- 230000001965 increasing effect Effects 0.000 claims description 12
- 230000000916 dilatatory effect Effects 0.000 claims description 8
- 239000003638 chemical reducing agent Substances 0.000 claims description 7
- 230000008569 process Effects 0.000 abstract description 22
- 239000010426 asphalt Substances 0.000 abstract description 16
- 239000003921 oil Substances 0.000 abstract description 16
- 239000000295 fuel oil Substances 0.000 abstract description 15
- 230000015572 biosynthetic process Effects 0.000 description 17
- 238000005755 formation reaction Methods 0.000 description 17
- 238000010796 Steam-assisted gravity drainage Methods 0.000 description 11
- 239000011435 rock Substances 0.000 description 9
- 230000010339 dilation Effects 0.000 description 7
- 239000002904 solvent Substances 0.000 description 7
- 238000010793 Steam injection (oil industry) Methods 0.000 description 6
- XQCFHQBGMWUEMY-ZPUQHVIOSA-N Nitrovin Chemical compound C=1C=C([N+]([O-])=O)OC=1\C=C\C(=NNC(=N)N)\C=C\C1=CC=C([N+]([O-])=O)O1 XQCFHQBGMWUEMY-ZPUQHVIOSA-N 0.000 description 4
- 238000007796 conventional method Methods 0.000 description 4
- 239000003085 diluting agent Substances 0.000 description 4
- 230000000694 effects Effects 0.000 description 4
- 230000035515 penetration Effects 0.000 description 4
- 238000010521 absorption reaction Methods 0.000 description 3
- 230000008901 benefit Effects 0.000 description 3
- 238000005516 engineering process Methods 0.000 description 3
- 230000005484 gravity Effects 0.000 description 3
- 238000011065 in-situ storage Methods 0.000 description 3
- 238000002347 injection Methods 0.000 description 3
- 239000007924 injection Substances 0.000 description 3
- 229910052500 inorganic mineral Inorganic materials 0.000 description 3
- 239000011707 mineral Substances 0.000 description 3
- 238000007792 addition Methods 0.000 description 2
- 230000007613 environmental effect Effects 0.000 description 2
- 239000007789 gas Substances 0.000 description 2
- 239000012585 homogenous medium Substances 0.000 description 2
- 230000006872 improvement Effects 0.000 description 2
- 230000007246 mechanism Effects 0.000 description 2
- 239000011148 porous material Substances 0.000 description 2
- 230000009467 reduction Effects 0.000 description 2
- 230000004044 response Effects 0.000 description 2
- 238000004088 simulation Methods 0.000 description 2
- 230000036962 time dependent Effects 0.000 description 2
- 239000008186 active pharmaceutical agent Substances 0.000 description 1
- 230000004075 alteration Effects 0.000 description 1
- 230000015556 catabolic process Effects 0.000 description 1
- 230000001010 compromised effect Effects 0.000 description 1
- 239000000356 contaminant Substances 0.000 description 1
- 230000001419 dependent effect Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000006073 displacement reaction Methods 0.000 description 1
- 230000002500 effect on skin Effects 0.000 description 1
- 230000005684 electric field Effects 0.000 description 1
- 230000002708 enhancing effect Effects 0.000 description 1
- 239000005431 greenhouse gas Substances 0.000 description 1
- 239000000383 hazardous chemical Substances 0.000 description 1
- 230000010354 integration Effects 0.000 description 1
- 239000007788 liquid Substances 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 238000005065 mining Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 238000005457 optimization Methods 0.000 description 1
- 230000000149 penetrating effect Effects 0.000 description 1
- 239000011343 solid material Substances 0.000 description 1
- 239000000243 solution Substances 0.000 description 1
- 238000000638 solvent extraction Methods 0.000 description 1
- 230000008016 vaporization Effects 0.000 description 1
- 230000035899 viability Effects 0.000 description 1
- 238000010792 warming Methods 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/16—Enhanced recovery methods for obtaining hydrocarbons
- E21B43/24—Enhanced recovery methods for obtaining hydrocarbons using heat, e.g. steam injection
- E21B43/2401—Enhanced recovery methods for obtaining hydrocarbons using heat, e.g. steam injection by means of electricity
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B36/00—Heating, cooling or insulating arrangements for boreholes or wells, e.g. for use in permafrost zones
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/16—Enhanced recovery methods for obtaining hydrocarbons
- E21B43/24—Enhanced recovery methods for obtaining hydrocarbons using heat, e.g. steam injection
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B47/00—Survey of boreholes or wells
- E21B47/12—Means for transmitting measuring-signals or control signals from the well to the surface, or from the surface to the well, e.g. for logging while drilling
- E21B47/13—Means for transmitting measuring-signals or control signals from the well to the surface, or from the surface to the well, e.g. for logging while drilling by electromagnetic energy, e.g. radio frequency
-
- H—ELECTRICITY
- H01—ELECTRIC ELEMENTS
- H01Q—ANTENNAS, i.e. RADIO AERIALS
- H01Q1/00—Details of, or arrangements associated with, antennas
- H01Q1/04—Adaptation for subterranean or subaqueous use
Definitions
- the present invention relates to hydrocarbon production methods, and specifically to thermal recovery methods.
- Heavy oil is a term commonly applied to describe oils having a specific gravity less than about 20° API. These oils, which include bitumen, are not readily producible by conventional techniques. Their viscosity is so high that the oil cannot easily be mobilized and driven to a production well by a pressure drive. Therefore, a recovery process is required to reduce the viscosity and then produce the oil.
- Thermal recovery methods as applied in heavy oil have the common objective of accelerating the recovery process. Raising the temperature of the host formation reduces the heavy oil viscosity allowing the near solid material at original temperature to flow as a liquid.
- steam injection from the surface into the formation is used as a conventional method to heat the heavy oil in situ, reducing its viscosity to a level where the oil is amenable to displacement.
- Typical methods of recovering oil from an oil sands reservoir include cyclic steam stimulation (CSS) and steam assisted gravity drainage (SAGD).
- CSS This normally requires steam to be at higher pressure than a similar SAGD process. Higher pressures are used to dilate the reservoir, so this process is more forgiving than SAGD in heterogeneous reservoirs.
- Steam-Oil Ratios (SORs) for CSS are typically higher (ranging from 3-6) than for continuous SAGD operations, requiring more water and energy.
- SAGD This is a gravity dependent process requiring high vertical permeability (>3D), a relatively thick pay zone (>10 m), a more homogeneous reservoir and higher oil saturation. SORs are typically lower for SAGD ranging from 2.0-3.0.
- Both CSS and SAGD methods require high volumes of water to be converted to steam, which is energy intensive. Both CSS and SAGD may require higher pressure operations, and thus have limitations in low Maximum Operating Pressure (MOP) regimes that are found in very shallow reservoirs (but are too deep for bitumen surface mining).
- MOP Maximum Operating Pressure
- Electromagnetic (EM) heating has been considered as a viable alternative to steam-based thermal processes.
- EM energy as part of in situ heavy oil production depends upon a number of factors that include: the presence of water; initial formation temperature; EM energy propagation through the formation; impedance matching and dielectric breakdown within the formation; and changes in the dielectric response of materials at different applied frequencies. Knowledge of the frequency-specific dielectric response of the formation will allow for optimization of process parameters for pay-zone identification and recovery. Water and minerals present in the formation can affect EM energy absorption by reservoir. Both pore water saturation and mineral-bound water, in addition to mineral content, can affect the measured dielectric properties of the formation. Once these factors have been taken into consideration, EMH (a thermal process) may be applied to a well to increase its productivity by the removal of thermal adaptable skin effects and the reduction of oil viscosity near the well bore. EM-thermal recovery can manifest the following advantages compared with other recovery technologies:
- EMH Enhanced Solvent Extraction Incorporating Electromagnetic Heat
- the present invention therefore seeks to provide a method for first enhancing reservoir permeability, followed by an advantageous thermal recovery method.
- a method for recovering a hydrocarbon from a subsurface reservoir comprising the steps of:
- a method for recovering a hydrocarbon from a subsurface low-permeability reservoir using electromagnetic heating comprising the steps of:
- a method for reducing water usage in a steam-based thermal hydrocarbon recovery technique comprising the steps of:
- a method for reducing electricity usage in an electromagnetic heat thermal hydrocarbon recovery technique comprising the steps of:
- a method for increasing production of hydrocarbon in an electromagnetic heat thermal recovery technique comprising the steps of:
- steps b-d are repeated at least once before applying the electromagnetic heat.
- steps b-e may be repeated at least once after applying the electromagnetic heat.
- the electromagnetic heat may be applied by a tool situate in the first well adjacent the reservoir; alternatively, an exemplary method may further comprise the step of drilling a second well into the reservoir, wherein the electromagnetic heat is applied by a tool situate in the second well and at least a part of the second portion of the hydrocarbon is produced to surface through the second well.
- the electromagnetic heat may be either liner/casing conveyed or reservoir conveyed.
- the electromagnetic heat may be from a source selected from the group consisting of a resistive heat and induction heat.
- the electromagnetic heat may be from a source selected from the group consisting of resistive AC/low frequency, induction heat, radiofrequency (RF) radiation heat and microwave radiation heat.
- the electromagnetic heat may also be applied with at least one viscosity reducing agent known to those skilled in the art.
