Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Ceased
Application number
PCT/NL2015/050344
Other languages
French (fr)
Inventor
Henricus Gerardus Andreas VAN VESSEM
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
IHC Holland lE BV
Original Assignee
IHC Holland lE BV
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by IHC Holland lE BV filed Critical IHC Holland lE BV
Priority to BR112016026907-1A priority Critical patent/BR112016026907B1/en
Priority to US15/311,784 priority patent/US10072390B2/en
Priority to CA2949046A priority patent/CA2949046C/en
Priority to CN201580026641.7A priority patent/CN106414854B/en
Priority to JP2016568598A priority patent/JP6568875B2/en
Priority to AU2015262084A priority patent/AU2015262084B2/en
Priority to EP15729261.6A priority patent/EP3146112B1/en
Priority to ES15729261T priority patent/ES3036807T3/en
Priority to KR1020167032086A priority patent/KR102498055B1/en
Priority to SG11201608992YA priority patent/SG11201608992YA/en
Publication of WO2015178765A1 publication Critical patent/WO2015178765A1/en
Anticipated expiration legal-status Critical
Ceased legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/24Prefabricated piles
    • E02D5/28Prefabricated piles made of steel or other metals
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/24Prefabricated piles
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D13/00Accessories for placing or removing piles or bulkheads, e.g. noise attenuating chambers
    • E02D13/04Guide devices; Guide frames
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D15/00Handling building or like materials for hydraulic engineering or foundations
    • E02D15/08Sinking workpieces into water or soil inasmuch as not provided for elsewhere
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/32Foundations for special purposes
    • E02D27/42Foundations for poles, masts or chimneys
    • E02D27/425Foundations for poles, masts or chimneys specially adapted for wind motors masts
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/24Prefabricated piles
    • E02D5/28Prefabricated piles made of steel or other metals
    • E02D5/285Prefabricated piles made of steel or other metals tubular, e.g. prefabricated from sheet pile elements
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D7/00Methods or apparatus for placing sheet pile bulkheads, piles, mouldpipes, or other moulds
    • E02D7/02Placing by driving
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D7/00Methods or apparatus for placing sheet pile bulkheads, piles, mouldpipes, or other moulds
    • E02D7/02Placing by driving
    • E02D7/06Power-driven drivers
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D7/00Methods or apparatus for placing sheet pile bulkheads, piles, mouldpipes, or other moulds
    • E02D7/28Placing of hollow pipes or mould pipes by means arranged inside the piles or pipes
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2200/00Geometrical or physical properties
    • E02D2200/16Shapes
    • E02D2200/1685Shapes cylindrical
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2250/00Production methods
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2250/00Production methods
    • E02D2250/0061Production methods for working underwater
    • E02D2250/0092Production methods for working underwater using hydraulical means
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2300/00Materials
    • E02D2300/0026Metals
    • E02D2300/0029Steel; Iron

