WO2007145567A1 - Installation électrique - Google Patents

Installation électrique Download PDF

Info

Publication number
WO2007145567A1
WO2007145567A1 PCT/SE2007/000568 SE2007000568W WO2007145567A1 WO 2007145567 A1 WO2007145567 A1 WO 2007145567A1 SE 2007000568 W SE2007000568 W SE 2007000568W WO 2007145567 A1 WO2007145567 A1 WO 2007145567A1
Authority
WO
WIPO (PCT)
Prior art keywords
plant
energy plant
energy
building
design
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Ceased
Application number
PCT/SE2007/000568
Other languages
English (en)
Inventor
Sven-Erik Ahl
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to FI20095019A priority Critical patent/FI20095019A7/fi
Publication of WO2007145567A1 publication Critical patent/WO2007145567A1/fr
Anticipated expiration legal-status Critical
Priority to NO20090018A priority patent/NO20090018L/no
Ceased legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H1/00Buildings or groups of buildings for dwelling or office purposes; General layout, e.g. modular co-ordination or staggered storeys
    • E04H1/12Small buildings or other erections for limited occupation, erected in the open air or arranged in buildings, e.g. kiosks, waiting shelters for bus stops or for filling stations, roofs for railway platforms, watchmen's huts or dressing cubicles
    • E04H1/1205Small buildings erected in the open air
    • E04H1/1238Shelters for engines, e.g. electrical meter housings
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H1/00Buildings or groups of buildings for dwelling or office purposes; General layout, e.g. modular co-ordination or staggered storeys
    • E04H1/12Small buildings or other erections for limited occupation, erected in the open air or arranged in buildings, e.g. kiosks, waiting shelters for bus stops or for filling stations, roofs for railway platforms, watchmen's huts or dressing cubicles
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24HFLUID HEATERS, e.g. WATER OR AIR HEATERS, HAVING HEAT-GENERATING MEANS, e.g. HEAT PUMPS, IN GENERAL
    • F24H9/00Details
    • F24H9/02Casings; Cover lids; Ornamental panels
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04NPICTORIAL COMMUNICATION, e.g. TELEVISION
    • H04N7/00Television systems
    • H04N7/14Systems for two-way working
    • H04N7/15Conference systems
    • H04N7/152Multipoint control units therefor

