WO2016144164A1 - Procédé de positionnement d'une installation de forage sur une plateforme offshore - Google Patents

Procédé de positionnement d'une installation de forage sur une plateforme offshore Download PDF

Info

Publication number
WO2016144164A1
WO2016144164A1 PCT/NL2016/050152 NL2016050152W WO2016144164A1 WO 2016144164 A1 WO2016144164 A1 WO 2016144164A1 NL 2016050152 W NL2016050152 W NL 2016050152W WO 2016144164 A1 WO2016144164 A1 WO 2016144164A1
Authority
WO
WIPO (PCT)
Prior art keywords
skid
rig
drilling
assembly
drilling rig
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Ceased
Application number
PCT/NL2016/050152
Other languages
English (en)
Inventor
Joop Roodenburg
Arthur Alexander DE MUL
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Huisman Equipment BV
Original Assignee
Itrec BV
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Priority claimed from NL2015090A external-priority patent/NL2015090B1/en
Application filed by Itrec BV filed Critical Itrec BV
Priority to GB1716339.5A priority Critical patent/GB2555232A/en
Publication of WO2016144164A1 publication Critical patent/WO2016144164A1/fr
Anticipated expiration legal-status Critical
Ceased legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B17/00Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor
    • E02B17/02Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor placed by lowering the supporting construction to the bottom, e.g. with subsequent fixing thereto
    • E02B17/021Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor placed by lowering the supporting construction to the bottom, e.g. with subsequent fixing thereto with relative movement between supporting construction and platform
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B15/00Supports for the drilling machine, e.g. derricks or masts
    • E21B15/003Supports for the drilling machine, e.g. derricks or masts adapted to be moved on their substructure, e.g. with skidding means; adapted to drill a plurality of wells
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B35/00Vessels or similar floating structures specially adapted for specific purposes and not otherwise provided for
    • B63B35/003Vessels or similar floating structures specially adapted for specific purposes and not otherwise provided for for transporting very large loads, e.g. offshore structure modules