Definitions

  • the present invention relates to a tubular foundation element, in particular a pile e.g. a jacket pile, to be installed in a ground formation, the tubular foundation element having at least one open end, typically both ends open, allowing a pile driver with an anvil to be inserted into the tubular foundation element.
  • the present invention further relates to an assembly for installing tubular foundation elements, in particular piles e.g. jacket piles, in a ground formation, which assembly comprises a pile driver and an anvil. Further, the present invention relates to a method of installing a tubular foundation element, in particular a pile or a jacket pile, in a ground formation, by means of a pile driver .
  • pile driving is done by a hammer with a sleeve, wherein the sleeve is stabbed over the pile.
  • the hammer delivers one or more blows to the pile, thereby driving the pile into the ground formation.
  • the presently provided tubular foundation element comprises a support at the inside thereof, which support is adapted to transmit energy from the anvil directly to the tubular foundation element, during
  • the tubular foundation element During installation of the tubular foundation element, a driver is placed on the support provided at the inside of the tubular foundation element and the tubular foundation element penetrates the soil material of the ground formation, in particular an underwater ground formation, and the soil material enters the tubular foundation element. At a predetermined point during driving of the tubular foundation element, the anvil and the support hit the soil material, thereby forcing the soil material to move downwards. As a result, the part of the tubular foundation element above the support contains no or little soil material.
  • the soil material within the tubular foundation element is compressed during installation of the tubular foundation element and, therefore, becomes more dense.
  • a further element is inserted into the tubular foundation element, for instance a jacket leg of a jacket, grout may be provided around the further element and within the tubular foundation element to provide a fixation of the further element relative to the tubular foundation element. Due to the more dense soil material, mixing of the grout with the soil material may be prevented or reduced and grouting is improved.
  • the support is provided in the upper half of the tubular foundation element, in
  • 'upper' refers to a tubular
  • the tubular foundation element which is vertically oriented.
  • the tubular foundation element has a length in a range from 20 to 120 m, preferably in a range from 40 to 70 m, and the support is placed at a distance from the at least one open end, which distance is in a range from 4 to 10 m, in particular in a range from 6 to 8 m, and/or in a range from 7% to 30%, in particular in a range from 10% to 25% of the total length of the tubular foundation element.
  • the upper part of the tubular foundation element i.e. the part above the support, stays clean during
  • a jacket leg may be inserted and fixed with respect to the tubular foundation element by means of grout. Due to the clean upper part of the tubular foundation element, no removal of soil material is required before grouting.
  • the support may comprise a flange secured to an inner surface of the tubular foundation element.
  • the flange may be secured, e.g. welded or bolted, to the inner surface, in particular an inner wall of the tubular foundation element.
  • the support may be substantially tapered towards the toe of the tubular foundation element in the longitudinal direction thereof.
  • 'toe' refers to the lowermost end of the tubular foundation element. Due to the tapered shape of the support towards the toe of the tubular foundation element, the energy delivered via the anvil to the support is transmitted efficiently to the wall of the tubular foundation element.
  • the invention further relates to a method of installing a tubular foundation element in a ground formation, by means of a pile driver.
  • the method comprises the steps of providing a tubular foundation element with a support at the inside thereof; placing an anvil on the support; placing the driver on the anvil; and driving the tubular foundation element into the ground formation, wherein during installation the support transmits energy from the anvil directly to the tubular foundation element.
  • the support may be provided in the upper half of the tubular foundation element, in particular in the upper quarter of the tubular foundation element.
  • 'upper' refers to a tubular foundation element which is vertically oriented .
  • driver and/or anvil are held by the tubular foundation element during driving thereof.
  • the tubular foundation element is placed directly on the ground formation and driven into the ground formation.
  • the anvil compresses soil material of the ground formation within the tubular foundation element during at least a part of a installing process of the tubular foundation element.
  • the upper layer of the ground formation in particular
  • underwater ground formation has to be excavated before the tubular foundation element may be installed in the ground formation .
  • the upper part of the tubular foundation element i.e. the part above the support, contains no or little soil material after installation of the tubular foundation element. Therefore, the upper part of the tubular foundation element does not require to be emptied after installation. Further, the soil material within the tubular foundation elements is compressed during installation of the tubular foundation element. Due to the compression of the soil material of the ground formation, the soil material of the ground formation, in particular the upper layer, is more dense after installation.
  • the tubular foundation element may be placed onto the ground formation, in particular a ground formation with a soft upper layer, without excavating the upper layer of the ground formation.
  • the method may further comprise a step of placing a template having at least two guides for guiding a tubular foundation element on the ground formation, in particular before the tubular foundation element is placed on the ground formation .
  • water when the tubular foundation element is installed in an underwater ground formation, water may be relieved from the tubular foundation element, in particular at least from the part between the underwater ground formation and the support, during installation of the tubular foundation element in the underwater ground formation.
  • the invention further relates to an assembly for installing a tubular foundation element as presently provided, in a ground formation, comprising a pile driver and an anvil, wherein the support at the inside of the tubular foundation element is adapted to transmit energy from the anvil directly to the tubular foundation element, during installation of the tubular foundation element.
