WO2018201833A1 - Procédé et dispositif d'attribution de ressources de liaison montante - Google Patents
Procédé et dispositif d'attribution de ressources de liaison montante Download PDFInfo
- Publication number
- WO2018201833A1 WO2018201833A1 PCT/CN2018/081558 CN2018081558W WO2018201833A1 WO 2018201833 A1 WO2018201833 A1 WO 2018201833A1 CN 2018081558 W CN2018081558 W CN 2018081558W WO 2018201833 A1 WO2018201833 A1 WO 2018201833A1
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- bearer
- logical channel
- uplink
- resource allocation
- uplink scheduling
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Ceased
Links
Images
Classifications
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W72/00—Local resource management
- H04W72/20—Control channels or signalling for resource management
- H04W72/21—Control channels or signalling for resource management in the uplink direction of a wireless link, i.e. towards the network
Definitions
- the present disclosure relates to the field of communications technologies, and in particular, to an uplink resource allocation method and apparatus.
- LCP Logical Channel Prioritization
- the LCP of the LTE system is based on a priority parameter priority corresponding to a single RB (Radio Bearer) of the network configuration.
- the specific implementation process is as follows:
- Step 1 Perform the first round of resource allocation in the order of priority order of priority parameters of all logical channels with tokens.
- the first round of resource allocation is performed based on the PBR (Prioritized Bit Rate) of each logical channel.
- PBR Primary Bit Rate
- the number of tokens available for each logical channel is updated according to the uplink resource allocation.
- Step 2 If there are remaining resources, then perform the second round of resource allocation.
- the second round of resource allocation is allocated as a data allocation resource other than PBR in the order of priority order of priority parameters of all logical channels having data transmission.
- Resource allocation allocates resources or exhausts resources of all logical channels with tokens.
- the 5G NR system mainly supports three types of services:
- eMBB enhanced Mobile Broadband
- the delay requirement of the URLLC service is particularly high, and the end-to-end delay is 0.5 ms.
- the priority of the priority parameter in the QoS parameter does not need to consider the delay, and the priority of the URLLC service may be lower than the priority of the eMBB service.
- the baseband parameter (Numerology) is a term of the 3GPP (3rd Generation Partnership Project) RAN (Radio Access Network).
- the main difference between the different baseband parameters is that the subcarrier spacing supported by the different baseband parameters is different.
- the subcarrier spacing supported by the 5G NR system includes at least: 15 kHz, 60 kHz, and the baseband parameters corresponding to the two different subcarrier spacings are two independent baseband parameters.
- the baseband parameters used by high-speed terminals are different from the baseband parameters used by low-speed terminals; the baseband parameters used by high-frequency terminals and low-frequency terminals are also different.
- the baseband parameters that can be used by different services may also be different.
- the baseband parameters used by URLLC and eMBB may be different.
- the TTI length is 1 ms.
- different TTI lengths such as one OFDM (Orthogonal Frequency Division Multiplexing) symbol length, are introduced.
- Different TTI lengths are used in 5G systems and can be applied to each baseband parameter. That is, different baseband parameters in 5G NR can use different TTI lengths, and the same TTI length can be used, and any baseband parameters can be different at any one time.
- the length of the TTI used by the terminal can be dynamically changed.
- the selection of the length of the TTI is mainly related to the service delay.
- the URLLC service may have a shorter TTI length, such as the TTI length of one OFDM symbol, because the delay requirement is relatively high.
- the priority parameter priority and service delay in the current service QoS parameters are not significant.
- the priority parameter is still independent of the delay, then there may be a problem that the transmission resource of the URLLC service is preempted by the higher priority service, resulting in the URLLC. The latency requirements of the business cannot be met.
- the embodiments of the present disclosure provide a solution to the problem that a transmission resource of a low priority but delay sensitive service is preempted by a high priority service.
- an uplink resource allocation method includes:
- the terminal receives one or more uplink grants (UL grants);
- the terminal When the terminal performs uplink resource allocation on each uplink scheduling grant, based on the mapping relationship between the bearer or logical channel and the baseband parameter and/or the TTI length, the maximum baseband parameter and/or the TTI length that can be supported is equal to the uplink scheduling grant.
- the corresponding baseband parameter and/or TTI length, and the bearer or logical channel with data to be transmitted allocates uplink resources.
- the terminal when the terminal performs uplink resource allocation on each uplink scheduling grant, based on the mapping relationship between the bearer or logical channel and the baseband parameter and/or the TTI length, the maximum baseband parameter and/or TTI length that can be supported.
- the method further includes:
- the maximum baseband parameter and/or the TTI length that can be supported is greater than the baseband parameter corresponding to the uplink scheduling grant, based on the mapping relationship between the bearer or logical channel and the baseband parameter and/or the TTI length. / or TTI length, and the bearer or logical channel with data to be transmitted allocates uplink resources.
- the mapping relationship between the bearer or logical channel and the baseband parameter and/or the TTI length is a network side configuration or a protocol convention.
- mapping relationship between the bearer or logical channel and the baseband parameter and/or the TTI length includes:
- mapping relationship between the bearer or logical channel and the maximum baseband parameter and/or TTI length used by the bearer or logical channel is a mapping relationship between the bearer or logical channel and the maximum baseband parameter and/or TTI length used by the bearer or logical channel.
- the terminal when the terminal performs resource allocation on each uplink scheduling grant, based on a mapping relationship between the bearer or logical channel and the baseband parameter and/or the TTI length, the maximum baseband parameter and/or TTI length that can be supported is equal to the The baseband parameter and/or the TTI length corresponding to the uplink scheduling grant, and the bearer or the logical channel to which the data needs to be transmitted allocate uplink resources, including:
- the selected maximum baseband parameter and/or the TTI length is equal to the baseband parameter and/or the TTI length corresponding to the uplink scheduling grant to be processed and the data needs to be transmitted.
- Uplink resources Allocating uplink resources to bearers or logical channels in the bearer or logical channel priority queue according to a predetermined resource allocation manner, until all uplink resources corresponding to all uplink scheduling grants in the uplink scheduling authorization processing priority queue are allocated or all bearers are allocated. Or the uplink data is allocated to the data to be transmitted of the logical channel.
- the processing sequence of the multiple uplink scheduling grants is agreed by a protocol, or configured by a network side, or depends on a terminal implementation.
- the predetermined resource allocation manner is configured by a network, or is agreed by a protocol, or depends on a terminal implementation.
- the predetermined resource allocation manner includes:
- the first round of PBR resource allocation is performed according to the PBR of each bearer or logical channel in the bearer or logical channel priority queue. If the first round of PBR resource allocation ends with the uplink scheduling grant and the remaining uplink resources, the bearer or bearer is again compared. Each of the logical channel priority queues has remaining data of the bearer or logical channel that needs to be transmitted, and the second round of remaining data resource allocation is performed until all uplink resources corresponding to the uplink scheduling grant are allocated or carried or logical channel priority queues All the bearer or logical channel data to be transmitted are allocated uplink resources; or
- All the bearers or logical channels in the bearer or logical channel priority queue are allocated resources according to the amount of data to be transmitted in sequence, until the uplink resources corresponding to the uplink scheduling grant are all allocated or all bearers in the bearer or logical channel priority queue or The uplink data is allocated to the data to be transmitted of the logical channel; or
- the first round of PBR resource allocation is performed according to its PBR for each bearer or logical channel in the bearer or logical channel priority queue, wherein the bearer or logical channel that does not need to perform two rounds of resource allocation is determined in the bearer or logical channel priority queue.