Definitions

  • the invention relates to a method for positioning a drilling rig onto an offshore platform.
  • the wells may be plugged and the platform may be abandoned meaning that the facilities to drill wells, to extract and process oil and natural gas or to temporarily store product until it can be brought to shore for refining and marketing have been removed.
  • a cantilevered drilling rig may be provided over the platform typically using a jack-up type vessel.
  • An advantage of using such a jack-up type vessel with cantilevered drilling rig is that the process becomes more or less independent of the dimensions and type of platform.
  • drawbacks of using a jack-up type vessel with cantilevered drilling rig are that the vessel is relatively large and that it takes relatively a lot of time to setup the vessel and cantilevered drilling rig before drilling can commence. This makes the use of a jack-up type vessel not cost effective.
  • this object is achieved by a method for positioning a drilling rig onto an offshore platform provided with a fixed first rig skid beam and a fixed second rig skid beam arranged horizontally and parallel to each other and defining a longitudinal direction, said method being characterized by the following steps:
  • the drilling rig onto the offshore platform such that the first and second skid assembly engage with the first and second rig skid beam respectively to support the drilling rig from the first and second rig skid beam and to skid the drilling rig relative to the first and second rig skid beam in the longitudinal direction.
  • the invention is based on the insight that equipment can be made much smaller and setting up can be done much faster when a relatively small drilling rig is transferred to the platform. As a result thereof no large cantilevers and supporting structures are required as is currently done in the prior art. Further, the vessel carrying the equipment does not have to be of the jack-up type, but can be a semi-submersible or any other vessel.
  • the inventors also realized that when the equipment is to be used for multiple different platforms, the drilling rig to be transferred to the platform should be able to adjust itself to the specific situation.
  • the inventors realized that the main difference between platforms is that the rig skid beams on the platform may be arranged at different distances, so that the drilling rig should at least be able to adjust itself to the specific distance between the rig skid beams in order to be able to re-use the rig skid beams.
  • rig skid beams Re-use of the rig skid beams has the advantage that these rig skid beams can be used to support and skid the drilling rig relative to the platform to position the drilling rig above a well and to subsequently move the drilling rig to a another well. This means that no complex adjustments have to be made to the platform itself.
  • the at least two skid shoes of the first skid assembly are connected by a separate load transfer beam, and wherein the at least two skid shoes of the second skid assembly are connected by a separate load transfer beam.
  • all skid shoes may comprise a corresponding gripping unit and push-pull device, so that introduction of undesired loads can be prevented by synchronizing the operation of the different gripping units and push-pull device without the use of a separate load transfer beam.
  • positioning the drilling rig onto the offshore platform includes lifting the drilling rig with a crane and lowering the drilling rig onto the offshore platform.
  • the crane may be provided on the vessel transporting the drilling rig, but may also be provided on a separate vessel. In case the platform itself is provided with a crane, this crane may alternatively or additionally be used to position the drilling rig onto the offshore platform.
  • the skid shoes and the gripping units of the first and second skid assembly comprise respective jaws to be positioned around a flange of the first or second rig skid beam, wherein preferably the jaws are moveable between a retracted position in which a distance between the jaws is large enough to let the respective flange pass, and an active position in which the jaws are arranged around the respective flange, and wherein positioning the drilling rig onto the offshore platform includes:
  • the jaws of the gripping units of the first and second skid assembly are preferably configured to temporarily fix its position relative to a respective flange by clamping the respective flange, so that the corresponding push-pull device can move the drilling rig over the skid beams while the gripping units clamp the respective flanges. It is preferred that the gripping units are able to clamp flanges of different thicknesses, so that the drilling rig can be used in combination with any skid beam having a flange thickness falling in a particular range.
  • the drilling rig comprises a third rig skid beam and a fourth rig skid beam arranged horizontally and parallel to each other and defining a transverse direction perpendicular to the longitudinal direction
  • the skid system comprises a third skid assembly to engage with the third rig skid beam and a fourth skid assembly to engage with the fourth rig skid beam, each third and fourth skid assembly comprising at least two skid shoes to engage with the respective third or fourth rig skid beam, a gripping unit to grip the respective third or fourth rig skid beam, and a push-pull device to apply push and pull forces between the gripping unit and one of the at least two skid shoes, and wherein the skid shoes of the third and fourth skid assemblies are carried by the skid shoes of the first and second skid assemblies, thereby allowing to skid the drilling rig relative to the platform in the transverse direction.
  • the drilling rig can be positioned in the transverse direction as well and can be accurately positioned above any well.
  • the wells may be arranged in multiple parallel rows and by being able to skid in the transverse direction as well, all rows can be serviced by moving the drilling rig over the offshore platform only.
  • the third skid assembly and the fourth skid assembly are used to adjust the distance between the first and second skid assembly.
  • vessels and platforms may be moveable relative to each other due to wave and wind actions. This makes transferring equipment from one vessel or platform to another vessel or platform always more difficult than on land.
