US3299191A - Method and means for erecting bridges - Google Patents

Method and means for erecting bridges Download PDF

Info

Publication number
US3299191A
US3299191A US331991A US33199163A US3299191A US 3299191 A US3299191 A US 3299191A US 331991 A US331991 A US 331991A US 33199163 A US33199163 A US 33199163A US 3299191 A US3299191 A US 3299191A
Authority
US
United States
Prior art keywords
support
staging
span
sections
bridge
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
US331991A
Other languages
English (en)
Inventor
Mantscheff Alexander
Wittfoht Hans
Ochsenbauer Helmut
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Polensky and Zollner
Original Assignee
Polensky and Zollner
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Polensky and Zollner filed Critical Polensky and Zollner
Application granted granted Critical
Publication of US3299191A publication Critical patent/US3299191A/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges
    • E01D21/10Cantilevered erection
    • E01D21/105Balanced cantilevered erection
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D2101/00Material constitution of bridges
    • E01D2101/20Concrete, stone or stone-like material
    • E01D2101/24Concrete
    • E01D2101/26Concrete reinforced
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D2101/00Material constitution of bridges
    • E01D2101/20Concrete, stone or stone-like material
    • E01D2101/24Concrete
    • E01D2101/26Concrete reinforced
    • E01D2101/28Concrete reinforced prestressed
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y10TECHNICAL SUBJECTS COVERED BY FORMER USPC
    • Y10TTECHNICAL SUBJECTS COVERED BY FORMER US CLASSIFICATION
    • Y10T29/00Metal working
    • Y10T29/49Method of mechanical manufacture
    • Y10T29/49826Assembling or joining
    • Y10T29/49828Progressively advancing of work assembly station or assembled portion of work