  • the pile driver comprises a hydraulic pile driver.
  • the assembly may comprise a template having at least two guides for guiding a tubular foundation element, which template is to be placed on the underwater ground formation, at least during installing the tubular foundation element.
  • EP 2 312 060 relates to a system and a method for installing tubular foundation elements in an underwater ground formation, the system comprising a hydraulic driver, an anvil and an adaptor for transmitting energy from the anvil to the toe of the foundation element, which adaptor fits inside the tubular foundation element.
  • the inner wall of the foundation element is provided with a support for the adaptor at or near its toe.
  • CN 201068569 relates to a pile-driving machine, comprising a ram, a pile, an inner sleeve and a hoisting device.
  • the inner sleeve is located in a lower part of the outer sleeve.
  • the ram can move upwards and downwards within the outer sleeve, thereby directly hitting the inner sleeve.
  • Lugs are projecting from the ram, which lugs strike the top of the outer sleeve to move the outer sleeve downwards.
  • US 3,824,797 relates to driving long piles into submerged lands with a liquid ram or spear generated in an evacuated tube.
  • the pile itself is used as at least a portion of the working chamber for generating a water hammer.
  • JPH0365737 relates to a driving assembly for installing piles in a ground formation.
  • Figures 1 and 2 illustrate the different stages of installing a tubular foundation element in a ground formation
  • Figure 3 illustrates an installation of a jacket leg in the tubular foundation element of Figures 1 and 2.
  • installation of a jacket starts with installing a number a jacket piles in a ground formation, e.g. an underwater ground formation.
  • a ground formation e.g. an underwater ground formation.
  • jacket legs of the jacket are placed within the jacket piles.
  • a jacket leg extends in the upper part of a jacket pile.
  • Grout may be added to the jacket pile, in particular the upper part of the jacket pile, in order to fixate the jacket leg with respect to the jacket pile .
  • Figure 1 shows an embodiment of a tubular foundation element 1, in this embodiment a jacket pile 1 which might be installed in an underwater ground formation 4.
  • the tubular foundation element 1 is placed on the surface of the underwater ground formation 4 and is held by a guide 3 of a template 6.
  • the jacket pile 1 has a circular cross-section and a diameter in the range from 1.5 to 3.5 m .
  • the jacket pile 1 is provided with a support, in this embodiment a flange 2 provided at an inner wall of the jacket pile 1.
  • the flange 2 is attached to the inner wall of the jacket pile 1 by, e.g. welding, bolting, or any suitable manner to attach the flange 2 to the inner wall of the jacket pile 1.
  • the flange 2 may be provided with openings (not shown) in order to let water out from the lower part of the jacket pile 1 below the flange 2. It is therewith prevented that the water pressure within the lower part of the jacket pile 1 exceeds a predetermined value as a result of driving the jacket pile 1 by means of the driver 4, in
  • blows are delivered directly to an upper side, i.e. top surface of the flange 2.
  • openings might be provided in the tubular foundation element 1 and/or in an anvil 8 to let water out from the lower part of the tubular foundation element 1 below the support 2.
  • a driver 7 with an anvil 8 is placed on top of the support 2, such that energy is transmitted from the anvil 8 directly to the tubular
  • the driver 7 and the anvil 8 deliver blows to the flange 2 and therewith to the tubular foundation element 1 to install the tubular foundation element 1 in the underwater ground formation 4.
  • the flange 2 and the anvil 8 reach the surface of the underwater ground formation 4.
  • the driver 7 with the anvil 8 can be hosted by a hoisting device such as a crane (not shown), which crane is for example placed on a surface vessel, such as a jack-up barge (not shown) .
  • the driver may be a hydraulic driver, e.g. one out of the IHC Hydrohammer S-series connected to a power pack on board of a surface vessel (not shown) .
  • the length B of the legs of the jacket in Figure 3 may be 5 m.
  • the tubular foundation element 1 may extend a distance D above the surface of the underwater ground formation 4, which distance D in this example is 1.5 m.
  • the length C is in this example in a range from 4 to 10 m, in particular in a range from 6 to 8 m, and/or in a range from 7% to 30%, in particular in a range from 10% to 25% of the total length of the tubular foundation element 1.
  • the jacket leg 9 comprises welding beads 10, which may contribute to the fixation of the jacket leg 9 to the tubular foundation element 1.
  • the jacket leg 9 is inserted partly into the tubular foundation element 1 as indicated with arrow A.
  • the compressed soil material is more dense. Due to the more dense soil material, mixing of the grout and the soil material is prevented or reduced, which leads to a reliable fixation of the jacket leg to the tubular foundation element 1.
  • the tubular foundation element 1 is installed in the ground formation by driving within the tubular foundation element 1. As a result thereof, the tubular foundation element 1 acts as a noise reducing element. As a further result, the diameter of the tubular foundation element 1 is not enlarged during driving. Thus the tubular foundation element 1 may be installed without
  • a further advantage is a low centre of gravity due to the pile driver 7 being inserted in the tubular foundation element 1 during driving thereof.
  • the anvil 8 since the anvil 8 is placed on the support 2 during driving of the tubular foundation element 1, energy delivered to the support by, i.a. the anvil 8 is transmitted to the wall of the tubular foundation element.
  • the transmitted energy is in particular transmitted downwards, i.e. via the wall of the tubular foundation element 1, in particular from the support 2 towards the toe of the tubular foundation element.
  • the part of the tubular foundation element 1 contributing to the generation of noise is reduced.
  • the invention is not restricted to the above-described embodiments, which can be varied in a number of ways within the scope of the claims. It is, for example possible that a noise mitigation system is used during installing of the tubular foundation element.
  • the noise mitigation system comprises a tubular sleeve, which can be placed around the tubular foundation element during driving thereof.
  • the tubular sleeve reduces the noise produced during driving of the tubular foundation element.
  • the noise mitigation system may be used in combination with a template as described above.
  • tubular foundation element is composed of multiple parts, in particular
  • One of the parts comprises a support, which might have a length in a range from 5-25 cm, in particular in a range from 10 to 15 cm .

