US6957580B2 - System and method for measurements of depth and velocity of instrumentation within a wellbore - Google Patents

System and method for measurements of depth and velocity of instrumentation within a wellbore Download PDF

Info

Publication number
US6957580B2
US6957580B2 US10/811,317 US81131704A US6957580B2 US 6957580 B2 US6957580 B2 US 6957580B2 US 81131704 A US81131704 A US 81131704A US 6957580 B2 US6957580 B2 US 6957580B2
Authority
US
United States
Prior art keywords
acceleration sensor
downhole portion
signal
wellbore
survey tool
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
US10/811,317
Other languages
English (en)
Other versions
US20050160812A1 (en
Inventor
Roger Ekseth
Martyn Ian Greensmith
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Gyrodata Inc
Original Assignee
Gyrodata Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Gyrodata Inc filed Critical Gyrodata Inc
Priority to US10/811,317 priority Critical patent/US6957580B2/en
Assigned to GYRODATA, INCORPORATED reassignment GYRODATA, INCORPORATED ASSIGNMENT OF ASSIGNORS INTEREST (SEE DOCUMENT FOR DETAILS). Assignors: EKSETH, ROGER, GREENSMITH, MARTYN IAN
Priority to DE602005018168T priority patent/DE602005018168D1/de
Priority to AT05711962T priority patent/ATE451538T1/de
Priority to PCT/US2005/002275 priority patent/WO2005073509A1/en
Priority to EP05711962A priority patent/EP1714004B1/de
Priority to CA2554254A priority patent/CA2554254C/en
Priority to US11/134,660 priority patent/US7350410B2/en
Publication of US20050160812A1 publication Critical patent/US20050160812A1/en
Publication of US6957580B2 publication Critical patent/US6957580B2/en
Application granted granted Critical
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B47/00Survey of boreholes or wells
    • E21B47/02Determining slope or direction
    • E21B47/022Determining slope or direction of the borehole, e.g. using geomagnetism
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B47/00Survey of boreholes or wells
    • E21B47/04Measuring depth or liquid level
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01PMEASURING LINEAR OR ANGULAR SPEED, ACCELERATION, DECELERATION, OR SHOCK; INDICATING PRESENCE, ABSENCE, OR DIRECTION, OF MOVEMENT
    • G01P7/00Measuring speed by integrating acceleration