- the remaining data of the bearer or logical channel that has the remaining data to be transmitted is subjected to the second round of remaining data resource allocation until the uplink resources corresponding to the uplink scheduling grant are all allocated or all bearers or logical channels in the bearer or logical channel priority queue are allocated. Uplink resources are allocated to the data to be transmitted; or
- the first round of PBR resource allocation is performed according to its PBR for each bearer or logical channel in the bearer or logical channel priority queue, wherein the bearer or logic that does not need to perform two rounds of resource allocation in the bearer or logical channel priority queue is determined.
- the channel does not need to be allocated uplink resources for the first round of PBR resource allocation; if the first round of PBR resource allocation ends with the uplink scheduling grant and the remaining uplink resources, it is again compared with the bearer or logical channel priority queue.
- Each of the remaining data of the bearer or logical channel that needs to be transmitted with the remaining data is allocated for the second round of resources until all uplink resources corresponding to the uplink scheduling grant are allocated or all bearers or logical channels in the logical channel priority queue are to be transmitted.
- the data is allocated uplink resources.
- the maximum baseband parameter and/or the TTI length that can be supported is greater than the uplink scheduling.
- Authorize the corresponding baseband parameters and/or TTI length, and have bearer or logical channel allocation resources for data transmission including:
- the maximum baseband parameter and/or the TTI length that is selected to be supported is greater than the baseband parameter corresponding to the uplink scheduling grant to be processed, according to the corresponding relationship between the bearer or logical channel and the baseband parameter and/or the TTI length. And/or TTI length, and some or all of the bearer or logical channel with data to be transmitted;
- the method further includes:
- the terminal combines the uplink resources allocated to the same bearer or logical channel, and then determines the data amount of the bearer or logical channel, and organizes a Media Access Control (MAC) service data unit for one bearer or logical channel.
- MAC Media Access Control
- the terminal allocates an uplink resource for each bearer or logical channel, and generates a MAC SDU for the bearer or logical channel.
- an uplink resource allocation apparatus is further provided, where the apparatus includes:
- a receiving module configured to receive one or more uplink scheduling authorizations
- a first resource allocation module configured to perform a maximum resource base parameter and/or a TTI length based on a mapping relationship between a bearer or a logical channel and a baseband parameter and/or a TTI length when performing uplink resource allocation on each uplink scheduling grant. It is equal to the baseband parameter and/or the TTI length corresponding to the uplink scheduling grant, and the bearer or the logical channel to which the data needs to be transmitted allocates the uplink resource.
- the device further includes:
- a second resource allocation module configured to: if the corresponding uplink scheduling grant has remaining uplink resources, based on a mapping relationship between the bearer or the logical channel and the baseband parameter and/or the TTI length, the maximum baseband parameter and/or the TTI length that can be supported is greater than the The uplink scheduling grant corresponds to the baseband parameter and/or the TTI length, and the bearer or the logical channel to which the data needs to be transmitted allocates the uplink resource.
- the mapping relationship between the bearer or logical channel and the baseband parameter and/or the TTI length is a network side configuration or a protocol convention.
- mapping relationship between the bearer or logical channel and the baseband parameter and/or the TTI length includes:
- mapping relationship between the bearer or logical channel and the maximum baseband parameter and/or TTI length used by the bearer or logical channel is a mapping relationship between the bearer or logical channel and the maximum baseband parameter and/or TTI length used by the bearer or logical channel.
- the first resource allocation module includes:
- a first determining unit configured to determine a processing sequence of the multiple uplink scheduling grants, and generate an uplink scheduling grant processing priority queue
- a second determining unit configured to sequentially select an uplink scheduling grant to be processed according to a processing priority of the uplink scheduling grant in the uplink scheduling authorization processing priority queue from high to low, and determine that the uplink scheduling grant to be processed corresponds to Baseband parameters and/or TTI lengths;
- a first queue generating unit configured to select a supported maximum baseband parameter and/or a TTI length equal to a baseband parameter corresponding to an uplink scheduling grant to be processed, and/or according to a correspondence between a bearer or a logical channel and a baseband parameter and/or a TTI length.
- a first resource allocation unit configured to perform uplink resource allocation on a bearer or a logical channel in the bearer or logical channel priority queue according to a predetermined resource allocation manner, until all uplink scheduling grants in the uplink scheduling authorization processing priority queue are corresponding
- the uplink resources are all allocated or the data to be transmitted of all bearers or logical channels are allocated uplink resources.
- the processing sequence of the multiple uplink scheduling grants is agreed by a protocol, or configured by a network side, or depends on a terminal implementation.
- the predetermined resource allocation manner is configured by a network, or is agreed by a protocol, or depends on a terminal implementation.
- the predetermined resource allocation manner includes:
- the first round of PBR resource allocation is performed according to the PBR of each bearer or logical channel in the bearer or logical channel priority queue. If the first round of PBR resource allocation ends with the uplink scheduling grant and the remaining uplink resources, the bearer or bearer is again compared. Each of the logical channel priority queues has remaining data of the bearer or logical channel that needs to be transmitted, and the second round of remaining data resource allocation is performed until all uplink resources corresponding to the uplink scheduling grant are allocated or carried or logical channel priority queues All the bearer or logical channel data to be transmitted are allocated uplink resources; or
- All the bearers or logical channels in the bearer or logical channel priority queue are allocated resources according to the amount of data to be transmitted in sequence, until the uplink resources corresponding to the uplink scheduling grant are all allocated or all bearers in the bearer or logical channel priority queue or The uplink data is allocated to the data to be transmitted of the logical channel; or
- the first round of PBR resource allocation is performed according to its PBR for each bearer or logical channel in the bearer or logical channel priority queue, wherein the bearer or logical channel that does not need to perform two rounds of resource allocation is determined in the bearer or logical channel priority queue.
- the remaining data of the bearer or logical channel that has the remaining data to be transmitted is subjected to the second round of remaining data resource allocation until the uplink resources corresponding to the uplink scheduling grant are all allocated or all bearers or logical channels in the bearer or logical channel priority queue are allocated. Uplink resources are allocated to the data to be transmitted; or
- the first round of PBR resource allocation is performed according to its PBR for each bearer or logical channel in the bearer or logical channel priority queue, wherein the bearer or logic that does not need to perform two rounds of resource allocation in the bearer or logical channel priority queue is determined.
- the channel does not need to be allocated uplink resources for the first round of PBR resource allocation; if the first round of PBR resource allocation ends with the uplink scheduling grant and the remaining uplink resources, it is again compared with the bearer or logical channel priority queue.
- Each of the remaining data of the bearer or logical channel that needs to be transmitted with the remaining data is allocated for the second round of resources until all uplink resources corresponding to the uplink scheduling grant are allocated or all bearers or logical channels in the logical channel priority queue are to be transmitted.
- the data is allocated uplink resources.
- the second resource allocation module includes:
- the selecting unit is configured to: if the corresponding uplink scheduling grant has remaining uplink resources, according to the correspondence between the bearer or the logical channel and the baseband parameter and/or the TTI length, the maximum supported baseband parameter and/or the TTI length is greater than the uplink scheduling to be processed. Authorize the corresponding baseband parameters and/or TTI length, and have some or all of the bearers or logical channels for which data needs to be transmitted;
- a second queue generating unit configured to sort the selected bearer or logical channel according to priorities of the bearer or the logical channel, and generate a bearer or a logical channel priority queue
- a second resource allocation unit configured to perform uplink resource allocation on a bearer or a logical channel in the bearer or logical channel priority queue, until all uplink resources are allocated or all mapped to a bearer or logical channel on the uplink scheduling grant All data is allocated uplink resources.
