WO2015197422A2 - Procédé et appareil de récupération perfectionnés - Google Patents
Procédé et appareil de récupération perfectionnés Download PDFInfo
- Publication number
- WO2015197422A2 WO2015197422A2 PCT/EP2015/063409 EP2015063409W WO2015197422A2 WO 2015197422 A2 WO2015197422 A2 WO 2015197422A2 EP 2015063409 W EP2015063409 W EP 2015063409W WO 2015197422 A2 WO2015197422 A2 WO 2015197422A2
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- gas
- downhole
- valve
- liquid
- injection
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Ceased
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/16—Enhanced recovery methods for obtaining hydrocarbons
- E21B43/166—Injecting a gaseous medium; Injecting a gaseous medium and a liquid medium
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/16—Enhanced recovery methods for obtaining hydrocarbons
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B34/00—Valve arrangements for boreholes or wells
- E21B34/06—Valve arrangements for boreholes or wells in wells
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/16—Enhanced recovery methods for obtaining hydrocarbons
- E21B43/164—Injecting CO2 or carbonated water
Definitions
- the present invention relates to an apparatus and method for enhanced oil recovery, and specifically relates to a water-alternating gas recovery process and apparatus.
- WAG water-alternating-gas
- Enhanced oil recovery using water alternating gas injection can increase both production rates and ultimate recovery from a field.
- traditional WAG techniques present challenges relating to health and safety, operations and CAPEX/OPEX.
- WAG switch-overs give rise to a safety challenge in that it must be ensured that high pressure gas cannot enter the water injection system.
- this problem is overcome by having a 'WAG skid' where one injection system is physically disconnected, for example, by removing pipe spools or by inserting blinds and having a double block and bleed system.
- spools and extensive manual work are often used when executing a WAG cycle. These operations are time consuming, hazardous and expensive, but ensure that the water and gas injection systems are always physically separated.
- WAG operations could be considered in the design of surface equipment. For example, by providing a fail-safe switch over system that can be operated remotely on an unmanned platform.
- Hydrate formation at surface is a risk during traditional WAG switchovers due to the lower pressure and temperature present at surface, the mixing of hydrocarbon gas and water and temperature reductions due to the Joule-Thomson effect during surface equipment bleed downs.
- An aspect or embodiment relates a downhole water-alternating-gas (WAG) switchover apparatus located or locatable in a wellbore that extends from a surface to a subsurface location.
- WAG downhole water-alternating-gas
- the apparatus may comprise:
- At least one first channel configured to convey a liquid downhole from the surface
- At least one second channel configured to convey a gas downhole from the surface.
- the apparatus may comprise one or more downhole valve or switching systems.
- the one or more downhole valve or switching systems may be configured to switch the downhole apparatus between alternately providing the liquid downhole and the gas downhole.
- the one or more downhole valve or switching systems may be configured to selectively provide the liquid or the gas downhole from the respective first and second channels.
- the apparatus may comprise an injection apparatus, which may be configured to alternatingly inject the liquid and/or gas downhole.
- the apparatus may comprise water-alternating-gas injection apparatus.
- the gas may be or comprise natural gas.
- the liquid may be or comprise water, e.g. the liquid may be or comprise an aqueous solution.
- the one or more downhole valve systems may comprise one or more first valves or devices for regulating flow of the liquid to the downhole location and/or one or more second valves or devices for regulating flow of the gas to the downhole location.
- the downhole apparatus may be switchable between at least first and second configurations, wherein, in the first configuration, the first valves or devices may be closed and the second valves or devices may be open such that gas may be injected or injectable to the downhole location via the at least one second channel and the at least one second valve or device and, in a second configuration, the first valves or devices may be open and the second valves or devices may be closed such that the liquid may be injected or injectable to the downhole location via the at least one first channel and the at least one first valves or devices.
- the one or more downhole valve or switching systems e.g. the first and/or second valves or devices
- the one or more downhole valve or switching systems may be located or locatable downhole, in use, e.g. in a subsurface location, such as in the wellbore.
- the apparatus may comprise a tubular or other hollow conduit.