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • Piles And Underground Anchors (AREA)
  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)
  • Foundations (AREA)

Abstract

The present invention relates to a tubular foundation element, in particular a pile e.g. a jacket pile, to be installed in a ground formation. The tubular foundation element has at least one open end, typically both ends open, allowing a pile driver with an anvil to be inserted into the tubular foundation element. The tubular foundation element comprises a support at the inside thereof, which support is adapted to transmit energy from the anvil directly to the tubular foundation element, during installation of the tubular foundation element.

Description

TUBULAR FOUNDATION
The present invention relates to a tubular foundation element, in particular a pile e.g. a jacket pile, to be installed in a ground formation, the tubular foundation element having at least one open end, typically both ends open, allowing a pile driver with an anvil to be inserted into the tubular foundation element. The present invention further relates to an assembly for installing tubular foundation elements, in particular piles e.g. jacket piles, in a ground formation, which assembly comprises a pile driver and an anvil. Further, the present invention relates to a method of installing a tubular foundation element, in particular a pile or a jacket pile, in a ground formation, by means of a pile driver .
It is known that pile driving is done by a hammer with a sleeve, wherein the sleeve is stabbed over the pile. The hammer delivers one or more blows to the pile, thereby driving the pile into the ground formation.
It is an object of the present invention to provide a tubular foundation element which does not require or requires less removal of soil material.
To this end, the presently provided tubular foundation element comprises a support at the inside thereof, which support is adapted to transmit energy from the anvil directly to the tubular foundation element, during
installation of the tubular foundation element.
During installation of the tubular foundation element, a driver is placed on the support provided at the inside of the tubular foundation element and the tubular foundation element penetrates the soil material of the ground formation, in particular an underwater ground formation, and the soil material enters the tubular foundation element. At a predetermined point during driving of the tubular foundation element, the anvil and the support hit the soil material, thereby forcing the soil material to move downwards. As a result, the part of the tubular foundation element above the support contains no or little soil material.
Moreover, the soil material within the tubular foundation element is compressed during installation of the tubular foundation element and, therefore, becomes more dense. If a further element is inserted into the tubular foundation element, for instance a jacket leg of a jacket, grout may be provided around the further element and within the tubular foundation element to provide a fixation of the further element relative to the tubular foundation element. Due to the more dense soil material, mixing of the grout with the soil material may be prevented or reduced and grouting is improved.
It is noted that in the context of the present patent application, the term directly is referred to as without changing direction, and is also referred to as with nothing in between. Thus, the energy transmitted from the anvil to the tubular foundation element does not change direction during transmittal as such.
In a preferred embodiment, the support is provided in the upper half of the tubular foundation element, in
particular in the upper quarter of the tubular foundation element. In this respect, 'upper' refers to a tubular
foundation element which is vertically oriented. In a more specific embodiment, the tubular foundation element has a length in a range from 20 to 120 m, preferably in a range from 40 to 70 m, and the support is placed at a distance from the at least one open end, which distance is in a range from 4 to 10 m, in particular in a range from 6 to 8 m, and/or in a range from 7% to 30%, in particular in a range from 10% to 25% of the total length of the tubular foundation element. In this embodiment, the upper part of the tubular foundation element, i.e. the part above the support, stays clean during
installation of the tubular foundation element. In the upper part, a jacket leg may be inserted and fixed with respect to the tubular foundation element by means of grout. Due to the clean upper part of the tubular foundation element, no removal of soil material is required before grouting.
The support may comprise a flange secured to an inner surface of the tubular foundation element. The flange may be secured, e.g. welded or bolted, to the inner surface, in particular an inner wall of the tubular foundation element.
The support may be substantially tapered towards the toe of the tubular foundation element in the longitudinal direction thereof. In this respect, 'toe' refers to the lowermost end of the tubular foundation element. Due to the tapered shape of the support towards the toe of the tubular foundation element, the energy delivered via the anvil to the support is transmitted efficiently to the wall of the tubular foundation element.
The invention further relates to a method of installing a tubular foundation element in a ground formation, by means of a pile driver. The method comprises the steps of providing a tubular foundation element with a support at the inside thereof; placing an anvil on the support; placing the driver on the anvil; and driving the tubular foundation element into the ground formation, wherein during installation the support transmits energy from the anvil directly to the tubular foundation element.
The support may be provided in the upper half of the tubular foundation element, in particular in the upper quarter of the tubular foundation element. In this respect, 'upper' refers to a tubular foundation element which is vertically oriented .
In an embodiment the driver and/or anvil are held by the tubular foundation element during driving thereof.
In a preferred embodiment, the tubular foundation element is placed directly on the ground formation and driven into the ground formation. In a more specific embodiment, the anvil compresses soil material of the ground formation within the tubular foundation element during at least a part of a installing process of the tubular foundation element. Usually, the upper layer of the ground formation, in particular
underwater ground formation, has to be excavated before the tubular foundation element may be installed in the ground formation .
Thus, as explained above, the upper part of the tubular foundation element, i.e. the part above the support, contains no or little soil material after installation of the tubular foundation element. Therefore, the upper part of the tubular foundation element does not require to be emptied after installation. Further, the soil material within the tubular foundation elements is compressed during installation of the tubular foundation element. Due to the compression of the soil material of the ground formation, the soil material of the ground formation, in particular the upper layer, is more dense after installation.
Due to compression of the soil material during installation, the tubular foundation element may be placed onto the ground formation, in particular a ground formation with a soft upper layer, without excavating the upper layer of the ground formation.
The method may further comprise a step of placing a template having at least two guides for guiding a tubular foundation element on the ground formation, in particular before the tubular foundation element is placed on the ground formation .
In an embodiment, when the tubular foundation element is installed in an underwater ground formation, water may be relieved from the tubular foundation element, in particular at least from the part between the underwater ground formation and the support, during installation of the tubular foundation element in the underwater ground formation.
The invention further relates to an assembly for installing a tubular foundation element as presently provided, in a ground formation, comprising a pile driver and an anvil, wherein the support at the inside of the tubular foundation element is adapted to transmit energy from the anvil directly to the tubular foundation element, during installation of the tubular foundation element. It is preferred that the pile driver comprises a hydraulic pile driver.
The assembly may comprise a template having at least two guides for guiding a tubular foundation element, which template is to be placed on the underwater ground formation, at least during installing the tubular foundation element.
For the sake of completeness, attention is drawn to the following prior art.