Definitions

  • the present application relates generally to systems and method for determining the depth, the velocity, or both the depth and the velocity of an instrumentation package within a wellbore.
  • Surface-based wellbore depth measurements are typically made periodically during wellbore drilling for the exploration of oil and gas deposits to determine the absolute depth of the drilling tool within the wellbore.
  • the depth of the drilling tool is typically determined by surface measurements of the lengths of the pipe sections inserted into the wellbore between the drilling tool and the surface.
  • the drilling of the wellbore is periodically halted and a survey tool is lowered into the wellbore.
  • a survey tool As the survey tool is guided along the wellbore, it can provide information regarding its orientation and location by sending signals through a wire or cable to the surface.
  • the absolute depth of the survey tool down the wellbore is typically given by a surface-based measurement of the length of the wire or cable between the survey tool and the surface.
  • surface-based logging measurements of the absolute depth of detected geological formations are typically made by surface measurements of the length of the wire or cable between the logging tool and the surface.
  • the cumulative length of the pipe sections or of the wire while within the wellbore can differ from the cumulative length measured at the surface, resulting in errors in the determination of the absolute depth.
  • surface-based measurements of the velocity of the survey tool along the wellbore can be used to determine the relative distances between detected features or formations within the wellbore. For example, the time period between detecting two separate features along the wellbore and the velocity of the survey tool during this time period can be multiplied together to provide the relative distance between the two detected features.
  • surface-based velocity measurements do not provide a sufficient accuracy (e.g., within only a few centimeters) to tell when two geophysical sensors with significant along-hole separation pass the same geological formation within only a few centimeters of accuracy.
  • the survey tool can move in a jerking manner with varying velocity.
  • these effects can result in the velocity of the survey tool within the wellbore differing from the measured velocity of the wire or cable at the surface.
  • Inertial navigation systems have been proposed as being able to provide improved wellbore depth and velocity measurements. Such inertial navigation systems can determine the depth of the survey tool by double integration of the detected acceleration. However, such procedures are vulnerable to noise in the detected acceleration, which results in a drift of the depth measurement from the true depth of the survey tool. It has been difficult, and will likely continue to be difficult, to get such inertial navigation systems to work without providing aiding data such as surface-based depth measurements or updates of the depth obtained while the survey tool is stationary (i.e., zero-velocity updates) to remove this drift. However, it is generally desirable to avoid using surface-based aiding data, since such data would effectively transform an inertial navigation system into a surface-depth system, thereby including the problems of such systems. It is also generally desirable to avoid zero-velocity updates due to large increases in the time and costs associated with such surveys.
  • Improved wellbore depth and velocity measurements are desirable to understand the geological formations being drilled and the oil or gas deposits being accessed. For example, improved measurements can resolve uncertainties in the depth measurements of a geological fault from wellbore positioning surveys in two nearby wells. In addition, improved wellbore depth measurements are helpful for drilling safety by providing more reliable information regarding the true wellbore depth to avoid drilling into adjacent wells.
  • a survey tool is adapted for use in a wellbore.
  • the survey tool comprises a downhole portion having an axis.
  • the downhole portion is adapted to move within the wellbore with the axis generally parallel to the wellbore.
  • the survey tool further comprises a first acceleration sensor mounted at a first position within the downhole portion.
  • the first acceleration sensor is adapted to generate a first signal indicative of an acceleration of the first acceleration sensor along the axis.
  • the survey tool further comprises a second acceleration sensor mounted at a second position within the downhole portion. The second position is spaced from the first position by a non-zero distance along the axis.
  • the second acceleration sensor is adapted to generate a second signal indicative of an acceleration of the second acceleration sensor along the axis.
  • the survey tool further comprises a controller adapted to receive the first signal and the second signal and to calculate a depth, a velocity, or both a depth and a velocity of the downhole portion in response to the first signal and the second signal.
  • a method determines a depth of a downhole portion of a survey tool along a wellbore.
  • the method comprises providing a survey tool comprising a downhole portion.
  • the downhole portion comprises a first acceleration sensor and a second acceleration sensor.
  • the first acceleration sensor is adapted to generate a first signal indicative of an acceleration of the first acceleration sensor along the wellbore.
  • the second acceleration sensor is adapted to generate a second signal indicative of an acceleration of the second acceleration sensor along the wellbore.
  • the second acceleration sensor is spaced from the first acceleration sensor by a non-zero distance.
  • the method further comprises receiving the first signal and the second signal while the downhole portion is at a first location within the wellbore.
  • the method further comprises receiving the first signal and the second signal while the downhole portion is at a second location within the wellbore.
  • the method further comprises calculating a depth of the downhole portion of the survey tool in response to the first signal and the second signal received while the downhole portion is at the first location and in response to the first signal and the second signal received while the downhole portion is at the second location.
  • a method determines a velocity of a downhole portion of a survey tool along a wellbore.
  • the method comprises providing a survey tool comprising a downhole portion.
  • the downhole portion comprises a first acceleration sensor and a second acceleration sensor.
  • the first acceleration sensor is adapted to generate a first signal indicative of an acceleration of the first acceleration sensor along the wellbore.
  • the second acceleration sensor is adapted to generate a second signal indicative of an acceleration of the second acceleration sensor along the wellbore.
  • the second acceleration sensor is spaced from the first acceleration sensor by a non-zero distance.
  • the method further comprises receiving the first signal and the second signal while the downhole portion is at a first location within the wellbore.
  • the method further comprises receiving the first signal and the second signal while the downhole portion is at a second location within the wellbore.
  • the method further comprises calculating a velocity of the downhole portion of the survey tool in response to the first signal and the second signal received while the downhole portion is at the first location and in response to the first signal and the second signal received while the downhole portion is at the second location.
  • FIG. 1 schematically illustrates a survey tool compatible with embodiments described herein for use in a wellbore.
  • FIG. 2 schematically illustrates the survey tool in a portion of the wellbore having a curvature.
  • FIG. 3 schematically illustrates a survey tool as part of a logging assembly having a first supplementary sensor and a second supplementary sensor.
  • FIG. 4A is a flowchart of an exemplary method of determining a depth of a downhole portion of a survey tool in accordance with embodiments described herein.
  • FIG. 4B is a flowchart of an exemplary method of determining a velocity of a downhole portion of a survey tool in accordance with embodiments described herein.
  • FIG. 5A schematically illustrates a survey tool having a first supplementary sensor and a second supplementary sensor passing a landmark feature.
  • FIG. 5B is a plot of the signals from the first supplementary sensor and the second supplementary sensor as a function of time.
  • Certain embodiments described herein provide a true downhole-based system for measuring a depth, a velocity, or both a depth and a velocity of a downhole portion with sufficient accuracy for logging and drilling applications.
  • FIG. 1 schematically illustrates a survey tool 10 compatible with embodiments described herein for use in a wellbore 20 .
  • the survey tool 10 comprises a downhole portion 30 having an axis 32 .
  • the downhole portion 30 is adapted to move within the wellbore 20 with the axis 32 generally parallel to the wellbore 20 .
  • the survey tool 10 further comprises a first acceleration sensor 40 mounted at a first position 42 within the downhole portion 30 .
  • the first acceleration sensor 40 is adapted to generate a first signal indicative of an acceleration of the first acceleration sensor 40 along the axis 32 .
  • the survey tool 10 further comprises a second acceleration sensor 50 mounted at a second position 52 within the downhole portion 30 .
  • the second position 52 is spaced from the first position 42 by a non-zero distance B along the axis 32 .
  • the second acceleration sensor 50 is adapted to generate a second signal indicative of an acceleration of the second acceleration sensor 50 along the axis 32 .
  • the survey tool 10 further comprises a controller 60 adapted to receive the first signal and the second signal.
  • the controller 60 is further adapted to calculate a depth, a velocity, or both a depth and a velocity of the downhole portion 30 in response to the first signal and the second signal.
  • the controller 60 is at the surface and is coupled to the downhole portion 30 by a cable 62 .
  • the survey tool 10 is a component of a drill string and is used to determine the actual depth of a drilling tool (e.g., drill bit) of the drilling assembly.
  • Drill strings compatible with embodiments described herein include, but are not limited to, measurement-while-drilling (MWD) strings.
  • the survey tool 10 is a component of a navigational string and is used to determine at least a portion of the wellbore path.
  • the survey tool 10 is a component of a logging string and is used to determine the actual depth of detected geological features along the wellbore 20 or relative depths between detected geological features along the wellbore 20 .
  • Logging strings compatible with embodiments described herein include, but are not limited to logging-while-drilling (LWD) strings.
  • the drill string or the logging string includes a sufficient number of sensors and adequate spacings between the first acceleration sensor 40 and the second acceleration sensor 50 to perform the method described below.
  • the drill string or the logging string includes redundant acceleration sensors (e.g., cross-axial accelerometers).