- the tubular or other conduit may define or comprise the first channel therewithin.
- the first channel may extend longitudinally within the tubular or other conduit.
- the apparatus may comprise one or more hollow casings, such as tubular casings, at least one or each of which may define a passage.
- the tubular or other conduit may be located or comprised within the one or more casings, e.g. within the passage(s) of the one or more casings.
- the apparatus may comprise a plurality of casings. At least one of the casings may be provided within at least one of the other casings.
- the second channel may be at least partially defined between at least one of the casings and the at least one other casing or the tubular or other conduit.
- the second flow channel may extend longitudinally along and/or between the casing and/or tubular or other conduit.
- the second channel may be comprised or located in or at least partially defined by one or more annuli, which may be provided or at least partially defined between the tubular or other conduit and an inner wall of one of the casings and/or between two casings.
- the one or more annuli may be provided radially outwardly of the tubular or other conduit.
- the second channel may be closed at one end, e.g. a downhole end, for example using one or more packers or other sealing devices or means.
- the first channel may comprise an inner or innermost channel.
- the second channel may be provided radially outwardly of the first channel.
- the second channel may comprise or be comprised or located in the first annulus out from the innermost channel.
- the second channel may comprise and/or be comprised in one or more side pocket mandrels (SPMs) and may include a hanger device for the innermost channel through which the second channel fluid may flow.
- the at least one second valve or device may comprise a gas injection device such as a gas lift valve.
- the at least one second valve or device may be operable to control communication from the second channel to the first channel.
- the at least one second valve or device may be provided on or in the wall of the tubular or other conduit.
- the at least one second valve may be configured to selectively allow passage of gas from the second channel to the first channel or downhole location.
- the at least one second valve or device may be switchable between a closed configuration in which flow of gas to the downhole location and/or first channel is blocked and an open and/or partially open configuration in which the gas may pass from the second channel to the downhole location and/or first channel via the at least one second valve or device.
- the at least one second valve or device may be provided or providable downhole, downstream and/or lower than the at least one first valve or device.
- the at least one first valve or device may comprise a sub-surface safety valve.
- the at least one first valve or device may be configured to selectively open and/or close the first channel.
- the at least one first valve or device may be configured to be selectively switchable between an open configuration in which the liquid may pass through the at least one first valve to the downhole location and a closed configuration in which flow of liquid through the at least one first valve to the downhole location is blocked.
- the at least one first valve or device may be provided uphole or upstream of or higher than the at least one second valve.
- the apparatus may be adapted to retain a head of liquid in the first channel uphole or upstream of the at least one first valve when the first valve is closed, e.g. during a gas injection operation, for example, when the second valve is open.
- the apparatus may comprise or be connectable to a liquid injection system.
- the liquid injection system may be connected or connectable to the first channel, e.g. via a liquid control valve.
- the liquid injection system may be located or locatable on the surface.
- the at least one first channel may be configured to convey the liquid from the surface to the downhole location.
- the apparatus may comprise or be connectable to a gas injection system.
- the gas injection system may be connected or connectable to the second channel, e.g. via a gas control valve.
- the gas injection system may be located or locatable on the surface.
- the at least one second channel may be configured to convey gas downhole from above surface or ground.
- the apparatus may be switchable between configurations in which the gas and liquid are alternately injected.
- the apparatus may be switchable into a liquid injection configuration by opening the liquid control valve and/or the first valve and closing the gas control valve and/or the second valve.
- the apparatus may be switchable in to a gas injection configuration by opening the gas control valve and/or the second valve and closing the liquid control valve and/or the first valve
- the apparatus may be configured to provide gas at flow rates of greater than 5 MMscf/d, preferably greater than 8 MMscf/d, for example greater than 10 MMscf/d.
- the apparatus may be configured to provide gas at flow rates of between 5 and 30 MMscf/d.
- the apparatus may be configured to provide gas at flow rates of greater than 12, e.g. greater than 15 MMscf/d
- An aspect or embodiment relates to a method for performing a downhole WAG switchover operation in a wellbore that extends from a surface, the method comprising: conveying a liquid downhole from the surface in a first channel; and
- the method may comprise operating one or more downhole valve systems so as to switch the downhole apparatus between alternately providing the liquid downhole and the gas downhole.