Definitions

  • the present invention relates to bridges in general, and more particularly to an improved method and means for erecting multispan bridges. Still more particularly, the invention relates to erection of bridges whose spans consist of sections, preferably of sections made of reinforced or prestressed concrete.
  • Another object of the invention is to provide a method of the just outlined characteristics according to which the spans may be assembled and mounted on their supports without necessitating the provision of a staging which extends from the one to the other end of the bridge, and according to which the spans may be assembled without necessitating the erection of temporary piers, abutments and similar supports.
  • a further object of the invention is to provide a method of erecting multispan cantilever bridges which may be practiced with equal advantage when the spans are assembled of prefabricated sections or when the spans consist of sections which are poured or otherwise built at the locale of actual use.
  • An additional object of the invention is to provide a method according to which the spans may be assembled in such sequence that the entire superstructure of the bridge may be completed within exceptionally short periods of time and which may be practiced with the help of simple, lightweight and easy-to-handle temporary staging.
  • a concomitant object of the invention is to provide improved means or arrangements, including a staging, for practicing the novel method and to construct the staging in such a way that it may facilitate delivery of construction materials to the point or points of use.
  • Still another object of the invention is to provide a staging which allows for simultaneous construction of two spans to thereby reduce the time necessary for completion of the superstructure in a multispan bridge, and whose length need not substantially exceed the length of the longest span so that such staging may be readily shifted to to different positions as the construction of the superstructure proceeds.
  • An additional object of the invention is to provide a staging which may be used in cooperation with the supports of a partially erected bridge to facilitate rapid, convenient and economical completion of the spans.
  • Still another object of our invention is to provide a novel bridge erecting arrangement including a staging which may be mounted above, below or at the level of the spans and which enables the crew to assemble the sections with utmost precision.
  • each span preferably consists of a plurality of sections made of reinforced or prestressed concrete and arranged end-to-end.
  • the method comprises the steps of building a support intermediate the ends of the bridge to be erected, mounting on the support an elongated temporary staging in such a way that the staging forms a cantilever whose arms extend from the support toward 3,29%,ifil Patented Jan. 17, 1967 both ends of the bridge whereby the staging enables the crew to work in the fields at the opposite sides of the sup port, and assembling portions of two spans in a simultaneous operation by working on the staging from the support in directions toward the respective ends of the bridge.
  • the bridge may be erected in the following manner: The crew erects at least two spaced supports at least one of which constitutes a pier and is located intermediate the ends of the bridge to be erected. In the next step, the crew assembles a portion of a first span by joining a plurality of sections in a direction from the other support toward the pier so that the thus completed portion of the first span bridges a portion of the field between the pier and the other support.
  • the staging is then mounted on the pier in such a way that one of its arms bridges the gap between the pier and the completed portion of the first span whereas its other arm extends beyond the pier in a direction away from the other support so that the staging enables the crew to work in the fields at the opposite sides of the pier.
  • the crew completes the first span by working on the staging from the pier toward the other support and simultaneously assembles a portion of a second span by working on the staging from the pier in a direction away from the other support.
  • the crew shifts the staging endwise so that it is supported by the additional pier and that one of its arms bridges the gap between the additional pier and the completed portion of the second span whereas the other arm of the staging extends from the additional pier in a direction away from the first mentioned pier.
  • the staging is now in a position to enable the crew to complete the second span by working from the additional pier toward the completed portion of the second span to simul' taneously complete at least a portion of a third span by working from the additional pier in a direction away from the second span.
  • the bridge comprises one or more supports between the additional pier and the respective end thereof, i.e., the staging is shifted endwise onto each consecutive support and the crew works in directions from each consecutive support toward the ends of the bridge so that portions of two spans may be assembled in a simultaneous operation. It is also possible to work with two stagings so that the superstructure is erected from both ends of the bridge.
  • FIG. 1 is a schematic elevational view of a partially completed cantilever bridge which is erected in accordance with the method of our invention
  • FIG. 2 is a similar elevational view and illustrates the bridge in a further stage of completion
  • FIG. 3 is another elevational view and shows the bridge in a third stage of completion.
  • FIG. 1 there is shown a partially erected bridge which comprises a plurality of spaced supports including a centrally located pier 2 and two outer piers 1, 3.
  • the bridge comprises four spans 8, 13, 17, 34 and its abutments (not shown in the drawings) are respectively located to the left and to the right of the supports 1 and 3.
  • the expression support is intended to denote a pier or an abutment.
  • the bridge of FIG. 1 is erected as follows: In the first step, the crew erects the abutments and the supports 1, 2 and 3. In the next step, sections 4, 5, 6 are mounted at the upper ends of the respective supports.
  • the sections 4, 5, 6 consist of reinforced or prestressed concrete and may be produced in situ, i.e., in concrete casings or forms at the locale of use.