  • the downhole portion 30 comprises a housing containing at least one of the acceleration sensors. As schematically illustrated by FIG. 1 , the housing of certain embodiments contains both the first acceleration sensor 40 and the second acceleration sensor 50 . In other embodiments, the first acceleration sensor 40 and the second acceleration sensor 50 are not contained in a single housing, but are positioned on different portions of the downhole portion 30 .
  • the downhole portion 30 is adapted to bend as the downhole portion 30 moves through a curved portion of the wellbore 20 .
  • FIG. 2 schematically illustrates a downhole portion 30 within a section of the wellbore 20 having a curvature such that the direction of the wellbore 20 changes by a non-zero angle ⁇ .
  • the downhole portion 30 bends by the non-zero angle ⁇ such that the axis 32 of the downhole portion 30 is substantially parallel to the wellbore 20 .
  • the axis 32 at the first position 42 is at the non-zero angle with respect to the axis 32 at the second position 52 .
  • the first acceleration sensor 40 and the second acceleration sensor 50 comprise accelerometers currently used in conventional wellbore survey tools.
  • one or both of the first acceleration sensor 40 and the second acceleration sensor 50 comprise a single-axis accelerometer sensitive to accelerations along a single sensing direction.
  • the single-axis accelerometer is advantageously mounted so that its sensing direction is substantially parallel with the axis 32 of the downhole portion 30 .
  • one or both of the first acceleration sensor 40 and the second acceleration sensor 50 comprise a two-axis (i.e., cross-axial) accelerometer sensitive to accelerations in an x-y plane.
  • the two-axis accelerometer is advantageously mounted so that its x-y plane is parallel to the axis 32 of the downhole portion 30 .
  • the first acceleration sensor 40 and the second acceleration sensor 50 are advantageously substantially identical.
  • Exemplary accelerometers include, but are not limited to, quartz flexure suspension accelerometers available from a variety of vendors. Other types of acceleration sensors are also compatible with embodiments described herein.
  • the distance B between the first position 42 and the second position 52 along the axis 32 of the downhole portion 30 is advantageously selected to be long enough to respond to curvature of the wellbore 20 such that the downhole portion 30 bends substantially equally to the curvature of the wellbore 20 .
  • the distance B of certain embodiments is selected such that the first acceleration sensor 40 and the second acceleration sensor 50 detect different accelerations along the axis 32 when the downhole portion 30 is in a curved portion of the wellbore 20 .
  • the distance B is larger than approximately 10 meters, while in other embodiments, the distance B is in a range between approximately 10 meters and approximately 30 meters. Other distances B are compatible with embodiments described herein.
  • the downhole portion 30 comprises one or more supplementary sensors in addition to the first acceleration sensor 40 and the second acceleration sensor 50 .
  • FIG. 3 schematically illustrates a survey tool 10 comprising a first supplementary sensor 70 and a second supplementary sensor 80 .
  • Exemplary supplementary sensors of the downhole portion 30 include, but are not limited to, gamma-ray sensors adapted to detect gamma rays from geological formations in proximity to the downhole portion 30 and magnetic sensors adapted to detect casing collars of the pipe casing sections of the wellbore 20 in proximity to the downhole portion 30 .
  • FIG. 3 schematically illustrates a survey tool 10 comprising a first supplementary sensor 70 and a second supplementary sensor 80 .
  • Exemplary supplementary sensors of the downhole portion 30 include, but are not limited to, gamma-ray sensors adapted to detect gamma rays from geological formations in proximity to the downhole portion 30 and magnetic sensors adapted to detect casing collars of the pipe casing sections of the wellbore 20
  • the first supplementary sensor 70 is below and in proximity to the first acceleration sensor 40 and the second supplementary sensor 80 is above and in proximity to the second acceleration sensor 50 .
  • Other embodiments can have other configurations of at least one supplementary sensor and the two acceleration sensors.
  • such supplementary sensors are used in conjunction with the survey tool 10 , as described more fully below, to provide additional data which is used to aid the determination of the depth, the velocity, or both the depth and the velocity of the downhole portion 30 within the wellbore 20 .
  • the controller 60 is adapted to determine the depth, the velocity, or both the depth and the velocity of the downhole portion 30 in response to signals received from the various sensors of the downhole portion 30 .
  • the controller 60 comprises a microprocessor adapted to perform the method described below for determining the depth, the velocity, or both the depth and the velocity of the downhole portion 30 within the wellbore 20 .
  • the controller 60 further comprises a memory subsystem adapted to store at least a portion of the data obtained from the various sensors.
  • the controller 60 can comprise hardware, software, or a combination of both hardware and software to accomplish the calculation of the depth, the velocity, or both the depth and the velocity.
  • the controller 60 comprises a standard personal computer.
  • the controller 60 is located within the downhole portion 30 . In certain other embodiments, at least a portion of the controller 60 is located at the surface and is coupled to the downhole portion 30 within the wellbore 20 by a wire or cable 62 . In such embodiments, the cable 62 comprises signal conduits through which signals are transmitted from the various sensors within the downhole portion 30 to the controller 60 . In certain embodiments in which the controller 60 is adapted to generate control signals for the various components of the survey tool 10 in the downhole portion 30 , the cable 62 is adapted to transmit the control signals from the controller 60 to the downhole portion 30 .
  • the controller 60 is adapted to perform a post-processing analysis of the data obtained from the various sensors of the survey tool 10 .
  • data is obtained and saved from the various sensors of the survey tool 10 as the downhole portion 30 travels within the wellbore 20 , and the saved data are later analyzed to determine relative depths and/or absolute depths of the various detected features.
  • the saved data obtained from the various sensors including any aiding data (described more fully below) advantageously includes time reference information (e.g., time tagging) so that the relative times of the detection of various features can be determined.
  • the relevant data from the various sensors are manually inspected and correlated with one another to provide aiding data.
  • the controller 60 performs this correlation of the saved data automatically to provide the aiding data.
  • the controller 60 provides a real-time processing analysis of the data obtained from the various sensors of the survey tool 10 .
  • data obtained from the various sensors of the survey tool 10 are analyzed while the downhole portion 30 travels within the wellbore 20 .
  • at least a portion of the data obtained from the various sensors is saved in memory for analysis by the controller 60 .
  • the controller 60 of certain such embodiments comprises sufficient data processing and data storage capacity to perform the real-time analysis.
  • the relevant data from the various sensors are advantageously correlated with one another by the controller 60 to provide aiding data.
  • FIG. 4A is a flowchart of an exemplary method 100 for determining a depth of a downhole portion 30 of a survey tool 10 along a wellbore 20 in accordance with embodiments described herein. While the method 100 is described herein by reference to the survey tool 10 schematically illustrated by FIGS. 1–3 , other survey tools 10 are also compatible with embodiments of the method 100 .
  • the method 100 comprises providing the survey tool 10 comprising a downhole portion 30 within the wellbore 20 in an operational block 110 .
  • the downhole portion 30 comprises a first acceleration sensor 40 and a second acceleration sensor 50 .
  • the first acceleration sensor 40 is adapted to generate a first signal indicative of an acceleration of the first acceleration sensor 40 along the wellbore 20 .
  • the second acceleration sensor 50 is adapted to generate a second signal indicative of an acceleration of the second acceleration sensor 50 along the wellbore 20 .
  • the second acceleration sensor 50 is spaced from the first acceleration sensor 40 by a non-zero distance.
  • the method 100 further comprises receiving the first signal and the second signal while the downhole portion 30 is at a first location within the wellbore 20 in an operational block 120 .
  • the downhole portion 30 of certain embodiments is stationary while at the first location, while in other embodiments, the downhole portion 30 is moving along the wellbore 20 while at the first location.
  • the method 100 further comprises receiving the first signal and the second signal while the downhole portion 30 is at a second location within the wellbore 20 in an operational block 130 .
  • the downhole portion 30 of certain embodiments is stationary while at the second location, while in other embodiments, the downhole portion 30 is moving along the wellbore 20 while at the second location.
  • the method 100 further comprises calculating a depth of the downhole portion 30 in an operational block 140 .
  • the depth is calculated in response to the first signal and the second signal received while the downhole portion 30 is at the first location and in response to the first signal and the second signal received while the downhole portion 30 is at the second location.
  • FIG. 4B is a flowchart of an exemplary method 200 for determining a velocity of a downhole portion 30 of a survey tool 10 between two locations along a wellbore 20 in accordance with embodiments described herein. While the method 200 is described herein by reference to the survey tool 10 schematically illustrated by FIGS. 1–3 , other survey tools 10 are also compatible with embodiments of the method 200 .
  • the method 200 comprises providing the survey tool 10 comprising a downhole portion 30 in an operational block 210 .
  • the downhole portion 30 comprises a first acceleration sensor 40 and a second acceleration sensor 50 .
  • the first acceleration sensor 40 is adapted to generate a first signal indicative of an acceleration of the first acceleration sensor 40 along the wellbore.
  • the second acceleration sensor 50 is adapted to generate a second signal indicative of an acceleration of the second acceleration sensor 50 along the wellbore.
  • the second acceleration sensor 50 is spaced from the first acceleration sensor 40 by a non-zero distance.
  • the method 200 further comprises receiving the first signal and the second signal while the downhole portion 30 is at a first location within the wellbore 20 in an operational block 220 .
  • the downhole portion 30 of certain embodiments is moving along the wellbore 20 while at the first location.
  • the method 200 further comprises receiving the first signal and the second signal while the downhole portion 30 is at a second location within the wellbore 20 in an operational block 230 .
  • the downhole portion 30 of certain embodiments is moving along the wellbore 20 while at the second location.
  • the method 200 further comprises calculating a velocity of the downhole portion 30 between the first location and the second location in an operational block 240 .
