WO2014197848A1 - Dispositif et procédé d'amélioration de l'ascension par poussée de gaz - Google Patents

Dispositif et procédé d'amélioration de l'ascension par poussée de gaz Download PDF

Info

Publication number
WO2014197848A1
WO2014197848A1 PCT/US2014/041387 US2014041387W WO2014197848A1 WO 2014197848 A1 WO2014197848 A1 WO 2014197848A1 US 2014041387 W US2014041387 W US 2014041387W WO 2014197848 A1 WO2014197848 A1 WO 2014197848A1
Authority
WO
WIPO (PCT)
Prior art keywords
gas
lift
side pocket
gas lift
injector
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Ceased
Application number
PCT/US2014/041387
Other languages
English (en)
Inventor
Jeffrey L. Bolding
Joseph D. CLARK
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
DROVER ENERGY SERVICES LLC
Original Assignee
DROVER ENERGY SERVICES LLC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by DROVER ENERGY SERVICES LLC filed Critical DROVER ENERGY SERVICES LLC
Publication of WO2014197848A1 publication Critical patent/WO2014197848A1/fr
Anticipated expiration legal-status Critical
Ceased legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/12Methods or apparatus for controlling the flow of the obtained fluid to or in wells
    • E21B43/121Lifting well fluids
    • E21B43/122Gas lift
    • E21B43/123Gas lift valves