- the method may comprise operating the one or more downhole valve systems to selectively provide the liquid or the gas to a downhole location from the respective first and second channels.
- the method may be or comprise an injection method, e.g. a method for alternatingly injecting a gas downhole and a fluid downhole, such as a water-alternating-gas injection method.
- the gas may be or comprise natural gas.
- the liquid may be or comprise water, e.g. an aqueous solution.
- the method may comprise using an apparatus as described above in relation to the first aspect.
- the method may be for operating the apparatus of the first aspect to perform a downhole WAG switchover.
- the method may comprise performing a downhole gas injection to liquid injection switchover.
- the gas injection to liquid injection switchover may comprise using or closing a gas control valve and/or using or closing a second valve.
- the gas injection to liquid injection switchover may comprise using or opening a liquid control valve.
- the gas injection to liquid injection switchover may comprise using or opening a first valve, which may be performed after the liquid control valve has been opened or operated.
- the gas injection to liquid injection switchover may comprise releasing a head of liquid retained upstream by the first valve, e.g. by using or opening the first valve.
- the method may comprise performing a downhole liquid injection to gas injection switchover.
- the liquid injection to gas injection switchover may comprise closing the liquid control valve and/or the first valve.
- the liquid injection to gas injection switchover may comprise retaining a head of liquid upstream of the first valve.
- the liquid injection to gas injection switchover may comprise opening the gas control valve and/or the second valve.
- the liquid injection to gas injection switchover may comprise ramping up or gradually increasing pressure of gas, e.g. by gradually opening the gas control valve.
- the method may comprise providing gas at flow rates of greater than 5 MMscf/d, preferably greater than 8 MMscf/d, for example greater than 10 MMscf/d, such as between 5 and 30 MMscf/d.
- Figure 1 is a cross-sectional representation of a wellbore system
- Figure 2 is a flowchart illustrating a method of operating the wellbore system of Figure 1 ;
- Figure 3 is a cross-sectional representation of the wellbore system of Figure 1 in use during a water injection cycle
- Figure 4 is a cross-sectional representation of the wellbore system of Figure 1 in use at the end of a water injection cycle
- Figure 5 is a cross-sectional representation of the wellbore system of Figure 1 in use during initiation of gas injection;
- Figure 6 is a cross-sectional representation of the wellbore system of Figure 1 in use during gas injection
- Figure 7 is a cross-sectional representation of the wellbore system of Figure 1 in use wherein gas injection has been stopped, the gas injection system isolated and the water injection system is also still isolated;
- Figure 8 is a cross-sectional representation of the wellbore system of Figure 1 in use during initiation of water injection;
- Figure 9 is a cross-sectional representation of the wellbore system of Figure 1 in use with water injection resumed.
- Figure 10 is a schematic showing a comparison of the components of the wellbore system of Figure 1 against a conventional WAG wellbore system.
- Figure 1 shows a wellbore system 5 for use in a water-alternating-gas enhanced oil recovery procedure.
- the wellbore system 5 of Figure 1 is advantageously arranged such that switchover of the wellbore system 5 between a gas injection configuration and a water injection configuration is carried out downhole.
- downhole or downstream herein refers to subsurface positions in a wellbore 10 that are away or further away from the surface and the use of uphole or upstream herein refers to positions that are towards to further toward the surface.
- the wellbore system 5 extends within the wellbore 10 from the surface 15 to a subsurface completion location 20.
- the wellbore system 5 comprises a hollow metallic or composite casing 25 defining a longitudinally extending passage 30 therein.
- the wellbore system 5 also comprises a hollow conduit in the form of a tubular 35 at least part of which is located within the passage 30 of the casing 25.
- a longitudinally extending first flow path or passage 40 is defined within the tubular 35.
- An annular space is at least partially defined between the casing 25 and the tubular 35, the annular space forming or comprising a second flow path or passage 50.
- the tubular 35 is supported using a high injection rate tubing hanger 55.
- the hanger 55 is configured to pass high gas rates, e.g.