- FIG. 1A is a simplified section view of a subsurface environment, illustrating a state before application of the within recovery techniques
- FIG. 1B is a simplified section view of the subsurface environment of FIG. 1A , with an injector/producer well drilled into the reservoir;
- FIG. 1C is a simplified section view of the subsurface environment of FIG. 1A , illustrating the effect of a series of CSS injection and production cycles;
- FIG. 1D is a simplified section view of the subsurface environment of FIG. 1A , illustrating the onset of exemplary EM heating from the same CSS well;
- FIG. 2 is a simplified section view of a combined CSS-RF wellbore configuration, as an example of the general CSS-EMH process
- FIG. 3 is a chart illustrating a reservoir deformation model
- FIG. 4 is a chart illustrating steady-state pressure after RF heating
- FIG. 5 is a chart illustrating steady-state temperature after RF heating
- FIG. 6 is an illustration of a reservoir model
- FIG. 7 is an illustration of reservoir initial permeability
- FIG. 8 is an illustration of reservoir initial porosity
- FIG. 9 is an illustration of improved reservoir permeability after CSS
- FIG. 10 is an illustration of improved reservoir porosity after CSS
- FIG. 11 is a flowchart illustrating an exemplary method according to the present invention.
- FIG. 12 is a section view of a target area having alternating areas of good caprock integrity and absence of caprock;
- FIG. 13 is a flowchart illustrating an embodiment of the present invention where caprock presence/integrity is under consideration
- FIG. 14 is a section view of strata illustrating areas to target with discrete CSS and EMH wells
- FIG. 15 is a simplified process flow diagram for discrete CSS and RF wells with integration of cogeneration
- FIG. 16 is a section view of strata illustrating areas to target with discrete CSS and EMH wells.
- FIG. 17 is a flowchart illustrating the use of an embodiment of the present invention with a reservoir having thick and thin pay zones.
- the present invention is directed to methods in which one or more CSS cycles are performed on a formation of interest, in order to dilate the reservoir rock and thus improve permeability, which results in a reservoir more amenable to EMH techniques such as RF thermal recovery.
- CSS acts to assist the EMH recovery method by preparing the reservoir and may thus enhance the utility of the EMH recovery method in appropriate reservoirs.
- exemplary embodiments according to the present invention begin with a single conventional CSS injection-production cycle, with operating parameters selected in order to produce the desired reservoir rock dilation effect.
- One or more CSS cycles may follow, depending on the reservoir and any other relevant factors identified by the skilled person.
- an EMH thermal recovery technique is applied, thus reducing water and energy usage when compared with conventional CSS alone.
- a single CSS cycle may be followed by an EMH application, followed again by a single CSS cycle and EMH application.
- two or more CSS cycles may be conducted in series, followed by EMH application.
- EMH as applied in exemplary embodiments of the present invention may take any number of forms, as set forth in Table 1.
- RF Radiation Heating Dielectric absorption in the range from 300 Hz-300 kHz that creates thermal energy through electrical resistance RF Radiation Heating Dielectric absorption (like microwave but at lower frequency) e.g. in the range from 300 kHz-300 MHz Faster heating process compared to previous types of EM-thermal mechanisms Instant heat penetration for a few tens of meters between wells at 1 MHz, depending on electrical properties of the reservoir RF Energy preferentially heats the target polar molecules such as water, oil, contaminants preferably to the host (OB and Rock) Microwave Radiation Heating Dielectric absorption e.g. in the range from 300 MHz Instant heat penetration up to a few meters maximum but with greater to 300 GHz heat rate compared to RF-heating
- EMH can be employed and used with or without viscosity reducing agents such as solvents, gas condensate, diluents or combinations thereof, while the use of steam is optional.
- viscosity reducing agents such as solvents, gas condensate, diluents or combinations thereof
- steam is optional.
- FIG. 1A illustrates the state of a reservoir 10 before recovery begins.
- Phase “0” the bitumen/heavy oil reservoir 10 is situate underneath a cap rock 12 , with surrounding rock layers above and below.
- FIG. 1B illustrating Phase “1” of recovery, an injector/producer well 14 is drilled through the overburden 16 and cap rock 12 into the reservoir rock 10 .
- Perforations 18 are generated in a conventional manner to allow flow of hydrocarbon into the well 14 , and an EMH tool (not shown, but illustrated in FIG. 2 ) is positioned in the bitumen/heavy oil bearing layer of the well 14 .
- perforations 18 are illustrated, it will be obvious to one skilled in the art that other suitable means of providing apertures are possible to allow passage of fluids across the casing and therefore are intended to fall within the scope of the present invention. While a vertical well is shown, the well could be vertical or horizontal, as would be obvious to those skilled in the art.
- FIG. 1C illustrating Phase “2” a series of CSS injection and production cycles is initially performed in order to create some voidage in the reservoir 10 and to create a high-temperature, low bitumen/heavy oil viscosity zone 20 around the wellbore.
- This zone 20 is a steam-heated zone adjacent the wellbore and EMH tool. At this point, where a desirable steam zone 20 has been prepared, traditional CSS operations will be paused.
- FIG. 1D illustrating Phase “3”
- EM-heating begins, injecting heat at a specific and selected power and frequency and allowing production of bitumen/heavy oil from the zone 20 previously heated using CSS.
- EMH operations will be paused when the bitumen/heavy oil production rate is below a certain determined rate, and at this point a number of CSS cycles may again be performed in order to increase the size of the steam-heated zone 20 , following which EMH operations can recommence.
- the alternating CSS-EMH process will cease once a determined economical limit is reached.
- the RF (radio frequency) heating may be paused during production or alternatively remain active during production.
- ⁇ , ⁇ 0 , ⁇ 0 , ⁇ ′ ⁇ j ⁇ ′′, ⁇ are the angular frequency, magnetic permeability of vacuum, electrical permittivity of vacuum, relative complex permittivity of reservoir, and electrical conductivity of the reservoir, respectively. It should be noted that the temperature dependency of relative complex permittivity and electrical conductivity of the reservoir has been neglected here for simplicity, which is consistent with using a classical wave equation in homogenous medium shown in (1).
- H 0 (2) is the Hankel function of the second kind of order zero and A + is constant determined by the radiation input power.
- T and p are temperature and pressure, respectively.
- ⁇ , M f , k, ⁇ are thermal conductivity, volumetric heat capacity of the fluid, reservoir permeability and fluid viscosity, respectively. Equations in (5) represent dilation effect (through CSS) on permeability and formation porosity, ⁇ ), as well as the temperature dependency of the fluid (in this case heavy oil/bitumen) viscosity.
- k 0 , ⁇ 0 , k M , ⁇ r , c p , D, and F are original permeability and porosity, a multiplier constant for permeability after dilation, porosity at a reference pressure p r , pore volume compressibility, and empirical constants for the viscosity correlation.
- FIG. 3 is a reservoir deformation model during a CSS process, from the CMG-STARS Manual.
- the exemplary methodology takes advantage of the dilation part of deformation by starting the RF-thermal recovery at the end of the dilation part of the CSS process.
- the system of nonlinear ordinary differential equations in (6) can be solved semi-analytically using the shooting method, which is based on converting the boundary value problem (BVP) into an equivalent initial value problem (IVP).
- the obtained IVP is then solved by the Runge-Kutta method using a generic set of parameters considered in Table 2 below.
- p max , T 0 , p b , r w , and p 0 are the maximum reservoir pressure due to steam injection (CSS), initial reservoir temperature, bottom hole pressure during the production period, wellbore radius and initial reservoir pressure, respectively.
- FIGS. 4 and 5 The results of the semi-analytical modeling are shown in FIGS. 4 and 5 where steady-state pressure and temperature are depicted for RF-thermal process with and without prior CSS operation. It can be observed that for an equal RF input power, the overall steady-state pressure for the case of CSS combined with RF-thermal process in higher than that of an RF-thermal process without CSS due to the higher permeability created by steam injection and consequently greater fluid flow, and for this same reason, the steady-state temperature is also lower for the coupled CSS-RF heating process intuitively due to the flowing heat convection and smoother thermal exchange in the reservoir. Furthermore, given the same input RF power and the reservoir parameters presented in Table 2, it was found that the production rate is increased by 30% by using coupled CSS-RF, calculated by
- FIG. 6 is a model of a 75 m ⁇ 75 m ⁇ 20 m reservoir using CMG-STARS, with depth in meters.
- Initial permeability is illustrated in FIG. 7 (in mD, with a 500 mD homogenous permeability assumption), and initial porosity is illustrated in FIG. 8 (with a 30% homogenous porosity assumption (fractions)).
- FIG. 9 illustrates the permeability improvement after 9 months of steam injection before applying RF heat for thermal recovery (in mD), showing an increase from 500 mD to a maximum value of 564 mD.
- FIG. 10 illustrates the porosity improvement after 9 months of steam injection before applying RF heat for thermal recovery, showing an increase (fraction) from 30% to a maximum of 33%.
- FIG. 11 illustrates an exemplary CSS-assisted RF-thermal recovery method in accordance with the present invention.
- FIGS. 1A-1D where a single CSS-EMH well was used, an exemplary hydrocarbon recovery system is disclosed in which CSS and EMH wells are discrete but integrated, optionally also including the use of cogeneration to reduce costs.
- FIG. 13 such a further exemplary method is illustrated.
- EMH alone is feasible the resource can be extracted using that conventional method.
- caprock integrity the above-described alternation of CSS cycles and EMH may be employed.
- caprock is absent or inadequate, a determination is made as to whether the reservoir permeability is suitable for conventional EMH (in which case that can be considered for implementation, including possibly cogeneration, as described below) or is insufficient.
- the exemplary embodiment incorporates the use of low-pressure CSS.
- the exact pressures involved will obviously depend on a variety of factors, primarily relating to the reservoir itself and the surrounding formations, as would be known to those skilled in the art.
- Low-pressure CSS cycles can be repeated as necessary to dilate the reservoir and make EMH (with or without cogeneration support) a viable thermal recovery method.
- the amount of electricity required for EMH may also present a disadvantage in certain contexts.