Definitions

  • Embodiments of the present invention generally relate to methods and apparatuses for a downhole operation. More particularly, the invention relates to methods and apparatuses for providing gas lift where gas is provided via an annular region accessed by a side pocket mandrel.
  • a common form of artificial lift is gas lift.
  • the purpose of a gas lift system is to introduce gas below the fluid column in order to increase the velocity of the fluid, thereby lifting the fluid to the surface.
  • Gas lift systems typically have several gas injection points along the length of the fluid column in the wellbore.
  • the production tubing is run inside the cased well preferably terminating just above the perforations in the casing.
  • a packer is utilized to seal the lower end of production tubing to the casing.
  • the gas injection points typically consist of side pocket mandrel's with gas lift valves in each side pocket.
  • pressurized gas is supplied to the annular region formed between the exterior of the production tubing and the interior of the casing.
  • the packer at the lower end of the production tubing prevents the pressurized gas from flowing into the formation.
  • the only pathway for the pressurized gas to flow is through the gas lift valves in the side pocket mandrels.
  • the fluid column is lightened by mixing gas with the fluid, increasing the velocity of the fluid as it moves upward in the production tubing thereby lifting fluid out of the well.
  • the pressurized gas supply is typically limited to the area above the packer.
  • the packer may be set 100 feet above the perforations through the casing.
  • the distance from the packer to the bottom perforations can be quite large, in some cases as much as 1000 feet or more.
  • the natural fluid level of the well may be lower than the lowest injection point in the gas lift system thereby rendering the gas lift system virtually useless and thereby rendering the fluid remaining in the well below the packer essentially unrecoverable by current gas lift methods.
  • the current invention describes an apparatus and method to lower the initial gas lift location to a deeper location within the wellbore that in many instances is below the packer and below the bottom of the production tubular.
  • Figure 1 depicts a typical gas lift system.
  • Figure 2 depicts the initial stage of the installation of a gas lift valve.
  • Figure 3 depicts the second stage of the installation of the gas lift valve
  • Figure 4 depicts the third stage of the installation of the gas lift valve.
  • Figure 5 depicts the fourth stage of the installation of the gas lift valve.
  • Figure 6 depicts the first stage of retrieving a gas lift valve with the kick over tool.
  • Figure 7 depicts the second stage of retrieving a gas lift valve with the kick over tool.
  • Figure 8 depicts the third stage of retrieving a gas lift valve with the kick over tool.
  • Figure 9 depicts the fourth stage of retrieving a gas lift valve with the kick over tool.
  • Figure 10 depicts an embodiment of the current invention where the kick over tool has been replaced by a bottom lift tool.
  • Figure 1 1 depicts the bottom lift tool in the second stage of its installation in the side pocket mandrel.
  • Figure 12 depicts the bottom lift tool in the final stage of its installation in the side pocket mandrel.
  • Figure 13 depicts an extended length bottom lift tool having multiple gas lift valves along its length.
  • Figure 1 depicts a typical gas lift system.
  • a wellbore 10 has a casing 12 that is run from the surface 20 through the formation zone 22.
  • Cement 14 holds the casing 12 in place and prevents the migration of wellbore fluids upwards between the casing 12 and the wellbore 10.
  • the casing 12 has perforations 16 to allow access from the formation zone 22 to the interior of the casing 12.
  • a production tubular 24 is run into the casing 12 from the surface 20.
  • a packer 26 is run in into the casing 12 on the production tubular 24 near or at the lower end of the production tubular 24.
  • the production tubular 24 has at least one side pocket mandrels. In figure 1 , two side pocket mandrels 32, and 34 are shown.
  • Figure 2 depicts the initial stage of the installation of a gas lift valve 38 in the side pocket mandrel 34.
  • the kick over tool 40 is run into the production tubular 24 on e-line, slick line, coil tubing, or any other means known in the industry, it is run slightly past the side pocket mandrel 34 in order to facilitate the location of the side pocket mandrel 34.
  • FIG. 3 depicts the second stage of the installation of the gas lift valve 38 in the side pocket mandrel 34.
  • the kick over tool 40 has been longitudinally located at the side pocket mandrel 34 and has been rotated to orient the gas lift valve 38 into the side pocket 42.
  • the kick over tool 40 then kicks out the gas lift valve 38.
  • FIG 4 depicts the third stage of the installation of the gas lift valve 38 in the side pocket mandrel 34.
  • the kick over tool 40 is jarred down so that the gas lift valve 38 is set into the side pocket 42 so that seals 35 and 37 on the gas lift valve straddle the inlets 45. Seals 35 and 37 allow pressurized gas to flow in from the annular area and into the gas lift valve 38.
  • the pressurized gas then typically flows upward through the gas lift valve where the pressurized gas may be regulated before being injected into the fluid stream adjacent the side pocket mandrel 34.
  • a release device 43 such as a shear pin, sheer screw, C ring, or other release device is actuated to release the kick over tool 40 from the gas lift valve 38.
