WO2016182111A1 - Procédé de gestion d'activité d'apprentissage et système de gestion d'activité d'apprentissage effectuant ce dernier - Google Patents
Procédé de gestion d'activité d'apprentissage et système de gestion d'activité d'apprentissage effectuant ce dernier Download PDFInfo
- Publication number
- WO2016182111A1 WO2016182111A1 PCT/KR2015/005171 KR2015005171W WO2016182111A1 WO 2016182111 A1 WO2016182111 A1 WO 2016182111A1 KR 2015005171 W KR2015005171 W KR 2015005171W WO 2016182111 A1 WO2016182111 A1 WO 2016182111A1
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- electronic document
- learning activity
- activity management
- user terminal
- progress
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Ceased
Links
Images
Classifications
-
- G—PHYSICS
- G06—COMPUTING OR CALCULATING; COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/10—Services
-
- G—PHYSICS
- G06—COMPUTING OR CALCULATING; COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/10—Services
- G06Q50/20—Education
Definitions
- the present invention relates to learning activity management techniques, and more particularly, to a method and system for managing the progress of learning activities for a user's electronic document.
- an electronic publication is a digitized form in which information is recorded and represented.
- electronic books, digital magazines, digital catalogs, and the like are electronic books, digital magazines, digital catalogs, and the like.
- Such an electronic publication is generated as a packaged medium in which various kinds of contents such as text and images are considered in consideration of off-line.
- SCORM interoperates with the Learning Management System (LMS) through the Run-Time Environment (RTE) API to perform progress management and user profile management. While the SCORM RTE API provides a powerful interface, There is a problem that the complexity of the increase.
- LMS Learning Management System
- RTE Run-Time Environment
- Korean Patent No. 10-1488875 relates to an e-learning learning terminal and an e-learning learning system, and provides management of learning progress based on a play time of learning content.
- the progress is recognized.
- the progress managed based on the actual progress there is a problem in identifying and managing the exact progress.
- a progress management that can be used only in a specific e-learning learning system, there is a problem that cannot be linked with various e-learning learning systems.
- Patent Document 1 Korean Registered Patent No. 10-1488875
- An object of the present invention is to provide a learning activity management method that can edit the progress check point in a method independent of the e-learning system in order to collect the progress information according to the user's learning activities in the production of e-learning content using electronic documents It is.
- An object of the present invention is to provide a learning activity management method that can calculate the progress rate on the basis of the movement of the page when a particular page containing the progress check point is moved.
- An object of the present invention is to provide a learning activity management method that can manage the progress through the learning activity management server by transmitting the progress rate calculated in the user terminal for playing the electronic document.
- the learning activity management method is performed in a learning activity management system comprising a user terminal and a learning activity management server, learning activity management method is (a) the user terminal is Receiving an electronic document including a progress check point from a learning activity management server; and (b) when the user terminal executes the electronic document, the user terminal includes the progress check point in the electronic document. Calculating a progress rate based on whether there is, and transmitting the progress rate to the learning activity management server.
- the progress check point may be added to or deleted from a ⁇ section> ⁇ / section> element of a Hyper Text Markup Language (HTML) code block of the content with respect to the content included in the page of the electronic document.
- HTML Hyper Text Markup Language
- the learning activity management server or the electronic document providing server may include the step of adding or deleting the progress check point in the electronic document.
- the learning activity management server searches for and provides an electronic document requested from the user terminal in an electronic document database or receives an electronic document from an electronic document providing server connected to the learning activity management server. It may include providing to the user terminal.
- the step (b) includes the step of checking the number of total progress check points and the page number list of the electronic document included in the electronic document when the user terminal executes the electronic document. can do.
- step (b) may include checking whether the progress check point is included in the corresponding page when the page of the electronic document is moved.
- the user terminal when the progress check point is included in the corresponding page, the user terminal includes the total number of progress check points included in the electronic document and the progress included in the moved page. Calculating a progress rate based on the cumulative number of check points.
- the learning activity management server may further include managing learning activities for the user terminal according to a management scheme performed by the learning activity management server based on the progress rate received from the user terminal.