- the device further includes:
- a MAC SDU generating module configured to combine uplink resources allocated to the same bearer or logical channel, and then determine the amount of data of the bearer or logical channel, and organize one MAC SDU for one bearer or logical channel;
- An uplink resource is allocated for each bearer or logical channel, and a MAC SDU is generated for the bearer or logical channel.
- a terminal comprising: a memory, a processor, and a program stored on the memory and executable on the processor, the processor implementing the program as described above The steps in the uplink resource allocation method.
- a computer readable storage medium having stored thereon a program, the program being executed by a processor to implement the steps in the uplink resource allocation method as described above.
- the terminal receives N uplink scheduling grants (N ⁇ 1), and performs resource allocation on each uplink scheduling grant based on bearer or logical channel and baseband parameters. / or TTI length mapping, preferentially for the maximum baseband parameters that can be supported and / or the TTI length equal to the baseband parameters and / or TTI length corresponding to the uplink scheduling grant and the bearer or logical channel allocated resources for data transmission; further If the corresponding uplink scheduling grant has remaining resources, the maximum baseband parameter and/or the TTI length that can be supported is greater than the baseband parameter and/or the TTI length corresponding to the uplink scheduling grant, and the data needs to be transmitted.
- a resource that avoids the problem that transmission resources of low-priority but delay-sensitive traffic are preempted by high-priority services.
- FIG. 1 is a flowchart of an uplink resource allocation method in an embodiment of the present disclosure
- step 102 in FIG. 1 is a specific flowchart of step 102 in FIG. 1;
- FIG. 3 is a flowchart of an uplink resource allocation method in another embodiment of the present disclosure.
- step 303 in FIG. 3 is a specific flowchart of step 303 in FIG. 3;
- FIG. 5 is a flowchart of an uplink resource allocation method in still another embodiment of the present disclosure.
- step 502 in FIG. 5 is a specific flowchart of step 502 in FIG. 5;
- FIG. 7 is a block diagram of an uplink resource allocation apparatus in an embodiment of the present disclosure.
- FIG. 8 is a schematic structural diagram of a terminal according to an embodiment of the present disclosure.
- FIG. 1 a flow of an uplink resource allocation method in an embodiment is shown, and the specific steps are as follows:
- Step 101 The terminal receives one or more uplink scheduling authorizations.
- Upstream scheduling authorization UL grant.
- Step 102 When the terminal performs uplink resource allocation on each uplink scheduling grant, based on the mapping relationship between the bearer or logical channel and the baseband parameter and/or the TTI length, the maximum baseband parameter and/or the TTI length that can be supported is equal to the uplink scheduling. Authorize the corresponding baseband parameters and/or TTI length, and the bearer or logical channel with data to be transmitted allocates uplink resources.
- bearers and logical channel expressions have the same meaning.
- mapping relationship between the bearer or logical channel and the baseband parameter and/or the TTI length includes any one or more of the following representations:
- the baseband parameter and/or the TTI length corresponding to the uplink scheduling grant includes any one or more of the following representations:
- the baseband parameters and TTI lengths corresponding to the uplink scheduling grant are the baseband parameters and TTI lengths corresponding to the uplink scheduling grant.
- the mapping relationship between the bearer or logical channel and the baseband parameter and/or the TTI length may be a network side configuration or a protocol convention.
- mapping relationship between the bearer or logical channel and the baseband parameter and/or the TTI length specifically refers to:
- mapping relationship between the bearer or logical channel and the maximum baseband parameter and/or TTI length used by the bearer or logical channel is of course not limited thereto.
- step 102 specifically includes:
- Step 1021 Determine a processing sequence of multiple uplink scheduling grants, and generate an uplink scheduling authorization processing priority queue.
- the processing sequence of multiple uplink scheduling grants is agreed by the protocol, for example, the processing sequence of multiple uplink scheduling grants or the processing of multiple uplink scheduling grants according to the baseband parameters and/or the length of the TTI from small to large.
- the order is configured by the network side, or the processing order of multiple uplink scheduling grants depends on the terminal implementation. Of course, it is not limited to this.
- Step 1022 Select an uplink scheduling grant to be processed in order of processing priority of the uplink scheduling grant in the priority scheduling queue according to the uplink scheduling authorization, and determine a baseband parameter corresponding to the to-be-processed uplink scheduling grant and/or TTI length;
- the baseband parameter and/or the TTI length corresponding to the uplink scheduling grant to be processed may be determined in a manner related to the related art, and is not repeatedly described herein.
- Step 1023 Select a supported maximum baseband parameter and/or a TTI length equal to a baseband parameter and/or a TTI length corresponding to an uplink scheduling grant to be processed, and have data according to a correspondence between a bearer or a logical channel and a baseband parameter and/or a TTI length.
- a bearer or a logical channel to be transmitted, and the selected bearer or logical channel is sorted according to the priority of the bearer or the logical channel to generate a bearer or a logical channel priority queue;
- the priority of the bearer or logical channel may be determined by a QoS parameter corresponding to the bearer or the logical channel.
- a QoS parameter corresponding to the bearer or the logical channel.
- Step 1024 Perform uplink resource allocation on the bearer or logical channel in the bearer or logical channel priority queue according to a predetermined resource allocation manner, until all uplink resources corresponding to all uplink scheduling grants in the uplink scheduling authorization processing priority queue are allocated. Or the uplink data is allocated to all data to be transmitted of the bearer or logical channel.
- the predetermined resources in steps 1022, 1023, and 1024 are repeatedly performed.
- the allocation mode performs uplink resource allocation on the bearer or logical channel in the bearer or logical channel priority queue until all uplink resources corresponding to all uplink scheduling grants in the uplink scheduling authorization processing priority queue are allocated or all bearers or logical channels are allocated. Uplink resources are allocated to the data to be transmitted.
- the predetermined resource allocation manner may be configured by the network, or by a protocol, or depending on the terminal.
- the predetermined resource allocation manner includes any one of the following:
- Manner 1 The first round of PBR resource allocation is performed according to the PBR of each bearer or logical channel in the bearer or logical channel priority queue. If the first round of PBR resource allocation ends with the uplink scheduling grant and the remaining uplink resources, then again Performing the second round of remaining data resource allocation according to the remaining data of the bearer or logical channel that needs to be transmitted in each of the bearer or logical channel priority queues until all uplink resources corresponding to the uplink scheduling grant are allocated or bearer or logical channel priority The uplink data is allocated to the data to be transmitted of all bearers or logical channels in the level queue;
- Manner 2 performing resource allocation according to the amount of data to be transmitted in sequence for each bearer or logical channel in the bearer or logical channel priority queue until all uplink resources corresponding to the uplink scheduling grant are allocated or carried or in the logical channel priority queue All the data to be transmitted of the bearer or logical channel is allocated uplink resources;
- Manner 3 The first round of PBR resource allocation is performed according to the PBR of each bearer or logical channel in the bearer or logical channel priority queue, where the bearer that does not need to perform two rounds of resource allocation is determined for the bearer or logical channel priority queue. Or logical channel, in the first round of PBR resource allocation, need to allocate uplink resources for all the data; if the first round of PBR resource allocation ends corresponding to the uplink scheduling grant and the remaining uplink resources, then compare the bearer or logical channel priority again.
- Each of the remaining data in the queue with the remaining data to be transmitted or the remaining data of the logical channel performs the second round of remaining data resource allocation until all uplink resources corresponding to the uplink scheduling grant are allocated or all bearers in the bearer or logical channel priority queue or The uplink data is allocated to the data to be transmitted of the logical channel;
- the above two rounds of resource allocation refer to: the first round of PBR resource allocation and the second round of remaining data resource allocation.
