WO2009079732A2 - Method for supplying concrete to construction sites - Google Patents

Method for supplying concrete to construction sites Download PDF

Info

Publication number
WO2009079732A2
WO2009079732A2 PCT/BR2008/000402 BR2008000402W WO2009079732A2 WO 2009079732 A2 WO2009079732 A2 WO 2009079732A2 BR 2008000402 W BR2008000402 W BR 2008000402W WO 2009079732 A2 WO2009079732 A2 WO 2009079732A2
Authority
WO
WIPO (PCT)
Prior art keywords
concrete
beton
mixer truck
water
cement
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Ceased
Application number
PCT/BR2008/000402
Other languages
English (en)
French (fr)
Other versions
WO2009079732A3 (en
Inventor
Willian Dennis Rosset
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Publication of WO2009079732A2 publication Critical patent/WO2009079732A2/en
Publication of WO2009079732A3 publication Critical patent/WO2009079732A3/en
Anticipated expiration legal-status Critical
Ceased legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28CPREPARING CLAY; PRODUCING MIXTURES CONTAINING CLAY OR CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28C9/00General arrangement or layout of plant
    • B28C9/04General arrangement or layout of plant the plant being mobile, e.g. mounted on a carriage or a set of carriages
    • B28C9/0472General arrangement or layout of plant the plant being mobile, e.g. mounted on a carriage or a set of carriages provided with two or more carriages for storing the ingredients or for the mixing device, e.g. transportable on rails
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28CPREPARING CLAY; PRODUCING MIXTURES CONTAINING CLAY OR CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28C7/00Controlling the operation of apparatus for producing mixtures of clay or cement with other substances; Supplying or proportioning the ingredients for mixing clay or cement with other substances; Discharging the mixture
    • B28C7/0046Storage or weighing apparatus for supplying ingredients
    • B28C7/0053Storage containers, e.g. hoppers, silos, bins
    • CCHEMISTRY; METALLURGY
    • C04CEMENTS; CONCRETE; ARTIFICIAL STONE; CERAMICS; REFRACTORIES
    • C04BLIME, MAGNESIA; SLAG; CEMENTS; COMPOSITIONS THEREOF, e.g. MORTARS, CONCRETE OR LIKE BUILDING MATERIALS; ARTIFICIAL STONE; CERAMICS; REFRACTORIES; TREATMENT OF NATURAL STONE
    • C04B40/00Processes, in general, for influencing or modifying the properties of mortars, concrete or artificial stone compositions, e.g. their setting or hardening ability
    • C04B40/0028Aspects relating to the mixing step of the mortar preparation

Definitions

  • the concrete likewise steel, is one of the main materials used in construction works. Composed of cement and aggregates - comprising stone, sand and water - we can nowadays manufacture concrete in various ways.
  • specialized concrete companies dose components in a central station, which is usually far from the construction site. They are then, carried in a beton and/or mixer truck, which is responsible for the blending and the transportation of the concrete. Therefore, it arrives at the field construction in a ready-to-use way. It can either be finished by adding additives or not. '
  • the objective of the current invention is to present a method for supplying concrete which overcomes the usual problems. It can neither be of difficult implementation nor of high complexity. Furthermore, the method must be one of low acquisition, with adequate maintenance, functioning and equipment.
  • Method means the careful dosing of dry concrete, aggregates -sand and comprising stone-, water and additives in a remote central station; the transportation of these parts, in a separate way, in appropriate places to the field work and the "in loco" blending of parts, in a local beton and/or mixer truck, which composes and blends the concrete right before its launching.
  • the attached drawings show the method for supplying concrete to construction sites, as well as the movable box of aggregates, which is used to supply the concrete to beton and/or mixer trucks.
  • Drawing figure 1 shows a block diagram of the method
  • Drawing figure 2 shows the movable box of aggregates which can be used to implement the method, previously described in drawing figure 1.
  • Drawing figures 3, 4 and 5 show a non-restrictive illustration of a possible configuration of the movable box, which is used to transport the dosed dry concrete, the aggregates and the water. They show a perspective, plant and section views.
  • Drawing figure 6 shows a schematic view of the movable box working together with a beton and/or mixer truck, "in loco".
  • the method for supplying concrete to construction sites consists of:
  • this method can feature modifications, which relate to the steps and parameters of the process, materials, dimensions, constructive details and functional configuration without exceeding the protection claimed by this patent requirement.