  • Figure 5 depicts the fourth stage of the installation of the gas lift valve 38 in the side pocket mandrel 34. With the gas lift valve 38 installed in the side pocket 42 and the kick over tool 40 released from the gas lift valve 38 the kick over tool 40 is then retrieved to the surface 20.
  • the pressurized gas in the annular area 50 flows in to the side pocket via inlets 45 then into and through the gas lift valve 38 in side pocket mandrel 34 to mix with the fluid from the formation zone 22 to both reduce the density of the fluid thereby lightening the column of liquid that must move upwards to the surface 20 and increases the fluids velocity.
  • the pressurized gas flow through gas lift valve 38 is depicted by arrow 54.
  • Figure 6 depicts the first stage of retrieving a gas lift valve 38 with the kick over tool 40.
  • the kick over tool 40 is run into the production tubular 24 it is run slightly past the side pocket mandrel 34 in order to facilitate the location of the gas lift valve 38 in the side pocket mandrel 34.
  • Figure 7 depicts the second stage of retrieving a gas lift valve 38 with the kick over tool 40.
  • the kick over tool 40 has been longitudinally located at the gas lift valve 38 and has been rotated to orient the release device 43 into the side pocket 42 and towards the top of the gas lift valve 38.
  • Figure 8 depicts the third stage of retrieving a gas lift valve 38 with the kick over tool 40. With the release device 43 kicked out into the side pocket mandrel 34 and towards the top of the gas lift valve 38 the kick over tool 40 and thus the release device 43 are jarred down so that the release device 43 latches onto the top of the gas lift valve 38. Subsequent jarring unsets the gas lift valve 38.
  • Figure 9 depicts the fourth stage of retrieving the gas lift valve 38 from the side pocket mandrel 34 with the kick over tool 40. With the gas lift valve 38 latched into the retrieving device 43 and unset from the side pocket mandrel 34 the kick over tool 40 and the gas lift valve 38 may be retrieved to the surface 20.
  • FIG 10 depicts an embodiment of the current invention where the kick over tool has been replaced by a bottom lift tool 100.
  • the bottom lift tool 100 has a stinger 106 at the upper end of the stinger 106 is a high pressure swivel 104 at the upper end of the high pressure link 103 is a second high pressure swivel 102 which in turn is connected to bottom lift injector 1 10.
  • Bottom lift injector 1 10 typically extends some distance, possibly hundreds of feet, below the inlets 45 and more preferably extend below the formation zone (not shown).
  • the stinger 106 may simply be a connection to sting into the gas lift mandrel 34 or it may be a gas lift valve to control the flow from the annulus into the bottom lift tool 100.
  • either high pressure swivel 102 or 104 could be replaced with a high pressure hose or other flexible conduit.
  • the entire assembly high pressure swivel 102 high pressure link 103 and high pressure swivel 104 could all be replaced with a high pressure hose or other flexible conduit.
  • the bottom lift injector 1 10 is attached to or is a part of coil tubing between three quarters of an inch and 1 inch outer diameter although larger or smaller diameters may be used.
  • the bottom lift tool 100 has a body 108. In many instances the body 108 has a check valve 1 15 to relieve pressure from the inner bore of the bottom lift tool 100, see Figure 12 Typically the bottom lift tool 100 has a standard size. In order to allow a standard size bottom lift tool 100 to be run into any larger size tubular interchangeable centralizer rings 109 may be provided. Typically the centralizer rings 109 are roller bogey centralizer rings and have vertical grooves or ports 107 to allow fluid to flow past the centralizer rings 109 as the bottom lift tool is run into the hole as well as when fluid is produced out of the well past the bottom lift tool. [0021] Figure 10 depicts the bottom lift tool 100 in the first stage of its installation in the side pocket mandrel 34.
  • bottom lift tool 100 As the bottom lift tool 100 is run into the production tubular 24 on a work line 1 12 such as e-line, slick line, coil tubing, or any other means known in the industry, it is run slightly past the side pocket mandrel 34 in order to locate the stinger 106 to the side pocket mandrel 34.
  • a work line 1 12 such as e-line, slick line, coil tubing, or any other means known in the industry
  • Figure 1 1 depicts the bottom lift tool 100 in the second stage of its installation in the side pocket mandrel 34.
  • the stinger 106 has been longitudinally located to the side pocket mandrel 34 and has been rotated to orient the stinger 106 into the side pocket 42.
  • the bottom lift tool 100 then kicks out the stinger 106.
  • Figure 12 depicts the bottom lift tool 100 in the third stage of its installation in the side pocket mandrel 34.
  • the bottom lift tool 100 With the stinger 106 kicked out into the side pocket mandrel 34 the bottom lift tool 100 is jarred down so that the stinger 106 is set into the side pocket 42.
  • a release device 1 14 such as a fishing neck, shear pin, sheer screw, C ring, or other release device is typically located at the upper end of the bottom lift tool 100 and where the bottom lift tool 100 is sized so that the release device 1 14 will be below the upper end of the side pocket mandrel 34 thereby providing a less restricted pathway for fluid to flow past the bottom lift tool 100 when the work line 1 12 is pulled out of the hole.
  • the release device 1 14 may be actuated to release the bottom lift tool 100 from the work line 1 12.
  • the work line 1 12 is then removed from the tubular 24 leaving the bottom lift tool 100 in place with the stinger 106 engaged with the side pocket 42 in side pocket mandrel 34.