  • the velocity is calculated in response to the first signal and the second signal received while the downhole portion 30 is at the first location and in response to the first signal and the second signal received while the downhole portion 30 is at the second location.
  • An exemplary embodiment for determining the depth, the velocity, or both the depth and the velocity of a downhole portion 30 of a survey tool 10 utilizing a first acceleration sensor 40 and a second acceleration sensor 50 is described below. While the exemplary embodiment described below has a minimum number of variables, other embodiments are not limited to only these variables. Additional variables may also be used, including, but not limited to, misalignments of the acceleration sensors relative to the axis 32 . In certain embodiments, the units of the parameters and variables below are in meters-kilogram-second (MKS) units.
  • MKS meters-kilogram-second
  • Aiding data from other downhole supplementary sensors is advantageously included in certain embodiments to enhance the resultant accuracy of the results.
  • Other embodiments do not utilize aiding data or such supplementary sensors.
  • the exemplary embodiment described below includes the use of aiding data, such as velocity data, absolute-depth data, and relative-depth data. Other types and/or combinations of aiding data are also used in other embodiments.
  • the periodicity of the measurements from the two accelerometers define time periods or “epochs” whereby one set of accelerometer measurements are taken at every epoch k. Aiding data are taken in the exemplary embodiments only at a subset of these epochs. In certain embodiments, the different types of aiding data are taken the same epochs, while in other embodiments, the different types of aiding data are taken at different epochs.
  • the first acceleration sensor 40 is referred to as the “upper acceleration sensor” and the second acceleration sensor 50 is referred to as the “lower acceleration sensor.”
  • the terms “upper” and “lower” are used herein merely to distinguish the two acceleration sensors according to their relative positions along the wellbore 20 , and are not to be interpreted as limiting. Other embodiments distinguish the two acceleration sensors from one another using other terms.
  • ⁇ k [ ⁇ a , k 2 ⁇ av , k ⁇ aD , k ⁇ ad , k ⁇ aI , k ⁇ va , k ⁇ v , k 2 ⁇ vD , k ⁇ vd , k ⁇ vI , k ⁇ Da , k ⁇ Dv , k ⁇ D , k 2 ⁇ Dd , k ⁇ DI , k ⁇ da , k ⁇ dv , k ⁇ dD , k ⁇ d , k 2 ⁇ dI , k ⁇ Ia , k ⁇ Iv , k ⁇ ID , k ⁇ Id , k ⁇ I , k 2 ] ; ( Eq . ⁇ 2 ) where ⁇ 2 i,k
  • the initial depth is referred to a known point in the wellbore 20 .
  • the initial inclinations of certain embodiments is determined from stationary acceleration sensor measurements or from known wellbore geometry of a landmark location. Additional acceleration sensors are compatible with the use of acceleration-sensor-based initial inclinations.
  • a pair of high-side cross-axial acceleration sensors can be used to provide initial stationary acceleration measurements in a direction substantially perpendicular to the axis 32 and having a component in a vertical plane.
  • the first acceleration sensor 40 and the second acceleration sensor 50 each comprises a two-axis accelerometer that provides signals indicative of the acceleration parallel to the axis 32 and the acceleration in a direction substantially perpendicular to the axis 32 and having a component in a vertical plane.
  • a L,0 is the initial lower acceleration sensor measurement in a direction generally parallel to the axis 32
  • a U,0 is the initial upper acceleration sensor measurement in a direction generally parallel to the axis 32
  • HA L,0 is the initial lower acceleration sensor measurement in a direction substantially perpendicular to the axis 32 and having a component in a vertical plane (i.e., the lower high-side acceleration)
  • HA U,0 is the initial upper acceleration sensor measurement in a direction substantially perpendicular to the axis 32 and having a component in a vertical plane (i.e., the upper high-side acceleration).
  • the zero elements of the co-variance matrix ⁇ 0 result from the fact that the downhole portion 30 is initially stationary (i.e., acceleration and velocity both equal zero).
  • ⁇ t is the time period between epoch k ⁇ 1 and epoch k.
  • other embodiments utilize other equations which include higher-order terms to predict the state vector of epoch k based on an earlier state vector of epoch k ⁇ 1.
  • p a is the maximum change of acceleration over time period ⁇ t
  • p v is the maximum change of velocity over time period ⁇ t
  • p D is the maximum change of depth over time period ⁇ t
  • p d is the maximum change of apparent dogleg over time period ⁇ t
  • p 1 is the maximum change of inclination over time period ⁇ t.
  • the multiplication factor ⁇ is in a range between approximately 2 and approximately 5, and in other embodiments, the multiplication factor ⁇ is substantially equal to 3.
  • Other aiding measurements can be used in accordance with embodiments described herein.
  • ⁇ k [ 1 0 0 0 0 ⁇ ⁇ ⁇ t 1 0 0 0 ( ⁇ ⁇ ⁇ t ) 2 / 2 ⁇ ⁇ ⁇ t 1 0 0 0 0 0 1 0 0 d k - 1 * ⁇ ⁇ ⁇ t 0 v k - 1 * ⁇ ⁇ ⁇ t 1 ] .
  • ⁇ A,k [ 1 0 0 0 - g * sin ⁇ ( I k - ) 1 0 0 sin ⁇ ( I k - - d k - * B ) * B - sin ⁇ ( I k - - d k - * B ) ] .
  • Equations 20 through 24 denotes the values of the predicted state vector prior to the update using the acceleration measurements.
  • X k ⁇ and ⁇ k ⁇ are the state vector and state co-variance matrix, respectively, of epoch k after the prediction but prior to the measurement update. Aiding Data
  • the downhole portion 30 of the survey tool 10 is stopped within the wellbore 20 one or more times to obtain aiding data while the downhole portion 30 is stationary. In certain embodiments, the downhole portion 30 is stopped at one or more random or arbitrary times, while in other embodiments, the downhole portion 30 is stopped at multiple times with a predetermined period. In certain such embodiments which only have the first acceleration sensor 40 and the second acceleration sensor 50 , the state vector X k and the co-variance matrix ⁇ k can be expressed as:
  • ⁇ k [ 0 0 0 0 0 0 0 0 0 0 0 0 0 ⁇ D 2 0 0 0 0 0 0 ⁇ I 2 / B 2 ⁇ I 2 / ( B ⁇ 2 ) 0 0 0 ⁇ I 2 / ( B ⁇ 2 ) ⁇ I 2 ] . ( Eq . ⁇ 31 )
  • aiding velocity data is provided by one or more supplementary sensors which are part of the downhole portion 30 of the survey tool 10 .
  • exemplary supplementary sensors include, but are not limited to, gamma-ray sensors adapted to detect gamma rays from geological formations in proximity to the downhole portion 30 and magnetic sensors adapted to detect casing collars in proximity to the downhole portion 30 .
  • Such supplementary sensors do not continuously measure the velocity of the survey tool 10 , but they detect landmark features which can be used to calculate the average velocity of the downhole portion 30 as the downhole portion 30 passes the landmark feature or between the locations of two or more selected landmark features.
  • FIG. 5 schematically illustrates the signals from a first gamma-ray sensor 70 and a second gamma-ray sensor 80 as the downhole portion 30 moves past a geological formation 90 having a gamma-ray emission higher than the surrounding formations.
  • the first gamma-ray sensor 80 is lower than the second gamma-ray sensor 70 , so the first gamma-ray sensor 80 detects the formation 90 before the second gamma-ray sensor 70 detects the same formation 90 .
  • two magnetic sensors of the downhole portion 30 can be used to determine an average velocity of the downhole portion 30 relative to a casing collar of the wellbore 20 .
  • the measured velocity V k is the average velocity over the time interval ranging from T L to T U . However, the average velocity approaches the instantaneous velocity as the time interval (T L ⁇ T U ) approaches zero. In certain embodiments, the average velocity is used to analyze the state vector X k . In certain other embodiments, the analysis of the state vector X k utilizes the instantaneous velocity at epoch k. In certain such embodiments, the distance B v is selected to be as small as possible without letting the noise or uncertainty in the two time measurements corrupt the measured velocity.
  • the uncertainty ⁇ V,k in the measured velocity at epoch k depends on the instability of the velocity over the time interval between T L and T U , and on the uncertainty in the repeated detection of the landmark feature being referenced.
  • ⁇ det,k is constant among different epochs.
  • the maximum change of the velocity over the time period ⁇ t is assumed to be equal to the maximum change of the depth p D divided by the time period ⁇ t, where ⁇ t is small.
  • Equations 35 through 38 denotes the values of the various elements prior to the update using the aiding velocity data.
  • the detection of this landmark feature by one or more sensors of the downhole portion 30 can be used to provide aiding data.
  • one or more of the same supplementary sensors are used to provide both aiding velocity data and aiding absolute-depth data.
  • two supplementary sensors are used to provide two separate absolute-depth measurements of the same landmark feature.
  • the uncertainty ⁇ S,k of the absolute-depth measurements at epochs k and k′ depends on both the uncertainty in the given value of the absolute depth of the landmark feature and the uncertainty in the detection of the landmark feature by the supplementary sensor.
  • ⁇ det,k is constant for different epochs.
  • Equations 44 through 47 denotes the values of the various elements prior to the update using the aiding absolute-depth data.
  • the downhole portion 30 provides relative-depth data which does not depend on the known depths of landmark features.
  • such relative-depth data is provided by two supplementary sensors adapted to provide large and sharp signal spikes at landmark locations.
  • these landmark locations are previously known, while in other embodiments, these landmark locations are previously unknown.
  • the relative-depth data is provided by a similar configuration of two supplementary sensors of the downhole portion 30 as that which provides the aiding velocity data described above.
  • the velocity data is advantageously provided by two supplementary sensors which are relatively close together, the relative-depth data is advantageously provided by two supplementary sensors which are farther apart from one another.
  • the epoch k is defined to be the epoch during which the second supplementary sensor (e.g., the second gamma-ray sensor 80 of FIG. 3 ) passes a detectable landmark location and the epoch k′ is defined to be the epoch during which the first supplementary sensor (e.g., the first gamma-ray sensor 70 of FIG. 3 ) passes the same detectable landmark location.
  • D k′ is the calculated depth of the downhole portion 30 at epoch k′
  • B r is the distance between the first supplementary sensor and the second supplementary sensor (e.g., the two gamma-ray sensors 70 , 80 of FIG. 3 )
  • B a is the distance between the second acceleration sensor 50 and the second supplementary sensor (e.g., the second gamma-ray sensor 80 of FIG. 3 ).
  • the uncertainty in the relative-depth measurement at epoch k depends on both the uncertainty of the calculated depth at epoch k′ and the uncertainty in the relative depth detection.
  • ⁇ last,k is given by the third diagonal element ( ⁇ 33,k′ ) of the solution co-variance matrix at epoch k′.
  • ⁇ last,k is equal to ⁇ D , which is the uncertainty in the depth measurement.
  • Equations 51 through 54 denotes the values of the various elements prior to the update using the aiding relative-depth data.

