WO2003019432A3 - Outil de modelisation et de gestion de projets - Google Patents
Outil de modelisation et de gestion de projets Download PDFInfo
- Publication number
- WO2003019432A3 WO2003019432A3 PCT/EP2002/009094 EP0209094W WO03019432A3 WO 2003019432 A3 WO2003019432 A3 WO 2003019432A3 EP 0209094 W EP0209094 W EP 0209094W WO 03019432 A3 WO03019432 A3 WO 03019432A3
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- project
- link
- model
- models
- defining
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Ceased
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING OR CALCULATING; COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/04—Forecasting or optimisation specially adapted for administrative or management purposes, e.g. linear programming or "cutting stock problem"
-
- G—PHYSICS
- G06—COMPUTING OR CALCULATING; COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0631—Resource planning, allocation, distributing or scheduling for enterprises or organisations
Landscapes
- Business, Economics & Management (AREA)
- Human Resources & Organizations (AREA)
- Engineering & Computer Science (AREA)
- Strategic Management (AREA)
- Economics (AREA)
- Entrepreneurship & Innovation (AREA)
- Operations Research (AREA)
- Game Theory and Decision Science (AREA)
- Development Economics (AREA)
- Marketing (AREA)
- Quality & Reliability (AREA)
- Tourism & Hospitality (AREA)
- Physics & Mathematics (AREA)
- General Business, Economics & Management (AREA)
- General Physics & Mathematics (AREA)
- Theoretical Computer Science (AREA)
- Educational Administration (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
- General Factory Administration (AREA)
Abstract
Priority Applications (3)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| US10/487,095 US20050027582A1 (en) | 2001-08-20 | 2002-08-12 | Project modelling and management tool |
| EP02776930A EP1419470A2 (fr) | 2001-08-20 | 2002-08-12 | Outil de modelisation et de gestion de projets |
| CA002457878A CA2457878A1 (fr) | 2001-08-20 | 2002-08-12 | Outil de modelisation et de gestion de projets |
Applications Claiming Priority (2)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| LU90817 | 2001-08-20 | ||
| LU90817A LU90817B1 (fr) | 2001-08-20 | 2001-08-20 | Outil de modélisation et de gestion de projets |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| WO2003019432A2 WO2003019432A2 (fr) | 2003-03-06 |
| WO2003019432A3 true WO2003019432A3 (fr) | 2004-01-29 |
Family
ID=19732009
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| PCT/EP2002/009094 Ceased WO2003019432A2 (fr) | 2001-08-20 | 2002-08-12 | Outil de modelisation et de gestion de projets |
Country Status (5)
| Country | Link |
|---|---|
| US (1) | US20050027582A1 (fr) |
| EP (1) | EP1419470A2 (fr) |
| CA (1) | CA2457878A1 (fr) |
| LU (1) | LU90817B1 (fr) |
| WO (1) | WO2003019432A2 (fr) |
Families Citing this family (54)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US6569012B2 (en) * | 2001-01-09 | 2003-05-27 | Topcoder, Inc. | Systems and methods for coding competitions |
| US8776042B2 (en) * | 2002-04-08 | 2014-07-08 | Topcoder, Inc. | Systems and methods for software support |
| US7292990B2 (en) * | 2002-04-08 | 2007-11-06 | Topcoder, Inc. | System and method for software development |
| US20060248504A1 (en) * | 2002-04-08 | 2006-11-02 | Hughes John M | Systems and methods for software development |
| US7260772B2 (en) * | 2002-10-21 | 2007-08-21 | The Boeing Company | System and method for creating a pert chart |
| US7437739B1 (en) * | 2002-11-26 | 2008-10-14 | Unisys Corporation | Synchronizing data between a data store and a project management client tool |