- the cost of running electrical heaters may be undesirably high depending on the number of wells in production in a given reservoir and the power requirements. Further, often in remote areas a reliable power supply is not readily available. By introducing cogeneration as part of the full-field development, the operational costs may be significantly reduced.
- the electricity produced at the steam plant can power both the EMH cycles in the CSS-EMH wells, as well as those areas/pay zones that can only be produced using EMH.
- candidate areas for EMH are labeled by the numeral 1
- candidate areas for CSS are labeled by the numeral 2 .
- EMH recovery methods including the addition of solvents, are effective in areas with compromised cap rock integrity, thus requiring lower maximum operating temperatures.
- EMH can be operated at or near reservoir pressures and still be effective in vaporizing solvents for added drive and viscosity reduction. By using power generated at site, production costs may be substantially lowered. For example:
- the system includes both CSS wells (for producing hydrocarbon using traditional CSS methods) and RF/electricity wells (for producing hydrocarbon using RF or electricity-generated heat to mobilize the hydrocarbon).
- the CSS wells are provided with steam from a heat recovery steam unit.
- the CSS wells produce water which can be recycled for use in the heat recovery steam unit.
- the CSS wells also produce bitumen (in the illustrated example), which may be selectively blended with diluent at an oil treating plant.
- the heat recovery steam unit can also be used to produce electricity through a conventional cogeneration facility, as would be known to those skilled in the art.
- This produced electricity is then used to power the RF/electricity wells to produce bitumen which is sent to the oil treating plant.
- Solvent can be added to the RF/electricity production process, in a conventional manner, and returned to the supply source after production.
- the RF/electricity wells will also produce water that can be recycled for use in the heat recovery steam unit. It will be obvious to those skilled in the art that additional inputs such as electricity and/or heat will be required, but the use of cogeneration will substantially reduce the electrical costs of the facility and the environmental footprint.
- the overall EROI Energy Return on Investment
- CSS also has limited application in thin pay zones.
- thin pay zones a greater percentage of the useful heat is lost than in the case of thicker zones when the heat is warming a greater thickness of bitumen. This loss to overburden translates to higher operating costs.
- Thin bodies may also have reduced oil saturation, further reducing economic viability.
- both thick zones (where CSS is feasible) and thin zones (where CSS is not feasible) are stacked, as can be seen in FIG. 16 .
- FIG. 17 a flowchart illustrates an exemplary method for use with situations where thick and thin pay zones may be present.
- EMH cannot be feasibly employed on its own
- the reservoir is divided into areas with caprock and areas without caprock.
- areas without caprock the above description with respect to the similar steps of FIG. 13 is applicable.
- areas with caprock a determination is made as to whether the area with caprock is a thick pay zone; if so, high-pressure CSS can be employed; if not, the area may be produced using EMH since losses to the overburden are reduced and the process may be economic.
Landscapes
- Engineering & Computer Science (AREA)
- Geology (AREA)
- Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Physics & Mathematics (AREA)
- Geochemistry & Mineralogy (AREA)
- Fluid Mechanics (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Environmental & Geological Engineering (AREA)
- Remote Sensing (AREA)
- Electromagnetism (AREA)
- Geophysics (AREA)
- Geophysics And Detection Of Objects (AREA)
- Constitution Of High-Frequency Heating (AREA)
- Production Of Liquid Hydrocarbon Mixture For Refining Petroleum (AREA)
- Variable-Direction Aerials And Aerial Arrays (AREA)
- Physical Or Chemical Processes And Apparatus (AREA)
Abstract
A method for enhanced oil recovery using cyclic steam stimulation (CSS) and electromagnetic heating (EMH). One or more CSS cycles are conducted on a subsurface hydrocarbon reservoir in order to dilate the reservoir and improve permeability, followed by EMH application for thermal recovery of the hydrocarbon to surface. The alternating process can be repeated as desired while economically viable. The method is particularly applicable to produce heavy hydrocarbons such as bitumen or heavy oil from a heterogeneous reservoir that has low permeability.
Description
- The present invention relates to hydrocarbon production methods, and specifically to thermal recovery methods.
- Heavy oil is a term commonly applied to describe oils having a specific gravity less than about 20° API. These oils, which include bitumen, are not readily producible by conventional techniques. Their viscosity is so high that the oil cannot easily be mobilized and driven to a production well by a pressure drive. Therefore, a recovery process is required to reduce the viscosity and then produce the oil.
- Thermal recovery methods as applied in heavy oil have the common objective of accelerating the recovery process. Raising the temperature of the host formation reduces the heavy oil viscosity allowing the near solid material at original temperature to flow as a liquid. For heavy oil reservoirs, steam injection from the surface into the formation is used as a conventional method to heat the heavy oil in situ, reducing its viscosity to a level where the oil is amenable to displacement.
- Typical methods of recovering oil from an oil sands reservoir include cyclic steam stimulation (CSS) and steam assisted gravity drainage (SAGD). Limitations of each include: CSS: This normally requires steam to be at higher pressure than a similar SAGD process. Higher pressures are used to dilate the reservoir, so this process is more forgiving than SAGD in heterogeneous reservoirs. Steam-Oil Ratios (SORs) for CSS are typically higher (ranging from 3-6) than for continuous SAGD operations, requiring more water and energy. SAGD: This is a gravity dependent process requiring high vertical permeability (>3D), a relatively thick pay zone (>10 m), a more homogeneous reservoir and higher oil saturation. SORs are typically lower for SAGD ranging from 2.0-3.0.
- Both CSS and SAGD methods require high volumes of water to be converted to steam, which is energy intensive. Both CSS and SAGD may require higher pressure operations, and thus have limitations in low Maximum Operating Pressure (MOP) regimes that are found in very shallow reservoirs (but are too deep for bitumen surface mining).
- There are other situations where steam injection may not work well:
-
- Thin pay-zones, where heat losses to adjacent (non-oil-bearing) formations may be significant.
- Low permeability formations, where the injected fluid may have difficulty penetrating deep into the reservoir.
- Reservoir heterogeneity, where high permeability streaks or fractures may cause early injected fluid breakthrough and reduce the sweep.
- Electromagnetic (EM) heating, or EMH, has been considered as a viable alternative to steam-based thermal processes.
- Use of EM energy as part of in situ heavy oil production depends upon a number of factors that include: the presence of water; initial formation temperature; EM energy propagation through the formation; impedance matching and dielectric breakdown within the formation; and changes in the dielectric response of materials at different applied frequencies. Knowledge of the frequency-specific dielectric response of the formation will allow for optimization of process parameters for pay-zone identification and recovery. Water and minerals present in the formation can affect EM energy absorption by reservoir. Both pore water saturation and mineral-bound water, in addition to mineral content, can affect the measured dielectric properties of the formation. Once these factors have been taken into consideration, EMH (a thermal process) may be applied to a well to increase its productivity by the removal of thermal adaptable skin effects and the reduction of oil viscosity near the well bore. EM-thermal recovery can manifest the following advantages compared with other recovery technologies:
-
- Heat is generated in-situ.
- It does not need a working fluid.
- It does not need a significant water supply.
- It reduces the produced water cut.
- There is no emission concern.
- There are no hazardous chemical concerns.
- It can be operated at a reduced energy intensity (J/bbl are reduced).
- It can operate at a lower pressure.
- One limitation of EMH is that it can't run at optimal economics when reservoirs have a lower permeability, which may be found in heterogeneous reservoirs. For example, ESEIEH (Enhanced Solvent Extraction Incorporating Electromagnetic Heat) typically follows the same rules-of-thumb for operability as SAGD. This process operates at significantly lower temperatures, resulting in lower pressure, and relies on solvents to reduce the viscosity to a point where the bitumen can flow. Since it relies on gravity drainage, higher permeable reservoirs are the best application.
- What is needed, therefore, is a thermal recovery method that can be used with some lower-permeability reservoirs while addressing limitations of conventional techniques such as CSS, SAGD and EMH.
- The present invention therefore seeks to provide a method for first enhancing reservoir permeability, followed by an advantageous thermal recovery method.
- According to a first broad aspect of the present invention, there is provided a method for recovering a hydrocarbon from a subsurface reservoir, the method comprising the steps of:
-
- a. drilling a first well into the reservoir;
- b. injecting a heated fluid through the first well into the reservoir;
- c. allowing the heated fluid to heat a first portion of the hydrocarbon;
- d. producing the first portion of the hydrocarbon to surface through the first well;
- e. applying electromagnetic heat to the reservoir to heat a second portion of the hydrocarbon; and
- f. producing the second portion of the hydrocarbon to surface.
- According to a second broad aspect of the present invention, there is provided a method for recovering a hydrocarbon from a subsurface low-permeability reservoir using electromagnetic heating, the method comprising the steps of:
-
- a. drilling a first well into the reservoir;
- b. injecting a heated fluid through the first well into the reservoir under a pressure higher than reservoir pressure, dilating the reservoir and increasing permeability;
- c. allowing the heated fluid to heat a first portion of the hydrocarbon;
- d. producing the first portion of the hydrocarbon to surface through the first well;
- e. applying electromagnetic heat to the reservoir to heat a second portion of the hydrocarbon; and
- f. producing the second portion of the hydrocarbon to surface.
- According to a third broad aspect of the present invention, there is provided a method for reducing water usage in a steam-based thermal hydrocarbon recovery technique, the method comprising the steps of:
-
- a. drilling a first well into a reservoir containing a hydrocarbon;
- b. injecting steam through the first well into the reservoir under a pressure higher than reservoir pressure, dilating the reservoir and increasing permeability;
- c. allowing the steam to heat a first portion of the hydrocarbon;
- d. producing the first portion of the hydrocarbon to surface through the first well;
- e. applying electromagnetic heat to the reservoir to heat a second portion of the hydrocarbon; and
- f. producing the second portion of the hydrocarbon to surface.