EP 2 312 060 relates to a system and a method for installing tubular foundation elements in an underwater ground formation, the system comprising a hydraulic driver, an anvil and an adaptor for transmitting energy from the anvil to the toe of the foundation element, which adaptor fits inside the tubular foundation element. The inner wall of the foundation element is provided with a support for the adaptor at or near its toe.
CN 201068569 relates to a pile-driving machine, comprising a ram, a pile, an inner sleeve and a hoisting device. The inner sleeve is located in a lower part of the outer sleeve. The ram can move upwards and downwards within the outer sleeve, thereby directly hitting the inner sleeve. Lugs are projecting from the ram, which lugs strike the top of the outer sleeve to move the outer sleeve downwards.
US 3,824,797 relates to driving long piles into submerged lands with a liquid ram or spear generated in an evacuated tube. In one embodiment, the pile itself is used as at least a portion of the working chamber for generating a water hammer.
JPH0365737 relates to a driving assembly for installing piles in a ground formation.
Aspects of the invention will be explained in greater detail by reference to exemplary embodiments of the invention shown in the drawings, in which:
Figures 1 and 2 illustrate the different stages of installing a tubular foundation element in a ground formation; and
Figure 3 illustrates an installation of a jacket leg in the tubular foundation element of Figures 1 and 2.
In practice, installation of a jacket, e.g. for a wind turbine, starts with installing a number a jacket piles in a ground formation, e.g. an underwater ground formation. After installing the jacket piles, jacket legs of the jacket are placed within the jacket piles. A jacket leg extends in the upper part of a jacket pile. Grout may be added to the jacket pile, in particular the upper part of the jacket pile, in order to fixate the jacket leg with respect to the jacket pile .
To this end, Figure 1 shows an embodiment of a tubular foundation element 1, in this embodiment a jacket pile 1 which might be installed in an underwater ground formation 4. The tubular foundation element 1 is placed on the surface of the underwater ground formation 4 and is held by a guide 3 of a template 6. In this example, the jacket pile 1 has a circular cross-section and a diameter in the range from 1.5 to 3.5 m .
The jacket pile 1 is provided with a support, in this embodiment a flange 2 provided at an inner wall of the jacket pile 1. The flange 2 is attached to the inner wall of the jacket pile 1 by, e.g. welding, bolting, or any suitable manner to attach the flange 2 to the inner wall of the jacket pile 1.
In an embodiment, the flange 2 may be provided with openings (not shown) in order to let water out from the lower part of the jacket pile 1 below the flange 2. It is therewith prevented that the water pressure within the lower part of the jacket pile 1 exceeds a predetermined value as a result of driving the jacket pile 1 by means of the driver 4, in
particular a hydraulic driver, which driver delivers blows to the flange 2. In this embodiment the blows are delivered directly to an upper side, i.e. top surface of the flange 2.
In other embodiments, openings (not shown) might be provided in the tubular foundation element 1 and/or in an anvil 8 to let water out from the lower part of the tubular foundation element 1 below the support 2.
As can be seen in Figure 3, when the jacket pile 1 is installed in the underwater ground formation 4, the flange 2 is below the surface of the underwater ground formation 4.
As can be seen in Figure 2, a driver 7 with an anvil 8 is placed on top of the support 2, such that energy is transmitted from the anvil 8 directly to the tubular
foundation element 1, during installation of the tubular foundation element 1. The driver 7 and the anvil 8 deliver blows to the flange 2 and therewith to the tubular foundation element 1 to install the tubular foundation element 1 in the underwater ground formation 4. At a predetermined point during installing of the tubular foundation element 1, the flange 2 and the anvil 8 reach the surface of the underwater ground formation 4.
Installing of the tubular foundation element 1 continues and the flange and in particular the anvil 8 delivering blows to the flange 2 of the tubular foundation element 1 deliver blows to the soil material within the tubular foundation element. As a result, the soil material 5 within the tubular foundation element 1 is compressed and becomes more dense, at least the soil material directly below the anvil 8 and the flange 2.
It is noted that the driver 7 with the anvil 8 can be hosted by a hoisting device such as a crane (not shown), which crane is for example placed on a surface vessel, such as a jack-up barge (not shown) . The driver may be a hydraulic driver, e.g. one out of the IHC Hydrohammer S-series connected to a power pack on board of a surface vessel (not shown) .
In practice the length B of the legs of the jacket in Figure 3 may be 5 m. In the installed state, the tubular foundation element 1 may extend a distance D above the surface of the underwater ground formation 4, which distance D in this example is 1.5 m. The length C is in this example in a range from 4 to 10 m, in particular in a range from 6 to 8 m, and/or in a range from 7% to 30%, in particular in a range from 10% to 25% of the total length of the tubular foundation element 1.
Due to the anvil 8 with the driver 7 forcing the soil material to move downwards during driving of the tubular foundation element 1, it is not required to empty the part of the tubular foundation element 1 above the flange 2 after installation. As a result of compressing the soil material within the tubular foundation element 1, the soil material is more dense and is a good match for the grout used to fixate the jacket leg 9 relative to the jacket pile 1, i.e. grouting is improved.
In this embodiment, the jacket leg 9 comprises welding beads 10, which may contribute to the fixation of the jacket leg 9 to the tubular foundation element 1. The jacket leg 9 is inserted partly into the tubular foundation element 1 as indicated with arrow A.
As a further result, the compressed soil material is more dense. Due to the more dense soil material, mixing of the grout and the soil material is prevented or reduced, which leads to a reliable fixation of the jacket leg to the tubular foundation element 1.
Further advantages of the tubular foundation element as presently provided are as follows. The tubular foundation element 1 is installed in the ground formation by driving within the tubular foundation element 1. As a result thereof, the tubular foundation element 1 acts as a noise reducing element. As a further result, the diameter of the tubular foundation element 1 is not enlarged during driving. Thus the tubular foundation element 1 may be installed without
additional structural elements at the outside of the
foundation element and/or without adjusting the guide 3 of the template 6.
A further advantage is a low centre of gravity due to the pile driver 7 being inserted in the tubular foundation element 1 during driving thereof.
Moreover, since the anvil 8 is placed on the support 2 during driving of the tubular foundation element 1, energy delivered to the support by, i.a. the anvil 8 is transmitted to the wall of the tubular foundation element. The transmitted energy is in particular transmitted downwards, i.e. via the wall of the tubular foundation element 1, in particular from the support 2 towards the toe of the tubular foundation element. As a result, the part of the tubular foundation element 1 contributing to the generation of noise is reduced.
It should be appreciated, however, that these embodiments may not be construed as limiting the scope of protection for the present invention.
It is noted that the drawings are schematic, not necessarily to scale and that details that are not required for understanding the present invention may have been omitted. The terms "upward", "downward", "below", "above", and the like relate to the embodiments as oriented in the drawings, unless otherwise specified. Further, elements that are at least substantially identical or that perform an at least
substantially identical function are denoted by the same numeral .
The invention is not restricted to the above-described embodiments, which can be varied in a number of ways within the scope of the claims. It is, for example possible that a noise mitigation system is used during installing of the tubular foundation element. The noise mitigation system comprises a tubular sleeve, which can be placed around the tubular foundation element during driving thereof. The tubular sleeve reduces the noise produced during driving of the tubular foundation element. The noise mitigation system may be used in combination with a template as described above.
In a further embodiment, the tubular foundation element is composed of multiple parts, in particular
cylindrical parts, which are placed on top of each other. One of the parts comprises a support, which might have a length in a range from 5-25 cm, in particular in a range from 10 to 15 cm .