  • positioning the skid assemblies relative to the first and second rig skid beam in the longitudinal direction is usually not that critical, but positioning the skid assemblies relative to the first and second rig skid beam in the transverse direction may be more difficult.
  • guiding elements are provided on the offshore platform prior to positioning the drilling rig onto the offshore platform to guide the positioning of the drilling rig relative to the platform in a horizontal transverse direction perpendicular to the longitudinal direction.
  • the drilling rig comprises multiple modules, wherein one of the modules is a support frame for supporting a drilling tower, said support frame comprising a carrier frame and the skid system, and wherein positioning the drilling rig onto the offshore platform starts with the positioning of the support frame on the platform followed by the other modules.
  • An advantage of using a separate support frame is that it is easier to provide a stable support on the platform first before transferring the more heavy equipment to the platform.
  • a further advantage may be that it is possible to combine the separate support frame with different drilling towers, wherein only the separate support frame needs to be adaptable to the different offshore platforms, instead of all drilling towers being adaptable.
  • the use of a separate support frame that is positioned first on the platform can also be combined with the other features described above for the drilling rig as a whole.
  • the third and fourth rig skid beams are arranged on the carrier frame of the support frame when this feature is applied, and the guiding elements on the platform guide the positioning of the support frame in the transvers direction.
  • the drilling tower is formed by multiple modules and the drilling tower is positioned on the carrier frame of the support frame by assembling the multiple modules on the carrier frame.
  • the carrier frame of the support frame is provided with guiding elements to guide the positioning of the drilling tower relative to the carrier frame in the horizontal direction perpendicular to the longitudinal direction.
  • the guide elements are moveable between an active position in which they are able to guide the drilling rig, carrier frame and/or the drilling tower, whatever is applicable, and an inactive position in which the guiding elements do not interfere with movements of the drilling rig over the platform and operation of the drilling rig.
  • the first aspect of the invention also relates to a drilling rig to be positioned on an offshore platform with a fixed first rig skid beam and a fixed second rig skid beam arranged horizontally and parallel to each other and defining a longitudinal direction, said drilling rig comprising a skid system to skid the drilling rig relative to the platform in the longitudinal direction with a first skid assembly to engage with the first rig skid beam and a second skid assembly to engage with the second rig skid beam, each first and second skid assembly comprising at least two skid shoes to engage with the respective first or second rig skid beam, a gripping unit to grip the respective first or second rig skid beam, and a push-pull device to apply push and pull forces between the gripping unit and one of the at least two skid shoes, wherein the distance between the first and second skid assembly is adjustable.
  • the skid shoes and the gripping units of the first and second skid assembly comprise respective jaws to be positioned around a flange of the first or second rig skid beam, wherein preferably the jaws are moveable between a retracted position in which a distance between the jaws is large enough to let the respective flange pass, and an active position in which the jaws are arranged around the respective flange.
  • the jaws of the gripping units of the first and second skid assembly are preferably configured to temporarily fix its position relative to a respective flange by clamping the respective flange, so that the corresponding push-pull device can move the drilling rig over the skid beams while the gripping units clamp the respective flanges. It is preferred that the gripping units are able to clamp flanges of different thicknesses, so that the drilling rig can be used in combination with any skid beam having a flange thickness falling in a particular range.
  • the drilling rig further comprises a third rig skid beam and a fourth rig skid beam arranged horizontally and parallel to each other and defining a transverse direction substantially perpendicular to the longitudinal direction
  • the skid system comprises a third skid assembly to engage with the third rig skid beam and a fourth skid assembly to engage with the fourth rig skid beam, each third and fourth skid assembly comprising at least two skid shoes to engage with the respective third or fourth rig skid beam, a gripping unit to grip the respective third or fourth rig skid beam, and a push-pull device to apply push and pull forces between the gripping unit and one of the at least two skid shoes, and wherein the skid shoes of the third and fourth skid assemblies are carried by the skid shoes of the first and second skid assemblies, thereby allowing to skid the drilling rig relative to the platform in the transverse direction.
  • the drilling rig comprises a drilling tower and a support frame for the drilling tower, said support frame comprising a carrier frame and the skid system.
  • an offshore platform provided with a fixed rig skid beam and a fixed second rig skid beam arranged horizontally and parallel to each other and defining a longitudinal direction
  • the platform further comprises guiding elements that are pivotable about a pivot axis by an actuator between an active position in which the guiding elements are able to guide a drilling rig or part thereof that is to be positioned on the platform by the first and second rig skid beams in a horizontal transverse direction perpendicular to the longitudinal direction, and an inactive position in which the guiding elements are out of the way to allow movement and operation of the drilling rig.
  • the guiding elements are lying parallel to the first and second rig skid beams in the inactive position and preferably do not extend above the first and second rig skid beams in the inactive position.
  • the offshore platform is a platform suitable to be used in the invention according to the first aspect.
  • an offshore platform with a skiddable structure and a supply vessel near the offshore platform, wherein a telescopic pivotable walkway is provided extending between the supply vessel and the skiddable structure, so that the length and orientation of the walkway is automatically adjusted when the skiddable structure skids over the platform or when the relative position between platform and vessel changes.
