WO2007129899A1 - Installation de forage de fond marin à tube enroulé - Google Patents
Installation de forage de fond marin à tube enroulé Download PDFInfo
- Publication number
- WO2007129899A1 WO2007129899A1 PCT/NO2007/000151 NO2007000151W WO2007129899A1 WO 2007129899 A1 WO2007129899 A1 WO 2007129899A1 NO 2007000151 W NO2007000151 W NO 2007000151W WO 2007129899 A1 WO2007129899 A1 WO 2007129899A1
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- coiled tubing
- drilling rig
- drilling
- accordance
- drum
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Ceased
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B7/00—Special methods or apparatus for drilling
- E21B7/12—Underwater drilling
- E21B7/124—Underwater drilling with underwater tool drive prime mover, e.g. portable drilling rigs for use on underwater floors
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B19/00—Handling rods, casings, tubes or the like outside the borehole, e.g. in the derrick; Apparatus for feeding the rods or cables
- E21B19/14—Racks, ramps, troughs or bins, for holding the lengths of rod singly or connected; Handling between storage place and borehole
- E21B19/143—Racks, ramps, troughs or bins, for holding the lengths of rod singly or connected; Handling between storage place and borehole specially adapted for underwater drilling
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B19/00—Handling rods, casings, tubes or the like outside the borehole, e.g. in the derrick; Apparatus for feeding the rods or cables
- E21B19/22—Handling reeled pipe or rod units, e.g. flexible drilling pipes
Definitions
- This invention regards a drilling rig on the seabed. More particularly, it regards a drilling rig situated on the seabed, and where the drilling rig is provided with a coiled tubing drum and a feeder device for coiled tubing, the feeder device being arranged to move the coiled tubing into and out of a borehole.
- oil and gas deposits in the earth's crust are produced by drilling a hole down to the deposits, allowing the oil and gas deposits to be drained to the surface .
- the equipment used to drill holes in the earth's crust chiefly comprises a drilling derrick in which is arranged a wire-based hoisting system to lift and lower drill pipes.
- auxiliary equipment is used to handle drill pipes and to set casing in the borehole.
- An alternative to drilling from floating drilling platforms is to place the drilling rig directly on the seabed, thus avoiding the need for large and expensive platforms.
- the object of the invention is to remedy or reduce at least one of the drawbacks of prior art.
- a drilling rig in accordance with the invention is situated on the seabed, and is characterized in that it is provided with a coiled tubing drum and a feeder device for coiled tubing, the feeder device being arranged to move the coiled tubing into and out of a borehole.
- the coiled tubing drum is a complementary fit to guides attached to the drilling rig.
- the coiled tubing drum which is arranged to be hoisted between the drilling rig and a surface vessel, is guided into the correct position on the drilling rig by the guides.
- the drilling rig is provided with at least a first automated handling means arranged to operate at least one of the feeder device and the coiled tubing drum.
- the drilling rig is provided with at least a second automated handling means arranged to handle tools and components between a tool cartridge and the coiled tubing.
- the tool cartridge is rotatably supported.
- the drilling rig is enclosed in an enclosure.
- the enclosure is provided with closable openings to sluice in equipment such as the coiled tubing drum and tool cartridges.
- Drilling rig operations may be controlled from a surface vessel, as the drilling rig communicates with the surface vessel via a power and control cable.
- the drilling rig is also provided with equipment for controlling the well during drilling. Besides the actual drilling and handling automates, there are installed drill fluid pumps, hydraulic aggregates and also other auxiliary equipment required to carry out the drilling operation.
- a drilling rig according to the invention provides a solution for remote-controlled execution of drilling operations by means of a drilling unit situated on the seabed.
- Use of the device according to the invention makes it possible to achieve a considerable reduction in costs, compared with the use of large floating or fixed installations where the drilling equipment is located above sea level.
- the invention will also make the operation less weather- dependent and will allow drilling near the rim of the Arctic ice.
- coiled tubing instead of screwed pipe sections makes the drilling much easier, among other things by eliminating the need for auxiliary pipe handling equipment, and the making and breaking of pipe joints.
- Fig. 1 is a schematic diagram of an enclosed drilling rig for coiled tubing drilling, with a connection to a surface vessel;
- Fig. 2 is a schematic diagram of the drilling rig with part of the enclosure removed to show a drill floor for coiled tubing drilling;
- Fig. 3 shows a section of the drill floor with automated handling means and tool cartridges, plus well control equipment; and
- Fig. 4 is a schematic drawing of an automated handling means for tool handling.