Definitions

  • the present invention is based on a complete energy plant integrated into a building structure, the design of which fits into the surrounding environment and which has the strength/durability to withstand simple lifts and transport,
  • the present invention solves these problems by the series manufacturing of entire plants placed in purpose-designed building structures and supplied completely assembled as "ready-to-connect" finished units.
  • the energy plant is supplied complete from the factory with electrical, heating, water and sanitation installations that, at the customer's site, are connected to a prepared conduit and electricity supply.
  • the present application describes a complete energy plant that can be factory supplied ready-installed in a so-called "heating room”. This is the size of a garden shed. Its roof is equipped with energy receivers (e.g. solar collectors or solar cells). The slope of the heating room's roof is optimised for energy reception and, on-site, the heating room can be placed optimally in relation to the sun.
  • heating room This is the size of a garden shed. Its roof is equipped with energy receivers (e.g. solar collectors or solar cells).
  • the slope of the heating room's roof is optimised for energy reception and, on-site, the heating room can be placed optimally in relation to the sun.
  • Installation time is short and, consequently, costs are low, The entire plant is manufactured efficiently in series rather than individually at the customer's site. The total cost will thus be less than that of individually built plants.
  • the heating room may be said to have an attractive design. It should certainly not obtrude or protrude in its setting. For this reason and because the internal plant can weigh several tons, the heating room is constructed in a new way that uses a number of unique design solutions, which are included in this description and application.
  • the load-bearing parts are made from plate metal and plate metal profiles. This gives the strength that permits the entire package to be lifted using a crane and the lifting eyes mounted to the load-bearing roof structure, The ability to lift the entire package using a large mobile crane also makes it possible to avoid touching garden surfaces. This means that deliveries can be received regardless of the ground's bearing capacity. At certain times, e.g. rainy periods, this capacity can limit accessibility.
  • the floor is plate metal and the walls are plaster, This is favourably fire-retardant.
  • S Figure 1 shows a house to which the energy plant is to be connected.
  • Figure 2 shows the energy plant with a schematic of a solution that uses pellets.
  • Figure 3 shows the energy plant connected to the conduit.
  • Figure 4 shows the lifting eyes and shackles.
  • Figure 5 shows certain floor-level details.
  • Figure 6 shows details of the solutions for connecting walls to the floor.
  • Figure 7 shows details of solutions at corner posts.
  • Figure 8 shows details of corner post/batten arrangements.
  • Figure 1 shows a dwelling-house with a conduit (2) that contains the necessary connection pipes and which is finished with connection components (3) for connecting to the energy plant.
  • the design of the conduit (2) includes professionally executed insulation, To be perceived as attractive, if not beautiful, the building that houses the energy plant has an architectural appearance. This is to distinguish the present "machinery/plant” from today's predominantly container-like designs. 5
  • the plant should enhance the appearance of its settings. If the plant is carefully positioned in relation to shading objects and the sun's trajectory, the solar collector (7) on the roof can function optimally as a receiver.
  • Figure 2 shows a cutaway sketch of an installed pellet plant.
  • the main components in such a plant are the pellet container (4), the burner feeder (5) and 0 the electronics (6) that control the entire plant.
  • the heating circuit fittings (7 and 8) handle the energy from the sun,
  • the energy plant is not restricted solely to pellet systems. It may also be based on other energy converting plants, e.g. oil, diesel, heat pumps (ground and lake), etc,
  • the eyes (10) used for lifting are located under a detachable plate and may themselves be removable.
  • Figure 3 shows how the conduit (2), which is buried in the ground, is connected to the energy plant.
  • Outline sketch 4 shows some of the essential elements involved when lifting the plant for transport to the customer.
  • the lifting eyes (10) can be permanently fitted in a load-bearing beam or fitted when they are required. Said eyes are accessed by removing a plate metal element that forms the roof ridge.
  • the lower part of the roof frame has bolt holes for the fitting of shackles that are used to lash the plant for transport. This is a better solution than the usual strapping, which often results in damage (crushing, etc.) to the body of the building, Traffic authorities require loads to be secured.
  • Figure 5 contains a detail drawing showing a solution for fitting battens in a longitudinal bottom beam (12).
  • the solution uses bolts (13) and weld nuts (14).
  • Figure 6 shows how wooden battens (18) are mated up to the floor plate (17), transverse load-bearing floor beams and longitudinal bottom beams (15).
  • Figure 7 shows details of the fitting of wooden battens (19) to a corner post (20).
  • Figure 8 shows how wooden battens (21) are screwed to a corner post (22) using hexagon head wood screws (22).
  • the solutions described here can, of course, be widely varied and the figures and text relate solely to one possible construction. The present invention is not limited solely to this one construction.
  • the body of the building can be designed as modules so that the external dimensions can be varied in accordance with the storage needs presented by different energy types or by different sizes of energy plants and output requirements.
  • the proposed floor construction (see figure 6) has a plate metal profile forming a sill around the room. In the event of leaks, said sill stops the leakage damaging the walls,

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Multimedia (AREA)
  • Signal Processing (AREA)
  • Physics & Mathematics (AREA)
  • Thermal Sciences (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)
  • Foundations (AREA)
  • Cultivation Receptacles Or Flower-Pots, Or Pots For Seedlings (AREA)

Abstract

La présente invention concerne une installation électrique complète fabriquée en usine et qui, sur le chantier du client, est soulevée et placée dans son intégralité sur son lieu d'implantation correct en utilisant une grue. Si un camion-grue est utilisé, il peut généralement être placé sur la rue afin que le jardin reste intact. Les clôtures et autres obstacles que pourrait rencontrer le camion n'ont pas besoin d'être retirés et aucun passage de roues n'est laissé sur les pelouses et les plates-bandes.
PCT/SE2007/000568 2006-06-12 2007-06-11 Installation électrique Ceased WO2007145567A1 (fr)