  • the skiddable structure is skiddable in two orthogonal directions over the platform.
  • the skiddable structure is a support frame for a drilling tower as described with respect to the first aspect.
  • the walkway comprises actuators to position a free end of the walkway on the skiddable structure.
  • the free end of the walkway can be temporarily connected to the skiddable structure.
  • the walkway is configured to support all cabling and piping between the supply vessel and the offshore platform, which cabling and piping may include power cables, hydraulic power lines, mud lines, mud return lines and/or fire hose water supply.
  • the walkway is provided extending between the supply vessel and the offshore platform instead of between the supply vessel and the skiddable structure on the offshore platform.
  • the supply vessel may be a barge, semi-submersible or floater.
  • the third aspect may readily be combined with the first and/or second aspect of the invention where applicable.
  • FIG. 1 depicts schematically a perspective view of an offshore platform and vessel transporting a drilling rig according to an embodiment of the invention
  • Fig. 2 depicts a support frame of the drilling rig when positioned on the platform of Fig. 1 ;
  • Fig. 3 depicts the support frame of Fig. 2 when being positioned on another platform
  • Fig 4 depicts the support frame of Fig. 2 when fully coupled to the platform of Fig.
  • Fig 5 depicts the positioning of a frame of a drilling tower on the support frame of
  • Fig 6 depicts a side view of the complete drilling rig of Fig. 1 when positioned on the platform.
  • Fig. 1 schematically depicts a perspective view of an offshore platform 1 and a vessel 3 transporting a drilling rig according to an embodiment of the invention.
  • the platform 1 may be an underperforming or abandoned offshore platform that is about to be re-used.
  • the platform 1 comprises a deck 5 supported above water level by multiple interconnected columns 7 fixed to the sea bottom.
  • the platform in this embodiment is therefore a fixed platform, but the invention may also be applied to other platform types.
  • Provided on the deck 5 are a first rig skid beam 9 and a second rig skid beam 1 1.
  • the first and second rig skid beam 9, 1 1 are fixed to the deck 5 and arranged horizontally and parallel to each other.
  • the first and second rig skid beam 9, 1 1 define a longitudinal direction indicated by arrow 13.
  • the deck 5 comprises further two rows of openings 6 allowing a drilling rig to drill through, to extract e.g. oil and natural gas through, and/or to perform well intervention or plug and abandonment operations.
  • guiding elements 14 which, as will be shown later, allow to guide the positioning of the drilling rig in a horizontal transverse direction indicated by arrow 12, which transverse direction is perpendicular to the
  • guiding elements 14 are shown in an active position in which they can guide the drilling rig.
  • the guiding elements can also be pivoted to an inactive position in which they lie parallel to the deck 5 and therefore do not interfere with
  • the vessel 3 here embodied as a semi-submersible, is positioned next to the platform 1.
  • the vessel comprises cranes 15 and 16 to transfer equipment from and to the vessel 3, hence, in this embodiment between the vessel 3 and the platform 1.
  • the drilling rig to be positioned on the platform is in this embodiment formed by multiple modules, wherein one of the modules is a support frame to be positioned on the platform, and the remaining module or modules form a drilling tower to be positioned on the support frame.
  • the support frame is a universal support frame that can also be used with other drilling towers, possibly after some minor modifications.
  • Fig. 2 depicts a support frame 20 with a carrier frame 22 and a skid system.
  • the skid system comprises a first and second skid assembly for skidding the carrier frame 22 and thus the drilling rig relative to the platform 1 in the longitudinal direction 13, and a third and fourth skid assembly for skidding the carrier frame 22 and thus the drilling rig relative to the platform 1 in the transverse direction 12.
  • the support frame 20 is positioned on the platform 1 by for instance crane 15 of Fig. 1 , such that the first skid assembly engages with the first rig skid beam 9 and such that the second skid assembly engages with the second rig skid beam 1 1.
  • the first skid assembly can be seen partially in Fig. 2 and comprises a skid shoe 24 engaging with the first rig skid beam 9, a gripping unit 26 for gripping the first rig skid beam 9, and a push-pull device 28 between the gripping unit 26 and the skid shoe 24 to apply push and pull forces between the gripping unit 26 and skid shoe 24.
  • the first skid assembly comprises another skid shoe engaging with the first rig skid beam 9, thereby providing two support locations for the carrier frame 22.
  • the second skid assembly can also be seen partially in Fig. 2 and comprises a skid shoe 34 engaging with the second rig skid beam 1 1 , a gripping unit 36 for gripping the second rig skid beam 1 1 , and a push-pull device 38 between the gripping unit 36 and the skid shoe 34 to apply push and pull forces between the gripping unit 36 and skid shoe 34.
  • the second skid assembly comprises another skid shoe engaging with the second rig skid beam 1 1 , thereby providing two additional support locations for the carrier frame 22.
  • first and second skid assembly in total four support locations are provided by the first and second skid assembly.
  • more support locations may be provided by increasing the number of skid shoes, which skid shoes may be combined with a respective gripping unit and push-pull device if required or desired.
  • the third skid assembly can be seen in full in Fig. 2 and comprises a skid shoe 44 engaging with a third rig skid beam 42 on the carrier frame 22 and carried by skid shoe 24 of the first skid assembly, a skid shoe 45 engaging with the third rig skid beam 42 and carried by skid shoe 34 of the second skid assembly, a gripping unit 46 to grip the third rig skid beam 42, and a push-pull device 48 arranged between the gripping unit 46 and skid shoe 44 to apply push and pull forces between the gripping unit 46 and the skid shoe 44.