- the hanger 55 is provided with holes having a sufficient area to make the hanger suitable for high injection rate use.
- Packers 60 or other sealing arrangements known in the art seal between the tubular 35 and the casing 25 in order to close off a downhole end of the second flow path 50, for example at between 2500 and 6500 ftTVDRT (true vertical depth rotary table), which is equivalent to approximately between 1000 mTVDRT and 2000 mTVDRT.
- ftTVDRT true vertical depth rotary table
- the tubular 35 is provided with a subsurface valve system 65 at a downhole location for selectively opening and closing the first flow path 40 that runs within the tubular 35.
- a sub-surface safety valve can be conveniently used for this purpose.
- the subsurface valve system 65 is operable remotely, e.g. from the surface 15, in order to selectively open and close the subsurface valve system 65 and thereby the first flow path 40, for example, using hydraulic, electrical, mechanical or other means that would be apparent to a skilled person.
- Gas injection devices 75 such as a high rate gas lift valve(s) installed into side pocket mandrels (SPMs), are provided in the wall of the tubular 35 such that the gas injection device 75 extends between the first and second flow paths 40, 50. In this way, pressurised gas supplied via the second flow path 50 in the annulus can be selectively and controllably injected into the first flow path 40 within the tubular 35 using the gas injection device 75.
- the gas injection device 75 is provided downhole of and/or lower than the subsurface valve system 65 (e.g. the SSSV).
- the gas injection device 75 is remotely controllable and/or comprises one or more check valves to permit flow of gas from the second flow path 50 into the first flow path 40 of the tubular 35 downstream of the subsurface valve system 65 during gas injection but prevent fluid from the first flow path 40 of the tubular 35 from flowing into the annular space during the liquid injection cycle.
- the gas injection device may be controllable using hydraulic, electrical, mechanical, pressure or other means that would be apparent to a skilled person.
- a water injection system 80 is connected to the tubular 35 via a water control valve system 85 for selectively injecting water into the first flow path 40.
- the water control valve system 85 is arranged to selectively isolate the water injection system 80 from the first flow path 40.
- a gas injection system 90 is connected to the annular space via a gas control valve system 95, for selectively injecting gas into the second flow path 50.
- the gas control valve system 95 is arranged to selectively isolate the gas injection system 90 from the second flow path 50.
- the water injection system 80 of the wellbore system 5 of Figure 1 is connected to the first flow path 40 at the surface whilst the gas injection system 90 is connected to a different (i.e. the second) flow path 50.
- both water and gas are provided downhole using different flow paths 40, 50 and switching between water and gas injection is performed downhole by selectively controlling the gas injection device 75 and the subsurface valve system 65.
- the process of performing downhole switchover of the water-alternating-gas injection process is detailed in Figure 2 and illustrated in Figures 3 to 9.
- the process is initiated by performing water injection (step 205 of Figure 2) into the subsurface completion location with the gas injection system 90 isolated using the gas control valve system 95 and the gas injection device 75.
- the water control valve system 85 is opened so that water is injected into the first flow path 40 within the tubular 35 by the water injection system 80.
- the subsurface valve system 65 is also set to the open position such that the injected water passes through the subsurface valve system 65 to the lower completion position 20.
- the water injection system 80 is isolated using the water control valve system 85 and the subsurface valve system 65 (i.e. the SSSV) is closed in step 210 of Figure 2, and as shown in Figure 4.
- the gas control valve system 95 is operable to de- isolate the gas injection system 90 in order to slowly increase the pressure of gas being supplied from the gas injection system 90 into the second flow path 50 in step 215 of Figure 2.
- the gas injection device 75 is operable to inject the gas from the second flow path 50 into the first flow path 40 at a location downstream or downhole of the subsurface valve system 65. In this way, the water below the subsurface valve system 65 is gradually displaced by the gas and forced into the subsurface completion location 20 and thereby into neighbouring geological formations.
- the bottom hole pressure (BHP) is monitored to ensure that the formation is not fractured. Since the subsurface valve system 65 is closed, the column of water is retained within the tubular 35 upstream / uphole of the subsurface valve system 65 during the entire gas injection cycle.