  • High pressure gas flow from the annular region flows through inlet 45 and into stinger 106 as depicted by arrow 121 the high pressure gas flow then continues upwards in the stinger 106 through high pressure swivel 104 and into high pressure link 103 as depicted by arrow 123.
  • the high pressure gas then continues on upward through high pressure swivel 102 and into the coil tubing of 128 bottom lift tool 100 where it is directed back downwards through the coil tubing 128 as depicted by arrow 125 the high pressure gas then continues downward through the bottom lift injector 1 10 as depicted by arrow 127 until it is injected into the fluid column as depicted by arrow 129.
  • a gas lift valve, nozzle, or other flow restriction may be placed at any location in the bottom lift tool 100 such as in the bottom lift injector 1 10 or in the body 108 of the bottom lift tool 100.
  • the stinger 106 may incorporate a gas lift valve, nozzle, or other flow restriction while also allowing gas to flow into the bottom lift tool 100 then down through the coil tubing 128 to the bottom lift injector 1 10.
  • a gas lift valve in the stinger 106 as well as a gas lift valve or other nozzle in bottom lift injector 1 10 at least two separate gas lift locations may be utilized.
  • the coil tubing 128 may incorporate gas lift valves, nozzles, or other flow restrictions along its length thereby allowing numerous gas lift injection sites along the length of the coil tubing 128 before the high pressure gas reaches the bottom lift injector 1 10. Multiple gas lift injection sites along the length of the bottom lift injector 1 10 are particularly useful when the bottom of the production tubular 24 or the packer 26, as indicated in Figure 13, are far from the producing formation 17, as indicated in Figure 13, for example 1000 feet.
  • Figure 13 depicts a bottom lift tool 100, such as the bottom lift tool 100 depicted in Figure 12, having an extended length coil tubing 128 with a bottom lift injector 1 10, which may incorporate a gas lift valve or other nozzle to regulate the gas flow through the nozzle and further includes a first gas lift valve 130 and a second gas lift valve 132 along the length of the bottom lift injector 1 10.
  • the bottom lift tool 100 is depicted in casing 131 that is cemented by cement 132 in the well 134. As depicted the casing 130 does not extend to the formation zone 17 in practice the casing 130 may or may not extend to the formation zone 17 and may or may not be cemented to formation zone 17.
  • any number of gas lift valves may be used along the length of the coil tubing 128.
  • the lower end of the bottom lift injector 1 10 may incorporate an additional gas lift valve, a nozzle, or may remain open so that gas may exit the lower end of the bottom lift injector 1 10.
  • the operator may desire multiple gas lift injection sites along the length of the coil tubing 128 as it connects to the bottom lift injector 1 10 in those instances when the coil tubing 128 connecting the body 108 of the bottom lift tool 100 to the bottom lift injector 1 10 is extremely long and having a single gas lift valve or nozzle at only the lower end of the bottom lift injector 1 10 would be insufficient or impractical.
  • the release device 1 14 may be a fishing neck.
  • the release device 1 14 may be an overshot or 108have an internal or external polished bore receptacle, thereby allowing coil tubing to fluidically engage and inject gas or fluids such as chemicals to unload the well or treat the well for other production problems.
  • the release device 1 14 in addition to having an internal or external polished bore receptacle or in some instances in place of having a polished bore receptacle may provide an electrical power or data connection. By providing an electrical power or data connection a downhole data device to record and transmit data such as temperature, pressure, and valve state may be communicated to the surface.
  • the electrical power or data connection could be a wet connect or by induction.
  • a typical gas lift system reaches its production limits when the fluid level from the well is reduced to a level below the lowest gas injection point. Because gas lift wells typically use the annular region between the casing in the production tubular to provide high pressure gas and the bottom of this annular area must be packed off the bottom of the production tubular or at least the packer must be above the perforations in the casing. The operator may allow for production logging, by setting the packer far enough away from perforations to be sure that he is above the perforations. In practice the packer may be set 100 or 1000 feet above the perforations thereby leaving the lowest gas injection point 100 or even 1000 feet above the perforations.
  • a method of producing this remaining column of liquid calls for running a work line into the well to remove the gas lift valve in the side pocket mandrel. Then running back into the well with the bottom lift tool to stab the bottom lift tools stinger into the side pocket mandrel accessing the high pressure gas in the annular region. The high pressure gas is then routed into the stinger upwards into the body of the tool through flexible conduit or flexible joints then back down towards the bottom of the well or at least to the perforations through the bottom lift injector which may be of smaller diameter coil tubing such as three-quarter inch or 1 inch coil tubing.
  • Bottom, lower, or downward denotes the end of the well or device away from the surface, including movement away from the surface.
  • Top upwards, raised, or higher denotes the end of the well or the device towards the surface, including movement towards the surface.