  • the fourth skid assembly which is similar to the third skid assembly, is carried in a similar way by the non-visible skid shoes of the first and second skid assemblies and engages with a fourth rig skid beam 43.
  • the gripping units 26, 36 and skid shoes 24, 34 of the first and second skid assembly comprise jaws, which can only be seen in Fig. 2 for the gripping units 26 and 36 and are indicated by reference numbers 26a, 26b, 36a, 36b.
  • the skid shoes have a similar construction.
  • the jaws 26a, 26b, 36a, 36b are moveable between a retracted position, as shown in Fig.
  • the first, second, third and fourth skid assemblies operate in a known manner to the skilled person, meaning that the gripping unit is able to grip a rig skid beam, after which operation of the push-pull device will move the corresponding skid shoe and therefore the entire structure supported by it. Gripping can be done using friction, but also, as is known in the art, using pin-hole configurations when the first and second rig skid beams are provided with holes along their length. Positioning in the transverse direction needs to be done accurately in order to prevent damage to the skid shoes, gripping units and/or first and second rig skid beams. However, accurate positioning may be challenging due to wave actions and weather conditions when the support frame is lifted by a crane.
  • Positioning is therefore carried out using the guiding elements 14.
  • the guiding elements 14 are pivotable about respective pivot axes 14a between the inactive position substantially parallel to the deck 5 and the active position as shown in Fig. 2 using an actuator 14b, in this case a hydraulic cylinder.
  • the guiding elements 14 engage with longitudinal beams 23 of the carrier frame 22 thereby fixing the position of the carrier frame 22 in the transverse direction. Subsequent lowering then ensures that the skid shoes and gripping units of the first and second skid assembly properly engage with the first and second rig skid beams respectively.
  • Fig. 3 depicts the support frame 20 of Fig. 2 on a different offshore platform V comprising a deck 5' supported by columns 7'.
  • the deck 5' comprises a fixed first rig skid beam 9' and a fixed second rig skid beam 1 1 ' arranged horizontally and parallel to each other and defining a longitudinal direction 13'.
  • the main difference between the platform 1 of Figs. 1 and 2, and the platform V of Fig. 3 is that a distance between the first and second rig skid beams of the platform V of Fig. 3 is smaller than a distance between the first and second rig skid beams of the platform 1 of Figs. 1 and 2.
  • the advantage of using a drilling rig according to the invention is that the first and second skid assembly are adjustable in a horizontal transverse direction perpendicular to the longitudinal direction.
  • the third and fourth skid assembly can advantageously be used to adjust the distance between the first and second skid assembly by moving the skid shoes 44, 45 and gripping units 46 of the third and fourth skid assembly relative to the third and fourth skid beams 42, 43 on the carrier frame 22 of the support frame 20.
  • the step of adjusting the distance between the first and second skid assembly may be carried out on the vessel 3, where for instance the support frame for this purpose is supported from the deck by e.g. four supports, such that the skid assemblies can freely move without interfering with the deck or other equipment.
  • Fig. 4 depicts a similar situation as Fig. 2, with the difference that the jaws e.g. 26a, 26b, of the first skid assembly and the jaws, e.g. 36a, 36b, of the second skid assembly have moved to the active position to couple with the first and second rig skid beams 9, 1 1 respectively.
  • the support frame can be loaded.
  • loading may also be in the form of providing a telescopic pivotable walkway 90 between the vessel 3 and the support frame 20 as skiddable structure as is shown in Fig. 5.
  • Personnel is than able to walk from and to the platform while the length and angular orientation of the walkway is automatically adjusted during skidding of the support frame over the platform.
  • the walkway 90 may comprise actuators to move a free end of the walkway to the support frame on the platform.
  • the walkway may also be used prior to positioning the support frame to allow personnel on the platform to install the guiding elements 14 on the platform.
  • Figs. 2-4 also show that the carrier frame 22 is provided with guiding elements 50 that are similar to guiding elements 14. Guiding elements 50 are provided on the carrier frame 22 to guide the positioning of a drilling tower on the carrier frame in the transverse direction by engaging with the drilling tower.
  • the drilling tower may comprise multiple modules which in this embodiment are assembled on the carrier frame positioned on the platform.
  • Fig. 5 depicts a base structure 60 with pipe loader 70 after being positioned on the carrier frame 22 of the support frame 20.
  • the base structure may have been lifted of the vessel by crane 15 and subsequently be lowered on the support frame 20.
  • the guiding elements 50 may be moved out of the way by pivoting them to an inactive position parallel to the carrier frame 22 as shown in Fig. 5. Pivoting the guiding elements 50 may be done in the same way as the guiding elements 14 using an actuator 50b to pivot the guiding elements 50 about a pivot axis 50a.
  • a drilling rig mast 65 may be provided to the platform, e.g. by crane 15 to assemble the drilling tower.
  • the pipe loader 70 transferred to the platform with the base structure may be provided with alignment elements 80, 81 which fix the position of the drilling mast in one or more directions allowing easy assembly.
  • the alignment elements may be removable, so that during operation the alignment elements do not interfere with the operations.
  • Fig. 6 depicts a fully assembled drilling rig positioned on the platform in side view with removed alignment elements 80, 81.
  • skid shoe 34 of the second skid assembly and skid shoe 35 also part of the second skid assembly are connected by a separate load transfer beam 85, so that skid shoe 35 can be dragged along with the skid shoe 34.
  • components required to drive and power the skid system e.g. the gripping units and push-pull devices, are preferably provided on the support frame. These components may comprise hydraulic motors, valves, control electronics etc. However, one or more of these components may also be provided on the drilling tower or on the vessel transporting the drilling rig, where dedicated cabling and tubing provides the necessary power and resources.