Claims

1. Tubular foundation element, in particular a pile e.g. a jacket pile, to be installed in a ground formation, the tubular foundation element having at least one open end, typically both ends open, allowing a pile driver with an anvil to be inserted into the tubular foundation element, and
characterized in that the tubular foundation element comprises a support at the inside thereof, which support is adapted to transmit energy from the anvil directly to the tubular
foundation element, during installation of the tubular
foundation element.
2. Tubular foundation element according to claim 1, wherein the support is located in the upper half of the tubular foundation element, in particular in the upper quarter of the tubular foundation element.
3. Tubular foundation element according to claim 1 or
2, wherein the tubular foundation element has a length in a range from 20 to 120 m, preferably in a range from 40 to 70 m, and wherein the support is placed at a distance from the at least open end, wherein the distance is in a range from 4 to 10 m, in particular in a range from 6 to 8 m, and/or in a range from 7% to 30%, in particular in a range from 10% to 25% of the total length of the tubular foundation element.
4. Tubular foundation element according to claim 1, 2 or 3, wherein the support comprises a flange secured to an inner surface of the tubular foundation element.
5. Tubular foundation element according to any of the preceding claims, wherein the support is substantially tapered towards the toe of the tubular foundation element in the longitudinal direction thereof.
6. Tubular foundation element according to any of the preceding claims, wherein the tubular foundation element has two open ends .
7. Method of installing a tubular foundation element, in particular a pile or a jacket pile, in a ground formation, by means of a pile driver, characterized by
providing a tubular foundation element with a support at the inside thereof,
placing an anvil on the support,
placing the pile driver on the anvil, and
driving the tubular foundation element into the ground formation, wherein during installation the support transmits energy from the anvil directly to the tubular foundation element.
8. Method according to claim 7, wherein the support is provided in the upper half of the tubular foundation element, in particular in the upper quarter of the tubular foundation element .
9. Method according to claim 7 or 8, wherein the pile driver and/or anvil are held by the tubular foundation element during driving thereof.
10. Method according to any of claims 7-9, wherein the tubular foundation element is placed directly on the ground formation and, thereafter, is installed in the ground
formation.
11. Method according to any of the claims 7-10, wherein the anvil compresses soil material of the ground formation within the tubular foundation element during at least a part of a installing process of the tubular foundation element .
12. Method according to any of the claims 7-11, further comprising a step of placing a template having at least two guides for guiding a tubular foundation element at the ground formation, in particular before the tubular
foundation element is placed on the ground formation.
13. Method according to any of the claims 7-12, wherein water is relieved from the tubular foundation element, in particular at least from the part between a ground
formation and the support, during driving of the tubular foundation element into the underwater ground formation.
14. Assembly for installing a tubular foundation element according to any one of claims 1-6, in a ground formation, comprising a pile driver and an anvil, and
characterized in that the support at the inside of the tubular foundation element is adapted to transmit energy from the anvil directly to the tubular foundation element, during installation of the tubular foundation element.
15. Assembly according to claim 14, further comprising a template having at least two guides for guiding a tubular foundation element, which template is to be placed on the underwater ground formation, at least during installing the tubular foundation element.
PCT/NL2015/050344 2014-05-22 2015-05-13 Tubular foundation Ceased WO2015178765A1 (en)