- According to a fourth broad aspect of the present invention, there is provided a method for reducing electricity usage in an electromagnetic heat thermal hydrocarbon recovery technique, the method comprising the steps of:
-
- a. drilling a first well into a reservoir containing a hydrocarbon;
- b. injecting a heated fluid through the first well into the reservoir under a pressure higher than reservoir pressure, dilating the reservoir and increasing permeability;
- c. allowing the heated fluid to heat a first portion of the hydrocarbon;
- d. producing the first portion of the hydrocarbon to surface through the first well;
- e. applying electromagnetic heat to the reservoir to heat a second portion of the hydrocarbon; and
- f. producing the second portion of the hydrocarbon to surface.
- According to a fifth broad aspect of the present invention, there is provided a method for increasing production of hydrocarbon in an electromagnetic heat thermal recovery technique, the method comprising the steps of:
-
- a. drilling a first well into a reservoir containing the hydrocarbon;
- b. injecting a heated fluid through the first well into the reservoir under a pressure higher than reservoir pressure, dilating the reservoir and increasing permeability;
- c. allowing the heated fluid to heat a first portion of the hydrocarbon;
- d. producing the first portion of the hydrocarbon to surface through the first well;
- e. applying electromagnetic heat to the reservoir to heat a second portion of the hydrocarbon; and
- f. producing the second portion of the hydrocarbon to surface.
- In some exemplary embodiments of the above aspects, steps b-d are repeated at least once before applying the electromagnetic heat. Steps b-e may be repeated at least once after applying the electromagnetic heat. The electromagnetic heat may be applied by a tool situate in the first well adjacent the reservoir; alternatively, an exemplary method may further comprise the step of drilling a second well into the reservoir, wherein the electromagnetic heat is applied by a tool situate in the second well and at least a part of the second portion of the hydrocarbon is produced to surface through the second well.
- The electromagnetic heat may be either liner/casing conveyed or reservoir conveyed. In the former, the electromagnetic heat may be from a source selected from the group consisting of a resistive heat and induction heat. In the latter, the electromagnetic heat may be from a source selected from the group consisting of resistive AC/low frequency, induction heat, radiofrequency (RF) radiation heat and microwave radiation heat. The electromagnetic heat may also be applied with at least one viscosity reducing agent known to those skilled in the art.
- A detailed description of exemplary embodiments of the present invention is given in the following. It is to be understood, however, that the invention is not to be construed as being limited to these embodiments.
- In the accompanying drawings, which illustrate exemplary embodiments of the present invention:
-
FIG. 1A is a simplified section view of a subsurface environment, illustrating a state before application of the within recovery techniques; -
FIG. 1B is a simplified section view of the subsurface environment ofFIG. 1A , with an injector/producer well drilled into the reservoir; -
FIG. 1C is a simplified section view of the subsurface environment ofFIG. 1A , illustrating the effect of a series of CSS injection and production cycles; -
FIG. 1D is a simplified section view of the subsurface environment ofFIG. 1A , illustrating the onset of exemplary EM heating from the same CSS well; -
FIG. 2 is a simplified section view of a combined CSS-RF wellbore configuration, as an example of the general CSS-EMH process; -
FIG. 3 is a chart illustrating a reservoir deformation model; -
FIG. 4 is a chart illustrating steady-state pressure after RF heating; -
FIG. 5 is a chart illustrating steady-state temperature after RF heating; -
FIG. 6 is an illustration of a reservoir model; -
FIG. 7 is an illustration of reservoir initial permeability; -
FIG. 8 is an illustration of reservoir initial porosity; -
FIG. 9 is an illustration of improved reservoir permeability after CSS; -
FIG. 10 is an illustration of improved reservoir porosity after CSS; -
FIG. 11 is a flowchart illustrating an exemplary method according to the present invention; -
FIG. 12 is a section view of a target area having alternating areas of good caprock integrity and absence of caprock; -
FIG. 13 is a flowchart illustrating an embodiment of the present invention where caprock presence/integrity is under consideration; -
FIG. 14 is a section view of strata illustrating areas to target with discrete CSS and EMH wells; -
FIG. 15 is a simplified process flow diagram for discrete CSS and RF wells with integration of cogeneration; -
FIG. 16 is a section view of strata illustrating areas to target with discrete CSS and EMH wells; and -
FIG. 17 is a flowchart illustrating the use of an embodiment of the present invention with a reservoir having thick and thin pay zones. - Exemplary embodiments of the present invention will now be described with reference to the accompanying drawings.
- Throughout the following description specific details are set forth in order to provide a more thorough understanding to persons skilled in the art. However, well known elements may not have been shown or described in detail to avoid unnecessarily obscuring the disclosure. The following description of examples of the invention is not intended to be exhaustive or to limit the invention to the precise forms of any exemplary embodiment. Accordingly, the description and drawings are to be regarded in an illustrative, rather than a restrictive, sense.
- The present invention is directed to methods in which one or more CSS cycles are performed on a formation of interest, in order to dilate the reservoir rock and thus improve permeability, which results in a reservoir more amenable to EMH techniques such as RF thermal recovery. Thus, unlike conventional CSS recovery methods where CSS is the primary or only technique employed, in the present invention CSS acts to assist the EMH recovery method by preparing the reservoir and may thus enhance the utility of the EMH recovery method in appropriate reservoirs. Those skilled in the art will be readily able to determine whether a particular reservoir is appropriate for application of the present invention and exemplary embodiments set forth herein.
- In essence, exemplary embodiments according to the present invention begin with a single conventional CSS injection-production cycle, with operating parameters selected in order to produce the desired reservoir rock dilation effect. One or more CSS cycles may follow, depending on the reservoir and any other relevant factors identified by the skilled person. After completion of the one or more CSS cycles, an EMH thermal recovery technique is applied, thus reducing water and energy usage when compared with conventional CSS alone.
- Various cycle combination can be considered for implementation, again depending on the reservoir and any other relevant factors identified by the skilled person. For example, a single CSS cycle may be followed by an EMH application, followed again by a single CSS cycle and EMH application. Alternatively, two or more CSS cycles may be conducted in series, followed by EMH application.
- EMH as applied in exemplary embodiments of the present invention may take any number of forms, as set forth in Table 1.
-
TABLE 1 EMH Methods Liner or Casing Conveyed Resistive Heating Element Conduction through liner or casing. Heat penetration is time dependent. EM energy converts to thermal energy in the heating element. Induction Heat Conduction through liner or casing. Heat penetration is time dependent. EM energy used to induce eddy current flow in the well casing that creates thermal energy. Reservoir Conveyed Resistive AC/Low Frequency Formation electrical resistance via ionic conduction e.g. 50 or 60 Hz When low frequency AC current is used, it is considered resistive or ohmic heating Induction Heat Electromagnetic energy used to induce eddy current flow in the reservoir e.g. in the range from 300 Hz-300 kHz that creates thermal energy through electrical resistance RF Radiation Heating Dielectric absorption (like microwave but at lower frequency) e.g. in the range from 300 kHz-300 MHz Faster heating process compared to previous types of EM-thermal mechanisms Instant heat penetration for a few tens of meters between wells at 1 MHz, depending on electrical properties of the reservoir RF Energy preferentially heats the target polar molecules such as water, oil, contaminants preferably to the host (OB and Rock) Microwave Radiation Heating Dielectric absorption e.g. in the range from 300 MHz Instant heat penetration up to a few meters maximum but with greater to 300 GHz heat rate compared to RF-heating - In some exemplary embodiments of the present invention, EMH can be employed and used with or without viscosity reducing agents such as solvents, gas condensate, diluents or combinations thereof, while the use of steam is optional. One skilled in the art will recognize that the above ranges are examples and one can easily adopt the proper frequency to adapt to the intended application. It can also be used in a variety of well configurations; horizontal, vertical, inclined and directional.
- Turning now to
FIGS. 1A , 1B, 1C and 1D, a first exemplary method is illustrated.FIG. 1A illustrates the state of areservoir 10 before recovery begins. Termed Phase “0”, the bitumen/heavy oil reservoir 10 is situate underneath acap rock 12, with surrounding rock layers above and below. InFIG. 1B illustrating Phase “1” of recovery, an injector/producer well 14 is drilled through theoverburden 16 andcap rock 12 into thereservoir rock 10.Perforations 18 are generated in a conventional manner to allow flow of hydrocarbon into the well 14, and an EMH tool (not shown, but illustrated inFIG. 2 ) is positioned in the bitumen/heavy oil bearing layer of the well 14. Whileperforations 18 are illustrated, it will be obvious to one skilled in the art that other suitable means of providing apertures are possible to allow passage of fluids across the casing and therefore are intended to fall within the scope of the present invention. While a vertical well is shown, the well could be vertical or horizontal, as would be obvious to those skilled in the art. - In
FIG. 1C illustrating Phase “2”, a series of CSS injection and production cycles is initially performed in order to create some voidage in thereservoir 10 and to create a high-temperature, low bitumen/heavyoil viscosity zone 20 around the wellbore. Thiszone 20 is a steam-heated zone adjacent the wellbore and EMH tool. At this point, where adesirable steam zone 20 has been prepared, traditional CSS operations will be paused. - In
FIG. 1D illustrating Phase “3”, EM-heating begins, injecting heat at a specific and selected power and frequency and allowing production of bitumen/heavy oil from thezone 20 previously heated using CSS. EMH operations will be paused when the bitumen/heavy oil production rate is below a certain determined rate, and at this point a number of CSS cycles may again be performed in order to increase the size of the steam-heatedzone 20, following which EMH operations can recommence. The alternating CSS-EMH process will cease once a determined economical limit is reached. Note that the RF (radio frequency) heating may be paused during production or alternatively remain active during production. - To illustrate the potential enhancement of EMH methods by using CSS dilation of the reservoir, modeling was conducted for RF-thermal recovery of heavy oil/bitumen. RF-heating is selected for this purpose because it takes the complete form of the electromagnetic model (Maxwell's equations) of the EMH into account. Similar methodology can be employed for other types of EMH by using approximate representations of electromagnetic governing equations. A simplified steady-state model of coupled electromagnetic-transport phenomena is developed and solved semi-analytically below to show the effect of improved permeability in the RF-thermal recovery using a CSS-dilation mechanism.