| DE10339112B4 (de) * | 2003-08-22 | 2005-09-29 | Peter Dilger | Verfahren zum Erzeugen mindestens eines Projekt-Referenzmodells, Verfahren zur Generierung einer strukturierten Konfigurationsinformation mittels eines solchen Projekt-Referenzmodells sowie Vorrichtung zur Durchführung, Verwaltung und Organisation solcher Verfahren |
| US7634485B2 (en) * | 2004-10-28 | 2009-12-15 | Microsoft Corporation | Project property sheets |
| TW200709088A (en) * | 2005-08-26 | 2007-03-01 | wen-xian Chen | Intelligent management method and the system thereof |
| US20070061428A1 (en) * | 2005-09-09 | 2007-03-15 | Autodesk, Inc. | Customization of applications through deployable templates |
| US20070078893A1 (en) * | 2005-09-30 | 2007-04-05 | Eric Milhet | Automated project management method |
| CN101454796A (zh) * | 2006-01-20 | 2009-06-10 | 托普科德公司 | 用于设计开发的系统和方法 |
| US20070220479A1 (en) * | 2006-03-14 | 2007-09-20 | Hughes John M | Systems and methods for software development |
| US7958487B2 (en) * | 2006-03-21 | 2011-06-07 | International Business Machines Corporation | Apparatus, system, and method for modifying an integration software template |
| US20070250378A1 (en) * | 2006-04-24 | 2007-10-25 | Hughes John M | Systems and methods for conducting production competitions |
| US20080052146A1 (en) * | 2006-05-01 | 2008-02-28 | David Messinger | Project management system |
| WO2007143001A2 (fr) * | 2006-05-31 | 2007-12-13 | Topcoder, Inc. | Système de gestion de projet |
| US7818288B1 (en) * | 2006-07-21 | 2010-10-19 | Sprint Communications Company L.P. | eTOM enhancement of functional requirements modeling |
| US8626557B2 (en) * | 2006-09-26 | 2014-01-07 | International Business Machines Corporation | System and method of providing snapshot to support approval of workflow changes |
| US20080167960A1 (en) * | 2007-01-08 | 2008-07-10 | Topcoder, Inc. | System and Method for Collective Response Aggregation |
| US20080184231A1 (en) * | 2007-01-31 | 2008-07-31 | Alexander Dreiling | Method and system for analyzing process models |
| US20080196000A1 (en) * | 2007-02-14 | 2008-08-14 | Fernandez-Lvern Javier | System and method for software development |
| US20080222074A1 (en) * | 2007-02-22 | 2008-09-11 | Peter Lieberwirth | Method or corresponding system employing templates for creating an organizational structure of knowledge |
| US20080222055A1 (en) * | 2007-03-07 | 2008-09-11 | Hughes John M | System and Method for Creating Musical Works |
| US8073792B2 (en) | 2007-03-13 | 2011-12-06 | Topcoder, Inc. | System and method for content development |
| US20080243575A1 (en) * | 2007-03-30 | 2008-10-02 | Keith Weinberger | System and Method for Dynamically Allocating Human Resources to a Project Plan |
| US20080249816A1 (en) * | 2007-04-05 | 2008-10-09 | Luke Khalilian | System and Method for Monitoring Workflow in a Project Management System |
| US7971180B2 (en) * | 2007-06-13 | 2011-06-28 | International Business Machines Corporation | Method and system for evaluating multi-dimensional project plans for implementing packaged software applications |
| US8032404B2 (en) * | 2007-06-13 | 2011-10-04 | International Business Machines Corporation | Method and system for estimating financial benefits of packaged application service projects |
| US8006223B2 (en) * | 2007-06-13 | 2011-08-23 | International Business Machines Corporation | Method and system for estimating project plans for packaged software applications |
| US20080313008A1 (en) * | 2007-06-13 | 2008-12-18 | International Business Machines Corporation | Method and system for model-driven approaches to generic project estimation models for packaged software applications |
| US20080312980A1 (en) * | 2007-06-13 | 2008-12-18 | International Business Machines Corporation | Method and system for staffing and cost estimation models aligned with multi-dimensional project plans for packaged software applications |