- Manner 4 The first round of PBR resource allocation is performed according to the PBR of each bearer or logical channel in the bearer or logical channel priority queue, wherein it is determined that the two rounds of resource allocation are not required for the bearer or logical channel priority queue.
- the uplink resource does not need to be allocated for the first round of PBR resource allocation; if the first round of PBR resource allocation ends with the uplink scheduling grant and the remaining uplink resources, then the bearer or logical channel priority is compared again.
- Each of the remaining data in the queue that has the remaining data to be transmitted or the remaining data of the logical channel performs the second round of resource allocation until all the uplink resources corresponding to the uplink scheduling grant are allocated or all bearers or logical channels in the bearer or logical channel priority queue are allocated.
- the uplink data is allocated for the data to be transmitted.
- the terminal organizes the MAC PDU according to the uplink resource allocation result, and there are two ways:
- Manner 1 The terminal combines the uplink resources allocated to the same bearer or logical channel, and then determines the data volume of the bearer or logical channel, and organizes one MAC SDU for one bearer or logical channel;
- Manner 2 The terminal allocates an uplink resource to each bearer or logical channel, and generates a MAC SDU for the bearer or logical channel.
- the terminal receives N uplink scheduling grants (N ⁇ 1), and performs resource allocation on each uplink scheduling grant, based on the mapping relationship between the bearer or logical channel and the baseband parameters and/or the TTI length. Avoiding low priority but relatively sensitive to delay, in order to support the maximum baseband parameter and/or the baseband parameter and/or TTI length corresponding to the uplink scheduling grant and the bearer or logical channel with data to be transmitted.
- the transmission resource of the service is preempted by high-priority services.
- Step 301 The terminal receives one or more uplink scheduling grants.
- Step 302 When the terminal performs uplink resource allocation on each uplink scheduling grant, based on the mapping relationship between the bearer or logical channel and the baseband parameter and/or the TTI length, the maximum baseband parameter and/or the TTI length that can be supported is equal to the uplink scheduling. Authorize the corresponding baseband parameters and/or TTI length, and the bearer or logical channel with data to be transmitted allocates uplink resources.
- steps 301 and 302 are the same as the steps 101 and 102 shown in FIG. 1 .
- steps 301 and 302 refer to the introduction of step 102, which is not described herein.
- Step 303 If the uplink scheduling grant has a remaining uplink resource, the maximum baseband parameter and/or the TTI length that can be supported is greater than the uplink scheduling grant corresponding to the mapping between the bearer or logical channel and the baseband parameter and/or the TTI length.
- the baseband parameters and/or the TTI length, and the bearer or logical channel with data to be transmitted allocates uplink resources.
- step 303 the specific process of step 303 is as follows:
- Step 3031 If there is any uplink resource corresponding to the uplink scheduling grant, according to the correspondence between the bearer or the logical channel and the baseband parameter and/or the TTI length, the maximum supported baseband parameter and/or the TTI length is greater than the uplink scheduling grant to be processed.
- Step 3032 Sort the selected bearer or logical channel according to the priority of the bearer or the logical channel, generate a bearer or logical channel priority queue, and perform uplink resources on the bearer or logical channel in the bearer or logical channel priority queue. Allocating, until the uplink resources are all allocated or all data mapped to the bearer or logical channel on the uplink scheduling grant are allocated uplink resources.
- the terminal organizes the MAC PDU according to the uplink resource allocation result, and there are two ways:
- Manner 1 The terminal combines the uplink resources allocated to the same bearer or logical channel, and then determines the data volume of the bearer or logical channel, and organizes one MAC SDU for one bearer or logical channel;
- Manner 2 The terminal allocates an uplink resource to each bearer or logical channel, and generates a MAC SDU for the bearer or logical channel.
- the terminal receives N uplink scheduling grants (N ⁇ 1), and performs resource allocation on each uplink scheduling grant, based on the mapping relationship between the bearer or logical channel and the baseband parameters and/or the TTI length. Allocating resources for a maximum baseband parameter and/or a baseband parameter and/or a TTI length corresponding to the uplink scheduling grant and having a data to be transmitted or a logical channel; if there is remaining resources corresponding to the uplink scheduling grant, Low priority but delay comparison can be avoided for the maximum baseband parameters that can be supported and/or the bearer or logical channel allocation resources with the TTI length corresponding to the base scheduling parameters and/or TTI length corresponding to the uplink scheduling grant and having data to be transmitted.
- the transmission resources of sensitive services are preempted by high-priority services.
- Step 501 Determine an uplink scheduling authorization processing priority queue.
- the terminal receives the N uplink scheduling grants, determines the processing sequence of the N uplink scheduling grants, and generates an uplink scheduling grant processing priority queue, where N is greater than or equal to 1.
- the processing sequence of the N uplink scheduling grants may be a protocol, for example, the sequence of the N uplink scheduling grants may be configured by the network side according to the baseband parameters and/or the length of the TTI from small to large.
- Step 502 Process the priority queue according to the uplink scheduling authorization, select an uplink scheduling grant at the head of the queue, and perform uplink resource allocation for the uplink scheduling grant.
- Step 5021 Select an uplink scheduling grant to process the first uplink scheduling grant to be processed in the priority queue, and determine a baseband parameter and/or a TTI length corresponding to the uplink scheduling grant.
- Step 5022 Select a supported maximum baseband parameter and/or a TTI length equal to a baseband parameter and/or a TTI length corresponding to an uplink scheduling grant to be processed according to a correspondence between a bearer or a logical channel and a baseband parameter and/or a TTI length, and have data.
- the bearer that needs to be transmitted is then sorted in descending order according to the priority of the bearer or logical channel according to the priority of the bearer or logical channel to generate a bearer or logical channel priority queue.
- Step 5023 Perform uplink resource allocation on the bearer or logical channel in the bearer or logical channel priority queue.
- Manner 1 The first round of resource allocation is performed according to its PBR for each bearer or logical channel in the bearer or logical channel priority queue. If there are remaining resources at the end of the first round of resource allocation, the second round of resource allocation is performed again against the remaining data of the bearer or logical channel in the bearer or logical channel priority queue that needs to be transmitted, until the resources are exhausted or The resources to be transmitted of all bearers in the bearer priority queue are allocated resources.
- Manner 2 The resources are allocated according to the amount of data to be transmitted in sequence for each bearer or logical channel in the bearer or logical channel priority queue. Resources are allocated until the resource is exhausted or the data to be transmitted of all bearers or logical channels in the bearer or logical channel priority queue.
- Manner 3 The first round of resource allocation is performed according to its PBR for each bearer or logical channel in the bearer or logical channel priority queue. For the bearer or logical channel in the bearer or logical channel priority queue that does not need to perform two rounds of resource allocation, in the first round of resource allocation, resources need to be allocated for all the data. If there are remaining resources at the end of the first round of resource allocation, the second round of resource allocation is performed again against the remaining data of the bearer or logical channel in the bearer or logical channel priority queue that needs to be transmitted, until the resources are exhausted or The data to be transmitted of all bearers or logical channels in the bearer or logical channel priority queue are allocated resources.
- the bearer or logical channel configured in the bearer or logical channel priority queue that does not need to perform two rounds of resource allocation is transmitted in the first round of resource allocation.
- the first round of resource allocation is performed according to the PBR of each bearer or logical channel in the bearer or logical channel priority queue. For the bearer or logical channel in the bearer or logical channel priority queue that does not need to perform two rounds of resource allocation, no resources need to be allocated for the first round of resource allocation. If there are remaining resources at the end of the first round of resource allocation, the second round of resource allocation is performed again against the remaining data of the bearer or logical channel in the bearer or logical channel priority queue that needs to be transmitted, until the resources are exhausted or The data to be transmitted of all bearers or logical channels in the bearer or logical channel priority queue are allocated resources.