- Starting with the electromagnetic aspect and considering time-harmonic Maxwell's equations in a homogenous medium yields the wave equation for the electric-field written as:
-
- where ω, μ0, ε0, ε′−jε″, σ, are the angular frequency, magnetic permeability of vacuum, electrical permittivity of vacuum, relative complex permittivity of reservoir, and electrical conductivity of the reservoir, respectively. It should be noted that the temperature dependency of relative complex permittivity and electrical conductivity of the reservoir has been neglected here for simplicity, which is consistent with using a classical wave equation in homogenous medium shown in (1).
- Now, employing an RF antenna (electromagnetic radiating source) in a vertical or horizontal wellbore in the same configuration as a vertical or horizontal CSS process (illustrated in
FIG. 2 for a vertical wellbore as an example), assuming only radial dependency, i.e., axisymmetrical and depth-invariant condition, or mathematically, -
- will have the following analytical solution:
-
E=A + H 0 (2)(γr) (2) - where H0 (2) is the Hankel function of the second kind of order zero and A+ is constant determined by the radiation input power. Using Poynting's theorem yields the time-average dissipated electromagnetic power density in the following form:
-
- It should be mentioned again that the proposed technique is not limited to vertical boreholes and can be applied to horizontal wellbores, as well.
- For the transport phenomenon aspect of the model, conservation of energy, conservation of mass, and Darcy's equations under steady-state and single-phase fluid flow conditions are coupled and yield:
-
- In (4) T and p are temperature and pressure, respectively. Also, λ, Mf, k, μ are thermal conductivity, volumetric heat capacity of the fluid, reservoir permeability and fluid viscosity, respectively. Equations in (5) represent dilation effect (through CSS) on permeability and formation porosity, φ), as well as the temperature dependency of the fluid (in this case heavy oil/bitumen) viscosity. Also, k0, φ0, kM, φr, cp, D, and F are original permeability and porosity, a multiplier constant for permeability after dilation, porosity at a reference pressure pr, pore volume compressibility, and empirical constants for the viscosity correlation.
- Now, according to the proposed workflow, first one or a few cycles of CSS are carried out followed by the RF-thermal process. The reservoir deformation model of dilation-recompaction is shown in
FIG. 3 , which is a reservoir deformation model during a CSS process, from the CMG-STARS Manual. - The exemplary methodology takes advantage of the dilation part of deformation by starting the RF-thermal recovery at the end of the dilation part of the CSS process. The proposed multi-physics model takes the porosity at the end of the dilation branch of the deformation curve (fr=1 or A=B, in
FIG. 3 ) as the constant values for porosity and permeability during the production-recompaction period. Now, assuming only radial dependency, (4) is simplified to the following form: -
- with the following boundary conditions:
-
- The system of nonlinear ordinary differential equations in (6) can be solved semi-analytically using the shooting method, which is based on converting the boundary value problem (BVP) into an equivalent initial value problem (IVP). The obtained IVP is then solved by the Runge-Kutta method using a generic set of parameters considered in Table 2 below. In (7) and (8), pmax, T0, pb, rw, and p0 are the maximum reservoir pressure due to steam injection (CSS), initial reservoir temperature, bottom hole pressure during the production period, wellbore radius and initial reservoir pressure, respectively.
-
TABLE 2 φ 0.3 ρf 1020 (kg/m3) cf 2.09 (kJ/kg/K) Mf = ρfcf 2131.8 (kJ/m3/K) D 2.2 × 10−6 (cp) F 6611.7(K) f = ω/(2π) 2 (MHz) H (pay-zone thickness) 20 (m) ε′ 10 ε″ 0.5 σ 0.06 (S/m) μ0 4π × 10−7 (H/m) ε 01/(36 × π) × 10−9 (F/m) φr = φ0 30% cp 4.5 × 10−5 (1/kPa) pmax 9277 (kPa) pr 3447 (kPa) k0 500 (mD) kM 3 T0 37.7 (° C.) pb 350 (kPa) p0 3447 (kPa) rw 0.1 (m) - The results of the semi-analytical modeling are shown in
FIGS. 4 and 5 where steady-state pressure and temperature are depicted for RF-thermal process with and without prior CSS operation. It can be observed that for an equal RF input power, the overall steady-state pressure for the case of CSS combined with RF-thermal process in higher than that of an RF-thermal process without CSS due to the higher permeability created by steam injection and consequently greater fluid flow, and for this same reason, the steady-state temperature is also lower for the coupled CSS-RF heating process intuitively due to the flowing heat convection and smoother thermal exchange in the reservoir. Furthermore, given the same input RF power and the reservoir parameters presented in Table 2, it was found that the production rate is increased by 30% by using coupled CSS-RF, calculated by -
- The same reservoir model was adopted for a complete CSS process simulation using CMG-STARS. The reservoir model is illustrated in
FIG. 6 , which is a model of a 75 m×75 m×20 m reservoir using CMG-STARS, with depth in meters. Initial permeability is illustrated inFIG. 7 (in mD, with a 500 mD homogenous permeability assumption), and initial porosity is illustrated inFIG. 8 (with a 30% homogenous porosity assumption (fractions)). -
FIG. 9 illustrates the permeability improvement after 9 months of steam injection before applying RF heat for thermal recovery (in mD), showing an increase from 500 mD to a maximum value of 564 mD.FIG. 10 illustrates the porosity improvement after 9 months of steam injection before applying RF heat for thermal recovery, showing an increase (fraction) from 30% to a maximum of 33%. - Although RF heating is utilized in the above simulation exercise, it will be obvious to those skilled in the art that this method may have utility with other frequency ranges.
-
FIG. 11 illustrates an exemplary CSS-assisted RF-thermal recovery method in accordance with the present invention. After one or more CSS cycles have been applied to a low-permeability reservoir, a determination is made as to whether the permeability has been enhanced to a desired level. If the answer is yes, EMH thermal recovery can begin; if the answer is no, further CSS cycles may be applied to the reservoir. After EMH application, it may be determined that further permeability enhancement is desirable, in which case the process would loop back to one or more additional CSS cycles followed by EMH thermal recovery. - While higher pressure CSS may be employed where appropriate to dilate the reservoir rock to enhance EMH methods, it is known to those skilled in the art that certain formations may not be suitable for such higher pressure injection methods. It is known that in any project area where heavy oil or bitumen reservoirs are found, there are usually areas that require recovery methods other than CSS due to lower maximum operating pressure (MOP) limitations. This is due to the absence of a capping formation leaving areas of the project un-producible using CSS. See
FIG. 12 , for example, which illustrates a situation where areas marked with thenumeral 1 manifest an absence of caprock and thus are not appropriate candidates for CSS, whereas the areas marked with thenumeral 2 are provided with sufficient caprock coverage. - According to a further exemplary embodiment of the present invention, then, and unlike the embodiment of
FIGS. 1A-1D where a single CSS-EMH well was used, an exemplary hydrocarbon recovery system is disclosed in which CSS and EMH wells are discrete but integrated, optionally also including the use of cogeneration to reduce costs. Turning now toFIG. 13 , such a further exemplary method is illustrated. In this case, if EMH alone is feasible the resource can be extracted using that conventional method. If it is not, then it must be determined whether suitable caprock integrity is present for the target formation. Where there is suitable caprock integrity, the above-described alternation of CSS cycles and EMH may be employed. However, where caprock is absent or inadequate, a determination is made as to whether the reservoir permeability is suitable for conventional EMH (in which case that can be considered for implementation, including possibly cogeneration, as described below) or is insufficient. - If the permeability is insufficient for conventional EMH thermal recovery methods, but the caprock integrity makes higher-pressure CSS unsuitable, the exemplary embodiment incorporates the use of low-pressure CSS. The exact pressures involved will obviously depend on a variety of factors, primarily relating to the reservoir itself and the surrounding formations, as would be known to those skilled in the art. Low-pressure CSS cycles can be repeated as necessary to dilate the reservoir and make EMH (with or without cogeneration support) a viable thermal recovery method.
- As suggested above, the amount of electricity required for EMH may also present a disadvantage in certain contexts. Hence, the cost of running electrical heaters may be undesirably high depending on the number of wells in production in a given reservoir and the power requirements. Further, often in remote areas a reliable power supply is not readily available. By introducing cogeneration as part of the full-field development, the operational costs may be significantly reduced. The electricity produced at the steam plant can power both the EMH cycles in the CSS-EMH wells, as well as those areas/pay zones that can only be produced using EMH. Turning to
FIG. 14 , candidate areas for EMH are labeled by thenumeral 1, whereas candidate areas for CSS are labeled by thenumeral 2. - Electricity produced on-site has two major advantages:
-
- Steady and reliable power is produced, thus reducing the risk of a plant shutdown due to power grid interruptions; and
- Electricity produced by natural gas-run cogeneration units has a reduced environmental footprint when compared to coal-fired power plants, thus reducing overall greenhouse gas emissions.