| US8055606B2 (en) * | 2007-06-13 | 2011-11-08 | International Business Machines Corporation | Method and system for self-calibrating project estimation models for packaged software applications |
| US8005706B1 (en) * | 2007-08-03 | 2011-08-23 | Sprint Communications Company L.P. | Method for identifying risks for dependent projects based on an enhanced telecom operations map |
| US8000992B1 (en) | 2007-08-03 | 2011-08-16 | Sprint Communications Company L.P. | System and method for project management plan workbook |
| US20090192849A1 (en) * | 2007-11-09 | 2009-07-30 | Hughes John M | System and method for software development |
| WO2009089447A1 (fr) * | 2008-01-11 | 2009-07-16 | Topcoder, Inc. | Système et méthodes d'organisation de compétitions |
| US9405513B2 (en) * | 2008-04-18 | 2016-08-02 | Software Ag | Systems and methods for graphically developing rules for transforming models between description notations |
| US20100030627A1 (en) * | 2008-08-01 | 2010-02-04 | Christopher Lee | system and method of managing project templates |
| US20100036691A1 (en) * | 2008-08-06 | 2010-02-11 | International Business Machines Corporation | Phase driven modeling services |
| US20100306007A1 (en) * | 2009-06-01 | 2010-12-02 | Microsoft Corporation | Enterprise project types |
| FR3004568A1 (fr) * | 2013-04-11 | 2014-10-17 | Claude Rivoiron | Suivi de projet |
| US11416830B2 (en) * | 2018-09-25 | 2022-08-16 | Salesforce.Com, Inc. | Method and system for automatically creating action plans based on an action plan template |
| US11113667B1 (en) | 2018-12-18 | 2021-09-07 | Asana, Inc. | Systems and methods for providing a dashboard for a collaboration work management platform |
| US11449836B1 (en) | 2020-07-21 | 2022-09-20 | Asana, Inc. | Systems and methods to facilitate user engagement with units of work assigned within a collaboration environment |
| US11694162B1 (en) * | 2021-04-01 | 2023-07-04 | Asana, Inc. | Systems and methods to recommend templates for project-level graphical user interfaces within a collaboration environment |
| US11676107B1 (en) | 2021-04-14 | 2023-06-13 | Asana, Inc. | Systems and methods to facilitate interaction with a collaboration environment based on assignment of project-level roles |
| US12141756B1 (en) | 2021-05-24 | 2024-11-12 | Asana, Inc. | Systems and methods to generate project-level graphical user interfaces within a collaboration environment |
| US12182505B1 (en) | 2021-06-10 | 2024-12-31 | Asana, Inc. | Systems and methods to provide user-generated project-level graphical user interfaces within a collaboration environment |
| US12159262B1 (en) | 2021-10-04 | 2024-12-03 | Asana, Inc. | Systems and methods to provide user-generated graphical user interfaces within a collaboration environment |
| US11635884B1 (en) | 2021-10-11 | 2023-04-25 | Asana, Inc. | Systems and methods to provide personalized graphical user interfaces within a collaboration environment |
| US12536503B1 (en) | 2021-12-06 | 2026-01-27 | Asana, Inc. | Systems and methods to track and present navigation through records of a collaboration environment |
| US12093896B1 (en) | 2022-01-10 | 2024-09-17 | Asana, Inc. | Systems and methods to prioritize resources of projects within a collaboration environment |
| US12412156B1 (en) | 2022-07-21 | 2025-09-09 | Asana, Inc. | Systems and methods to characterize work unit records of a collaboration environment based on freeform arrangement of visual content items |
Citations (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| EP0950971A2 (fr) * | 1998-04-16 | 1999-10-20 | Hitachi, Ltd. | Systeme et methode de gestion du travail sur un projet |