- reference number 1 denotes a surface vessel equipped with lifting equipment 3 and 4 for deploying and retrieving the drilling rig 7 between the surface 2 of the sea and the seabed 8.
- Power and control cables 5 run between the surface vessel 1 and the drilling rig 7, together with a hoisting cable 6.
- the drilling rig 7 is provided with an enclosure 9, see Figure 2, which encloses all technical devices.
- the internal hydrostatic pressure of the enclosure 9 is slightly lower than the hydrostatic pressure outside the enclosure 9, so as to prevent any contamination caused by drilling from escaping to the surrounding environment .
- the upper portion of the enclosure 9 is provided with closable sluiceways 10 and 15.
- a coiled tubing drum 11 Inside the enclosed drilling rig 7 there is arranged a coiled tubing drum 11 on which is wound coiled tubing 13, see Figure 2.
- the coiled tubing 13 is passed through a feeder device 12 and down into a borehole 30, where a drill bit 32 connected to the coiled tubing 13 is powered by a drill fluid motor 31.
- Two first automated handling means 14 are provided for handling of tools and components (not shown) , which means have a working range which extends to the feeder device 12 and the coiled tubing drum 11.
- the coiled tubing drum 11 comprises a base 18 and guides 19, see Figure 3. On a deck 23 located below the coiled tubing drum 11 there is positioned several tool and component cartridges 16, in addition to a second automated handling means 22 for handling of tools and components between the
- Equipment 20 for well control and sealing around the coiled tubing 13 is positioned on the deck 23 to prevent a blowout of fluid from the borehole 30.
- the second automated handling means 22, positioned on the i drill floor 23, comprises a vertical string section 26 provided with bearing discs 24 at either end, see Figure 4.
- the string section 26 is arranged for rotation about its vertical axis.
- the string section 26 is provided with a vertically ) displaceable carriage 29, to which there is connected an arm 27 via hydraulic cylinders 25 and a hinge joint 33.
- the arm 27 is provided with a gripping device 28 for handling tools and components (not shown) .
Landscapes
- Engineering & Computer Science (AREA)
- Life Sciences & Earth Sciences (AREA)
- Geology (AREA)
- Mining & Mineral Resources (AREA)
- Physics & Mathematics (AREA)
- Environmental & Geological Engineering (AREA)
- Fluid Mechanics (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Mechanical Engineering (AREA)
- Earth Drilling (AREA)
- Drilling And Exploitation, And Mining Machines And Methods (AREA)
Abstract
La présente invention concerne une installation de forage (7) située sur ou près du fond marin (8), cette installation de forage (7) étant pourvue d'un cylindre supportant un tube enroulé (11) et d'un dispositif d'avance (12) agencé pour déplacer le tube enroulé (13) dans et en dehors d'un sondage (30).
Applications Claiming Priority (2)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| NO20061958 | 2006-05-02 | ||
| NO20061958A NO324989B1 (no) | 2006-05-02 | 2006-05-02 | Anordning ved borerigg på havbunnen |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| WO2007129899A1 true WO2007129899A1 (fr) | 2007-11-15 |
Family
ID=38667947
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| PCT/NO2007/000151 Ceased WO2007129899A1 (fr) | 2006-05-02 | 2007-04-30 | Installation de forage de fond marin à tube enroulé |
Country Status (2)
| Country | Link |
|---|---|
| NO (1) | NO324989B1 (fr) |
| WO (1) | WO2007129899A1 (fr) |
Cited By (15)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US7584796B2 (en) * | 2002-04-30 | 2009-09-08 | Coupler Developments Limited | Drilling rig |
| US7600570B2 (en) * | 2005-07-05 | 2009-10-13 | Seabed Rig As | Drilling rig placed on the sea bed and equipped for drilling of oil and gas wells |