Landscapes

  • Physics & Mathematics (AREA)
  • Geology (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • Geophysics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • General Physics & Mathematics (AREA)
  • Geophysics And Detection Of Objects (AREA)
  • Length Measuring Devices With Unspecified Measuring Means (AREA)
US10/811,317 2004-01-26 2004-03-26 System and method for measurements of depth and velocity of instrumentation within a wellbore Expired - Lifetime US6957580B2 (en)

Priority Applications (7)

Application Number Priority Date Filing Date Title
US10/811,317 US6957580B2 (en) 2004-01-26 2004-03-26 System and method for measurements of depth and velocity of instrumentation within a wellbore
EP05711962A EP1714004B1 (de) 2004-01-26 2005-01-25 System und verfahren zur tiefen- und geschwindigkeitsmessung der geräteausrüstung in einem bohrloch
AT05711962T ATE451538T1 (de) 2004-01-26 2005-01-25 System und verfahren zur tiefen- und geschwindigkeitsmessung der geräteausrüstung in einem bohrloch
PCT/US2005/002275 WO2005073509A1 (en) 2004-01-26 2005-01-25 System and method for measurements of depth and velocity of instrumentation within a wellbore
DE602005018168T DE602005018168D1 (de) 2004-01-26 2005-01-25 System und verfahren zur tiefen- und geschwindigkeitsmessung der geräteausrüstung in einem bohrloch
CA2554254A CA2554254C (en) 2004-01-26 2005-01-25 System and method for measurements of depth and velocity of instrumentation within a wellbore
US11/134,660 US7350410B2 (en) 2004-01-26 2005-05-20 System and method for measurements of depth and velocity of instrumentation within a wellbore

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
US53923404P 2004-01-26 2004-01-26
US10/811,317 US6957580B2 (en) 2004-01-26 2004-03-26 System and method for measurements of depth and velocity of instrumentation within a wellbore

Related Child Applications (1)

Application Number Title Priority Date Filing Date
US11/134,660 Continuation US7350410B2 (en) 2004-01-26 2005-05-20 System and method for measurements of depth and velocity of instrumentation within a wellbore

Publications (2)

Publication Number Publication Date
US20050160812A1 US20050160812A1 (en) 2005-07-28
US6957580B2 true US6957580B2 (en) 2005-10-25

Family

ID=34798925

Family Applications (2)

Application Number Title Priority Date Filing Date
US10/811,317 Expired - Lifetime US6957580B2 (en) 2004-01-26 2004-03-26 System and method for measurements of depth and velocity of instrumentation within a wellbore
US11/134,660 Expired - Lifetime US7350410B2 (en) 2004-01-26 2005-05-20 System and method for measurements of depth and velocity of instrumentation within a wellbore

Family Applications After (1)

Application Number Title Priority Date Filing Date
US11/134,660 Expired - Lifetime US7350410B2 (en) 2004-01-26 2005-05-20 System and method for measurements of depth and velocity of instrumentation within a wellbore

Country Status (6)

Country Link
US (2) US6957580B2 (de)
EP (1) EP1714004B1 (de)
AT (1) ATE451538T1 (de)
CA (1) CA2554254C (de)
DE (1) DE602005018168D1 (de)
WO (1) WO2005073509A1 (de)