  • the manner in which the sections may be poured and secured in position is illustrated in the right-hand part of FIG. 1.
  • the support 3 carries at its upper end a temporary cantilever platform 7 which enables the crew to pour the section 6 and to locate it at the upper end of the support 3.
  • the span 8 between the support 1 and the left-hand abutment is already completed, and this span consists of a series of concrete sections 40, 4b, 4c assembled end-to-end and extending to the left of the section 4. It is further to be noted that the crew has completed the left-hand portion of the second span 13 which extends between the supports 1 and 2.
  • This left-hand portion of the span 13 comprises concrete sections 9, 10, 11, 12 which are assembled end-to-end and extend from the section 4 in a direction toward the support 2.
  • the crew resorts to a temporary staging 14 here shown as comprising an elongated frame or truss whose length exceeds substantially the distance between the sections and 12.
  • the staging 14 comprises an overhead truss forming a cantilever one arm of which rests on the sections 9-12 of the partially completed span 13 and the other arm of which extends beyond the support 2 in a direction toward the support 3, i.e., across a portion of the field of the span 17.
  • a knife edge bearing 16, mounted on the section 5 supports an intermediate portion of the staging 14 and the left-hand end of this staging carries a similar bearing 15 which rests on one of the sections 912. It is normally of advantage to connect the bearing 15 with the staging 14 so that this bearing may be shifted, when the staging is moved endwise to another position, for example, to the position shown in FIG. 3.
  • the crew may proceed with completion of the span 13 and simultaneously assembles and completes the lefthand portion of the span 17.
  • two sections 18, 18' are poured and then secured to the section 5 at the opposite sides thereof so that the section 18 constitutes the rightmost element of the span 13 and the section 18 constitutes the leftmost element of the span 17.
  • the crew then proceeds to pour the sections 19, 19 which are secured to the sections 18, 18 in the next following operation.
  • the sections 18, 18, 19, 19' are formed in frames or casings 14A, 148 (shown by heavy lines) which are mounted on working platforms 21), 21 suspended from the staging 14.
  • the lower part of this staging comprises guideways or rails 14D for dollies or similar carriages (not shown) which may travel in the longitudinal direction of the staging and which may carry heavy rods 22, 23, 24, 25 or similar attaching means to support the Working platforms 20, 21.
  • the platform 20 is suspended on rods 20, 24 and the platform 21 is suspended on rods 23, 25.
  • each or some of these rods may be provided with external threads to mesh with suitable spindle nuts which are rotated by hydraulic adjusting apparatus mounted on the staging 14 and serving to adjust the position of the platforms 20, 21.
  • the rods 22, 23 are provided with threads and respectively carry the outer ends of the platforms 20, 21, i.e., such ends which are more distant from the support 2.
  • the rods 24, 25 may but need not be directly secured to the staging 14; in FIG.
  • the deformation of staging 14 affects little or does not affect at all the accuracy of connection between a completed, permanently secured section (18 or 18) and the inner end of a freshly completed section (19 or 19).
  • Eventual deformation of the staging 14 is compensated for by adjustments in the axial position of the rods 22, 23 so that the sections 19, 19' may be connected to the sections 18, 18' with utmost accuracy.
  • the rods 22, 23 serve to support and to adjust the angular position of the platforms 20, 21 (in the event that the staging 14 undergoes some deformation) in such a way that each freshly completed section may be placed end-to-end and in faceto-face abutment with the previously completed section.
  • the rods 2225 may be replaced by hydraulic presses or other combined attaching and adjusting means.
  • the load upon the staging 14 is distributed substantially evenly at both sides of the bearing 16 so that the staging may be of lightweight construction.
  • the staging 14 resembles a cantilever beam whose arms are subjected to balanced loads whereby the bearing 15 subjects the left-hand portion of the span 13 to minimal stresses. Consequently, and if the sections of the spans 8, 13, 17 are of average length and weight, the staging 14 may comprise a lightweight truss which is easy to shift and which may be constructed at reasonable cost.
  • the bridge may be erected with the help of a comparatively short staging.
  • the overall length of the staging 14 need not exceed 1.2 times the length of the span 13 or 17.
  • the length of the staging 14 exceeds the length of the span 13 by about 25 percent. This is possible because the sections 1848', 19-19' etc. are assembled from opposite sides of that support (2) which carries the staging.
  • Such method brings about the aforementioned advantage that the completed portion of the span 13 (sections 9-12) is subjected to minimal stresses.
  • the bearing 15 merely transmits such stresses which are due to the fact that the length of the staging between the bearings 15, 16 exceeds the distance between the bearing 16 and the right-hand end of the staging as well as any such stresses which are due to eventual imbalance between the weights of the platforms 20, 21. Also, such highly advantageous distribution of loads remains unchanged when the platforms 20, 21 are moved away from the support 2 upon completion and attachment of sections 1848', 19419 etc. It will be readily understood that all movements of the platforms 20, 21 longitudinally of the rails 14D may be synchronized in such a way that the platforms remain mirror symmetrical with reference to the support 2.
  • the cantilever including the sections 5, 18, 18, 19, 19' may be stabilized by ballast 27 secured to heavy rods 28 which connect the section 13 with the staging 14 at the left-hand side of the bearing 16 so that the cantilever is held against tilting and eventual overturning in a clockwise direction.
  • the ballast 27 may be omitted if the bridge is erected in such a way that the combined weight of the sections 18, 19 exceeds the combined weight of the sections 18', 19', i.e., if the cantilever consisting of the sections carried by the support 2 tends to tilt in a counterclockwise direction, as viewed in FIG. 1.