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Geology (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Structural Engineering (AREA)
  • Civil Engineering (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • Physics & Mathematics (AREA)
  • Ocean & Marine Engineering (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Combustion & Propulsion (AREA)
  • Chemical & Material Sciences (AREA)
  • Transportation (AREA)
  • Earth Drilling (AREA)

Abstract

L'invention concerne un procédé de positionnement d'une installation de forage sur une plateforme offshore dotée d'une première poutre fixe de châssis d'installation et d'une deuxième poutre fixe de châssis d'installation agencées horizontalement et parallèles entre elles et définissant une direction longitudinale, ledit procédé étant caractérisé par les étapes suivantes : a. positionner un navire à proximité de la plateforme offshore, ledit navire transportant l'installation de forage avec un système de châssis comprenant un premier ensemble de châssis destiné à s'engager avec la première poutre de châssis d'installation et un deuxième ensemble de châssis destiné à s'engager avec la deuxième poutre de châssis d'installation, chacun des premier et deuxième ensembles de châssis comprenant au moins deux patins de châssis destinés à s'engager avec les première et deuxième poutres de châssis d'installation respectives, une unité de prise destinée à agripper la première ou la deuxième poutre de châssis d'installation respective, et un dispositif pousseur-tireur destiné à appliquer des forces de poussée et de traction entre l'unité de prise et un desdits deux patins de châssis ; b. régler une distance entre le premier et le deuxième ensemble de châssis pour qu'elle corresponde à une distance entre la première et la deuxième poutre de châssis d'installation ; et c. positionner l'installation de forage sur la plateforme offshore de façon que le premier et le deuxième ensemble de châssis s'engagent respectivement avec la première et la deuxième poutre de châssis d'installation pour supporter l'installation de forage à partir de la première et de la deuxième poutre de châssis d'installation et pour faire glisser l'installation de forage par rapport à la première et la deuxième poutre de châssis d'installation dans la direction longitudinale.
PCT/NL2016/050152 2015-03-09 2016-03-04 Procédé de positionnement d'une installation de forage sur une plateforme offshore Ceased WO2016144164A1 (fr)