- a second aspect of the present invention for achieving the above object is a learning activity management system, the learning activity management server for providing an electronic document containing a progress check point and the electronic activity from the learning activity management server,
- the electronic document includes a user terminal that calculates a progress rate based on whether the progress check point is included in the electronic document and transmits the progress rate to the learning activity management server.
- the learning activity management server or the electronic document providing server for providing an electronic document to the user terminal may provide the progress check point to the electronic document Can be added or deleted.
- the learning activity management server may search for and provide an electronic document requested from the user terminal in an electronic document database or receive an electronic document from an electronic document providing server connected to the learning activity management server and provide the electronic document to the user terminal. Can be.
- the user terminal may check the total number of progress check points included in the electronic document and a list of page numbers of the electronic document.
- the user terminal can check whether the progress check point is included in the corresponding page.
- the user terminal determines the total number of progress check points included in the electronic document and the cumulative number of progress check points included in the moved page.
- the progress rate can be calculated on the basis.
- the learning activity management server may manage learning activities for the user terminal according to a management scheme performed by the learning activity management server based on the progress rate received from the user terminal.
- the learning activity management method of the present invention as described above, there is an advantage that the progress can be managed in a method independent of the e-learning system through the electronic document including the progress check point.
- the progress check point can be added to or deleted from a specific content block included in the electronic document regardless of the e-learning system.
- FIG. 1 is a block diagram of a learning activity management system according to a preferred embodiment of the present invention.
- FIG. 2 is a block diagram of a user terminal of FIG. 1.
- FIG. 3 is a flowchart illustrating a learning activity management method performed in the learning activity management system of FIG. 1.
- 4 is an example of an electronic document including a progress check point.
- first, second, etc. are used to describe various elements, components and / or sections, these elements, components and / or sections are of course not limited by these terms. These terms are only used to distinguish one element, component or section from another element, component or section. Therefore, the first device, the first component, or the first section mentioned below may be a second device, a second component, or a second section within the technical spirit of the present invention.
- an identification code (eg, a, b, c, etc.) is used for convenience of description, and the identification code does not describe the order of the steps, and each step is clearly specified in context. Unless stated in order, it may occur differently from the stated order. That is, each step may occur in the same order as specified, may be performed substantially simultaneously, or may be performed in the reverse order.
- FIG. 1 is a block diagram of a learning activity management system according to a preferred embodiment of the present invention.
- the learning activity management system 100 includes a user terminal 110 and a learning activity management server 120, where the user terminal 110 and the learning activity management server 120 form a network.
- the network may be implemented by a communication technology such as mobile communication and wired / wireless Internet, short-range communication, broadcast communication.
- the user terminal 110 is an ebook reader in which an application that allows a user to read an electronic document, for example, a viewer or the like, can be installed and driven.
- the user terminal 100 may include a tablet computer, a mobile terminal, a smart phone, a personal computer, a personal digital assistant, and an e-book reader. ), Navigation, or the like.
- the user terminal 110 accesses the learning activity management server 120 through a wired or wireless communication network, searches for and downloads a specific electronic document according to a user's control command.
- the user terminal 110 stores the downloaded electronic document and displays it on the screen.
- the user terminal 110 may receive a specific electronic document from an electronic document providing server.
- the electronic document providing server may be connected to the user terminal 110 through a network to provide a specific electronic document to the user terminal 110.
- the electronic document providing server may be connected to the learning activity management server 120 through a network. In this case, when the user terminal 110 requests a specific electronic document from the learning activity management server 120, the learning activity management server The 120 may receive the specific electronic document from the electronic document providing server and provide the same to the user terminal 110 again.
- the learning activity management server 120 provides electronic documents (ie, electronic publications) such as e-books and digital magazines.
- the learning activity management server 120 transmits the electronic document to the user terminal 110 when the user terminal 110 requests the download of a specific electronic document.
- the learning activity management server 120 may perform a user authentication with respect to the user terminal 110, and then search and read an electronic document selected by the user from an electronic document database (not shown) and transmit the same to the user terminal 110. have.
- the function of the learning activity management server 120 may be performed by an electronic document providing server separate from the learning activity management server.
- the electronic document providing server may be connected to the learning activity management server 120 to search for and read a specific electronic document requested from the learning activity management server 120 and transmit it to the learning activity management server 120.