  • stabilizing means such as the fasteners 26, ballast 27 and rods 23, is of particular advantage when the spans are very long so that the cantilever formed by the sections extending to both sides of a support is very heavy.
  • platforms 2t), 21 are separated therefrom and the rods 22, 24 and 23, 25 are shifted away from each other by moving the respective dollies along the rails 14]).
  • the platforms 2t 21 are arrested in requisite positions to to permit completion of the next pair of mirror symmetrical sections 29, 29' which are shown in FIG. 2 and which are subsequentiy secured to the sections 19, 19'.
  • the rods 24, 25 are respectively fixed to the sections 19, 19 and the ballast 27 may be shifted to the left, as viewed in FIG. 1 or 2.
  • the same procedure is then followed preparatory to, during, and after completion of the next pair of sections 30, shown in FIG. 2, which are respectively secured to the sections 29, 29.
  • FIG. 2 illustrates this section in the casing 14A with the rods 22, 24 respectively secured to the sections 12, 36 to insure that the section 31 is properly aligned with these sections and may be fixed thereto to complete the span 13.
  • the rods 24 may be fixed to the staging 14 while the crew assembles and secures the section 31 in the position of FIG. 2.
  • the rods 22 may be secured to the section 12 and/or to the staging 14.
  • the section 31 actually constitutes a short suspended span between the arms 9-12 and 18-19, 29, 30 of the span 13.
  • the length of the rods 22, 23, 24, 25 is selected in such a way that each may be secured to a fixed section or to the dollies on the staging 14.
  • the platform 21 is preferably detached from the section 30 to constitute a counterweight at the right-hand end of the staging 14.
  • FIG. 3 illustrates a further step in the erection of the bridge.
  • the staging 14 has been shifted endwise so that the bearing 15 rests on the section 29 (i.e., at a point close to the support 2) and that the right-hand end of the staging overlies the section 6 on the support 3.
  • the platform 21 is preferably disconnected from the staging and is carried by one of the sections which constitute the completed left-hand portion of the span 17 (e.g., the platform 21 may be carried by the section 18 which is close to the support 2).
  • the platform 20 has been moved all the way to the bearing 15 and constitutes a counterweight to balance the staging during shifting. Actual transfer of the staging 14 from the position of FIGS.
  • the platform 21 is then reattached to the staging 14 and is moved to a position next to the section 30 so that the crew may complete the span 17 by working from the section 31) toward the section 6 or vice versa.
  • the platform 21 is then reattached to the staging 14 and is moved to a position next to the section 30 so that the crew may complete the span 17 by working from the section 31) toward the section 6 or vice versa.
  • the platforms 20, 21 are preferably provided with pivotable bottom walls 50 so that they may bypass the supports. For example, when the bottom wall 50 of the platform 20 is pivoted downwardly, it enables the platform 20 to pass along the support 2 and to be moved into the field of the span 17 so that it may be used with the platform 21 in completing the right-hand portion of this span.
  • the staging 14 is preferably shifted to the right and beyond the poistion of FIG. 3 so that the crew may complete the right-hand portion of the span 17 simultaneously with assembling the left-hand portion of the span 34 in the same way as described in connection with FIG. 1.
  • the bearing 15 then comes to rest on the sectoin 29' or 30' and the right-hand arm of the truss extends beyond the support 3.
  • the staging is now ready to allow for simultaneous erection of two spans (17 and 34) beginning at the section 6 and working from both sides of this section toward the section 30' and toward the right-hand abutment (not shown) which is to hold the right-hand portion of the span 34.
  • the platform 21 is then moved to the right and beyond the support 3 and the platform 20 is moved in position next to the left-hand end of the section 6 so that the two platforms are ready to permit completion and attachment of two sections corresponding to the sections 18, 18 of FIG. 1.
  • the staging 14 may perform another important funotion, namely, it may serve as a temporary bridge for delivery of construction materials to the platforms 20, 21. Thus, all such materials may be transported along the completed span or spans and thereupon along the staging 14.
  • materials necessary for construction and attachment of sections will be delivered along the span 8, thereupon along the completed left-hand portion (sections 9-12) of the span 13, along the left-hand arm of the truss, and onto the platforms 20, 21.
  • the materials may be delivered from the left-hand end of the bridge, along the spans 8, 13, and along the lefthand arm of the truss.
  • the delivery of materials is independent from the configuration of terrain since a road or railroad normally connects to each end of the bridge so that the problem of delivering material for the span is solved as soon as the supports for the bridge are 7 completed. This is of utmost importance when the bridge must extend across a deep canyon, a rapidly flowing river or across another obstacle which would prevent delivery of construction materials beneath the spans.
  • the staging preferably comprises a truss composed of a series of adjoining triangles.
  • Such construction is of light weight and is sufiiciently rigid to withstand all stresses which arise during the erection of spans.
  • the triangles provide sufficient room for transport of bulky construction materials.
  • the overhead staging 14 may be replaced by a staging which is suspended from the supports so that the platforms are located at a level above the suspended staging or, alternatively, the staging may be carried by one or more supports in such a way that it extends laterally thereof (for example adjacent to and at the level of a span).
  • a multispan bridge may be erected by simultaneous utilization of two stagings, especially when the bridge comprises a large number of piers and if both ends of the bridge are readily accessible.