Cited By (18)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20070143022A1 (en) * 2005-12-19 2007-06-21 Schlumberger Technology Corporation, Incorporated In The State Of Texas Data logging
US20090084546A1 (en) * 2007-10-02 2009-04-02 Roger Ekseth System and method for measuring depth and velocity of instrumentation within a wellbore using a bendable tool
US20090235732A1 (en) * 2008-03-20 2009-09-24 Baker Hughes Incorporated Method and apparatus for measuring true vertical depth in a borehole
US20090314546A1 (en) * 2008-06-24 2009-12-24 Mintchev Martin P In-drilling alignment
US20100096186A1 (en) * 2008-10-22 2010-04-22 Gyrodata, Incorporated Downhole surveying utilizing multiple measurements
US20100100329A1 (en) * 2008-10-22 2010-04-22 Gyrodata, Incorporated Downhole surveying utilizing multiple measurements
US20100198518A1 (en) * 2009-01-30 2010-08-05 Roger Ekseth Reducing error contributions to gyroscopic measurements from a wellbore survey system
US20100300755A1 (en) * 2009-06-02 2010-12-02 Baker Hughes Incorporated System and method for estimating velocity of a downhole component
WO2011126760A2 (en) 2010-03-30 2011-10-13 Gyrodata, Incorporated Bending of a shaft of a steerable borehole drilling tool
EP2818632A2 (de) 2013-06-25 2014-12-31 Gyrodata, Incorporated Positionierungstechniken in Umgebungen mit mehreren Bohrlöcher
EP2927419A1 (de) 2014-04-04 2015-10-07 Gyrodata, Incorporated System und verfahren zur überwachung von werkzeugrotation während eines kreiselkompassbohrlochtests
EP2980350A2 (de) 2014-07-29 2016-02-03 Gyrodata, Incorporated System und verfahren zur bereitstellung einer kontinuierlichen bohrlochüberwachung
US9631446B2 (en) 2013-06-26 2017-04-25 Impact Selector International, Llc Impact sensing during jarring operations
US9951602B2 (en) 2015-03-05 2018-04-24 Impact Selector International, Llc Impact sensing during jarring operations
US10689969B2 (en) 2014-07-29 2020-06-23 Gyrodata, Incorporated System and method for providing a continuous wellbore survey
US10781691B2 (en) 2014-07-29 2020-09-22 Gyrodata Incorporated System and method for providing a continuous wellbore survey
US11175431B2 (en) 2017-06-14 2021-11-16 Gyrodata, Incorporated Gyro-magnetic wellbore surveying
US11193363B2 (en) 2017-12-04 2021-12-07 Gyrodata, Incorporated Steering control of a drilling tool

Families Citing this family (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7234539B2 (en) 2003-07-10 2007-06-26 Gyrodata, Incorporated Method and apparatus for rescaling measurements while drilling in different environments
US6957580B2 (en) 2004-01-26 2005-10-25 Gyrodata, Incorporated System and method for measurements of depth and velocity of instrumentation within a wellbore
US8528637B2 (en) 2006-09-20 2013-09-10 Baker Hughes Incorporated Downhole depth computation methods and related system
US8122954B2 (en) * 2006-09-20 2012-02-28 Baker Hughes Incorporated Downhole depth computation methods and related system
US8899322B2 (en) * 2006-09-20 2014-12-02 Baker Hughes Incorporated Autonomous downhole control methods and devices
CN101936728B (zh) * 2010-07-05 2012-04-25 河海大学 滑动式智能测斜仪电缆导向探头定位装置
US8905129B2 (en) * 2011-12-14 2014-12-09 Baker Hughes Incorporated Speed activated closure assembly in a tubular and method thereof
EP2888444B1 (de) 2012-07-16 2016-11-16 Halliburton Energy Services, Inc. System und verfahren zum korrigieren der geschwindigkeit eines bohrlochwerkzeugstrangs
AU2012385499B2 (en) 2012-07-16 2016-07-14 Halliburton Energy Services, Inc. A system and method for wireline tool pump-down operations
US9945222B2 (en) * 2014-12-09 2018-04-17 Schlumberger Technology Corporation Closed loop control of drilling curvature
US20160369619A1 (en) * 2014-12-19 2016-12-22 Schlumberger Technology Corporation Drilling measurement systems and methods
US12535001B2 (en) 2017-09-29 2026-01-27 Baker Hughes Oilfield Operations Llc Downhole acoustic system for determining a rate of penetration of a drill string and related methods
WO2019067987A1 (en) 2017-09-29 2019-04-04 Baker Hughes, A Ge Company, Llc HOLE DOWN SYSTEM FOR DETERMINING A PENETRATION RATE OF A DOWNHOLE TOOL AND ASSOCIATED METHODS
WO2019213534A1 (en) 2018-05-04 2019-11-07 Hydromax USA, LLC Pipe inspection systems and methods
GB2586228B (en) * 2019-08-08 2024-01-17 Nemein Ltd Sensor arrangement for determining drill conditions in boreholes
US20220356800A1 (en) * 2021-04-29 2022-11-10 Halliburton Energy Services, Inc. Drilling Quasi-Stationary Data Extraction And Processing

Citations (20)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4537067A (en) 1982-11-18 1985-08-27 Wilson Industries, Inc. Inertial borehole survey system
US4909336A (en) 1988-09-29 1990-03-20 Applied Navigation Devices Drill steering in high magnetic interference areas
US4987684A (en) 1982-09-08 1991-01-29 The United States Of America As Represented By The United States Department Of Energy Wellbore inertial directional surveying system
EP0646696A1 (de) 1993-10-04 1995-04-05 Anadrill International SA Bewegungskompensationsgerät und Verfahren zum Bestimmen der Richtung eines Bohrlochs
US5657547A (en) 1994-12-19 1997-08-19 Gyrodata, Inc. Rate gyro wells survey system including nulling system
US5812068A (en) 1994-12-12 1998-09-22 Baker Hughes Incorporated Drilling system with downhole apparatus for determining parameters of interest and for adjusting drilling direction in response thereto
US5821414A (en) 1997-02-07 1998-10-13 Noy; Koen Survey apparatus and methods for directional wellbore wireline surveying
US5842149A (en) 1996-10-22 1998-11-24 Baker Hughes Incorporated Closed loop drilling system
US6021377A (en) 1995-10-23 2000-02-01 Baker Hughes Incorporated Drilling system utilizing downhole dysfunctions for determining corrective actions and simulating drilling conditions
US6145378A (en) 1997-07-22 2000-11-14 Baroid Technology, Inc. Aided inertial navigation system
US6173773B1 (en) 1999-04-15 2001-01-16 Schlumberger Technology Corporation Orienting downhole tools
US6192748B1 (en) 1998-10-30 2001-02-27 Computalog Limited Dynamic orienting reference system for directional drilling
US6206108B1 (en) 1995-01-12 2001-03-27 Baker Hughes Incorporated Drilling system with integrated bottom hole assembly
US6315062B1 (en) 1999-09-24 2001-11-13 Vermeer Manufacturing Company Horizontal directional drilling machine employing inertial navigation control system and method
US6381858B1 (en) 2000-09-22 2002-05-07 Schlumberger Technology Corporation Method for calculating gyroscopic wellbore surveys including correction for unexpected instrument movement
US20020056201A1 (en) 1999-03-11 2002-05-16 Tim Dallas Method for drilling under rivers and other obstacles
US20020112887A1 (en) 2001-02-20 2002-08-22 Harrison William H. Directional borehole drilling system and method
US6453239B1 (en) 1999-06-08 2002-09-17 Schlumberger Technology Corporation Method and apparatus for borehole surveying
US6837332B1 (en) * 1999-03-22 2005-01-04 Halliburton Energy Services, Inc. Method and apparatus for cancellation of unwanted signals in MWD acoustic tools
WO2005008029A1 (en) 2003-07-10 2005-01-27 Gyrodata, Incorporated Determination of the orientation and/or position of the downhole device