- the learning activity management server 120 may manage electronic document data and lists downloaded for each user corresponding to the user terminal 110, and learning activities for each of the electronic documents downloaded by the user terminal 110 (for example, progress rate) may be managed and feedback to the user terminal 110 may be provided.
- the learning activity management server 120 receives the electronic document including the progress check point from the electronic document providing server and provides the electronic document to the user terminal 110, or adds or deletes the progress check point to the electronic document. Can be provided to The learning activity management server 120 or the electronic document serving server may include attributes for the Hyper Text Markup Language (HTML) elements of the electronic document or section tags of the HTML5 semantic tag. Use ⁇ section> ⁇ / section> to add or remove progress check points.
- HTML Hyper Text Markup Language
- the learning activity management server 120 or the electronic document providing server may add a progress check point to an element of an HTML code block of a specific content of a specific page of the electronic document as follows.
- the present invention can lower the complexity of content creation when implementing the same effect.
- FIG. 2 is a block diagram of a user terminal of FIG. 1.
- the user terminal 110 includes a communication unit 210, a user input unit 220, a memory 230, an output unit 240, and a control unit 250, and the output unit 240 includes a display unit. 241 and a sound output unit 242.
- the communication unit 210 transmits and receives an electronic document and various contents by the user terminal 110 performing data communication with another user terminal or the learning activity management server 120.
- the communication unit 210 may be implemented as a mobile communication module, a wired / wireless internet module, a short range communication module, or a broadcast communication module.
- the user input unit 220 generates input data for the user to control the operation of the user terminal 110.
- the user input unit 220 may include a key pad, a dome switch, a touch pad, a jog wheel, a jog switch, and the like.
- the memory 230 may store a program for controlling the operation of the user terminal 110 or may perform a function for temporarily storing input / output data.
- the memory 230 stores electronic documents and viewer applications.
- the memory 230 may be a flash memory type, a hard disk type, a multimedia card micro type, a card type memory (for example, SD or XD memory), RAM Random Access Memory (RAM) Static Random Access Memory (SRAM), Read-Only Memory (ROM), Electrically Erasable Programmable Read-Only Memory (EEPROM), Programmable Read-Only Memory (PROM) magnetic memory, It may include any one or more storage media of the optical disk, web storage (web storage).
- RAM Random Access Memory
- SRAM Static Random Access Memory
- ROM Read-Only Memory
- EEPROM Electrically Erasable Programmable Read-Only Memory
- PROM Programmable Read-Only Memory
- the output unit 240 is for outputting any one or more signals such as a text signal, an audio signal, an image signal, an alarm signal, and a warning signal, and may include a display unit 241 and an audio output unit 242. .
- the display unit 241 displays information processed by the user terminal 110.
- the user terminal 110 displays a graphical user interface (GUI), an electronic document, content, and the like.
- GUI graphical user interface
- Such displays include liquid crystal displays, thin film transistor-liquid crystal displays, organic light-emitting diodes, flexible displays, and 3D displays.
- a transparent display, a touch screen, and an electronic paper display may include any one or more.
- EPD Electronic Paper Display, when the display unit 241 is implemented as a touch screen, the display unit 241 may also be used as an input device.
- the sound output unit 242 outputs an audio signal, and outputs an audio signal (sound signal) related to a function performed in the user terminal 110.
- the sound output unit 242 may include a speaker, a buzzer, and the like.
- the controller 250 controls the above-described components to control the overall operation of the user terminal 110.
- the controller 250 loads the electronic document selected by the user from the memory 230 and displays the electronic document on the screen of the display unit 241.
- the controller 250 cleans up the electronic document HTML page and checks the page number list when loading the electronic document from the memory 230. In addition, the controller 250 determines whether there is a progress check point in the electronic document by arranging the electronic document HTML page. When the progress check points exist on the electronic document, the controller 250 may calculate the progress rate based on the total number of progress check points and the cumulative number of progress check points included in the moved page.
- FIG. 3 is a flowchart illustrating a learning activity management method performed in the learning activity management system of FIG. 1.
- the user terminal 110 receives an electronic document including the progress check point from the learning activity management server 120 (step S301).
- the progress check point may be added to or deleted from an element of the HTML code block of the content with respect to the content included in the page constituting the electronic document.
- the learning activity management server 120 or the electronic document providing server may add or delete a progress check point to the electronic document to generate an electronic document including the progress check point.