- Step 5024 If the uplink scheduling grant has remaining resources after the resource allocation is completed in step 5023, the maximum supported baseband parameter and/or TTI length is greater than the corresponding relationship between the bearer or logical channel and the baseband parameter and/or the TTI length.
- Step 503 Update the uplink scheduling grant priority processing queue, delete the already processed uplink scheduling grant, and then repeat step 502 until all uplink scheduling grant resources are exhausted or all bearers or logical channels are in their corresponding baseband parameters/ The uplink resource is allocated on the uplink scheduling grant corresponding to the TTI.
- the terminal organizes the MAC PDU according to the uplink resource allocation result, and there are two ways:
- Manner 1 Combine the resources allocated to the same bearer, determine the amount of data that can be carried, and organize a MAC SDU for one bearer.
- the terminal receives N uplink scheduling grants (N ⁇ 1), and when performing resource allocation on each uplink scheduling grant, based on the mapping relationship between the bearer and the baseband parameter/TTI length, the priority is the maximum that can be supported.
- the baseband parameter/TTI length is equal to the baseband parameter/TTI length corresponding to the uplink scheduling grant and there is a bearer allocation bearer or logical channel allocation resource for which data needs to be transmitted; if there are remaining resources, the maximum baseband parameter/TTI length that can be supported is greater than
- the uplink scheduling grant corresponds to the baseband parameter/TTI length and the data needs to be transmitted by the bearer allocation bearer or the logical channel allocation resource, which can prevent the transmission resource of the low priority but relatively delay sensitive service from being preempted by the high priority service. The problem.
- an uplink resource allocation apparatus is also provided in the embodiment of the present disclosure.
- the uplink resource allocation apparatus is similar to the uplink resource allocation method in the embodiments of the present disclosure.
- the implementation of the dispensing device can be seen in the implementation of the method, and the repetitions are not described.
- the apparatus 700 includes:
- the receiving module 701 is configured to receive one or more uplink scheduling grants;
- the first resource allocation module 702 is configured to: when the uplink resource allocation is performed on each uplink scheduling grant, based on the mapping relationship between the bearer or logical channel and the baseband parameter and/or the TTI length, the maximum baseband parameter and/or TTI that can be supported.
- the length is equal to the baseband parameter and/or the TTI length corresponding to the uplink scheduling grant, and the bearer or the logical channel to which the data needs to be transmitted allocates the uplink resource.
- the apparatus 700 further includes:
- the second resource allocation module 703 is configured to: if the corresponding uplink scheduling grant has remaining uplink resources, based on the mapping relationship between the bearer or the logical channel and the baseband parameter and/or the TTI length, the maximum baseband parameter and/or the TTI length that can be supported is greater than
- the uplink scheduling grant corresponds to a baseband parameter and/or a TTI length, and a bearer or a logical channel to which the data needs to be transmitted allocates an uplink resource.
- the mapping relationship between the bearer or logical channel and the baseband parameter and/or the TTI length is a network side configuration or a protocol convention.
- the mapping relationship between the bearer or logical channel and the baseband parameter and/or the TTI length includes:
- mapping relationship between the bearer or logical channel and the maximum baseband parameter and/or TTI length used by the bearer or logical channel is a mapping relationship between the bearer or logical channel and the maximum baseband parameter and/or TTI length used by the bearer or logical channel.
- the first resource allocation module 702 includes:
- the first determining unit 7021 is configured to determine a processing sequence of the multiple uplink scheduling grants, and generate an uplink scheduling authorization processing priority queue.
- the second determining unit 7022 is configured to sequentially select the uplink scheduling grant to be processed according to the processing priority of the uplink scheduling grant in the uplink scheduling authorization processing priority queue from high to low, and determine the uplink scheduling grant to be processed.
- the first queue generating unit 7023 is configured to select a supported maximum baseband parameter and/or a TTI length equal to a baseband parameter corresponding to the uplink scheduling grant to be processed according to the correspondence between the bearer or logical channel and the baseband parameter and/or the TTI length. Or a bearer or a logical channel having a TTI length and having data to be transmitted, and sorting the selected bearer or logical channel according to the priority of the bearer or the logical channel to generate a bearer or a logical channel priority queue;
- the first resource allocation unit 7024 is configured to perform uplink resource allocation on the bearer or logical channel in the bearer or logical channel priority queue according to a predetermined resource allocation manner, until all uplink scheduling grants in the uplink scheduling authorization processing priority queue correspond to Uplink resources are all allocated or all bearer or logical channel data to be transmitted are allocated uplink resources.
- the processing sequence of the multiple uplink scheduling grants is agreed by a protocol, or configured by a network side, or implemented by a terminal.
- the predetermined resource allocation manner is configured by a network, or is agreed by a protocol, or is implemented by a terminal.
- the predetermined resource allocation manner includes:
- the first round of PBR resource allocation is performed according to the PBR of each bearer or logical channel in the bearer or logical channel priority queue. If the first round of PBR resource allocation ends with the uplink scheduling grant and the remaining uplink resources, the bearer or bearer is again compared. Each of the logical channel priority queues has remaining data of the bearer or logical channel that needs to be transmitted, and the second round of remaining data resource allocation is performed until all uplink resources corresponding to the uplink scheduling grant are allocated or carried or logical channel priority queues All the bearer or logical channel data to be transmitted are allocated uplink resources; or
- All the bearers or logical channels in the bearer or logical channel priority queue are allocated resources according to the amount of data to be transmitted in sequence, until the uplink resources corresponding to the uplink scheduling grant are all allocated or all bearers in the bearer or logical channel priority queue or The uplink data is allocated to the data to be transmitted of the logical channel; or
- the first round of PBR resource allocation is performed according to its PBR for each bearer or logical channel in the bearer or logical channel priority queue, wherein the bearer or logical channel that does not need to perform two rounds of resource allocation is determined in the bearer or logical channel priority queue.
- the remaining data of the bearer or logical channel that has the remaining data to be transmitted is subjected to the second round of remaining data resource allocation until the uplink resources corresponding to the uplink scheduling grant are all allocated or all bearers or logical channels in the bearer or logical channel priority queue are allocated. Uplink resources are allocated to the data to be transmitted; or
- the first round of PBR resource allocation is performed according to its PBR for each bearer or logical channel in the bearer or logical channel priority queue, wherein the bearer or logic that does not need to perform two rounds of resource allocation in the bearer or logical channel priority queue is determined.
- the channel does not need to be allocated uplink resources for the first round of PBR resource allocation; if the first round of PBR resource allocation ends with the uplink scheduling grant and the remaining uplink resources, it is again compared with the bearer or logical channel priority queue.
- Each of the remaining data of the bearer or logical channel that needs to be transmitted with the remaining data is allocated for the second round of resources until all uplink resources corresponding to the uplink scheduling grant are allocated or all bearers or logical channels in the logical channel priority queue are to be transmitted.
- the data is allocated uplink resources.
- the second resource allocation module 703 includes:
- the selecting unit 7031 is configured to: if the corresponding uplink scheduling grant has remaining uplink resources, according to the correspondence between the bearer or the logical channel and the baseband parameter and/or the TTI length, the maximum supported baseband parameter and/or the TTI length is greater than the uplink to be processed. Scheduling the corresponding baseband parameters and/or TTI lengths, and having some or all of the bearers or logical channels for which data needs to be transmitted;
- the second queue generating unit 7032 is configured to sort the selected bearer or logical channel according to the priority of the bearer or the logical channel, and generate a bearer or a logical channel priority queue.