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Geology (AREA)
  • Mining & Mineral Resources (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Organic Low-Molecular-Weight Compounds And Preparation Thereof (AREA)

Abstract

L'invention concerne un dispositif et un procédé permettant d'abaisser encore l'emplacement de l'ascension par poussée de gaz la plus basse dans un trou de forage. L'outil d'ascension basse qui est utilisé comporte des joints souples pour le guidage dans un mandrin de poche latérale, afin d'accéder au gaz à haute pression de l'espace annulaire. Ce gaz est dévié dans la canule de guidage grâce à l'outil d'ascension basse plus loin dans le trou de forage, sous l'extrémité la plus basse du tube de production et de la garniture d'étanchéité, et de préférence au moins jusqu'à atteindre le bas des perforations du tubage.
PCT/US2014/041387 2013-06-07 2014-06-06 Dispositif et procédé d'amélioration de l'ascension par poussée de gaz Ceased WO2014197848A1 (fr)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
US201361832420P 2013-06-07 2013-06-07
US61/832,420 2013-06-07

Publications (1)

Publication Number Publication Date
WO2014197848A1 true WO2014197848A1 (fr) 2014-12-11

Family

ID=52008631

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/US2014/041387 Ceased WO2014197848A1 (fr) 2013-06-07 2014-06-06 Dispositif et procédé d'amélioration de l'ascension par poussée de gaz

Country Status (1)

Country Link
WO (1) WO2014197848A1 (fr)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3025912A (en) * 1957-11-04 1962-03-20 Otis Eng Co Well tool having pivotally connected tubular sections
US4708595A (en) * 1984-08-10 1987-11-24 Chevron Research Company Intermittent oil well gas-lift apparatus
US20090255684A1 (en) * 2008-04-10 2009-10-15 Bolding Jeffrey L System and method for thru tubing deepening of gas lift
US7770637B2 (en) * 2007-10-12 2010-08-10 Ptt Exploration And Production Public Company Limited Bypass gas lift system and method for producing a well

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3025912A (en) * 1957-11-04 1962-03-20 Otis Eng Co Well tool having pivotally connected tubular sections
US4708595A (en) * 1984-08-10 1987-11-24 Chevron Research Company Intermittent oil well gas-lift apparatus
US7770637B2 (en) * 2007-10-12 2010-08-10 Ptt Exploration And Production Public Company Limited Bypass gas lift system and method for producing a well
US20090255684A1 (en) * 2008-04-10 2009-10-15 Bolding Jeffrey L System and method for thru tubing deepening of gas lift

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
POLASEK ET AL.: "Gas Lift for Long, Perforated Intervals.", 2012 GAS-LIFT WORKSHOP., February 2012 (2012-02-01), Retrieved from the Internet <URL:http://www.alrdc.com/workshops/20122012GasLiftWorkshop/presentationsl3%20-%201%20-%20Presentation%20-%20Production%20Control%20Services%20-%20Gas%20Lift%20Below%20Packer.pdf> [retrieved on 20140919] *
SCHLUMBERGER. PERFLIFT: "Product Literature", 4 September 2012 (2012-09-04), Retrieved from the Internet <URL:https://web.archive.orglweb/20120904073233/http://www.slb.com/serviceslproduction/artificial_lift/gas_liftiperforated_gas_lift.aspx> [retrieved on 20140919] *

Similar Documents

Publication Publication Date Title
US10472916B2 (en) Subsea tree and methods of using the same
US6959766B2 (en) Downhole ball drop tool
RU2495235C1 (ru) Способ и устройство для регулируемой закачки жидкости по пластам
US20080135248A1 (en) Method and apparatus for completing and fluid treating a wellbore
RU2645044C1 (ru) Оснастка и операции перемещаемого узла сопряжения
US8413726B2 (en) Apparatus, assembly and process for injecting fluid into a subterranean well
CA2659692A1 (fr) Ensemble de completion pour train de tiges inutilise avec systeme et methodes d&#39;injection
US20090095467A1 (en) Bypass gas lift system and method for producing a well
US20090294133A1 (en) Injection Apparatus and Method
US8191624B2 (en) Bypass gas lift system for producing a well
CA2489674A1 (fr) Tube de vitesse a orifices pour operations d&#39;ascension par poussee de gaz
US9470074B2 (en) Device and method for improving gas lift
US7044227B2 (en) Subsea well injection and monitoring system
WO2014197848A1 (fr) Dispositif et procédé d&#39;amélioration de l&#39;ascension par poussée de gaz
CN206220873U (zh) 一种可实现带压拖动水力喷射压裂的管柱
CN204283312U (zh) 一种井下防喷器
CN101514621A (zh) 多区域中的无钻机的防砂
CN100572746C (zh) 火驱采油分层注蒸汽和空气的方法
CN205445570U (zh) 水力喷射压裂管柱装置
US12163392B2 (en) Back pressure valve capsule
US10519749B2 (en) Adjustable steam injection tool
CA3036153C (fr) Tubage et extraction au gaz annulaire
RU184369U9 (ru) Устройство для направления потока жидкости
RU2162931C2 (ru) Скважинный дроссель
CN204252992U (zh) 选择性压裂采气一体化管柱

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 14807985

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 14807985

Country of ref document: EP

Kind code of ref document: A1