  • the method of our invention may be practiced in erection of many types of bridges independently of the crosssectional configuration of the sections.
  • the sections may be of the hollow box type (bridge of airproof cases) or the spans may be assembled of sections which resemble flat slabs.
  • the sections may be prefabricated so that the working platforms merely serve as a means for transporting the prefabricated sections to the locale of actual use and as assembly stands during connection of freshly delivered sections to the sections which are already mounted on one or more supports.
  • the method of the present invention it is of no importance whether the spans are assembled of prefabricated sections or whether the sections are made in situ.
  • a staging whose length is such that its truss forms a cantilever mounted on the support 2 and having one arm supported by the completed portion 9-12 of the span 13 Whereas the other arms of the truss finds support on the section 6, i.e., on the pier 3.
  • each span consists of sections arranged end-to-end, the steps of building one and another spaced support, at
  • At least said one support being located intermediate the ends of the bridge to be erected; building a portion of a first span extending from said other support toward said one support; shifting from said other support to said one support an elongated double-armed temporary staging one arm of which is supported by said built portion of the first span and the other arm of which forms a cantilever extending beyond said one support in a direction away from said other support whereby the staging enables the crew to work on opposite sides of said one support; building the remainder of said first span by working on said staging from said one support toward said other support; simultaneously assembly a portion of a second span by working on said staging from said one support in a direc tion away from said other support; and repeating said stepswith the exception of the first onetowards at least one additional support.
  • a method of erecting mulitispan bridges including two outer supports and a third support located intermediate said outer supports; the steps of building a portion of a first span extending from one of said outer supports toward said third support; arranging on said third support an elongated double-armed temporary staging one arm of which is supported by said built portion of the first span and the other arm of which forms a cantilever extending beyond said third support in a direction toward the other outer support whereby the staging enables the crew to work on opposite sides of said third support; building the remainder of said first span by working on said staging from said third support toward said one outer support; building a portion of a second span by working on said staging from said third support toward said other outer support; shifting the staging from said third support onto said other outer support so that one arm of the staging is supported by said built portion of the second span; and building the remainder of said second span by working on said staging in a direction from said other outer span toward said third span.
  • a method of erecting multispan bridges including two outer supports and a third support located intermediate said outer supports, the steps of building a portion of a first span extending from one of said outer supports toward said third support; arranging on said third support an elongated double-armed temporary staging one arm of which is supported by said built portion of the first span and the other arm of which forms a cantilever extending beyond said third support in a direction toward the other outer support whereby the staging enables the crew to work on opposite sides of said third support; building the remainder of said first span by working on said staging from said third support toward said one outer support; simultaneously building a portion of a second span by working on said staging from said third support toward said other outer support; shifting the staging from said third support onto said otl er outer support so that one arm of the staging is supported by said built portion of the second span and that the other arm of said sta gin-g forms a cantilever extending beyond said other outer support in a direction away from said third span; building the remainder of said second span by
  • An arrangement for use in erection of multispan bridges whose spans consist of a plurality of sections connected end-to-end and wherein the spans extend across the fields between a plurality of supports at least one of which is located intermediate the ends of the bridge to be erected, comprising a temporary staging including an elongated double-armed frame whose length exceeds at least slightly the maximum length of a span, said frame being arranged to be carried by said one support and having a first arm including a bearing supported by a partially built first span extending from another support toward said one support and a second arm forming a cantilever extending beyond said one support in a direction away from said other support .so that the crew may work on opposite sides of said one support by mounting pairs of sections on said one support so -as to build the remainder of said first span and to simultaneously build a portion of a .second span which extends from said one support in a direction away from said other support, said staging including a second bearing supported by said one support and said elongated
  • a method of erecting multispan bridges including one and another spaced support, at least said one support being located intermediate the ends of the bridge to be erected, the steps of building a portion of a first span extending from said other support toward said one support; supporting on said one support an elongated double-armed temporary staging one arm of which is supported by said built portion of said first span and the other arm of which forms a cantilever extending beyond said one support in a direction away from said other support whereby the staging enables the crew to work on opposite sides of said one support; building the remainder of said first span by working on said staging from said one support toward said other support; building a portion of a second span by working on said staging from said one support in a direction away from said other support; and repeating said steps-with the exception of the first onetowards at least one additional support.