Priority Applications (1)

Application Number Priority Date Filing Date Title
GB1716339.5A GB2555232A (en) 2015-03-09 2016-03-04 Method for positioning a drilling rig onto an offshore platform

Applications Claiming Priority (4)

Application Number Priority Date Filing Date Title
NL2014425 2015-03-09
NL2014425 2015-03-09
NL2015090A NL2015090B1 (en) 2015-07-06 2015-07-06 Method for positioning a drilling rig onto an offshore platform.
NL2015090 2015-07-06

Publications (1)

Publication Number Publication Date
WO2016144164A1 true WO2016144164A1 (fr) 2016-09-15

Family

ID=55808819

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/NL2016/050152 Ceased WO2016144164A1 (fr) 2015-03-09 2016-03-04 Procédé de positionnement d'une installation de forage sur une plateforme offshore

Country Status (2)

Country Link
GB (1) GB2555232A (fr)
WO (1) WO2016144164A1 (fr)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106592559A (zh) * 2016-12-21 2017-04-26 兰州兰石集团有限公司 一种自升式钻井平台钻台防滑移及倾覆的锁紧装置
WO2018093253A1 (fr) 2016-11-17 2018-05-24 Itrec B.V. Système de forage assisté par navire d'accompagnement comprenant un système de câble d'extraction, procédé de transfert de tubulaires à l'aide d'un tel système et procédé d'installation d'un tel système
WO2019157135A1 (fr) * 2018-02-08 2019-08-15 Saudi Arabian Oil Company Système de ripage intelligent pour opérations terrestres
WO2022219554A1 (fr) * 2021-04-13 2022-10-20 Saipem S.P.A. Procédé et système d'entretien et de forage d'un puits pour l'extraction d'hydrocarbures
WO2025077093A1 (fr) * 2023-10-13 2025-04-17 上海佳豪船海工程研究设计有限公司 Navire capable de glisser sur de l'eau peu profonde ayant une pointe de pale oscillante, et son procédé de commande

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB1089313A (en) * 1965-03-02 1967-11-01 Bethlehem Steel Corp Apparatus for positioning a derrick and associated drilling equipment over a marine drilling site
US4030699A (en) * 1975-05-02 1977-06-21 Union Industrielle Et D'entreprise Handling device for shifting heavy loads along a sliding track
US4829924A (en) * 1986-07-21 1989-05-16 Dynovation Design And Engineering Inc. Semi submersible device and method to set and salvage marine superstructures
US4938628A (en) * 1989-10-31 1990-07-03 Transworld Drilling Company System for moving drilling module to fixed platform
US5407302A (en) * 1993-02-11 1995-04-18 Santa Fe International Corp. Method and apparatus for skid-off drilling
NL1006889C2 (nl) * 1997-08-29 1999-03-02 Marine Structure Consul Boorinstallatie.
US20140270975A1 (en) * 2013-03-15 2014-09-18 Keppel Offshore & Marine Technology Center Three rail multi-directional direct cantilever skidding system

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB1089313A (en) * 1965-03-02 1967-11-01 Bethlehem Steel Corp Apparatus for positioning a derrick and associated drilling equipment over a marine drilling site
US4030699A (en) * 1975-05-02 1977-06-21 Union Industrielle Et D'entreprise Handling device for shifting heavy loads along a sliding track
US4829924A (en) * 1986-07-21 1989-05-16 Dynovation Design And Engineering Inc. Semi submersible device and method to set and salvage marine superstructures
US4938628A (en) * 1989-10-31 1990-07-03 Transworld Drilling Company System for moving drilling module to fixed platform
US5407302A (en) * 1993-02-11 1995-04-18 Santa Fe International Corp. Method and apparatus for skid-off drilling
NL1006889C2 (nl) * 1997-08-29 1999-03-02 Marine Structure Consul Boorinstallatie.
US20140270975A1 (en) * 2013-03-15 2014-09-18 Keppel Offshore & Marine Technology Center Three rail multi-directional direct cantilever skidding system