Priority Applications (10)

Application Number Priority Date Filing Date Title
BR112016026907-1A BR112016026907B1 (en) 2014-05-22 2015-05-13 TUBULAR FOUNDATION ELEMENT, METHOD AND SET FOR INSTALLING A TUBULAR FOUNDATION ELEMENT
US15/311,784 US10072390B2 (en) 2014-05-22 2015-05-13 Tubular foundation element, assembly and method for installing tubular foundation elements in a ground formation
CA2949046A CA2949046C (en) 2014-05-22 2015-05-13 Tubular foundation
CN201580026641.7A CN106414854B (en) 2014-05-22 2015-05-13 Tubular foundation
JP2016568598A JP6568875B2 (en) 2014-05-22 2015-05-13 Tubular foundation member, assembly, and method for installing tubular foundation member in ground
AU2015262084A AU2015262084B2 (en) 2014-05-22 2015-05-13 Tubular foundation
EP15729261.6A EP3146112B1 (en) 2014-05-22 2015-05-13 Tubular foundation
ES15729261T ES3036807T3 (en) 2014-05-22 2015-05-13 Tubular foundation
KR1020167032086A KR102498055B1 (en) 2014-05-22 2015-05-13 Tubular foundation
SG11201608992YA SG11201608992YA (en) 2014-05-22 2015-05-13 Tubular foundation

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
NL2012858A NL2012858B1 (en) 2014-05-22 2014-05-22 Tubular foundation element, assembly and method for installing tubular foundation elements in a ground formation.
NL2012858 2014-05-22

Publications (1)

Publication Number Publication Date
WO2015178765A1 true WO2015178765A1 (en) 2015-11-26

Family

ID=51541250

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/NL2015/050344 Ceased WO2015178765A1 (en) 2014-05-22 2015-05-13 Tubular foundation

Country Status (12)

Country Link
US (1) US10072390B2 (en)
EP (1) EP3146112B1 (en)
JP (1) JP6568875B2 (en)
KR (1) KR102498055B1 (en)
CN (1) CN106414854B (en)
AU (1) AU2015262084B2 (en)
BR (1) BR112016026907B1 (en)
CA (1) CA2949046C (en)
ES (1) ES3036807T3 (en)
NL (1) NL2012858B1 (en)
SG (1) SG11201608992YA (en)
WO (1) WO2015178765A1 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113026797B (en) * 2021-03-18 2022-08-02 四川电力设计咨询有限责任公司 Hollow annular fan foundation and construction method thereof

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3824797A (en) 1971-07-16 1974-07-23 Orb Inc Evacuated tube water hammer pile driving
EP0525865A1 (en) 1991-07-24 1993-02-03 DE WAAL TECHNOLOGY & CONSULTANCY B.V. Method and device for driving piles
CN201068569Y (en) 2007-03-02 2008-06-04 周祥 Pile-driving machine
EP2312060A1 (en) 2009-10-16 2011-04-20 IHC Holland IE B.V. System for and method of installing foundation elements in an underwater ground formation

Family Cites Families (22)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB215177A (en) * 1923-04-13 1924-05-08 Edgard Frankignoul Improved method and means for the driving in of tube-work for foundations
GB561765A (en) * 1943-02-19 1944-06-02 Bell Noel Gonne Improvements in piles and foundations
DE1784396B1 (en) 1968-08-03 1971-07-01 Cordes Hugo Dipl Ing Ram hammer with sound-absorbing jacket
US4154307A (en) 1976-11-19 1979-05-15 Raymond International, Inc. Pile driving system
DE3047375C2 (en) 1980-12-16 1985-09-05 Koehring Gmbh, 2000 Hamburg Submersible pile driving device
JPS60159218A (en) 1984-01-28 1985-08-20 Ishikawajima Harima Heavy Ind Co Ltd Sound insulation device for pile hammer
JPH0365737A (en) 1989-08-03 1991-03-20 Nec Corp Peripheral control device
BR9002463A (en) * 1990-05-25 1991-11-26 Petroleo Brasileiro Sa PILE FOR PLATFORM FOUNDATION AND ITS INSTALLATION PROCESS
IT1248590B (en) * 1991-06-28 1995-01-19 Saipem Spa IMPROVED DEVICE FOR LIFTING AND BATTING OF FOUNDATION POLES OF OFFSHORE STRUCTURES
GB2257998A (en) * 1991-07-23 1993-01-27 Ashley Thomas Beighton Apparatus and method for driving piles
FR2694315B1 (en) * 1992-07-31 1994-10-21 Bouygues Offshore Method and device for driving a tube into the ground, by beating, in particular for making a foundation pile
US5423633A (en) * 1993-12-23 1995-06-13 Beheersmaatschappij Verstraeten B.V. Piling apparatus adapted to be provided in a tube
US6364577B1 (en) * 2000-05-22 2002-04-02 J. Ray McDermott, S.A. Pile driving transition piece
CN2599075Y (en) 2003-02-26 2004-01-14 夏树清 High efficiency hammer blow type composite pile driver
NL1023531C2 (en) 2003-05-26 2004-11-29 Heifu B V Device for installing a pile in the ground for foundation or sheet pile purposes.
EP1719842A1 (en) * 2005-05-03 2006-11-08 IHC Holland IE B.V. System and method for installing foundation elements
US7367780B2 (en) * 2005-09-30 2008-05-06 General Electric Company System and method for driving a monopile for supporting an offshore wind turbine
DE102006008095A1 (en) 2006-02-20 2007-08-23 Menck Gmbh Method and device for environmentally friendly ramming under water
CN100494581C (en) 2006-09-26 2009-06-03 华北建设集团有限公司 Concrete Bottom Cover and Tube Pile Hole Maker with Pile Wing and Construction Technology
JP2011208373A (en) * 2010-03-29 2011-10-20 Nippon Steel & Sumikin Metal Products Co Ltd Mechanical joint structure of steel pipe pile
CN202492846U (en) 2012-02-21 2012-10-17 中交二航局第三工程有限公司 Drop hammer pile-sinking device
NL2009610C2 (en) * 2012-10-11 2014-04-14 Ihc Sea Steel Ltd Pile driving guide.