| US5995937A (en) * | 1997-11-07 | 1999-11-30 | Deroyal Industries, Inc. | Modular health-care information management system utilizing reusable software objects |
| US6023702A (en) * | 1995-08-18 | 2000-02-08 | International Business Machines Corporation | Method and apparatus for a process and project management computer system |
Family Cites Families (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US6381739B1 (en) * | 1996-05-15 | 2002-04-30 | Motorola Inc. | Method and apparatus for hierarchical restructuring of computer code |
| JP3274393B2 (ja) * | 1997-09-22 | 2002-04-15 | 株式会社ディジタル・ビジョン・ラボラトリーズ | ネットワークシステム、データ配信方法、および、配信用データが記録されたコンピュータ読み取り可能な記録媒体 |
| US6349238B1 (en) * | 1998-09-16 | 2002-02-19 | Mci Worldcom, Inc. | System and method for managing the workflow for processing service orders among a variety of organizations within a telecommunications company |
| US6721713B1 (en) * | 1999-05-27 | 2004-04-13 | Andersen Consulting Llp | Business alliance identification in a web architecture framework |
| US7139999B2 (en) * | 1999-08-31 | 2006-11-21 | Accenture Llp | Development architecture framework |
| US20020099679A1 (en) * | 2001-01-19 | 2002-07-25 | Usitalo Scott Kenneth | Virtual interactive expert solution system |
-
2001
- 2001-08-20 LU LU90817A patent/LU90817B1/fr active
-
2002
- 2002-08-12 WO PCT/EP2002/009094 patent/WO2003019432A2/fr not_active Ceased
- 2002-08-12 EP EP02776930A patent/EP1419470A2/fr not_active Withdrawn
- 2002-08-12 US US10/487,095 patent/US20050027582A1/en not_active Abandoned
- 2002-08-12 CA CA002457878A patent/CA2457878A1/fr not_active Abandoned
Patent Citations (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US6023702A (en) * | 1995-08-18 | 2000-02-08 | International Business Machines Corporation | Method and apparatus for a process and project management computer system |
| US5995937A (en) * | 1997-11-07 | 1999-11-30 | Deroyal Industries, Inc. | Modular health-care information management system utilizing reusable software objects |
| EP0950971A2 (fr) * | 1998-04-16 | 1999-10-20 | Hitachi, Ltd. | Systeme et methode de gestion du travail sur un projet |
Non-Patent Citations (1)
| Title |
|---|
| BENJAMIN P C ET AL: "An introduction to using PROSIM for business process simulation and analysis", SIMULATION CONFERENCE PROCEEDINGS, 1998. WINTER WASHINGTON, DC, USA 13-16 DEC. 1998, PISCATAWAY, NJ, USA,IEEE, US, PAGE(S) 315-321, ISBN: 0-7803-5133-9, XP010319612 * |
Also Published As
| Publication number | Publication date |
|---|---|
| WO2003019432A2 (fr) | 2003-03-06 |
| EP1419470A2 (fr) | 2004-05-19 |
| CA2457878A1 (fr) | 2003-03-06 |
| LU90817B1 (fr) | 2003-02-21 |
| US20050027582A1 (en) | 2005-02-03 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| WO2003019432A3 (fr) | Outil de modelisation et de gestion de projets | |
| US7058930B2 (en) | Distributed program relocation for a computer system | |
| WO2002086670A3 (fr) | Interface et procede de logiciel de modelisation simplifiee | |
| MXPA02009253A (es) | Sistema y metodo para la definicion y ejecucion de procesos de negocio descendente. | |
| WO2004025411A3 (fr) | Systeme et procede de profilage interactif en mode intelligent | |
| WO2006110243A3 (fr) | Architecture de systeme informatique pour modelisation probabiliste | |
| CA2704080A1 (fr) | Systeme et procede de programmation cooperative d'un programme de simulation d'application informatique a developper | |
| WO2002063417A3 (fr) | Procede et dispositif de selection automatique de parties a un accord passe entre un requerant et un executant d'exigences selectionnees | |
| WO2005055014A3 (fr) | Application de configuration pour la construction d'automatisation | |
| EP1160678A3 (fr) | Procédé de modélisation d'un système probabilistique | |