- the learning activity management server 120 or the electronic document providing server inserts a progress check point 410 into a specific part of a specific page in an electronic document composed of pages 420, thereby checking the progress check point. You can create an electronic document that contains.
- the learning activity management server 120 searches for and provides an electronic document requested from the user terminal 110 in an electronic document database, or provides an electronic document from an electronic document providing server connected to the learning activity management server 120. Received may be provided to the user terminal 110.
- the electronic document database may be connected to the learning activity management server 120 to store and manage the electronic document including the progress check point.
- the learning activity management server 120 may request the electronic document from the electronic document providing server connected with the learning activity management server, and in this case, the electronic document providing server The requested electronic document may be searched and provided to the learning activity management server 120, and the learning activity management server 120 may provide the electronic terminal provided from the electronic document providing server to the user terminal 110.
- the user terminal 110 calculates the progress rate based on whether the electronic document includes the progress check point (step S302).
- the user terminal 110 when the user terminal 110 executes an electronic document, the user terminal 110 first checks the total number of progress check points included in the electronic document and a list of page numbers of the electronic document. For example, referring to FIG. 4, the total number of progress check points is seven, and the page number list of the electronic document is ⁇ 1, 2,... , 12 ⁇ .
- the user terminal 110 checks whether the progress check point is included in the page. If the page includes the progress check point, the user terminal 110 determines the progress rate based on the total number of progress check points included in the electronic document and the cumulative number of progress check points included in the moved page. Calculate. In one embodiment, the progress rate may be calculated by Equation 1 below.
- the reason for +1 to the total number of check points is that the progress check point may not exist on the last page of the electronic document, in which case the actual progress rate even if the page containing the last check point was moved Is to consider the case where it does not reach 100%. That is, referring to FIG. 4, even if the 11 pages including the seventh progress check point are moved, the progress of the last 12 pages is not advanced, so even if all the progress check points included in the electronic document are moved. However, the progress rate does not correspond to 100%, and it must be read to the last page so that the progress rate can reach 100%.
- the user terminal 110 moves all pages including the progress check point of the electronic document, and when the final page is confirmed based on the list of page numbers of the electronic document, the progress rate is 100%. Can be calculated.
- the user terminal 110 checks whether there is a progress check point on page 3. . Since there is no progress check point on page 3, the user terminal 110 does not calculate the progress rate.
- the user terminal 110 checks whether there is a progress check point on page 6. Since there is a progress check point on page 6, the user terminal 110 calculates the progress rate.
- the user terminal 110 checks the execution time on the page, and only increases the progress rate when the execution time exceeds the preset reference time. It can also be calculated. More specifically, the user terminal 110 calculates the execution time of each page when the electronic document is executed, and checks whether the progress check point is included in the corresponding page when the page of the electronic document is moved. When the progress check point is included in the page, the user terminal 110 checks whether the execution time of the page exceeds a preset reference time. That is, the user terminal 110 may calculate the progress rate using Equation 1 only when the progress check point is included in the corresponding page and the execution time of the corresponding page exceeds a preset reference time. Through this, the progress rate can be prevented from being calculated only by the user moving the page of the electronic document.
- the user terminal 110 transmits the calculated progress rate to the learning activity management server 120 (step S303).
- the learning activity management server 120 may manage learning activities for the user terminal 110 according to a management method performed by the learning activity management server 120 based on the progress rate received from the user terminal 110 (step S304).
- the learning activity management server 120 may be variously applied, and thus, any learning activity management server 120 receives the progress rate from the user terminal 110 and performs the learning activity management server 120.
- the progress rate may be used.
- the learning activity management server 120 may provide a learning activity plan based on the progress rate received from the user terminal 110 or may prompt the progress of learning for a user whose progress rate does not reach a specific criterion. .