| US7644768B2 (en) * | 2006-03-20 | 2010-01-12 | Seabed Rig As | Separation device for material from a drilling rig situated on the seabed |
| US7735561B2 (en) * | 2007-03-01 | 2010-06-15 | Chevron U.S.A. Inc. | Subsea adapter for connecting a riser to a subsea tree |
| CN102322219A (zh) * | 2011-05-26 | 2012-01-18 | 上海交通大学 | 海底射流钻井车 |
| US8672043B2 (en) | 2010-11-03 | 2014-03-18 | Nabors Alaska Drilling, Inc. | Enclosed coiled tubing boat and methods |
| WO2017044852A1 (fr) * | 2015-09-10 | 2017-03-16 | Cameron International Corporation | Système d'extraction d'hydrocarbures sous-marins |
| US9810033B1 (en) * | 2016-09-02 | 2017-11-07 | Schlumberger Technology Corporation | Subsea drilling systems and methods |
| US10697245B2 (en) | 2015-03-24 | 2020-06-30 | Cameron International Corporation | Seabed drilling system |
| CN113464053A (zh) * | 2021-06-09 | 2021-10-01 | 派格水下技术(广州)有限公司 | 水下小型井口连续油管钻井系统 |
| US11624238B1 (en) * | 2022-06-10 | 2023-04-11 | China University Of Petroleum (East China) | Deepwater subsea coiled tubing drilling rig |
| US11781385B1 (en) * | 2022-10-12 | 2023-10-10 | China University Of Petroleum (East China) | Subsea coiled tubing drilling system and subsea drilling device thereof |
| US12560045B1 (en) | 2024-12-26 | 2026-02-24 | Halliburton Energy Services, Inc. | Subsea well intervention systems and methods |
| US12560046B1 (en) | 2024-12-26 | 2026-02-24 | Halliburton Energy Services, Inc. | Subsea well intervention systems and methods |
| US12571279B1 (en) | 2024-12-26 | 2026-03-10 | Halliburton Energy Services, Inc. | Subsea well intervention systems and methods |
Citations (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| DE2056064A1 (de) * | 1970-11-14 | 1972-05-18 | Erno Raumfahrttechnik Gmbh | Unterwasserbohrgerät |
| WO2002014651A1 (fr) * | 2000-08-11 | 2002-02-21 | Exxonmobil Upstream Research Company | Systeme d'intervention sous-marin |
| US20030106714A1 (en) * | 2001-12-12 | 2003-06-12 | Smith Michael Lee | Use of coiled tubing unit systems in sub sea operations |
| WO2003093625A2 (fr) * | 2002-04-30 | 2003-11-13 | Maris International Limited | Installation de forage |
Family Cites Families (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| NO317384B1 (no) * | 2001-04-04 | 2004-10-18 | Offshore Resource Group As | Fremgangsmate og anordning for verktoyinnforing i undervanns olje og gass reservoar |
-
2006
- 2006-05-02 NO NO20061958A patent/NO324989B1/no not_active IP Right Cessation
-
2007
- 2007-04-30 WO PCT/NO2007/000151 patent/WO2007129899A1/fr not_active Ceased
Patent Citations (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| DE2056064A1 (de) * | 1970-11-14 | 1972-05-18 | Erno Raumfahrttechnik Gmbh | Unterwasserbohrgerät |
| WO2002014651A1 (fr) * | 2000-08-11 | 2002-02-21 | Exxonmobil Upstream Research Company | Systeme d'intervention sous-marin |
| US20030106714A1 (en) * | 2001-12-12 | 2003-06-12 | Smith Michael Lee | Use of coiled tubing unit systems in sub sea operations |
| WO2003093625A2 (fr) * | 2002-04-30 | 2003-11-13 | Maris International Limited | Installation de forage |
Cited By (16)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US7584796B2 (en) * | 2002-04-30 | 2009-09-08 | Coupler Developments Limited | Drilling rig |
| US7600570B2 (en) * | 2005-07-05 | 2009-10-13 | Seabed Rig As | Drilling rig placed on the sea bed and equipped for drilling of oil and gas wells |
| US7644768B2 (en) * | 2006-03-20 | 2010-01-12 | Seabed Rig As | Separation device for material from a drilling rig situated on the seabed |
| US7735561B2 (en) * | 2007-03-01 | 2010-06-15 | Chevron U.S.A. Inc. | Subsea adapter for connecting a riser to a subsea tree |
| US8672043B2 (en) | 2010-11-03 | 2014-03-18 | Nabors Alaska Drilling, Inc. | Enclosed coiled tubing boat and methods |
| CN102322219A (zh) * | 2011-05-26 | 2012-01-18 | 上海交通大学 | 海底射流钻井车 |