- the pressure of the gas is ramped up in step 220 of Figure 2 so that the gas can be injected at high pressure to perform the gas injection portion of the WAG process, as shown in Figure 6.
- the gas is generally injected at high pressure and could be, for example, in the range of 5 to 30 million standard cubic feet per day (MMscf/d), equivalent to between 5,900 and 35,400 Nm 3 .hr "1 , preferably above 12 MMscf/d (14,150 Nm 3 .hr "1 ) and even above 15 MMscf/d (17,700 Nm 3 .hr "1 ).
- the wellbore system may operate at significantly higher pressures than a conventional gas lift arrangement.
- the thickness of the tubing and/or casing may be greater than a conventional gas lift arrangement and/or a higher yield strength, e.g. stronger, material may be used for the materials of the tubing & casing.
- the water control valve system 85 is then opened in step 230 of Figure 2 such that water is supplied by the water injection system 80 to the first flow 40 path in the tubular 35 such that pressure is applied to the water column 100 in the tubular 35.
- the subsurface valve system 65 is opened as shown in Figure 8 and step 235 of Figure 2, and the water column 100 in the tubular 35 above the subsurface valve system 65 travels down towards the bottom of the well.
- the head of pressure of the water column 100 combined with the pressure applied by the water injection system 80 results in a pressure that is high enough to displace most of the gas downwards and into the lower completion location 20 and thereby into the formation.
- the well head pressure then decreases as the water column 100 applies a hydrostatic head to the well.
- the hydrostatic head provided by the water column 100 above the subsurface valve system 65 should be sufficient to compensate for differences in pressure between the gas injection pressure and the water injection pressure.
- the gas injection system 90 operates at a maximum pressure of 180barg
- the water injection system 80 operates at 120barg
- a hydrostatic head of 60 bar 870 psi is required. This is equivalent to a water column 100 of approximately 1930 ft (588m).
- the sub-surface safety valve is typically located at around 1900- 2000 ft TVDRT (580-610m total vertical depth rotary table or TVDRT), this makes the SSSV a convenient mechanism for use as the subsurface valve system 65 whilst providing sufficient hydrostatic head in the column to allow downhole switch over from gas to water.
- the behaviour of the well can be field tested, for example, in order to ensure that the formation fracture pressure is not exceeded when the column of water is dropped by opening the subsurface valve system 65.
- the water injection part of the WAG process can then be carried out, as shown in Figure 9, after which the process can then return back to step 205 of Figure 2 if required in order to carry out additional alternations between water and gas injection as part of the WAG process.
- the wellbore system 5 of the present invention may require less components than some conventional WAG systems. For example, since any mixing of gas and water occurs downhole and at high temperature, hydrate formation may be less of an issue, such that systems designed to avoid hydrate formation such as Triethylene glycol (TEG) injection systems may not be required.
- TEG Triethylene glycol
- prior art systems often provide a "kill pump" in order to allow switching from gas cycle to water cycle.
- the kill pump is required because the hydrostatic pressure of the gas column is low, and results at pressures at surface which are higher than standard water injection systems.
- the kill pump is used to inject high pressure inhibited water or brine and build a water column which lowers the pressure at surface to a level where the regular water injection system can be used.
- the WAG system 5 of embodiments of the present invention retains the column of liquid 100 above the subsurface valve system 65 during the gas injection part of the WAG process.
- This column of liquid 100 can function as the kill fluid, which allows the well to cycle from gas to liquid. This may also allow the number of components to be further reduced, e.g. by dispensing with the kill pump.
- embodiments of the present invention allow the injector to be quickly switched over from gas to water injection, leading to a reduced overall gas compression requirement and increased recovery due to a faster response.
- the simpler downhole switching of embodiments of the present invention may allow simpler optimisation of the WAG process and more frequent switchover, which may lead to improved recovery.
- embodiments of the present invention may be particularly suitable for automation of the WAG process.
- both high pressure gas injection and lower pressure water injection must be connected to the same well. This may result in safety issues in ensuring that high pressure gas cannot enter the low pressure water injection system. This can be addressed by physically disconnecting and connecting the relevant injection systems or by using spools.