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)
US331991A 1962-12-21 1963-12-17 Method and means for erecting bridges Expired - Lifetime US3299191A (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DEP30840A DE1255695B (de) 1962-12-21 1962-12-21 Verfahren und Vorrichtung zum abschnittsweisen Herstellen von mehrfeldrigen Brueckenoder aehnlichen Tragwerken

Publications (1)

Publication Number Publication Date
US3299191A true US3299191A (en) 1967-01-17

Family

ID=7372049

Family Applications (1)

Application Number Title Priority Date Filing Date
US331991A Expired - Lifetime US3299191A (en) 1962-12-21 1963-12-17 Method and means for erecting bridges

Country Status (6)

Country Link
US (1) US3299191A (de)
AT (1) AT273212B (de)
CH (1) CH424848A (de)
DE (1) DE1255695B (de)
GB (1) GB1073831A (de)
NL (1) NL300819A (de)

Cited By (26)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3448511A (en) * 1966-04-01 1969-06-10 Strabag Bau Ag Arrangement and method for constructing multispan bridges or the like
US3490605A (en) * 1967-04-24 1970-01-20 Kurt Koss Traveling beam for the production of bridge sections
US3527553A (en) * 1968-02-06 1970-09-08 Felix M Adler Apparatus for the construction of elevated ways
US3571835A (en) * 1967-10-30 1971-03-23 Dyckerhoff & Widmann Ag Apparatus for concreting multiple section structures, particularly bridge supports of reinforced or prestressed concrete
US3707011A (en) * 1970-03-11 1972-12-26 Ind De Travaux Comp Bracing apparatus for movement of a bridging work
US3845515A (en) * 1971-08-14 1974-11-05 E Gelhard Self-progressing construction system
US3882564A (en) * 1973-09-24 1975-05-13 Genie Civil Et De Tech Ind Soc Process for construction of bridges, in particular motorway flyovers
US3897927A (en) * 1973-07-17 1975-08-05 Genie Civil Et De Tech Ind Soc Progressive molding apparatus with adjustable locating means
US3902212A (en) * 1973-07-17 1975-09-02 Genie Civil Et De Tech Ind Ge Building of multispan bridges or the like works, by the cantilever method
US3985480A (en) * 1972-08-18 1976-10-12 Dyckerhoff & Widmann Ag Apparatus for the sectional cantilever construction of bridge girder systems
US3989218A (en) * 1973-07-17 1976-11-02 Societe D'etudes De Genie Civil Et De Techniques Industrielles (Ge.C.T.I.) Cantilever form used in bridge construction
US4087220A (en) * 1974-03-12 1978-05-02 Kurt Koss Apparatus for building a concrete bridge superstructure
US4259759A (en) * 1978-02-16 1981-04-07 Oiles Industry Co. Ltd. Concrete bridge girder support structure and cantilever erection method using same
US4497153A (en) * 1981-06-19 1985-02-05 Mueller Eberhard Method and device for erecting building structures such as bridges, using pre-fabricated concrete beams
US4651375A (en) * 1984-11-15 1987-03-24 Romualdo Macchi Launching system for bridge bays, especially continuous-beam bridges made up of prefabricated segments and to be tightened upon installation by means of prestressed wires
US4799279A (en) * 1985-12-02 1989-01-24 Figg And Muller Engineers, Inc. Method of constructing the approach and main spans of a cable stayed segmental bridge
US20060107543A1 (en) * 2004-11-19 2006-05-25 Smith Timothy M Column placement template
US20070163058A1 (en) * 2005-12-20 2007-07-19 Flatiron Constructors, Inc. Method and Apparatus for Bridge Construction
US20090282626A1 (en) * 2008-01-28 2009-11-19 Powers James M Method of launching bridge spans in bridge construction
US20110030155A1 (en) * 2007-10-09 2011-02-10 Hntb Holdings Ltd Method for building over an opening via incremental launching
US20130055512A1 (en) * 2010-05-19 2013-03-07 Beijing Wowjoint Machinery Co Transportation and erection integrated machine with displacement platforms and methods for erecting bridge using the same
WO2016018166A1 (pt) 2014-07-31 2016-02-04 Pgpi - Marcas E Patentes, S.A. Processo de construção de estruturas com segmentos vazios e sistema de construção com segmentos vazios
WO2017003314A1 (en) * 2015-06-29 2017-01-05 Berd - Projecto, Investigação E Engenharia De Pontes, S.A. Process of hybrid construction of large span bridge with precast segments and hybrid large span bridge construction system with precast segments
CN109024308A (zh) * 2018-06-21 2018-12-18 上海建工集团股份有限公司 架桥机的恒载控制装置与方法
CN111893898A (zh) * 2020-08-19 2020-11-06 中国铁路设计集团有限公司 一种墩位起吊、运拼分离的悬拼造桥系统及其施工方法
CN114808708A (zh) * 2022-03-29 2022-07-29 中国铁建港航局集团有限公司 小箱梁高低吊法安装施工方法