- EMH recovery methods, including the addition of solvents, are effective in areas with compromised cap rock integrity, thus requiring lower maximum operating temperatures. EMH can be operated at or near reservoir pressures and still be effective in vaporizing solvents for added drive and viscosity reduction. By using power generated at site, production costs may be substantially lowered. For example:
-
- A 30,000 bbl/day CSS project with cogeneration may generate 4,195 MWh/day.
- This same project will demand 300 MWh/day for day-to-day operations.
- 3,895 MWh/d can be used to operate the EMH wells.
- An EMH well (either RF or electrical heating cables) will demand between 5-10 MWh/day of energy taking into consideration efficiency of the system and subsurface line losses.
- Thus, a 30,000 bbl/day CSS project with cogeneration could potentially provide enough power for more than 390 wells.
- Further field efficiency can be found in combining the solvent/diluent into a singular gas condensate, reducing the amount of solvent return equipment and using the diluent in the EMH process.
- Turning now to
FIG. 15 , an exemplary system according to the present invention is illustrated. Note that the system includes both CSS wells (for producing hydrocarbon using traditional CSS methods) and RF/electricity wells (for producing hydrocarbon using RF or electricity-generated heat to mobilize the hydrocarbon). In the exemplary system, the CSS wells are provided with steam from a heat recovery steam unit. The CSS wells produce water which can be recycled for use in the heat recovery steam unit. The CSS wells also produce bitumen (in the illustrated example), which may be selectively blended with diluent at an oil treating plant. The heat recovery steam unit can also be used to produce electricity through a conventional cogeneration facility, as would be known to those skilled in the art. This produced electricity is then used to power the RF/electricity wells to produce bitumen which is sent to the oil treating plant. Solvent can be added to the RF/electricity production process, in a conventional manner, and returned to the supply source after production. The RF/electricity wells will also produce water that can be recycled for use in the heat recovery steam unit. It will be obvious to those skilled in the art that additional inputs such as electricity and/or heat will be required, but the use of cogeneration will substantially reduce the electrical costs of the facility and the environmental footprint. The overall EROI (Energy Return on Investment) is increased as both steam and electricity are harnessed to produce bitumen. - Turning to yet a further exemplary embodiment, it is known that CSS also has limited application in thin pay zones. In thin pay zones, a greater percentage of the useful heat is lost than in the case of thicker zones when the heat is warming a greater thickness of bitumen. This loss to overburden translates to higher operating costs. Thin bodies may also have reduced oil saturation, further reducing economic viability. In some areas, both thick zones (where CSS is feasible) and thin zones (where CSS is not feasible) are stacked, as can be seen in
FIG. 16 . - In such a situation, exemplary embodiments according to the present invention may be advantageous. Turning to
FIG. 17 , a flowchart illustrates an exemplary method for use with situations where thick and thin pay zones may be present. Where EMH cannot be feasibly employed on its own, the reservoir is divided into areas with caprock and areas without caprock. For areas without caprock, the above description with respect to the similar steps ofFIG. 13 is applicable. For areas with caprock, a determination is made as to whether the area with caprock is a thick pay zone; if so, high-pressure CSS can be employed; if not, the area may be produced using EMH since losses to the overburden are reduced and the process may be economic. - As will be clear from the above, those skilled in the art would be readily able to determine obvious variants capable of providing the described functionality, and all such variants and functional equivalents are intended to fall within the scope of the present invention.
- Specific examples have been described herein for purposes of illustration. These are only examples. The technology provided herein can be applied to contexts other than the exemplary contexts described above. Many alterations, modifications, additions, omissions and permutations are possible within the practice of this invention. This invention includes variations on described embodiments that would be apparent to the skilled person, including variations obtained by: replacing features, elements and/or acts with equivalent features, elements and/or acts; mixing and matching of features, elements and/or acts from different embodiments; combining features, elements and/or acts from embodiments as described herein with features, elements and/or acts of other technology; and/or omitting combining features, elements and/or acts from described embodiments.
- The foregoing is considered as illustrative only of the principles of the invention. The scope of the claims should not be limited by the exemplary embodiments set forth in the foregoing, but should be given the broadest interpretation consistent with the specification as a whole.
Claims (50)
1. A method for recovering a hydrocarbon from a subsurface reservoir, the method comprising the steps of:
a. drilling a first well into the reservoir;
b. injecting a heated fluid through the first well into the reservoir;
c. allowing the heated fluid to heat a first portion of the hydrocarbon;
d. producing the first portion of the hydrocarbon to surface through the first well;
e. applying electromagnetic heat to the reservoir to heat a second portion of the hydrocarbon; and
f. producing the second portion of the hydrocarbon to surface.
2. The method of claim 1 further comprising repeating steps b-d at least once before applying the electromagnetic heat.
3. The method of claim 1 further comprising repeating steps b-e at least once after applying the electromagnetic heat.
4. The method of claim 1 wherein the electromagnetic heat is applied by a tool situate in the first well adjacent the reservoir.
5. The method of claim 1 further comprising the step of drilling a second well into the reservoir, wherein the electromagnetic heat is applied by a tool situate in the second well and at least a part of the second portion of the hydrocarbon is produced to surface through the second well.
6. The method of claim 1 wherein the electromagnetic heat is liner/casing conveyed.
7. The method of claim 1 wherein the electromagnetic heat is reservoir conveyed.
8. The method of claim 6 wherein the electromagnetic heat is from a source selected from the group consisting of a resistive heat and induction heat.
9. The method of claim 7 wherein the electromagnetic heat is from a source selected from the group consisting of resistive AC/low frequency, induction heat, radiofrequency radiation heat and microwave radiation heat.
10. The method of claim 1 wherein the electromagnetic heat is applied with at least one viscosity reducing agent.
11. A method for recovering a hydrocarbon from a subsurface low-permeability reservoir using electromagnetic heating, the method comprising the steps of:
a. drilling a first well into the reservoir;
b. injecting a heated fluid through the first well into the reservoir under a pressure higher than reservoir pressure, dilating the reservoir and increasing permeability;
c. allowing the heated fluid to heat a first portion of the hydrocarbon;
d. producing the first portion of the hydrocarbon to surface through the first well;
e. applying electromagnetic heat to the reservoir to heat a second portion of the hydrocarbon; and
f. producing the second portion of the hydrocarbon to surface.
12. The method of claim 11 further comprising repeating steps b-d at least once before applying the electromagnetic heat.
13. The method of claim 11 further comprising repeating steps b-e at least once after applying the electromagnetic heat.
14. The method of claim 11 wherein the electromagnetic heat is applied by a tool situate in the first well adjacent the reservoir.
15. The method of claim 11 further comprising the step of drilling a second well into the reservoir, wherein the electromagnetic heat is applied by a tool situate in the second well and at least a part of the second portion of the hydrocarbon is produced to surface through the second well.
16. The method of claim 11 wherein the electromagnetic heat is liner/casing conveyed.
17. The method of claim 11 wherein the electromagnetic heat is reservoir conveyed.
18. The method of claim 16 wherein the electromagnetic heat is from a source selected from the group consisting of a resistive heat and induction heat.
19. The method of claim 17 wherein the electromagnetic heat is from a source selected from the group consisting of resistive AC/low frequency, induction heat, radiofrequency radiation heat and microwave radiation heat.
20. The method of claim 11 wherein the electromagnetic heat is applied with at least one viscosity reducing agent.
21. A method for reducing water usage in a steam-based thermal hydrocarbon recovery technique, the method comprising the steps of:
a. drilling a first well into a reservoir containing a hydrocarbon;
b. injecting steam through the first well into the reservoir under a pressure higher than reservoir pressure, dilating the reservoir and increasing permeability;
c. allowing the steam to heat a first portion of the hydrocarbon;
d. producing the first portion of the hydrocarbon to surface through the first well;
e. applying electromagnetic heat to the reservoir to heat a second portion of the hydrocarbon; and
f. producing the second portion of the hydrocarbon to surface.
22. The method of claim 21 further comprising repeating steps b-d at least once before applying the electromagnetic heat.
23. The method of claim 21 further comprising repeating steps b-e at least once after applying the electromagnetic heat.
24. The method of claim 21 wherein the electromagnetic heat is applied by a tool situate in the first well adjacent the reservoir.
25. The method of claim 21 further comprising the step of drilling a second well into the reservoir, wherein the electromagnetic heat is applied by a tool situate in the second well and at least a part of the second portion of the hydrocarbon is produced to surface through the second well.
26. The method of claim 21 wherein the electromagnetic heat is liner/casing conveyed.
27. The method of claim 21 wherein the electromagnetic heat is reservoir conveyed.
28. The method of claim 26 wherein the electromagnetic heat is from a source selected from the group consisting of a resistive heat and induction heat.
29. The method of claim 27 wherein the electromagnetic heat is from a source selected from the group consisting of resistive AC/low frequency, induction heat, radiofrequency radiation heat and microwave radiation heat.
30. The method of claim 21 wherein the electromagnetic heat is applied with at least one viscosity reducing agent.
31. A method for reducing electricity usage in an electromagnetic heat thermal hydrocarbon recovery technique, the method comprising the steps of:
a. drilling a first well into a reservoir containing a hydrocarbon;
b. injecting a heated fluid through the first well into the reservoir under a pressure higher than reservoir pressure, dilating the reservoir and increasing permeability;
c. allowing the heated fluid to heat a first portion of the hydrocarbon;
d. producing the first portion of the hydrocarbon to surface through the first well;
e. applying electromagnetic heat to the reservoir to heat a second portion of the hydrocarbon; and
f. producing the second portion of the hydrocarbon to surface.
32. The method of claim 31 further comprising repeating steps b-d at least once before applying the electromagnetic heat.