| WO2002097566A3 (fr) | Systeme, procede et interface d'evaluation de la base de fournitures d'une chaine de fournitures | |
| WO2003102735A3 (fr) | Planification de la capacite | |
| EP1420602A3 (fr) | Systèmes et procédés de gestion de communications sans fil utilisant l'information d'espace des liaisons | |
| WO2006110247A3 (fr) | Systeme de modelisation probabiliste destine a la conception de produit | |
| WO2004081709A3 (fr) | Outil et procédé de gestion d'emploi | |
| WO2004054160A3 (fr) | Procede, systeme et dispositif logiques de generation automatique et de simulation d'une topologie de bus de terrain | |
| ATE366441T1 (de) | Xml-kodierungsverfahren | |
| WO2004017861A3 (fr) | Dispositif | |
| WO2001086875A3 (fr) | Dispositif permettant d'integrer un logiciel dans des modeles de disponibilite | |
| WO2004099944A3 (fr) | Dispositif et procedes pour desynchroniser des logiciels d'application orientes objet dans des environnements a temps d'execution controle | |
| WO2004056146A3 (fr) | Reseau de communication et procede de simulation ou de conception associe | |
| WO2002073355A3 (fr) | Systeme de programmation de configuration | |
| DE60140759D1 (de) | Verfahren und Rechnersystem für Anzeigestatusanpassung von Baumknoten | |
| WO2005031543A3 (fr) | Visibilite et synchronisation dans un modele de chaine d'approvisionnement multicategorie | |
| WO2004111801A3 (fr) | Techniques de communication de cagnottes progressives |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| AK | Designated states |
Kind code of ref document: A2 Designated state(s): AE AG AL AM AT AU AZ BA BB BG BR BY BZ CA CH CN CO CR CU CZ DE DK DM DZ EC EE ES FI GB GD GE GH GM HR HU ID IL IN IS JP KE KG KP KR KZ LC LK LR LS LT LU LV MA MD MG MK MN MW MX MZ NO NZ OM PH PL PT RO RU SD SE SG SI SK SL TJ TM TN TR TT TZ UA UG US UZ VN YU ZA ZM ZW Kind code of ref document: A2 Designated state(s): AE AG AL AM AT AU AZ BA BB BG BY BZ CA CH CN CO CR CU CZ DE DM DZ EC EE ES FI GB GD GE GH HR HU ID IL IN IS JP KE KG KP KR LC LK LR LS LT LU LV MA MD MG MN MW MX MZ NO NZ OM PH PL PT RU SD SE SG SI SK SL TJ TM TN TR TZ UA UG US UZ VN YU ZA ZM |
|
| AL | Designated countries for regional patents |
Kind code of ref document: A2 Designated state(s): GH GM KE LS MW MZ SD SL SZ TZ UG ZM ZW AM AZ BY KG KZ MD RU TJ TM AT BE BG CH CY CZ DE DK EE ES FI FR GB GR IE IT LU MC NL PT SE SK TR BF BJ CF CG CI CM GA GN GQ GW ML MR NE SN TD TG Kind code of ref document: A2 Designated state(s): GH GM KE LS MW MZ SD SL SZ UG ZM ZW AM AZ BY KG KZ RU TJ TM AT BE BG CH CY CZ DK EE ES FI FR GB GR IE IT LU MC PT SE SK TR BF BJ CF CG CI GA GN GQ GW ML MR NE SN TD TG |
|
| 121 | Ep: the epo has been informed by wipo that ep was designated in this application | ||
| DFPE | Request for preliminary examination filed prior to expiration of 19th month from priority date (pct application filed before 20040101) | ||
| WWE | Wipo information: entry into national phase |
Ref document number: 2002776930 Country of ref document: EP |
|
| WWE | Wipo information: entry into national phase |
Ref document number: 2457878 Country of ref document: CA |
|
| WWE | Wipo information: entry into national phase |
Ref document number: 2002339442 Country of ref document: AU |
|
| WWP | Wipo information: published in national office |
Ref document number: 2002776930 Country of ref document: EP |
|
| WWE | Wipo information: entry into national phase |
Ref document number: 10487095 Country of ref document: US |
|
| WWW | Wipo information: withdrawn in national office |
Ref document number: 2002776930 Country of ref document: EP |
|
| NENP | Non-entry into the national phase |
Ref country code: JP |
|
| WWW | Wipo information: withdrawn in national office |
Country of ref document: JP |