- each of these approaches are time consuming, hazardous and expensive.
- the water injection and gas injection are not directly connected at surface level and can be isolated individually.
- the subsurface safety valve (SSSV), hydraulic master valve (HMV), water control valve (WCV) and the column of liquid 100 maintained above the subsurface valve system 65 may also act as additional barriers for segregating the two injection systems 80, 90.
- embodiments of the present invention may provide a simpler and safer WAG switchover arrangement.
- the embodiments described herein are merely exemplary and that various modifications may be made thereto without departing from the scope of the invention.
- the space between the radially outward walls of the tubular and/or conduit and/or one or more further conduits is described in examples as a annular space, it will be appreciated that the space need not be annular, and that the invention is also effective with other, non-annular spaces.
- water is given as an example of a liquid and natural gas is given as an example of a gas, it will be appreciated that other fluids and/or liquids may be used.
- the second flow path is described as being comprised in or defined by an annular space between the tubular and a single casing, it will be appreciated that the downhole system may comprise a plurality of casings and that the second flow path may be comprised or defined between two casings, such as an outer two casings.
Landscapes
- Geology (AREA)
- Life Sciences & Earth Sciences (AREA)
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Environmental & Geological Engineering (AREA)
- Fluid Mechanics (AREA)
- Physics & Mathematics (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Chemical & Material Sciences (AREA)
- Chemical Kinetics & Catalysis (AREA)
- Filling Or Discharging Of Gas Storage Vessels (AREA)
- Physical Water Treatments (AREA)
Abstract
L'invention concerne un appareil à alternance de gaz et d'eau (WAG) et un procédé de fonctionnement associé, l'appareil se trouvant ou pouvant se trouver dans un puits de forage qui s'étend à partir d'une surface jusqu'à un emplacement souterrain, l'appareil comprenant au moins un premier canal conçu pour transporter un liquide de fond de trou à partir de la surface; au moins un second canal conçu pour transporter un gaz de fond de trou à partir de la surface; et l'appareil comprenant un ou plusieurs systèmes de clape de fond de trou pour la commutation de l'appareil de fond de trou entre un apport alternatif du liquide à l'emplacement de fond de trou et du gaz à l'emplacement de fond de trou.
Priority Applications (3)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| DKPA201671046A DK179653B8 (en) | 2014-06-24 | 2015-06-16 | Enhanced recovery method and apparatus |
| US15/321,449 US20170145800A1 (en) | 2014-06-24 | 2015-06-16 | Enhanced recovery method and apparatus |
| EP15729173.3A EP3161248A2 (fr) | 2014-06-24 | 2015-06-16 | Procédé et appareil de récupération perfectionnés |
Applications Claiming Priority (2)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| GB1411213.0 | 2014-06-24 | ||
| GBGB1411213.0A GB201411213D0 (en) | 2014-06-24 | 2014-06-24 | Enhanced oil recovery method and apparatus |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| WO2015197422A2 true WO2015197422A2 (fr) | 2015-12-30 |
| WO2015197422A3 WO2015197422A3 (fr) | 2016-02-18 |
Family
ID=51410042
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| PCT/EP2015/063409 Ceased WO2015197422A2 (fr) | 2014-06-24 | 2015-06-16 | Procédé et appareil de récupération perfectionnés |
Country Status (5)
| Country | Link |
|---|---|
| US (1) | US20170145800A1 (fr) |
| EP (1) | EP3161248A2 (fr) |
| DK (1) | DK179653B8 (fr) |
| GB (1) | GB201411213D0 (fr) |