- a second resource allocation unit 7033 configured to perform uplink resource allocation on a bearer or a logical channel in the bearer or logical channel priority queue, until all uplink resources are allocated or all bearers or logical channels mapped to the uplink scheduling grant All data is allocated uplink resources.
- the apparatus 700 further includes:
- a MAC SDU generating module 704 configured to combine uplink resources allocated to the same bearer or logical channel, determine data volume of the bearer or logical channel, and organize one MAC SDU for one bearer or logical channel;
- a MAC SDU is generated for the bearer or logical channel.
- the embodiment of the present disclosure further provides a terminal, including: a memory, a processor, and a computer program stored on the memory and operable on the processor, where the processor executes the program as shown in FIG. 1 to FIG. 6
- a terminal including: a memory, a processor, and a computer program stored on the memory and operable on the processor, where the processor executes the program as shown in FIG. 1 to FIG. 6
- the steps in the illustrated uplink resource allocation method including: a memory, a processor, and a computer program stored on the memory and operable on the processor
- FIG. 8 there is shown a structure of a terminal including a memory, a processor, and a computer program stored on the memory and operable on the processor, the processor executing the program to implement the following steps: receiving One or more uplink scheduling grants; the maximum baseband parameter and/or TTI length that can be supported based on the mapping relationship between bearer or logical channel and baseband parameters and/or TTI length when performing uplink resource allocation on each uplink scheduling grant It is equal to the baseband parameter and/or the TTI length corresponding to the uplink scheduling grant, and the bearer or the logical channel to which the data needs to be transmitted allocates the uplink resource.
- bus architecture represented by bus 800 can include any number of interconnected buses and bridges, and bus 800 will include various circuits of memory represented by one or more processors and memory 804 represented by general purpose processor 801. Linked together. The bus 800 can also link various other circuits such as peripherals, voltage regulators, and power management circuits.
- Bus interface 803 provides an interface between bus 800 and transceiver 802.
- Transceiver 802 can be an element or a plurality of elements, such as multiple receivers and transmitters, providing means for communicating with various other devices on a transmission medium. For example, transceiver 802 receives external data from other devices. The transceiver 802 is configured to send the processed data of the processor 801 to other devices.
- a user interface can also be provided, such as a keypad, display, speaker, microphone, joystick.
- the processor 801 is responsible for managing the bus 800 and the usual processing, running the general purpose operating system as described above.
- the memory 704 can be used to store data used by the processor 801 when performing operations.
- the processor 801 may be a CPU (Central Processing Unit), an ASIC (Application Specific Integrated Circuit), an FPGA (Field-Programmable Gate Array), or a CPLD (Complex). Programmable Logic Device, Complex Programmable Logic Device).
- the processor 801 is further configured to: if the corresponding uplink scheduling grant has remaining uplink resources, based on a mapping relationship between the bearer or the logical channel and the baseband parameter and/or the TTI length, the maximum baseband parameter and/or the TTI that can be supported.
- the length is greater than the baseband parameter and/or the TTI length corresponding to the uplink scheduling grant, and the bearer or the logical channel to which the data needs to be transmitted allocates the uplink resource.
- the mapping relationship between the bearer or logical channel and the baseband parameter and/or the TTI length is a network side configuration or a protocol convention.
- mapping relationship between the bearer or logical channel and the baseband parameter and/or the TTI length includes:
- mapping relationship between the bearer or logical channel and the maximum baseband parameter and/or TTI length used by the bearer or logical channel is a mapping relationship between the bearer or logical channel and the maximum baseband parameter and/or TTI length used by the bearer or logical channel.
- the processor 801 is further configured to: determine a processing sequence of the multiple uplink scheduling grants, generate an uplink scheduling grant processing priority queue, and process a processing priority of an uplink scheduling grant in the priority queue according to the uplink scheduling grant. Selecting an uplink scheduling grant to be processed in order from high to low, and determining a baseband parameter and/or a TTI length corresponding to the to-be-processed uplink scheduling grant; according to a correspondence between a bearer or a logical channel and a baseband parameter and/or a TTI length And selecting a supported maximum baseband parameter and/or a TTI length equal to a baseband parameter and/or a TTI length corresponding to the uplink scheduling grant to be processed and having a data bearer or a logical channel to be transmitted, and selecting the bearer or logical channel according to the bearer or The priority of the logical channel is sorted to generate a bearer or logical channel priority queue; the uplink resource allocation is performed on the bearer or logical channel in the bearer
- the processing sequence of the multiple uplink scheduling grants is agreed by a protocol, or configured by a network side, or depends on a terminal implementation.
- the predetermined resource allocation manner is configured by a network, or is agreed by a protocol, or depends on a terminal implementation.
- the predetermined resource allocation manner includes:
- the first round of PBR resource allocation is performed according to the PBR of each bearer or logical channel in the bearer or logical channel priority queue. If the first round of PBR resource allocation ends with the uplink scheduling grant and the remaining uplink resources, the bearer or bearer is again compared. Each of the logical channel priority queues has remaining data of the bearer or logical channel that needs to be transmitted, and the second round of remaining data resource allocation is performed until all uplink resources corresponding to the uplink scheduling grant are allocated or carried or logical channel priority queues All the bearer or logical channel data to be transmitted are allocated uplink resources; or
- All the bearers or logical channels in the bearer or logical channel priority queue are allocated resources according to the amount of data to be transmitted in sequence, until the uplink resources corresponding to the uplink scheduling grant are all allocated or all bearers in the bearer or logical channel priority queue or The uplink data is allocated to the data to be transmitted of the logical channel; or
- the first round of PBR resource allocation is performed according to its PBR for each bearer or logical channel in the bearer or logical channel priority queue, wherein the bearer or logical channel that does not need to perform two rounds of resource allocation is determined in the bearer or logical channel priority queue.
- the remaining data of the bearer or logical channel that has the remaining data to be transmitted is subjected to the second round of remaining data resource allocation until the uplink resources corresponding to the uplink scheduling grant are all allocated or all bearers or logical channels in the bearer or logical channel priority queue are allocated. Uplink resources are allocated to the data to be transmitted; or
- the first round of PBR resource allocation is performed according to its PBR for each bearer or logical channel in the bearer or logical channel priority queue, wherein the bearer or logic that does not need to perform two rounds of resource allocation in the bearer or logical channel priority queue is determined.
- the channel does not need to be allocated uplink resources for the first round of PBR resource allocation; if the first round of PBR resource allocation ends with the uplink scheduling grant and the remaining uplink resources, it is again compared with the bearer or logical channel priority queue.
- Each of the remaining data of the bearer or logical channel that needs to be transmitted with the remaining data is allocated for the second round of resources until all uplink resources corresponding to the uplink scheduling grant are allocated or all bearers or logical channels in the logical channel priority queue are to be transmitted.
- the data is allocated uplink resources.
- the processor 801 is further configured to: if the corresponding uplink scheduling grant has remaining uplink resources, select a supported maximum baseband parameter and/or a TTI length according to a correspondence between the bearer or the logical channel and the baseband parameter and/or the TTI length.
- the processor 801 is further configured to: combine the uplink resources allocated to the same bearer or logical channel, determine the data volume of the bearer or the logical channel, and organize one MAC SDU for one bearer or logical channel; or Each time a bearer or logical channel allocates an uplink resource, a MAC SDU is generated for the bearer or logical channel.
- the embodiment of the present disclosure further provides a computer readable storage medium having stored thereon a computer program, the program being executed by the processor to implement the steps in the uplink resource allocation method as shown in FIGS. 1 to 6.
- system and “network” are used interchangeably herein.
- B corresponding to A means that B is associated with A, and B can be determined from A.