33. The method of claim 31 further comprising repeating steps b-e at least once after applying the electromagnetic heat.
34. The method of claim 31 wherein the electromagnetic heat is applied by a tool situate in the first well adjacent the reservoir.
35. The method of claim 31 further comprising the step of drilling a second well into the reservoir, wherein the electromagnetic heat is applied by a tool situate in the second well and at least a part of the second portion of the hydrocarbon is produced to surface through the second well.
36. The method of claim 31 wherein the electromagnetic heat is liner/casing conveyed.
37. The method of claim 31 wherein the electromagnetic heat is reservoir conveyed.
38. The method of claim 36 wherein the electromagnetic heat is from a source selected from the group consisting of a resistive heat and induction heat.
39. The method of claim 37 wherein the electromagnetic heat is from a source selected from the group consisting of resistive AC/low frequency, induction heat, radiofrequency radiation heat and microwave radiation heat.
40. The method of claim 31 wherein the electromagnetic heat is applied with at least one viscosity reducing agent.
41. A method for increasing production of hydrocarbon in an electromagnetic heat thermal recovery technique, the method comprising the steps of:
a. drilling a first well into a reservoir containing the hydrocarbon;
b. injecting a heated fluid through the first well into the reservoir under a pressure higher than reservoir pressure, dilating the reservoir and increasing permeability;
c. allowing the heated fluid to heat a first portion of the hydrocarbon;
d. producing the first portion of the hydrocarbon to surface through the first well;
e. applying electromagnetic heat to the reservoir to heat a second portion of the hydrocarbon; and
f. producing the second portion of the hydrocarbon to surface.
42. The method of claim 41 further comprising repeating steps b-d at least once before applying the electromagnetic heat.
43. The method of claim 41 further comprising repeating steps b-e at least once after applying the electromagnetic heat.
44. The method of claim 41 wherein the electromagnetic heat is applied by a tool situate in the first well adjacent the reservoir.
45. The method of claim 41 further comprising the step of drilling a second well into the reservoir, wherein the electromagnetic heat is applied by a tool situate in the second well and at least a part of the second portion of the hydrocarbon is produced to surface through the second well.
46. The method of claim 41 wherein the electromagnetic heat is liner/casing conveyed.
47. The method of claim 41 wherein the electromagnetic heat is reservoir conveyed.
48. The method of claim 46 wherein the electromagnetic heat is from a source selected from the group consisting of a resistive heat and induction heat.
49. The method of claim 47 wherein the electromagnetic heat is from a source selected from the group consisting of resistive AC/low frequency, induction heat, radiofrequency radiation heat and microwave radiation heat.
50. The method of claim 41 wherein the electromagnetic heat is applied with at least one viscosity reducing agent.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| US14/583,345 US20150192003A1 (en) | 2014-01-08 | 2014-12-26 | Method for enhanced oil recovery using cyclic steam stimulation and electromagnetic heating |
Applications Claiming Priority (2)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| US201461924919P | 2014-01-08 | 2014-01-08 | |
| US14/583,345 US20150192003A1 (en) | 2014-01-08 | 2014-12-26 | Method for enhanced oil recovery using cyclic steam stimulation and electromagnetic heating |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| US20150192003A1 true US20150192003A1 (en) | 2015-07-09 |
Family
ID=53494768
Family Applications (3)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| US14/578,922 Abandoned US20150192005A1 (en) | 2014-01-08 | 2014-12-22 | Method of subsurface reservoir fracturing using electromagnetic pulse energy |
| US14/583,345 Abandoned US20150192003A1 (en) | 2014-01-08 | 2014-12-26 | Method for enhanced oil recovery using cyclic steam stimulation and electromagnetic heating |
| US14/587,473 Active US9506332B2 (en) | 2014-01-08 | 2014-12-31 | Method for enhanced hydrocarbon recovery using in-situ radio frequency heating of an underground formation with broadband antenna |
Family Applications Before (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| US14/578,922 Abandoned US20150192005A1 (en) | 2014-01-08 | 2014-12-22 | Method of subsurface reservoir fracturing using electromagnetic pulse energy |
Family Applications After (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| US14/587,473 Active US9506332B2 (en) | 2014-01-08 | 2014-12-31 | Method for enhanced hydrocarbon recovery using in-situ radio frequency heating of an underground formation with broadband antenna |
Country Status (2)
| Country | Link |
|---|---|
| US (3) | US20150192005A1 (en) |
| CA (3) | CA2875485C (en) |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US20170222297A1 (en) * | 2013-03-15 | 2017-08-03 | Chevron U.S.A. Inc. | Subsurface antenna for radio frequency heating |
| US11955782B1 (en) | 2022-11-01 | 2024-04-09 | Typhon Technology Solutions (U.S.), Llc | System and method for fracturing of underground formations using electric grid power |
Families Citing this family (42)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US9689253B2 (en) * | 2013-02-21 | 2017-06-27 | Schlumberger Technology Corporation | Use of nanotracers for imaging and/or monitoring fluid flow and improved oil recovery |
| US9938809B2 (en) | 2014-10-07 | 2018-04-10 | Acceleware Ltd. | Apparatus and methods for enhancing petroleum extraction |
| US9745839B2 (en) * | 2015-10-29 | 2017-08-29 | George W. Niemann | System and methods for increasing the permeability of geological formations |
| WO2017177319A1 (en) | 2016-04-13 | 2017-10-19 | Acceleware Ltd. | Apparatus and methods for electromagnetic heating of hydrocarbon formations |
| US9896919B1 (en) * | 2016-08-22 | 2018-02-20 | Saudi Arabian Oil Company | Using radio waves to fracture rocks in a hydrocarbon reservoir |
| US10920556B2 (en) * | 2016-08-22 | 2021-02-16 | Saudi Arabian Oil Comoanv | Using radio waves to fracture rocks in a hydrocarbon reservoir |
| US10451763B2 (en) | 2016-10-27 | 2019-10-22 | Schlumberger Technology Corporation | Evaluation of formation utilizing wideband electromagnetic measurements |
| CA2972203C (en) | 2017-06-29 | 2018-07-17 | Exxonmobil Upstream Research Company | Chasing solvent for enhanced recovery processes |
| CA2974712C (en) | 2017-07-27 | 2018-09-25 | Imperial Oil Resources Limited | Enhanced methods for recovering viscous hydrocarbons from a subterranean formation as a follow-up to thermal recovery processes |
| US11008841B2 (en) | 2017-08-11 | 2021-05-18 | Acceleware Ltd. | Self-forming travelling wave antenna module based on single conductor transmission lines for electromagnetic heating of hydrocarbon formations and method of use |
| CA2978157C (en) | 2017-08-31 | 2018-10-16 | Exxonmobil Upstream Research Company | Thermal recovery methods for recovering viscous hydrocarbons from a subterranean formation |
| CA2983541C (en) | 2017-10-24 | 2019-01-22 | Exxonmobil Upstream Research Company | Systems and methods for dynamic liquid level monitoring and control |
| WO2019119128A1 (en) | 2017-12-21 | 2019-06-27 | Acceleware Ltd. | Apparatus and methods for enhancing a coaxial line |
| US10669829B2 (en) | 2018-03-20 | 2020-06-02 | Saudi Arabian Oil Company | Using electromagnetic waves to remove near wellbore damages in a hydrocarbon reservoir |
| US11773706B2 (en) | 2018-11-29 | 2023-10-03 | Acceleware Ltd. | Non-equidistant open transmission lines for electromagnetic heating and method of use |
| CA3130635A1 (en) | 2019-03-06 | 2020-09-10 | Acceleware Ltd. | Multilateral open transmission lines for electromagnetic heating and method of use |
| CN110159241A (en) * | 2019-06-25 | 2019-08-23 | 中国矿业大学(北京) | A kind of microwave irradiation cooperates with the device of exploitation shale gas with hydraulic fracturing |
| US11319478B2 (en) | 2019-07-24 | 2022-05-03 | Saudi Arabian Oil Company | Oxidizing gasses for carbon dioxide-based fracturing fluids |
| US11492541B2 (en) | 2019-07-24 | 2022-11-08 | Saudi Arabian Oil Company | Organic salts of oxidizing anions as energetic materials |
| WO2021138355A1 (en) | 2019-12-31 | 2021-07-08 | Saudi Arabian Oil Company | Viscoelastic-surfactant fracturing fluids having oxidizer |
| US11352548B2 (en) | 2019-12-31 | 2022-06-07 | Saudi Arabian Oil Company | Viscoelastic-surfactant treatment fluids having oxidizer |
| US11339321B2 (en) | 2019-12-31 | 2022-05-24 | Saudi Arabian Oil Company | Reactive hydraulic fracturing fluid |
| US11268373B2 (en) | 2020-01-17 | 2022-03-08 | Saudi Arabian Oil Company | Estimating natural fracture properties based on production from hydraulically fractured wells |
| US11473009B2 (en) | 2020-01-17 | 2022-10-18 | Saudi Arabian Oil Company | Delivery of halogens to a subterranean formation |
| US11365344B2 (en) | 2020-01-17 | 2022-06-21 | Saudi Arabian Oil Company | Delivery of halogens to a subterranean formation |
| US11473001B2 (en) | 2020-01-17 | 2022-10-18 | Saudi Arabian Oil Company | Delivery of halogens to a subterranean formation |