| WO (1) | WO2015197422A2 (fr) |
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| WO2017158049A1 (fr) * | 2016-03-15 | 2017-09-21 | Statoil Petroleum As | Procédé d'ascension provoquée |
| WO2019033179A1 (fr) * | 2017-08-14 | 2019-02-21 | Petróleo Brasileiro S.A. - Petrobras | Système et procédé sous-marin pour la mise sous pression d'un réservoir de pétrole sous-marin par injection d'eau et/ou de gaz |
| WO2023203360A1 (fr) | 2022-04-22 | 2023-10-26 | Totalenergies Onetech | Installation permettant une meilleure récupération du pétrole |
Families Citing this family (7)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| BR102017021444B1 (pt) | 2017-10-06 | 2021-11-03 | Petróleo Brasileiro S.A. - Petrobras | Sistema e método submarino para pressurização de um reservatório de petróleo submarino através de injeção independente de água e gás |
| US11261714B2 (en) * | 2017-12-11 | 2022-03-01 | Ellina Beliaeva | System and method for removing substances from horizontal wells |
| FR3087475B1 (fr) * | 2018-10-22 | 2021-05-07 | Ifp Energies Now | Procede et systeme d’injection de gaz en sous-sol |
| GB2585367B (en) * | 2019-06-25 | 2021-07-14 | Equinor Energy As | Optimisation of water injection for liquid hydrocarbon production |
| WO2021108879A1 (fr) * | 2019-12-05 | 2021-06-10 | Petróleo Brasileiro S.A. - Petrobras | Système sous-marin de mise sous pression et procédé de commutation de fluide à injection alternée, d'eau et de gaz, dans un puits satellite doté d'une unique ligne sous-marine d'injection |
| WO2021174166A1 (fr) | 2020-02-28 | 2021-09-02 | Eor Etc Llc | Système et procédé de récupération améliorée de pétrole utilisant des bouchons de gaz et de liquide empilés alternés |
| US20250198260A1 (en) * | 2022-03-15 | 2025-06-19 | Totalenergies Onetech | Method for carbon dioxide injection into a subterranean reservoir |
Family Cites Families (13)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US2514259A (en) * | 1943-11-23 | 1950-07-04 | Bonnie J Roberts | Method and apparatus for injecting water or other liquids into gas input wells |
| US2869642A (en) * | 1954-09-14 | 1959-01-20 | Texas Co | Method of treating subsurface formations |
| US3373805A (en) * | 1965-10-14 | 1968-03-19 | Exxon Production Research Co | Steam lifting of heavy crudes |
| US4384615A (en) * | 1980-02-21 | 1983-05-24 | Halliburton Company | Method of mixing fluids in a well bore |
| US4620594A (en) * | 1984-08-08 | 1986-11-04 | Texaco Inc. | Vertical conformance steam drive oil recovery method |
| US5421408A (en) * | 1994-04-14 | 1995-06-06 | Atlantic Richfield Company | Simultaneous water and gas injection into earth formations |
| FR2792678B1 (fr) * | 1999-04-23 | 2001-06-15 | Inst Francais Du Petrole | Procede de recuperation assistee d'hydrocarbures par injection combinee d'une phase aqueuse et de gaz au moins partiellement miscible a l'eau |
| WO2004101945A2 (fr) * | 2003-05-12 | 2004-11-25 | Stone Herbert L | Procede pour ameliorer le balayage vertical de gisements de petrole |
| JP2008019644A (ja) * | 2006-07-13 | 2008-01-31 | Hitoshi Koide | 石油または天然ガスの増進回収方法及びその増進回収システム |
| WO2008058298A1 (fr) * | 2006-11-07 | 2008-05-15 | Geoffrey Jackson | Procédé et appareil d'introduction d'eau acide sous-saturée dans une formation géologique |
| EP2233690A1 (fr) * | 2009-03-13 | 2010-09-29 | BP Alternative Energy International Limited | Injection de fluide |
| US9790775B2 (en) * | 2013-03-15 | 2017-10-17 | Schlumberger Technology Corporation | Stimulation with natural gas |
| DE112013007380T5 (de) * | 2013-08-30 | 2016-05-12 | Landmark Graphics Corporation | Verfahren, System und Optimierungsmethode zur Verbesserung der Erdölgewinnung beim Water-Alternating-Gas-Injektionsprozess durch Verwendung von Untertage-Regelventilen (WAG-CV) |
-
2014