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2018093253A1 (fr) 2016-11-17 2018-05-24 Itrec B.V. Système de forage assisté par navire d'accompagnement comprenant un système de câble d'extraction, procédé de transfert de tubulaires à l'aide d'un tel système et procédé d'installation d'un tel système
CN106592559A (zh) * 2016-12-21 2017-04-26 兰州兰石集团有限公司 一种自升式钻井平台钻台防滑移及倾覆的锁紧装置
WO2019157135A1 (fr) * 2018-02-08 2019-08-15 Saudi Arabian Oil Company Système de ripage intelligent pour opérations terrestres
US10612315B2 (en) 2018-02-08 2020-04-07 Saudi Arabian Oil Company Smart skidding system for land operations
CN111699298A (zh) * 2018-02-08 2020-09-22 沙特阿拉伯石油公司 用于陆上作业的智能滑移系统
CN117449772A (zh) * 2018-02-08 2024-01-26 沙特阿拉伯石油公司 用于陆上作业的智能滑移系统
WO2022219554A1 (fr) * 2021-04-13 2022-10-20 Saipem S.P.A. Procédé et système d'entretien et de forage d'un puits pour l'extraction d'hydrocarbures
WO2025077093A1 (fr) * 2023-10-13 2025-04-17 上海佳豪船海工程研究设计有限公司 Navire capable de glisser sur de l'eau peu profonde ayant une pointe de pale oscillante, et son procédé de commande

Also Published As

Publication number Publication date
GB2555232A (en) 2018-04-25
GB201716339D0 (en) 2017-11-22

Similar Documents

Publication Publication Date Title
KR101952355B1 (ko) 부유식 해양 설비 및 웰 시추 방법
EP3014141B1 (fr) Fondations destinées à des accessoires de pipeline sous-marin
US10393288B2 (en) Marine reel lay method pipeline installation system and methods
WO2016144164A1 (fr) Procédé de positionnement d'une installation de forage sur une plateforme offshore
EP3735509B1 (fr) Intégration de puits dans des unités sous-marines remorquables
US8522880B2 (en) Floating offshore structure for hydrocarbon production
US20050207849A1 (en) Marine pipelay system and method
EP3145805B1 (fr) Déclassement de puits pétroliers et gaziers extra-côtiers
CN105189242A (zh) 离岸设施或船只的滑移系统
US10801270B2 (en) Jack-up rig for performing multiple independent operations simultaneously
EP2665958B1 (fr) Appareil et procédé de liaison sous-marine de pipeline
EP3204589B1 (fr) Section de colonne montante marine pour opérations liées au forage sous-marin
EP3722551A1 (fr) Améliorations relatives à la fourniture de structures allongées, en particulier de torchères ou de tours de ventilation sur des navires
CN113023095B (zh) 海上风电安装船用塔筒固定装置及塔筒运输工装
NL2015090B1 (en) Method for positioning a drilling rig onto an offshore platform.
KR100465882B1 (ko) 잭 시스템에 의한 리그선의 육상 데크메이팅 공법
EP3224517B1 (fr) Système de pose de canalisations sous-marines et procédé pour abaisser et/ou monter un pipeline en mer et comprenant un ou plusieurs accessoires associés
WO2016190742A2 (fr) Unité de reconditionnement, unité de reconditionnement mobile dotée de celle-ci, et procédé pour la fourniture d'une unité de reconditionnement
KR20170048837A (ko) 캔틸레버 데릭 시스템 및 이를 가지는 해양 플랜트
US9463851B2 (en) Drilling vessel and a method making use of said drilling vessel

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 16718504

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

ENP Entry into the national phase

Ref document number: 201716339

Country of ref document: GB

Kind code of ref document: A

Free format text: PCT FILING DATE = 20160304

122 Ep: pct application non-entry in european phase

Ref document number: 16718504

Country of ref document: EP

Kind code of ref document: A1