Landscapes

  • Chemical & Material Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Ceramic Engineering (AREA)
  • Dispersion Chemistry (AREA)
  • Materials Engineering (AREA)
  • Structural Engineering (AREA)
  • Organic Chemistry (AREA)
  • Preparation Of Clay, And Manufacture Of Mixtures Containing Clay Or Cement (AREA)
  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
PCT/BR2008/000402 2007-12-26 2008-12-16 Method for supplying concrete to construction sites Ceased WO2009079732A2 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
BRPI0704965-0 2007-12-26
BRPI0704965 BRPI0704965A2 (pt) 2007-12-26 2007-12-26 método de fornecer concreto a obras e equipamento para fornecer concreto a obras

Publications (2)

Publication Number Publication Date
WO2009079732A2 true WO2009079732A2 (en) 2009-07-02
WO2009079732A3 WO2009079732A3 (en) 2009-09-03

Family

ID=40801592

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/BR2008/000402 Ceased WO2009079732A2 (en) 2007-12-26 2008-12-16 Method for supplying concrete to construction sites

Country Status (2)

Country Link
BR (1) BRPI0704965A2 (pt)
WO (1) WO2009079732A2 (pt)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE102010023620A1 (de) * 2010-06-14 2011-12-15 Novaled Ag Bottom-emittierendes Bauelement

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB1417049A (en) * 1973-04-26 1975-12-10 Morgenstern H L Concrete mixing

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE102010023620A1 (de) * 2010-06-14 2011-12-15 Novaled Ag Bottom-emittierendes Bauelement

Also Published As

Publication number Publication date
BRPI0704965A2 (pt) 2010-03-30
WO2009079732A3 (en) 2009-09-03

Similar Documents

Publication Publication Date Title
US7939154B2 (en) Road and repair materials including magnetite and methods regarding same
KR20150009325A (ko) 도로 보수용 조성물을 이용한 콘크리트 포장 도로 보수공법
CN105926470A (zh) 高架桥梁改造方法
CN110144790A (zh) 一种透水砼的施工方法
CN109113368A (zh) 一种双网拉结式剪力墙及其加固施工方法
WO2009079732A2 (en) Method for supplying concrete to construction sites
KR101147160B1 (ko) 고내구성 투수콘크리트에 의한 비탈면 보호공법
AU2015302314B2 (en) Method of processing unhardened concrete
WO2010147328A3 (ko) 레미탈을 이용한 콘크리트 포장의 재포장 공법
CN110184871A (zh) 免养生道路无机结合旧料现场再生基层工艺以及道路结构
KR20160104771A (ko) 청정 표면을 가지는 콘크리트제품 제조방법
DE102007043269B4 (de) Verfahren und Anlage zur Errichtung von Betonbauwerken im Meerwasser
JP5686616B2 (ja) 吹付け工法
CN107218063A (zh) 地铁隧道混凝土喷射设备及工艺方法
JP2017509518A (ja) コンクリートを形成する方法
CN115821677A (zh) 路面再生双层连铺施工工艺
JP3161558U (ja) コンクリートミキサ車
KR101008580B1 (ko) 수화학광물을 이용하는 환경 복원 및 사면 보강 시스템
CN207420589U (zh) 地铁隧道混凝土喷射设备
JP2016186177A (ja) 舗装用補修材及び舗装の補修方法
DE4014798A1 (de) Verfahren und anlage fuer versatzausfuehrung
KR101073828B1 (ko) 탄각이 함유된 친환경 모르타르 조성물을 이용한 콘크리트 구조물의 보수공법
CN104563125A (zh) 药液砂浆投入用配管及利用它的注浆施工方法
KR101564440B1 (ko) 고성능 속경성 혼합콘크리트를 이용한 콘크리트포장 전단면 보수방법
KR101023675B1 (ko) 탄각이 함유된 친환경 백시멘트

Legal Events

Date Code Title Description
NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 08864080

Country of ref document: EP

Kind code of ref document: A2

ENPW Started to enter national phase and was withdrawn or failed for other reasons

Ref document number: PI0810288

Country of ref document: BR

Free format text: PEDIDO RETIRADO, UMA VEZ QUE, SEGUNDO O ART. 216 INCISO 2O DA LPI, O DOCUMENTO DE PROCURACAO NAO FOI PROTOCOLADO EM SESSENTA DIAS CONTADOS DA PRATICA DO PRIMEIRO ATO DA PARTE NO PROCESSO, E NAO HOUVE MANIFESTACAO DO REQUERENTE FRENTE A PUBLICACAO DO ARQUIVAMENTO DA PETICAO (11.6.1) NA RPI 2425 DE 27/06/2017.