- 2014-06-24 GB GBGB1411213.0A patent/GB201411213D0/en not_active Ceased
-
2015
- 2015-06-16 WO PCT/EP2015/063409 patent/WO2015197422A2/fr not_active Ceased
- 2015-06-16 DK DKPA201671046A patent/DK179653B8/en not_active IP Right Cessation
- 2015-06-16 US US15/321,449 patent/US20170145800A1/en not_active Abandoned
- 2015-06-16 EP EP15729173.3A patent/EP3161248A2/fr not_active Withdrawn
Cited By (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| WO2017158049A1 (fr) * | 2016-03-15 | 2017-09-21 | Statoil Petroleum As | Procédé d'ascension provoquée |
| GB2564979A (en) * | 2016-03-15 | 2019-01-30 | Equinor Energy As | Artificial lift method |
| GB2564979B (en) * | 2016-03-15 | 2021-06-23 | Equinor Energy As | Artificial lift method |
| WO2019033179A1 (fr) * | 2017-08-14 | 2019-02-21 | Petróleo Brasileiro S.A. - Petrobras | Système et procédé sous-marin pour la mise sous pression d'un réservoir de pétrole sous-marin par injection d'eau et/ou de gaz |
| US11149530B2 (en) | 2017-08-14 | 2021-10-19 | Petroleo Brasileiro S.A.—Petrobras | Subsea system and method for pressurization of a subsea oil reserve by injecting at least one of water and gas |
| WO2023203360A1 (fr) | 2022-04-22 | 2023-10-26 | Totalenergies Onetech | Installation permettant une meilleure récupération du pétrole |
Also Published As
| Publication number | Publication date |
|---|---|
| US20170145800A1 (en) | 2017-05-25 |
| GB201411213D0 (en) | 2014-08-06 |
| EP3161248A2 (fr) | 2017-05-03 |
| DK179653B1 (en) | 2019-03-13 |
| DK179653B8 (en) | 2019-04-10 |
| WO2015197422A3 (fr) | 2016-02-18 |
| DK201671046A1 (en) | 2017-02-27 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| DK179653B1 (en) | Enhanced recovery method and apparatus | |
| US8267173B2 (en) | Open hole completion apparatus and method for use of same | |
| AU2009210651B2 (en) | Apparatus, assembly and process for injecting fluid into a subterranean well | |
| US10208547B2 (en) | Increasing hydrocarbon recovery from reservoirs | |
| US10494900B2 (en) | System for stimulating a well | |
| US8413726B2 (en) | Apparatus, assembly and process for injecting fluid into a subterranean well | |
| EA026663B1 (ru) | Скважинное устройство и способы заканчивания, эксплуатации и нагнетания в скважинах с несколькими продуктивными интервалами | |
| US20160186544A1 (en) | Simultaneous injection and production well system | |
| US10060210B2 (en) | Flow control downhole tool | |
| US20090260814A1 (en) | System and Method to Facilitate Treatement and Sand Control in a Wellbore | |
| DK2550422T3 (en) | Pressurized well construction and operation systems and methods that can be used to kulbrinteoperationer, storage and resolution | |
| CN108474242A (zh) | 用于低压区域的环状屏障和井下系统 | |
| US11655682B2 (en) | Fluid storage and production | |
| US10590748B2 (en) | Reservoir stimulation method and apparatus | |
| US20150136406A1 (en) | Subsea Intervention Plug Pulling Device | |
| EP2532830B1 (fr) | Tubage de production à grande vitesse | |
| CN101514621B (zh) | 多区域中的无钻机的防砂 | |
| CA3026636C (fr) | Systeme et procede pour recuperation amelioree de petrole | |
| EP3580425B1 (fr) | Opérations de fond de trou |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| 121 | Ep: the epo has been informed by wipo that ep was designated in this application |
Ref document number: 15729173 Country of ref document: EP Kind code of ref document: A2 |
|
| WWE | Wipo information: entry into national phase |
Ref document number: 15321449 Country of ref document: US |
|
| NENP | Non-entry into the national phase |
Ref country code: DE |
|
| REEP | Request for entry into the european phase |
Ref document number: 2015729173 Country of ref document: EP |
|
| WWE | Wipo information: entry into national phase |
Ref document number: 2015729173 Country of ref document: EP |