- determining B from A does not mean that B is only determined based on A, and that B can also be determined based on A and/or other information.
- the disclosed method and apparatus may be implemented in other manners.
- the device embodiments described above are merely illustrative.
- the division of the unit is only a logical function division.
- there may be another division manner for example, multiple units or components may be combined or Can be integrated into another system, or some features can be ignored or not executed.
- the mutual coupling or direct coupling or communication connection shown or discussed may be an indirect coupling or communication connection through some interface, device or unit, and may be in an electrical, mechanical or other form.
- each functional unit in various embodiments of the present disclosure may be integrated into one processing unit, or each unit may be physically included separately, or two or more units may be integrated into one unit.
- the above integrated unit can be implemented in the form of hardware or in the form of hardware plus software functional units.
- the above-described integrated unit implemented in the form of a software functional unit can be stored in a computer readable storage medium.
- the above software functional unit is stored in a storage medium and includes a plurality of instructions for causing a computer device (which may be a personal computer, a server, or a network side device, etc.) to perform part of the steps of the transceiving method of the various embodiments of the present disclosure.
- the foregoing storage medium includes: a U disk, a mobile hard disk, a read-only memory (ROM), a random access memory (RAM), a magnetic disk, or an optical disk, and the like, which can store program codes. .
Landscapes
- Engineering & Computer Science (AREA)
- Computer Networks & Wireless Communication (AREA)
- Signal Processing (AREA)
- Mobile Radio Communication Systems (AREA)
Abstract
L'invention concerne un procédé et un dispositif de transmission de ressources de liaison montante. Le procédé comprend les étapes suivantes : un terminal reçoit une ou plusieurs autorisations de planification de liaison montante; et lors de l'exécution d'une attribution de ressources de liaison montante pour chacune des autorisations de planification de liaison montante, le terminal attribue, sur la base d'une relation de mappage entre un support ou un canal logique et une numérologie et/ou une longueur de TTI, une ressource de liaison montante vers un support ou un canal logique ayant des données à transmettre et ayant une numérologie et/ou une longueur de TTI correspondantes égales à une numérologie et/ou une longueur de TTI maximales pouvant être prises en charge.
Applications Claiming Priority (2)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201710308940.0A CN106961741B (zh) | 2017-05-04 | 2017-05-04 | 一种上行资源分配方法和装置 |
| CN201710308940.0 | 2017-05-04 |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| WO2018201833A1 true WO2018201833A1 (fr) | 2018-11-08 |
Family
ID=59482146
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| PCT/CN2018/081558 Ceased WO2018201833A1 (fr) | 2017-05-04 | 2018-04-02 | Procédé et dispositif d'attribution de ressources de liaison montante |
Country Status (2)
| Country | Link |
|---|---|
| CN (1) | CN106961741B (fr) |
| WO (1) | WO2018201833A1 (fr) |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN114223307A (zh) * | 2019-10-16 | 2022-03-22 | Oppo广东移动通信有限公司 | 数据传输方法、装置、设备及存储介质 |
| EP3911086A4 (fr) * | 2019-01-11 | 2022-05-11 | Spreadtrum Communications (Shanghai) Co., Ltd. | Procédé de sélection de ressource de transmission de liaison montante, terminal et support d'informations |
Families Citing this family (37)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| WO2018120985A1 (fr) * | 2016-12-29 | 2018-07-05 | 电信科学技术研究院 | Procédé et dispositif de réalisation d'une attribution de ressource |
| CN108282278B (zh) * | 2017-01-05 | 2021-02-05 | 华为技术有限公司 | 传输数据的方法、终端设备和网络设备 |
| CN106961741B (zh) * | 2017-05-04 | 2019-11-22 | 电信科学技术研究院 | 一种上行资源分配方法和装置 |
| US11160107B2 (en) | 2017-07-21 | 2021-10-26 | Lg Electronics Inc. | Method for performing a LCP procedure in wireless communication system and a device therefor |
| IL271210B2 (en) * | 2017-08-04 | 2024-01-01 | Guangdong Oppo Mobile Telecommunications Corp Ltd | Resource scheduling method, terminal device, and network device |
| CN109392148B (zh) * | 2017-08-11 | 2021-06-04 | 电信科学技术研究院 | 一种上行资源分配的方法、终端及网络设备 |
| CN111096034B (zh) * | 2017-08-11 | 2024-10-01 | Oppo广东移动通信有限公司 | 资源分配方法、装置、系统及计算机可读存储介质 |
| WO2019033428A1 (fr) * | 2017-08-18 | 2019-02-21 | 北京小米移动软件有限公司 | Procédé d'attribution de ressources de liaison montante, dispositif et terminal |
| CN109451855B (zh) * | 2017-08-18 | 2023-05-12 | 北京小米移动软件有限公司 | 上行资源分配方法、装置和终端 |
| CN114944904A (zh) | 2017-09-11 | 2022-08-26 | 中兴通讯股份有限公司 | 资源指示方法及装置、存储介质 |
| CN109756986B (zh) | 2017-11-03 | 2021-07-13 | 大唐移动通信设备有限公司 | 一种上行数据包资源分配方法和用户终端 |
| WO2019095112A1 (fr) * | 2017-11-14 | 2019-05-23 | Oppo广东移动通信有限公司 | Procédé de transmission de données, dispositif terminal et dispositif réseau |
| EP3714555A4 (fr) * | 2017-11-20 | 2021-07-07 | Nokia Solutions and Networks Oy | Transmission de liaison terrestre entre des dispositifs de réseau |
| JP2021508206A (ja) * | 2017-12-27 | 2021-02-25 | オッポ広東移動通信有限公司Guangdong Oppo Mobile Telecommunications Corp., Ltd. | データ送信方法、装置、コンピュータ装置及び記憶媒体 |
| CN110139373B (zh) * | 2018-02-09 | 2021-08-20 | 大唐移动通信设备有限公司 | 一种资源选择方法及用户终端 |
| CN110167066B (zh) * | 2018-02-14 | 2022-09-02 | 华为技术有限公司 | 一种数据传输方法及装置 |
| CN110324902B (zh) * | 2018-03-30 | 2023-06-27 | 华为技术有限公司 | 通信方法、通信装置和系统 |
| ES2989693T3 (es) | 2018-04-04 | 2024-11-27 | Zte Corp | Métodos y aparato para apropiarse de un recurso de transmisión de enlace ascendente en una comunicación inalámbrica |
| CN110636532B (zh) * | 2018-06-21 | 2021-01-08 | 维沃移动通信有限公司 | 一种功率分配方法及终端 |