| US10697245B2 (en) | 2015-03-24 | 2020-06-30 | Cameron International Corporation | Seabed drilling system |
| US20180355674A1 (en) * | 2015-09-10 | 2018-12-13 | Cameron International Corporation | Subsea Hydrocarbon Extraction System |
| WO2017044852A1 (fr) * | 2015-09-10 | 2017-03-16 | Cameron International Corporation | Système d'extraction d'hydrocarbures sous-marins |
| US9810033B1 (en) * | 2016-09-02 | 2017-11-07 | Schlumberger Technology Corporation | Subsea drilling systems and methods |
| CN113464053A (zh) * | 2021-06-09 | 2021-10-01 | 派格水下技术(广州)有限公司 | 水下小型井口连续油管钻井系统 |
| US11624238B1 (en) * | 2022-06-10 | 2023-04-11 | China University Of Petroleum (East China) | Deepwater subsea coiled tubing drilling rig |
| US11781385B1 (en) * | 2022-10-12 | 2023-10-10 | China University Of Petroleum (East China) | Subsea coiled tubing drilling system and subsea drilling device thereof |
| US12560045B1 (en) | 2024-12-26 | 2026-02-24 | Halliburton Energy Services, Inc. | Subsea well intervention systems and methods |
| US12560046B1 (en) | 2024-12-26 | 2026-02-24 | Halliburton Energy Services, Inc. | Subsea well intervention systems and methods |
| US12571279B1 (en) | 2024-12-26 | 2026-03-10 | Halliburton Energy Services, Inc. | Subsea well intervention systems and methods |
Also Published As
| Publication number | Publication date |
|---|---|
| NO20061958L (no) | 2007-11-05 |
| NO324989B1 (no) | 2008-01-14 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US7600570B2 (en) | Drilling rig placed on the sea bed and equipped for drilling of oil and gas wells | |
| CN1228534C (zh) | 海底油井修理船及其钻井方法 | |
| US6352114B1 (en) | Deep ocean riser positioning system and method of running casing | |
| US7036598B2 (en) | Intervention module for a well | |
| WO2004018826A1 (fr) | Module de forage sous-marin a utiliser dans le forage de puits de gaz et de petrole | |
| US20180355674A1 (en) | Subsea Hydrocarbon Extraction System | |
| RU2412327C2 (ru) | Устройство для смены инструментов в буровой установке для бурения, расположенной на дне моря | |
| KR20150125536A (ko) | 해양 시추 장치 및 해양 시추 방법 | |
| NO20111295A1 (no) | Setteverktoy for dypt vann | |
| WO2008100149A1 (fr) | Procédé et dispositif pour installer un appareil de forage sur lit marin | |
| NO346881B1 (en) | A system and a method for heave compensated make-up and break-out of drill pipe connections in connection with drilling | |
| NO345357B1 (en) | A heave compensating system for a floating drilling vessel | |
| WO2016054610A1 (fr) | Système d'installation de forage comprenant un ensemble centre de puits mobile | |
| US20090014213A1 (en) | Separation Device for Material from a Power Tong on a Drilling Rig Situated on the Sea Bed | |
| CA2644919C (fr) | Installation de forage situee sur le fond marin, comprenant un dispositif de separation | |
| WO2013101601A1 (fr) | Procédé et système pour intervention au câble dans un puits sous-marin à partir d'un navire flottant | |
| RU2624841C1 (ru) | Подводный буровой модуль для бурения нефтяных и газовых скважин | |
| KR102016375B1 (ko) | 엄빌리컬 호스 제어 장치 | |
| WO2023073022A1 (fr) | Ensemble tête de puits sous-marin destiné à être utilisé dans des opérations de forage sans colonne montante | |
| CN102505925A (zh) | 用于深水钻井的工具传送装置 | |
| KR20170027030A (ko) | 이동 가능한 시추 제어실 및 그러한 시추 제어실이 마련된 선박 | |
| US20100258320A1 (en) | Ocean floor deep-sea submerged deck | |
| KR20150041243A (ko) | 시추 장비 테스트용 압력 용기 및 이를 이용한 시추 장비 테스트 장치 |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| 121 | Ep: the epo has been informed by wipo that ep was designated in this application |
Ref document number: 07747612 Country of ref document: EP Kind code of ref document: A1 |
|
| NENP | Non-entry into the national phase |
Ref country code: DE |
|
| 122 | Ep: pct application non-entry in european phase |
Ref document number: 07747612 Country of ref document: EP Kind code of ref document: A1 |