Priority Applications (2)

Application Number Priority Date Filing Date Title
FI20095019A FI20095019A7 (fi) 2006-06-12 2007-06-11 Energialaitos
NO20090018A NO20090018L (no) 2006-06-12 2009-01-05 Kraftverk

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
SE0601302-3 2006-06-12
SE0601302A SE0601302L (sv) 2006-06-12 2006-06-12 Energianläggning

Publications (1)

Publication Number Publication Date
WO2007145567A1 true WO2007145567A1 (fr) 2007-12-21

Family

ID=38831991

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/SE2007/000568 Ceased WO2007145567A1 (fr) 2006-06-12 2007-06-11 Installation électrique

Country Status (4)

Country Link
FI (1) FI20095019A7 (fr)
NO (1) NO20090018L (fr)
SE (1) SE0601302L (fr)
WO (1) WO2007145567A1 (fr)

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4077568A (en) * 1975-06-18 1978-03-07 Intercity Electric & Mechanical Services Ltd. Mobile boiler house
SE520925C2 (sv) * 2002-01-07 2003-09-16 Bo-Gunnar Dahl Mobil huskonstruktion, av två separata enheter, för härbärgering av värmeavgivande apparater

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4077568A (en) * 1975-06-18 1978-03-07 Intercity Electric & Mechanical Services Ltd. Mobile boiler house
SE520925C2 (sv) * 2002-01-07 2003-09-16 Bo-Gunnar Dahl Mobil huskonstruktion, av två separata enheter, för härbärgering av värmeavgivande apparater

Also Published As

Publication number Publication date
SE0601302L (sv) 2007-12-13
NO20090018L (no) 2009-02-25
FI20095019L (fi) 2009-01-12
FI20095019A7 (fi) 2009-01-12

Similar Documents

Publication Publication Date Title
US7777363B2 (en) Wind engine and wind power system
US20100205870A1 (en) Structure
WO2012037291A2 (fr) Structure de services d'utilité publique polyvalente
US20140202449A1 (en) Multiplatform heating ventilation and air conditioning control system
US20090205266A1 (en) Modularized Self-sustaining Building System
CN101440635A (zh) 一层组合式轻钢结构房屋及其安装方法
JP3141450U (ja) 太陽電池モジュールの取付構造
JP2015190156A (ja) 車載可能な箱体を用いた簡易建造物
KR101383889B1 (ko) 독립형 태양광 발전시스템이 적용된 주거용 컨테이너 하우스
KR20210041992A (ko) 건축구조물, 태양에너지건축물과 이의 건설방법
CN101092841B (zh) 一种新型太阳能房顶的结构和材料
EP1106938B1 (fr) Ensemble de panneau solaire
WO2011140112A2 (fr) Système d'accumulateur et d'échangeur d'énergie géothermique et procédé de chauffage et de refroidissement
WO2017076808A1 (fr) Installation d'habitation mobile et son procédé de construction
DE10011357A1 (de) Gebäudesystem zur umweltfreundlichen Energieversorgung mittels einer unterirdischen Raumzelle aus wasserdichtem Beton und einem darüber angeordneten Solardach sowie weiterer energie- und versorgungstechnischer Einrichtungen
CN101603357B (zh) 陶瓷太阳能房顶
DE9410139U1 (de) Modulares Fertighaus
CN108019967B (zh) 基于太阳能的高层建筑用室内加热保温组件
Garrison The 2007 solar D house
CN109779048A (zh) 现场安装设置有真空式保温层外墙的施工方法
EP2144013A1 (fr) Système thermo-hydraulique et procédés de fonctionnement associés
CN221524726U (zh) 一种装配式大门结构
CN103141334A (zh) 一种新型节能日光温室
US20250369223A1 (en) Housing unit system and method of manufacture
CN211472703U (zh) 一种装配式户外泵房房体结构

Legal Events

Date Code Title Description
DPE2 Request for preliminary examination filed before expiration of 19th month from priority date (pct application filed from 20040101)
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 07748231

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 07748231

Country of ref document: EP

Kind code of ref document: A1