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE102022000549A1 (de) 2022-02-14 2023-08-17 Thomas Runkel Verfahren und Vorrichtung zur Brückenerneuerung in kurzer Bauzeit auf vorhandenen Pfeilern
DE102022001952A1 (de) 2022-06-04 2023-12-07 Thomas Runkel Verfahren und Vorrichtung zum Abbau einer Brücke

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2963764A (en) * 1950-07-06 1960-12-13 Dyckerhoff & Widmann Ag Constructing a prestressed concrete bridge
US3027633A (en) * 1955-08-19 1962-04-03 Yuba Cons Ind Inc Method and apparatus for bridge construction

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
AT217082B (de) * 1959-05-23 1961-09-11 Strabag Bau A G Und Kloeckner Einrichtung zum Betonieren langer Bauteile

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2963764A (en) * 1950-07-06 1960-12-13 Dyckerhoff & Widmann Ag Constructing a prestressed concrete bridge
US3027633A (en) * 1955-08-19 1962-04-03 Yuba Cons Ind Inc Method and apparatus for bridge construction

Cited By (36)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3448511A (en) * 1966-04-01 1969-06-10 Strabag Bau Ag Arrangement and method for constructing multispan bridges or the like
US3490605A (en) * 1967-04-24 1970-01-20 Kurt Koss Traveling beam for the production of bridge sections
US3571835A (en) * 1967-10-30 1971-03-23 Dyckerhoff & Widmann Ag Apparatus for concreting multiple section structures, particularly bridge supports of reinforced or prestressed concrete
US3527553A (en) * 1968-02-06 1970-09-08 Felix M Adler Apparatus for the construction of elevated ways
US3707011A (en) * 1970-03-11 1972-12-26 Ind De Travaux Comp Bracing apparatus for movement of a bridging work
US3845515A (en) * 1971-08-14 1974-11-05 E Gelhard Self-progressing construction system
US3985480A (en) * 1972-08-18 1976-10-12 Dyckerhoff & Widmann Ag Apparatus for the sectional cantilever construction of bridge girder systems
US3902212A (en) * 1973-07-17 1975-09-02 Genie Civil Et De Tech Ind Ge Building of multispan bridges or the like works, by the cantilever method
US3897927A (en) * 1973-07-17 1975-08-05 Genie Civil Et De Tech Ind Soc Progressive molding apparatus with adjustable locating means
US3989218A (en) * 1973-07-17 1976-11-02 Societe D'etudes De Genie Civil Et De Techniques Industrielles (Ge.C.T.I.) Cantilever form used in bridge construction
US3882564A (en) * 1973-09-24 1975-05-13 Genie Civil Et De Tech Ind Soc Process for construction of bridges, in particular motorway flyovers
US4087220A (en) * 1974-03-12 1978-05-02 Kurt Koss Apparatus for building a concrete bridge superstructure
US4259759A (en) * 1978-02-16 1981-04-07 Oiles Industry Co. Ltd. Concrete bridge girder support structure and cantilever erection method using same
US4497153A (en) * 1981-06-19 1985-02-05 Mueller Eberhard Method and device for erecting building structures such as bridges, using pre-fabricated concrete beams
US4651375A (en) * 1984-11-15 1987-03-24 Romualdo Macchi Launching system for bridge bays, especially continuous-beam bridges made up of prefabricated segments and to be tightened upon installation by means of prestressed wires
US4799279A (en) * 1985-12-02 1989-01-24 Figg And Muller Engineers, Inc. Method of constructing the approach and main spans of a cable stayed segmental bridge
US20060207113A1 (en) * 2004-11-19 2006-09-21 Smith Timothy M Column placement template
US7055251B1 (en) * 2004-11-19 2006-06-06 Smith Timothy M Column placement template
US20060107543A1 (en) * 2004-11-19 2006-05-25 Smith Timothy M Column placement template
US7191528B2 (en) * 2004-11-19 2007-03-20 Noisewall Technologies, Inc. Column placement template
US20070163058A1 (en) * 2005-12-20 2007-07-19 Flatiron Constructors, Inc. Method and Apparatus for Bridge Construction
WO2007076417A3 (en) * 2005-12-20 2008-11-27 Flatiron Constructors Inc Method and apparatus for bridge construction
US7520014B2 (en) * 2005-12-20 2009-04-21 Flatiron Constructors, Inc. Method and apparatus for bridge construction
AU2006330568B2 (en) * 2005-12-20 2011-04-21 Flatiron Constructors, Inc. Method and apparatus for bridge construction
US20110030155A1 (en) * 2007-10-09 2011-02-10 Hntb Holdings Ltd Method for building over an opening via incremental launching
US8359810B2 (en) * 2007-10-09 2013-01-29 Hntb Holdings Ltd Method for building over an opening via incremental launching
US7669272B2 (en) * 2008-01-28 2010-03-02 Powers James M Method of launching bridge spans in bridge construction
US20090282626A1 (en) * 2008-01-28 2009-11-19 Powers James M Method of launching bridge spans in bridge construction
US20130055512A1 (en) * 2010-05-19 2013-03-07 Beijing Wowjoint Machinery Co Transportation and erection integrated machine with displacement platforms and methods for erecting bridge using the same
US8555442B2 (en) * 2010-05-19 2013-10-15 Beijing Wowjoint Machinery Co. Transportation and erection integrated machine with displacement platforms and methods for erecting bridge using the same
WO2016018166A1 (pt) 2014-07-31 2016-02-04 Pgpi - Marcas E Patentes, S.A. Processo de construção de estruturas com segmentos vazios e sistema de construção com segmentos vazios
WO2017003314A1 (en) * 2015-06-29 2017-01-05 Berd - Projecto, Investigação E Engenharia De Pontes, S.A. Process of hybrid construction of large span bridge with precast segments and hybrid large span bridge construction system with precast segments
CN109024308A (zh) * 2018-06-21 2018-12-18 上海建工集团股份有限公司 架桥机的恒载控制装置与方法
CN111893898A (zh) * 2020-08-19 2020-11-06 中国铁路设计集团有限公司 一种墩位起吊、运拼分离的悬拼造桥系统及其施工方法
CN114808708A (zh) * 2022-03-29 2022-07-29 中国铁建港航局集团有限公司 小箱梁高低吊法安装施工方法
CN114808708B (zh) * 2022-03-29 2023-09-26 中国铁建港航局集团有限公司 小箱梁高低吊法安装施工方法