Family Cites Families (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3490149A (en) * 1966-05-27 1970-01-20 Schlumberger Technology Corp Methods and apparatus for determining depth in boreholes
US4545242A (en) * 1982-10-27 1985-10-08 Schlumberger Technology Corporation Method and apparatus for measuring the depth of a tool in a borehole
FR2703727B1 (fr) * 1993-04-09 1995-06-30 Schlumberger Services Petrol Procédé et dispositif pour déterminer une correction de profondeur pour un outil de diagraphie dans un puits de pétrole.
DE69435072T2 (de) * 1993-11-02 2009-01-29 Mitsubishi Kagaku Iatron, Inc. Antikörper gegen menschliches lösliches fibrin, hybridome, die sie produzieren und immunmessverfahren
US5585726A (en) * 1995-05-26 1996-12-17 Utilx Corporation Electronic guidance system and method for locating a discrete in-ground boring device
US6543280B2 (en) * 2000-07-07 2003-04-08 Inertial Response, Inc. Remote sensing and measurement of distances along a borehole
US6769497B2 (en) 2001-06-14 2004-08-03 Baker Hughes Incorporated Use of axial accelerometer for estimation of instantaneous ROP downhole for LWD and wireline applications
US6957580B2 (en) 2004-01-26 2005-10-25 Gyrodata, Incorporated System and method for measurements of depth and velocity of instrumentation within a wellbore

Patent Citations (22)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4987684A (en) 1982-09-08 1991-01-29 The United States Of America As Represented By The United States Department Of Energy Wellbore inertial directional surveying system
US4537067A (en) 1982-11-18 1985-08-27 Wilson Industries, Inc. Inertial borehole survey system
US4909336A (en) 1988-09-29 1990-03-20 Applied Navigation Devices Drill steering in high magnetic interference areas
EP0646696A1 (de) 1993-10-04 1995-04-05 Anadrill International SA Bewegungskompensationsgerät und Verfahren zum Bestimmen der Richtung eines Bohrlochs
US5812068A (en) 1994-12-12 1998-09-22 Baker Hughes Incorporated Drilling system with downhole apparatus for determining parameters of interest and for adjusting drilling direction in response thereto
US5657547A (en) 1994-12-19 1997-08-19 Gyrodata, Inc. Rate gyro wells survey system including nulling system
US5806195A (en) 1994-12-19 1998-09-15 Uttecht; Gary Rate gyro wells survey system including nulling system
US6206108B1 (en) 1995-01-12 2001-03-27 Baker Hughes Incorporated Drilling system with integrated bottom hole assembly
US6021377A (en) 1995-10-23 2000-02-01 Baker Hughes Incorporated Drilling system utilizing downhole dysfunctions for determining corrective actions and simulating drilling conditions
US5842149A (en) 1996-10-22 1998-11-24 Baker Hughes Incorporated Closed loop drilling system
US5821414A (en) 1997-02-07 1998-10-13 Noy; Koen Survey apparatus and methods for directional wellbore wireline surveying
US6145378A (en) 1997-07-22 2000-11-14 Baroid Technology, Inc. Aided inertial navigation system
US6192748B1 (en) 1998-10-30 2001-02-27 Computalog Limited Dynamic orienting reference system for directional drilling
US20020056201A1 (en) 1999-03-11 2002-05-16 Tim Dallas Method for drilling under rivers and other obstacles
US6837332B1 (en) * 1999-03-22 2005-01-04 Halliburton Energy Services, Inc. Method and apparatus for cancellation of unwanted signals in MWD acoustic tools
US6173773B1 (en) 1999-04-15 2001-01-16 Schlumberger Technology Corporation Orienting downhole tools
US6453239B1 (en) 1999-06-08 2002-09-17 Schlumberger Technology Corporation Method and apparatus for borehole surveying
US6315062B1 (en) 1999-09-24 2001-11-13 Vermeer Manufacturing Company Horizontal directional drilling machine employing inertial navigation control system and method
US6484818B2 (en) 1999-09-24 2002-11-26 Vermeer Manufacturing Company Horizontal directional drilling machine and method employing configurable tracking system interface
US6381858B1 (en) 2000-09-22 2002-05-07 Schlumberger Technology Corporation Method for calculating gyroscopic wellbore surveys including correction for unexpected instrument movement
US20020112887A1 (en) 2001-02-20 2002-08-22 Harrison William H. Directional borehole drilling system and method
WO2005008029A1 (en) 2003-07-10 2005-01-27 Gyrodata, Incorporated Determination of the orientation and/or position of the downhole device

Non-Patent Citations (6)

* Cited by examiner, † Cited by third party
Title
±150°/s Single Chip Yaw Rate Gyro with Signal Conditioning, Analog Devices, ADXRS150, (C) 2003 Analog Devices, Inc.
±300°/s Single Chip Yaw Rate Gyro with Signal Conditioning, Analog Devices, ADXRS300.
Geen, J., et al., New iMEMS(R) Angular-Rate-Sensing Gyroscope, Analog Dialogue, 2003, vol. 37, No. 3, pp. 1-4.
Teegarden, Darrell, et al., How to Model and Simulate Microgyroscope Systems, IEEE Spectrum, Jul. 1998, vol. 35, No. 7, pp. 66-75.
US 6,151,553, 11/2000, Estes et al. (withdrawn)
Yazdi, N., et al., Micromachined Inertial Sensors, Proc. of the IEEE, Aug. 1998, vol. 86, No. 8, pp. 1640-1659.