| CN110838899B (zh) * | 2018-08-16 | 2021-12-24 | 大唐移动通信设备有限公司 | 一种直接通信链路资源分配方法及终端 |
| CN113747596A (zh) | 2018-09-21 | 2021-12-03 | 华为技术有限公司 | 无线调度的方法和装置 |
| CN111132351B (zh) * | 2018-10-31 | 2023-04-07 | 大唐移动通信设备有限公司 | 一种资源分配方法、终端及节点设备 |
| CN111328138B (zh) * | 2018-12-13 | 2023-04-07 | 大唐移动通信设备有限公司 | Mac pdu的组织方法、装置及终端 |
| CN111385883B (zh) * | 2018-12-28 | 2023-01-10 | 展讯通信(上海)有限公司 | 一种数据传输方法及装置、存储介质、终端 |
| CN110602796B (zh) * | 2019-01-29 | 2023-06-06 | 北京中科晶上科技股份有限公司 | 移动宽带共享信道上的资源调度方法及电子设备 |
| CN111726865B (zh) * | 2019-03-21 | 2023-06-30 | 大唐移动通信设备有限公司 | 媒质接入控制业务数据单元处理、接收方法、设备及装置 |
| CN111294165B (zh) * | 2019-03-22 | 2021-06-08 | 展讯通信(上海)有限公司 | 资源分配方法及装置、存储介质、终端 |
| CN111294964A (zh) * | 2019-03-28 | 2020-06-16 | 展讯通信(上海)有限公司 | 资源选择、配置方法及装置、存储介质、用户设备、基站 |
| CN111836389B (zh) * | 2019-04-23 | 2023-07-25 | 中国移动通信有限公司研究院 | 上行资源调度方法、终端及网络侧设备 |
| CN111601383A (zh) * | 2019-06-17 | 2020-08-28 | 维沃移动通信有限公司 | 一种资源分配方法、终端和网络设备 |
| WO2021081908A1 (fr) * | 2019-10-31 | 2021-05-06 | Oppo广东移动通信有限公司 | Procédé d'attribution de ressources à un canal logique de liaison montante, et dispositif terminal |
| CN111428973B (zh) * | 2020-03-11 | 2024-04-12 | 慧镕电子系统工程股份有限公司 | 一种能有效提高资源利用率的虚拟资源分配方法 |
| CN113630891B (zh) * | 2020-05-06 | 2022-08-19 | 展讯通信(上海)有限公司 | Mac层优先级排序方法及装置、存储介质、用户设备 |
| CN113840305B (zh) * | 2020-06-24 | 2024-06-07 | 大唐移动通信设备有限公司 | 数据传输方法、参数配置方法、终端和网络侧设备 |
| CN117425223A (zh) * | 2022-07-08 | 2024-01-19 | 大唐移动通信设备有限公司 | 资源分配、信息配置方法、装置、终端设备及网络设备 |
| CN121397756A (zh) * | 2024-07-22 | 2026-01-23 | 维沃移动通信有限公司 | Lcp处理方法、传输方法、装置、终端及网络侧设备 |
| CN121510305A (zh) * | 2024-08-01 | 2026-02-10 | 荣耀终端股份有限公司 | 一种通信方法、通信装置及存储介质 |
Citations (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN105979597A (zh) * | 2016-06-27 | 2016-09-28 | 宇龙计算机通信科技(深圳)有限公司 | 通信资源的分配方法、分配装置、基站和终端 |
| CN106961741A (zh) * | 2017-05-04 | 2017-07-18 | 电信科学技术研究院 | 一种上行资源分配方法和装置 |
Family Cites Families (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| WO2013109888A1 (fr) * | 2012-01-19 | 2013-07-25 | Futurewei Technologies, Inc. | Systèmes et procédés pour l'attribution de ressources de liaison montantes |
| CN104363663B (zh) * | 2014-11-17 | 2018-02-06 | 电子科技大学 | 一种lte通信系统中基于混合业务的分组调度方法 |
| CN106376050B (zh) * | 2016-09-30 | 2022-03-18 | 宇龙计算机通信科技(深圳)有限公司 | 子载波间隔的设置/确定方法、装置、基站和终端 |
-
2017
- 2017-05-04 CN CN201710308940.0A patent/CN106961741B/zh active Active
-
2018
- 2018-04-02 WO PCT/CN2018/081558 patent/WO2018201833A1/fr not_active Ceased
Patent Citations (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN105979597A (zh) * | 2016-06-27 | 2016-09-28 | 宇龙计算机通信科技(深圳)有限公司 | 通信资源的分配方法、分配装置、基站和终端 |
| CN106961741A (zh) * | 2017-05-04 | 2017-07-18 | 电信科学技术研究院 | 一种上行资源分配方法和装置 |
Non-Patent Citations (3)
| Title |
|---|
| CATT: "MAC Model in NR", 3GPP TSG - RAN WG 2 MEETING #96, R2-167950, 18 November 2016 (2016-11-18), XP051177679 * |
| HUAWEI ET AL.: "LCP with Multiple Numerologies", 3GPP TSG - RAN WG 2 MEETING #96, R2-167575, 18 November 2016 (2016-11-18), XP055505421 * |
| NOKIA ET AL.: "Report of email discUSsion on [96#28][NR] MAC to support multiple numerologies", 3GPP TSG - RAN WG 2 NR ADHOC, R2-1700250, 19 January 2017 (2017-01-19), XP051203658 * |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| EP3911086A4 (fr) * | 2019-01-11 | 2022-05-11 | Spreadtrum Communications (Shanghai) Co., Ltd. | Procédé de sélection de ressource de transmission de liaison montante, terminal et support d'informations |
| CN114223307A (zh) * | 2019-10-16 | 2022-03-22 | Oppo广东移动通信有限公司 | 数据传输方法、装置、设备及存储介质 |
Also Published As
| Publication number | Publication date |
|---|---|
| CN106961741B (zh) | 2019-11-22 |
| CN106961741A (zh) | 2017-07-18 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| WO2018201833A1 (fr) | Procédé et dispositif d'attribution de ressources de liaison montante | |
| EP3554125B1 (fr) | Procédé, appareil, et système de traitement de données | |
| EP3840512B1 (fr) | Procédé d'attribution de ressources de liaison latérale et terminal | |
| US11039448B2 (en) | Resource scheduling method and apparatus | |
| WO2018059234A1 (fr) | Procédé et dispositif de rapport pour rapport d'état de tampon | |
| CN114514772B (zh) | 包括具有优先值的mac ce的逻辑信道的优先级化的方法和装置 | |
| CN106954277B (zh) | 一种调度请求处理方法和装置 | |
| CN108347784A (zh) | 一种资源调度方法以及无线接入网设备和终端设备 | |
| WO2020034740A1 (fr) | Procédé et dispositif pour déterminer et configurer une ressource de requête de planification, et support d'informations | |
| CN113556785A (zh) | 一种业务质量流的控制方法及相关设备 | |
| WO2014117347A1 (fr) | Procédé et appareil de planification de données | |
| CN108811140A (zh) | 一种数据业务传输方法及系统 | |
| CN108024341A (zh) | 一种调度方法、终端及基站 | |
| CN107872897B (zh) | 一种进行上行数据操作的方法和设备 | |
| CN111385883B (zh) | 一种数据传输方法及装置、存储介质、终端 | |
| US20240007895A1 (en) | Communication control device, communication control method and recording medium | |
| CN110446263B (zh) | 数据传输方法及装置 | |
| CN111866903B (zh) | 一种混合自动重传请求模式的配置方法及相关装置 | |
| CN108260220B (zh) | 一种进行资源分配的方法和设备 | |
| WO2018120985A1 (fr) | Procédé et dispositif de réalisation d'une attribution de ressource | |
| WO2026058757A1 (fr) | Dispositif de communication, système de communication sans fil, procédé de commande, et programme | |
| CN111328138B (zh) | Mac pdu的组织方法、装置及终端 | |
| WO2026009628A1 (fr) | Dispositif terminal, procédé pour un dispositif terminal et dispositif de station de base | |
| KR20260049103A (ko) | 통신 네트워크에서 확장 현실 서비스의 품질 관리를 위한 방법 및 장치 | |
| WO2026009629A1 (fr) | Dispositif terminal, procédé pour dispositif terminal et dispositif de station de base |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| 121 | Ep: the epo has been informed by wipo that ep was designated in this application |
Ref document number: 18794699 Country of ref document: EP Kind code of ref document: A1 |
|
| NENP | Non-entry into the national phase |
Ref country code: DE |
|
| 122 | Ep: pct application non-entry in european phase |
Ref document number: 18794699 Country of ref document: EP Kind code of ref document: A1 |