Landscapes
- Business, Economics & Management (AREA)
- Tourism & Hospitality (AREA)
- Engineering & Computer Science (AREA)
- Physics & Mathematics (AREA)
- Health & Medical Sciences (AREA)
- Theoretical Computer Science (AREA)
- General Physics & Mathematics (AREA)
- General Health & Medical Sciences (AREA)
- Strategic Management (AREA)
- Primary Health Care (AREA)
- General Business, Economics & Management (AREA)
- Marketing (AREA)
- Human Resources & Organizations (AREA)
- Economics (AREA)
- Educational Administration (AREA)
- Educational Technology (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
- Child & Adolescent Psychology (AREA)
Abstract
L'invention concerne un procédé de gestion d'activité d'apprentissage qui est effectué par un système de gestion d'activité d'apprentissage comprenant un terminal d'utilisateur et un serveur de gestion d'activité d'apprentissage. Le procédé de gestion d'activité d'apprentissage comprend les étapes consistant à : (a) recevoir, au moyen du terminal d'utilisateur, un document électronique comprenant un point de vérification de progression en provenance du serveur de gestion d'activité d'apprentissage ; et (b) lorsque le terminal d'utilisateur exécute le document électronique, calculer une vitesse de progression sur la base du fait que le point de vérification de progression est inclus ou non dans le document électronique, et transmettre la vitesse de progression au serveur de gestion d'activité d'apprentissage, au moyen du terminal d'utilisateur.
Applications Claiming Priority (2)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| KR1020150067178A KR20160133938A (ko) | 2015-05-14 | 2015-05-14 | 학습 활동 관리 방법 및 이를 수행하는 학습 활동 관리 시스템 |
| KR10-2015-0067178 | 2015-05-14 |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| WO2016182111A1 true WO2016182111A1 (fr) | 2016-11-17 |
Family
ID=57249586
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| PCT/KR2015/005171 Ceased WO2016182111A1 (fr) | 2015-05-14 | 2015-05-22 | Procédé de gestion d'activité d'apprentissage et système de gestion d'activité d'apprentissage effectuant ce dernier |
Country Status (2)
| Country | Link |
|---|---|
| KR (1) | KR20160133938A (fr) |
| WO (1) | WO2016182111A1 (fr) |
Families Citing this family (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| WO2020065832A1 (fr) | 2018-09-27 | 2020-04-02 | 株式会社村田製作所 | Substance électroconductrice, électrode positive et batterie secondaire |
| KR102795304B1 (ko) * | 2022-09-15 | 2025-04-16 | 주식회사 알디 | 범용 스트리밍 영상을 이용한 학습 관리 플랫폼 운영 방법 |
Citations (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP3567797B2 (ja) * | 1999-05-27 | 2004-09-22 | 日本電気株式会社 | 授業管理システム及びプログラムを記録した機械読み取り可能な記録媒体 |
| JP2007334914A (ja) * | 2007-08-22 | 2007-12-27 | Sony Corp | 電子ブック、書籍内容表示方法、書籍内容表示プログラム及び書籍内容表示プログラム格納媒体 |
| KR20080013327A (ko) * | 2006-08-08 | 2008-02-13 | (주)디유넷 | 학습 관리 시스템에 연동되는 게임 프로그램의 학습 정보추적 방법 및 시스템 |
| KR20120123973A (ko) * | 2011-05-02 | 2012-11-12 | (주)위지 | Scorm 표준을 이용하는 모바일 단말, 학습 관리 시스템 및 학습 관리 방법 |
| KR20130045781A (ko) * | 2011-10-25 | 2013-05-06 | 삼성전자주식회사 | 전자책 리더 기능을 구비한 단말기에서 전자책 표시 방법 및 장치 |
Family Cites Families (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| KR101488875B1 (ko) | 2013-03-28 | 2015-02-04 | 최성 | 이러닝 학습 단말 및 이러닝 학습 시스템 |
-
2015
- 2015-05-14 KR KR1020150067178A patent/KR20160133938A/ko not_active Ceased
- 2015-05-22 WO PCT/KR2015/005171 patent/WO2016182111A1/fr not_active Ceased
Patent Citations (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP3567797B2 (ja) * | 1999-05-27 | 2004-09-22 | 日本電気株式会社 | 授業管理システム及びプログラムを記録した機械読み取り可能な記録媒体 |