Cited By (38)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7302346B2 (en) * 2005-12-19 2007-11-27 Schlumberger Technology Corporation Data logging
US20070143022A1 (en) * 2005-12-19 2007-06-21 Schlumberger Technology Corporation, Incorporated In The State Of Texas Data logging
US20090084546A1 (en) * 2007-10-02 2009-04-02 Roger Ekseth System and method for measuring depth and velocity of instrumentation within a wellbore using a bendable tool
US8655596B2 (en) 2007-10-02 2014-02-18 Gyrodata, Incorporated System and method for measuring depth and velocity of instrumentation within a wellbore using a bendable tool
US8433517B2 (en) * 2007-10-02 2013-04-30 Gyrodata, Incorporated System and method for measuring depth and velocity of instrumentation within a wellbore using a bendable tool
US20120089334A1 (en) * 2007-10-02 2012-04-12 Gyrodata, Incorporated System and method for measuring depth and velocity of instrumentation within a wellbore using a bendable tool
US8065085B2 (en) * 2007-10-02 2011-11-22 Gyrodata, Incorporated System and method for measuring depth and velocity of instrumentation within a wellbore using a bendable tool
US7912647B2 (en) 2008-03-20 2011-03-22 Baker Hughes Incorporated Method and apparatus for measuring true vertical depth in a borehole
US20090235732A1 (en) * 2008-03-20 2009-09-24 Baker Hughes Incorporated Method and apparatus for measuring true vertical depth in a borehole
WO2009117206A3 (en) * 2008-03-20 2009-12-03 Baker Hughes Incorporated Method and apparatus for measuring true vertical depth in a borehole
GB2473347B (en) * 2008-03-20 2012-03-21 Baker Hughes Inc Method and apparatus for measuring true vertical depth in a borehole
GB2473347A (en) * 2008-03-20 2011-03-09 Baker Hughes Inc Method and apparatus for measuring true vertical depth in a borehole
US7823661B2 (en) * 2008-06-24 2010-11-02 Mintchev Martin P In-drilling alignment
US20090314546A1 (en) * 2008-06-24 2009-12-24 Mintchev Martin P In-drilling alignment
US8781744B2 (en) 2008-10-22 2014-07-15 Gyrodata Incorporated Downhole surveying utilizing multiple measurements
US8095317B2 (en) 2008-10-22 2012-01-10 Gyrodata, Incorporated Downhole surveying utilizing multiple measurements
US20100100329A1 (en) * 2008-10-22 2010-04-22 Gyrodata, Incorporated Downhole surveying utilizing multiple measurements
US8185312B2 (en) 2008-10-22 2012-05-22 Gyrodata, Incorporated Downhole surveying utilizing multiple measurements
US8428879B2 (en) 2008-10-22 2013-04-23 Gyrodata, Incorporated Downhole drilling utilizing measurements from multiple sensors
US8433519B2 (en) 2008-10-22 2013-04-30 Gyrodata, Incorporated Downhole surveying utilizing multiple measurements
US20100096186A1 (en) * 2008-10-22 2010-04-22 Gyrodata, Incorporated Downhole surveying utilizing multiple measurements
US8374793B2 (en) 2009-01-30 2013-02-12 Gyrodata, Incorporated Reducing error contributions to gyroscopic measurements from a wellbore survey system
US20100198518A1 (en) * 2009-01-30 2010-08-05 Roger Ekseth Reducing error contributions to gyroscopic measurements from a wellbore survey system
US8065087B2 (en) 2009-01-30 2011-11-22 Gyrodata, Incorporated Reducing error contributions to gyroscopic measurements from a wellbore survey system
US20100300755A1 (en) * 2009-06-02 2010-12-02 Baker Hughes Incorporated System and method for estimating velocity of a downhole component
WO2011126760A2 (en) 2010-03-30 2011-10-13 Gyrodata, Incorporated Bending of a shaft of a steerable borehole drilling tool
EP2818632A2 (de) 2013-06-25 2014-12-31 Gyrodata, Incorporated Positionierungstechniken in Umgebungen mit mehreren Bohrlöcher
US9631446B2 (en) 2013-06-26 2017-04-25 Impact Selector International, Llc Impact sensing during jarring operations
EP2927419A1 (de) 2014-04-04 2015-10-07 Gyrodata, Incorporated System und verfahren zur überwachung von werkzeugrotation während eines kreiselkompassbohrlochtests
US20150285056A1 (en) * 2014-04-04 2015-10-08 Gyrodata, Incorporated System and method for monitoring tool rotation during a gyrocompassing wellbore survey
US9631475B2 (en) * 2014-04-04 2017-04-25 Gyrodata, Incorporated System and method for monitoring tool rotation during a gyrocompassing wellbore survey
EP2980350A2 (de) 2014-07-29 2016-02-03 Gyrodata, Incorporated System und verfahren zur bereitstellung einer kontinuierlichen bohrlochüberwachung
US10077648B2 (en) 2014-07-29 2018-09-18 Gyrodata, Incorporated System and method for providing a continuous wellbore survey
US10689969B2 (en) 2014-07-29 2020-06-23 Gyrodata, Incorporated System and method for providing a continuous wellbore survey
US10781691B2 (en) 2014-07-29 2020-09-22 Gyrodata Incorporated System and method for providing a continuous wellbore survey
US9951602B2 (en) 2015-03-05 2018-04-24 Impact Selector International, Llc Impact sensing during jarring operations
US11175431B2 (en) 2017-06-14 2021-11-16 Gyrodata, Incorporated Gyro-magnetic wellbore surveying
US11193363B2 (en) 2017-12-04 2021-12-07 Gyrodata, Incorporated Steering control of a drilling tool

Also Published As

Publication number Publication date
US20050160812A1 (en) 2005-07-28
ATE451538T1 (de) 2009-12-15
US20050217365A1 (en) 2005-10-06
US7350410B2 (en) 2008-04-01
DE602005018168D1 (de) 2010-01-21
EP1714004B1 (de) 2009-12-09
EP1714004A1 (de) 2006-10-25
CA2554254A1 (en) 2005-08-11
WO2005073509A1 (en) 2005-08-11
CA2554254C (en) 2011-03-15

Similar Documents

Publication Publication Date Title
US6957580B2 (en) System and method for measurements of depth and velocity of instrumentation within a wellbore
US8065085B2 (en) System and method for measuring depth and velocity of instrumentation within a wellbore using a bendable tool
US8433519B2 (en) Downhole surveying utilizing multiple measurements
US8185312B2 (en) Downhole surveying utilizing multiple measurements
US11629588B2 (en) Method and device for depth positioning downhole tool and associated measurement log of a hydrocarbon well
US8490717B2 (en) Downhole magnetic measurement while rotating and methods of use
CA2243756C (en) Aided inertial navigation systems
US7363717B2 (en) System and method for using rotation sensors within a borehole
US6530154B2 (en) Method to detect deviations from a wellplan while drilling in the presence of magnetic interference
US20250059882A1 (en) Depth measurement within a borehole

Legal Events

Date Code Title Description
AS Assignment

Owner name: GYRODATA, INCORPORATED, TEXAS

Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNORS:EKSETH, ROGER;GREENSMITH, MARTYN IAN;REEL/FRAME:016094/0283

Effective date: 20041215

STCF Information on status: patent grant

Free format text: PATENTED CASE

CC Certificate of correction
FPAY Fee payment

Year of fee payment: 4

FPAY Fee payment

Year of fee payment: 8

FPAY Fee payment

Year of fee payment: 12