| US11946351B2 (en) | 2020-04-24 | 2024-04-02 | Acceleware Ltd. | Systems and methods for controlling electromagnetic heating of a hydrocarbon medium |
| US11578263B2 (en) | 2020-05-12 | 2023-02-14 | Saudi Arabian Oil Company | Ceramic-coated proppant |
| US11476582B2 (en) | 2020-06-29 | 2022-10-18 | Baker Hughes Oilfield Operations Llc | Tuning systems and methods for downhole antennas |
| US11487040B2 (en) | 2020-06-29 | 2022-11-01 | Baker Hughes Oilfield Operations Llc | Multi-frequency tuning network system and method |
| EP4183040A4 (en) | 2020-07-16 | 2024-03-13 | Acceleware Ltd. | SYSTEMS AND METHODS FOR GENERATING SIGNALS |
| US11643924B2 (en) | 2020-08-20 | 2023-05-09 | Saudi Arabian Oil Company | Determining matrix permeability of subsurface formations |
| US11326092B2 (en) | 2020-08-24 | 2022-05-10 | Saudi Arabian Oil Company | High temperature cross-linked fracturing fluids with reduced friction |
| US11542815B2 (en) | 2020-11-30 | 2023-01-03 | Saudi Arabian Oil Company | Determining effect of oxidative hydraulic fracturing |
| AR124801A1 (en) * | 2021-02-03 | 2023-05-03 | Ypf Tecnologia Sa | CRUDE OIL RECOVERY METHOD BY IMPRESED CURRENT |
| US12071589B2 (en) | 2021-10-07 | 2024-08-27 | Saudi Arabian Oil Company | Water-soluble graphene oxide nanosheet assisted high temperature fracturing fluid |
| US11680887B1 (en) | 2021-12-01 | 2023-06-20 | Saudi Arabian Oil Company | Determining rock properties |
| US12025589B2 (en) | 2021-12-06 | 2024-07-02 | Saudi Arabian Oil Company | Indentation method to measure multiple rock properties |
| US12012550B2 (en) | 2021-12-13 | 2024-06-18 | Saudi Arabian Oil Company | Attenuated acid formulations for acid stimulation |
| US12261636B2 (en) * | 2021-12-15 | 2025-03-25 | Intelliserv, Llc | Wireless data transmission systems, and related devices and methods |
| CN115354990B (en) * | 2022-08-19 | 2023-11-10 | 成都理工大学 | Intelligent exploitation device and method for directional radio-frequency heating heavy oil reservoir |
| CN115949451B (en) * | 2023-01-10 | 2026-04-03 | 中煤科工西安研究院(集团)有限公司 | A Collaborative Management Method for Multiple Disasters in the Triangular Zone of Coal Mining Faces Based on Directional Drilling |
Citations (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US20100258309A1 (en) * | 2009-04-10 | 2010-10-14 | Oluropo Rufus Ayodele | Heater assisted fluid treatment of a subsurface formation |
Family Cites Families (15)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US3114875A (en) * | 1961-05-04 | 1963-12-17 | Raytheon Co | Microwave device for testing formations surrounding a borehole having means for measuring the standing wave ratio of energy incident to and reflected from the formations |
| US4345650A (en) * | 1980-04-11 | 1982-08-24 | Wesley Richard H | Process and apparatus for electrohydraulic recovery of crude oil |
| US5132623A (en) * | 1990-11-20 | 1992-07-21 | Chevron Research And Technology Company | Method and apparatus for broadband measurement of dielectric properties |
| US6094176A (en) * | 1998-11-24 | 2000-07-25 | Northrop Grumman Corporation | Very compact and broadband planar log-periodic dipole array antenna |
| US6227293B1 (en) * | 2000-02-09 | 2001-05-08 | Conoco Inc. | Process and apparatus for coupled electromagnetic and acoustic stimulation of crude oil reservoirs using pulsed power electrohydraulic and electromagnetic discharge |
| US7091460B2 (en) * | 2004-03-15 | 2006-08-15 | Dwight Eric Kinzer | In situ processing of hydrocarbon-bearing formations with variable frequency automated capacitive radio frequency dielectric heating |
| GB2420358B (en) * | 2004-11-17 | 2008-09-03 | Schlumberger Holdings | System and method for drilling a borehole |
| MX2007008797A (en) * | 2005-01-19 | 2008-03-04 | Ksn En Llc | Subsurface imagery for temperature measurement and fluid flow for oil recovery using electromagnetic impedance tomography (emit). |
| WO2009043055A2 (en) * | 2007-09-28 | 2009-04-02 | Bhom Llc | System and method for extraction of hydrocarbons by in-situ radio frequency heating of carbon bearing geological formations |
| US8011451B2 (en) * | 2007-10-19 | 2011-09-06 | Shell Oil Company | Ranging methods for developing wellbores in subsurface formations |
| WO2009151891A2 (en) * | 2008-05-19 | 2009-12-17 | Halliburton Energy Services, Inc. | Formation treatment using electromagnetic radiation |
| US8931549B2 (en) * | 2010-03-26 | 2015-01-13 | David Randolph Smith | Method and apparatus for a subterranean and marine-submersible electrical transmission system for oil and gas wells |
| US8701760B2 (en) * | 2011-06-17 | 2014-04-22 | Harris Corporation | Electromagnetic heat treatment providing enhanced oil recovery |
| US20140014327A1 (en) * | 2012-07-13 | 2014-01-16 | Schlumberger Technology Corporation | Methodology and system for producing fluids from a condensate gas reservoir |
| US9399906B2 (en) * | 2013-08-05 | 2016-07-26 | Harris Corporation | Hydrocarbon resource heating system including balun having a ferrite body and related methods |
-
2014
- 2014-12-22 US US14/578,922 patent/US20150192005A1/en not_active Abandoned
- 2014-12-22 CA CA2875485A patent/CA2875485C/en active Active
- 2014-12-23 CA CA2875886A patent/CA2875886A1/en not_active Abandoned
- 2014-12-26 US US14/583,345 patent/US20150192003A1/en not_active Abandoned
- 2014-12-31 US US14/587,473 patent/US9506332B2/en active Active
- 2014-12-31 CA CA2876698A patent/CA2876698C/en active Active
Patent Citations (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US20100258309A1 (en) * | 2009-04-10 | 2010-10-14 | Oluropo Rufus Ayodele | Heater assisted fluid treatment of a subsurface formation |
Cited By (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US20170222297A1 (en) * | 2013-03-15 | 2017-08-03 | Chevron U.S.A. Inc. | Subsurface antenna for radio frequency heating |
| US10693237B2 (en) * | 2013-03-15 | 2020-06-23 | Chevron U.S.A. Inc. | Method of employing a subsurface antenna in two regions |
| US11955782B1 (en) | 2022-11-01 | 2024-04-09 | Typhon Technology Solutions (U.S.), Llc | System and method for fracturing of underground formations using electric grid power |
| US12444910B2 (en) | 2022-11-01 | 2025-10-14 | Typhon Technology Solutions (U.S.), Llc | Method for accessing electric grids to power fracturing operations |
Also Published As
| Publication number | Publication date |
|---|---|
| CA2875485A1 (en) | 2015-07-08 |
| CA2875886A1 (en) | 2015-07-08 |
| US20150192005A1 (en) | 2015-07-09 |
| CA2876698A1 (en) | 2015-07-08 |
| CA2876698C (en) | 2017-06-06 |
| CA2875485C (en) | 2017-08-22 |
| US20150192004A1 (en) | 2015-07-09 |
| US9506332B2 (en) | 2016-11-29 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CA2875886A1 (en) | Method for enhanced oil recovery using cyclic steam stimulation and electromagnetic heating | |
| Bayestehparvin et al. | Solvent-based and solvent-assisted recovery processes: state of the art | |
| US10082009B2 (en) | Effective solvent extraction system incorporating electromagnetic heating | |
| US8978755B2 (en) | Gravity drainage startup using RF and solvent | |
| AU2010363970B2 (en) | Effective solvent extraction system incorporating electromagnetic heating | |
| CA2807852C (en) | Gravity drainage startup using rf & solvent | |
| CN104428491A (en) | Method of recovering hydrocarbon resources while injecting solvent and supplying radio frequency power and related apparatus | |
| US20130008651A1 (en) | Method for hydrocarbon recovery using sagd and infill wells with rf heating | |
| CA2873787C (en) | Method to maintain reservoir pressure during hydrocarbon recovery operations using electrical heating means with or without injection of non-condensable gases | |
| CA2851782C (en) | Method for hydrocarbon recovery using heated liquid water injection with rf heating | |
| Souraki | A comparative field-scale simulation study on feasibility of SAGD and ES-SAGD processes in naturally fractured bitumen reservoirs | |
| US20150285047A1 (en) | Heat-assisted steam-based hydrocarbon recovery method | |
| US9416639B2 (en) | Combined RF heating and gas lift for a hydrocarbon resource recovery apparatus and associated methods | |
| Chun | Assessment of thermal recovery: Steam Assisted Gravity Drainage (SAGD) to improve recovery efficiency in the heavy-oil fields of the Peruvian jungle | |
| US9376900B2 (en) | Combined RF heating and pump lift for a hydrocarbon resource recovery apparatus and associated methods | |
| Bao | On steam based recovery process design | |
| Liu et al. | Parametric Study of Heavy Oil Recovery by Electromagnetic Heating | |
| CA2883967C (en) | Method and system for enabling fluid communication between wells in a bitumen reserve | |
| Sarkar et al. | A new concept for improving steamflood performance in shallow heavy oil reservoirs | |
| Song | Steam Injection Strategies for Bitumen Recovery from an Element of the Grosmont Carbonate Reservoir |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| AS | Assignment |
Owner name: HUSKY OIL OPERATIONS LIMITED, CANADA Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNORS:FLORES, CARLOS MAURICIO;TAABBODI, LORAN;SAEEDFAR, AMIN;AND OTHERS;SIGNING DATES FROM 20150204 TO 20150219;REEL/FRAME:035089/0945 |
|
| STCB | Information on status: application discontinuation |
Free format text: ABANDONED -- FAILURE TO RESPOND TO AN OFFICE ACTION |