| KR20080013327A (ko) * | 2006-08-08 | 2008-02-13 | (주)디유넷 | 학습 관리 시스템에 연동되는 게임 프로그램의 학습 정보추적 방법 및 시스템 |
| JP2007334914A (ja) * | 2007-08-22 | 2007-12-27 | Sony Corp | 電子ブック、書籍内容表示方法、書籍内容表示プログラム及び書籍内容表示プログラム格納媒体 |
| KR20120123973A (ko) * | 2011-05-02 | 2012-11-12 | (주)위지 | Scorm 표준을 이용하는 모바일 단말, 학습 관리 시스템 및 학습 관리 방법 |
| KR20130045781A (ko) * | 2011-10-25 | 2013-05-06 | 삼성전자주식회사 | 전자책 리더 기능을 구비한 단말기에서 전자책 표시 방법 및 장치 |
Also Published As
| Publication number | Publication date |
|---|---|
| KR20160133938A (ko) | 2016-11-23 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US9256582B2 (en) | Conversion of a presentation to Darwin Information Typing Architecture (DITA) | |
| US9342233B1 (en) | Dynamic dictionary based on context | |
| KR101622871B1 (ko) | 메신저의 대화내용을 관리하는 방법과 시스템 및 기록 매체 | |
| WO2013168885A9 (fr) | Procédé de fourniture d'écran de verrouillage et dispositif de terminal pour le mettre en œuvre | |
| WO2025048073A1 (fr) | Procédé et système de génération automatique de graphe de connaissances | |
| WO2018182057A1 (fr) | Procédé et système pour fournir une notification d'une liste de tâches à un utilisateur | |
| JP2021197153A (ja) | ワードスロットを識別するための方法及び装置、電子機器、記憶媒体並びにコンピュータプログラム | |
| WO2016032080A1 (fr) | Système de conversion de graphe utilisant des métadonnées et procédé associé | |
| WO2018004020A1 (fr) | Dispositif et procédé de vérification de correspondance d'éditions simultanées pour un document basé sur un langage de balisage | |
| US10861348B2 (en) | Cross-application feature linking and educational messaging | |
| CN114995691B (zh) | 一种文档处理方法、装置、设备和介质 | |
| CN102306164A (zh) | 用于web服务的后期资源本地化绑定 | |
| WO2016182111A1 (fr) | Procédé de gestion d'activité d'apprentissage et système de gestion d'activité d'apprentissage effectuant ce dernier | |
| US8381112B2 (en) | Data management tool | |
| KR102225413B1 (ko) | 클라우드 컴퓨팅 기반의 컨텐츠 공유를 위한 시스템 및 서비스 장치 | |
| WO2019172463A1 (fr) | Procédé, système et support d'enregistrement non transitoire lisible par ordinateur pour recommander une photo d'un profil | |
| CN111400581A (zh) | 用于标注样本的系统、方法和装置 | |
| WO2013062324A1 (fr) | Procédé d'application d'informations d'attribut supplémentaires à un contenu de livre électronique et dispositif mobile adapté à celui-ci | |
| EP3281122A1 (fr) | Procédé destiné à la génération automatique d'index dynamique servant au contenu affiché sur un dispositif électronique | |
| WO2013187555A1 (fr) | Système de service de partage de données, et dispositif et procédé pour un service de partage de données | |
| KR101469882B1 (ko) | 가상 프린터를 이용한 모바일 열람 서비스 시스템 및 방법 | |
| CN121523676A (zh) | 可访问界面元素的检测方法、装置、电子设备、存储介质和程序产品 | |
| JP6930553B2 (ja) | 情報処理システム、情報処理装置、情報処理方法及びプログラム | |
| KR101843113B1 (ko) | 인터렉티브 멀티 브라우징 북마크를 활용하여 콘텐츠 정보를 제공하는 방법, 단말 및 애플리케이션 | |
| WO2016122034A1 (fr) | Système et procédé de service de document électronique |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| 121 | Ep: the epo has been informed by wipo that ep was designated in this application |
Ref document number: 15891927 Country of ref document: EP Kind code of ref document: A1 |
|
| NENP | Non-entry into the national phase |
Ref country code: DE |
|
| 32PN | Ep: public notification in the ep bulletin as address of the adressee cannot be established |
Free format text: NOTING OF LOSS OF RIGHTS PURSUANT TO RULE 112(1) EPC (EPO FORM 1205A DATED 29.03.2018) |
|
| 122 | Ep: pct application non-entry in european phase |
Ref document number: 15891927 Country of ref document: EP Kind code of ref document: A1 |