Also Published As

Publication number Publication date
GB1073831A (en) 1967-06-28
AT273212B (de) 1969-08-11
CH424848A (de) 1966-11-30
DE1255695B (de) 1967-12-07
NL300819A (nl)

Similar Documents

Publication Publication Date Title
US3299191A (en) Method and means for erecting bridges
US4993094A (en) Bridge comprising a bridge floor and elements supporting said floor, particularly a long span cable-stayed bridge, and process of construction
US4352220A (en) Method for the construction of a cable-stayed or rein-girth bridge
CN102395731B (zh) 架空模板移动起重机及方法
GB1446446A (en) Apparatus for the construction of bridge support systems
US4825492A (en) Rapid deployment stationary bridge
US2963764A (en) Constructing a prestressed concrete bridge
US3882564A (en) Process for construction of bridges, in particular motorway flyovers
US3367074A (en) Method for erecting prefabricated bridges of concrete, and bridge erected by said method
US4646379A (en) Concrete deck truss bridge and method of construction
CN116876321B (zh) 一种变宽变箱非对称连续刚构桥及施工方法
EP0182753B1 (de) Versetzgerät, insbesondere für Brücken mit durchlaufendem Träger aus vorgefertigten Elementen hergestellt
CN109629454B (zh) 一种单侧提升节段梁的架桥设备和架桥方法
GB2074209A (en) Lattice girder for bridges etc.
CN117328687B (zh) 一种钢结构-混凝土组合结构的安装方法
US2692034A (en) Temporary form support for building concrete bridges
US3872532A (en) Prefabricated bridge
CN211420873U (zh) 应用于钢箱梁滑移施工的支撑架
JPS6041164B2 (ja) 斜張橋架設工法
US3833959A (en) Method of erecting a cantilever truss bridge; bridge; panel for a bridge; and dummy chords for panel
US1842136A (en) Automatically adjustable continuous bridge
RU2046879C1 (ru) Конструкция уширения пролетного строения
CN117626825B (zh) 一种用于拱桥桥面单向架设的配重施工方法
US1973742A (en) Arch construction
SU887696A1 (ru) Способ монтажа неразрезного сталежелезобетонного пролетного строени моста