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3824797A (en) 1971-07-16 1974-07-23 Orb Inc Evacuated tube water hammer pile driving
EP0525865A1 (en) 1991-07-24 1993-02-03 DE WAAL TECHNOLOGY & CONSULTANCY B.V. Method and device for driving piles
CN201068569Y (en) 2007-03-02 2008-06-04 周祥 Pile-driving machine
EP2312060A1 (en) 2009-10-16 2011-04-20 IHC Holland IE B.V. System for and method of installing foundation elements in an underwater ground formation

Also Published As

Publication number Publication date
BR112016026907A2 (en) 2017-08-15
SG11201608992YA (en) 2016-12-29
KR20170012235A (en) 2017-02-02
CA2949046C (en) 2023-05-09
KR102498055B1 (en) 2023-02-10
JP2017516931A (en) 2017-06-22
CN106414854A (en) 2017-02-15
AU2015262084A1 (en) 2016-11-17
BR112016026907B1 (en) 2022-08-30
EP3146112B1 (en) 2025-07-02
US10072390B2 (en) 2018-09-11
EP3146112C0 (en) 2025-07-02
JP6568875B2 (en) 2019-08-28
EP3146112A1 (en) 2017-03-29
CN106414854B (en) 2020-01-10
ES3036807T3 (en) 2025-09-24
NL2012858B1 (en) 2016-03-15
US20170096791A1 (en) 2017-04-06
CA2949046A1 (en) 2015-11-26
AU2015262084B2 (en) 2019-03-14

Similar Documents

Publication Publication Date Title
EP2312060B1 (en) System for and method of installing foundation elements in an underwater ground formation
JP5801103B2 (en) Method and system for installing foundation elements in submarine ground
CN100591859C (en) Pile pulling construction method for pile pulling machine
US10106944B2 (en) Pile-driver and method for application thereof
CN206646497U (en) A kind of clad steel casing structure
EP1857597A2 (en) Method and pile-driving device for inserting foundation piles into the ground
CN105672316A (en) Steel pile sinking damping device and construction method
EP3146112B1 (en) Tubular foundation
EP3152367A1 (en) Assembly and method for installing foundation elements in a ground formation
KR102497170B1 (en) Hybrid internal excavation hydraulic piling system and construction method thereof: HIPS
US9732493B2 (en) Method and an apparatus for attenuating pressure pulses
CN108005079B (en) Implanted precast pile grouting device and implanted grouting process
EP3351688B1 (en) Apparatus and method for stabilizing a foundation of a building
CN110984146A (en) Piling method of sheet pile enclosure structure and hanging bracket type piling hammer
JPS6039810B2 (en) Rock penetration method for steel pipe piles using a weight type excavator and its equipment

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 15729261

Country of ref document: EP

Kind code of ref document: A1

ENP Entry into the national phase

Ref document number: 2949046

Country of ref document: CA

WWE Wipo information: entry into national phase

Ref document number: 15311784

Country of ref document: US

ENP Entry into the national phase

Ref document number: 2015262084

Country of ref document: AU

Date of ref document: 20150513

Kind code of ref document: A

Ref document number: 20167032086

Country of ref document: KR

Kind code of ref document: A

REEP Request for entry into the european phase

Ref document number: 2015729261

Country of ref document: EP

WWE Wipo information: entry into national phase

Ref document number: 2015729261

Country of ref document: EP

ENP Entry into the national phase

Ref document number: 2016568598

Country of ref document: JP

Kind code of ref document: A

NENP Non-entry into the national phase

Ref country code: DE

REG Reference to national code

Ref country code: BR

Ref legal event code: B01A

Ref document number: 112016026907

Country of ref document: BR

ENP Entry into the national phase

Ref document number: 112016026907

Country of ref document: BR

Kind code of ref document: A2

Effective date: 20161117

WWG Wipo information: grant in national office

Ref document number: 2015729261

Country of ref document: EP