WO2019102438A1 - Coffrage perdu et système de support - Google Patents
Coffrage perdu et système de support Download PDFInfo
- Publication number
- WO2019102438A1 WO2019102438A1 PCT/IB2018/059344 IB2018059344W WO2019102438A1 WO 2019102438 A1 WO2019102438 A1 WO 2019102438A1 IB 2018059344 W IB2018059344 W IB 2018059344W WO 2019102438 A1 WO2019102438 A1 WO 2019102438A1
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- formwork
- support
- section
- operatively
- units
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Ceased
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B5/00—Floors; Floor construction with regard to insulation; Connections specially adapted therefor
- E04B5/16—Load-carrying floor structures wholly or partly cast or similarly formed in situ
- E04B5/32—Floor structures wholly cast in situ with or without form units or reinforcements
- E04B5/36—Floor structures wholly cast in situ with or without form units or reinforcements with form units as part of the floor
- E04B5/38—Floor structures wholly cast in situ with or without form units or reinforcements with form units as part of the floor with slab-shaped form units acting simultaneously as reinforcement; Form slabs with reinforcements extending laterally outside the element
- E04B5/40—Floor structures wholly cast in situ with or without form units or reinforcements with form units as part of the floor with slab-shaped form units acting simultaneously as reinforcement; Form slabs with reinforcements extending laterally outside the element with metal form-slabs
Definitions
- This invention relates to formwork or moulds used in the construction of reinforced concrete suspended slabs, staircases and beams.
- Formwork is first assembled on a support structure to form a mould before reinforcement bars are placed on top or inside it and concrete is poured into the formwork, vibrated and allowed to set.
- the formwork is made of steel panels that are clipped together, or from wood panels that have to be carpentered together.
- the formwork has to be greased to prevent concrete from sticking to it so that it can be reused multiple times.
- Steel panel formwork is made from modular units, thus requiring the reinforced concrete structure to be of certain dimensions, being a multiple of the modular units.
- Wooden formwork does not have this restriction but requires carpentry.
- the formwork has a finite life before it has to be replaced, fixed or maintained.
- the greasing/oiling of the formwork as well as handling has a strong effect on the longevity of the formwork - if the concrete sticks to the formwork, it has to be pried or hammered away thus damaging the formwork.
- Repeated transport of the formwork between construction sites has a similar negative impact on its longevity.
- a shoring or support system is deployed on the floor below.
- This shoring can be in the form of scaffolding, props, or supports.
- Some initial permanent formwork was made of corrugated metal sheet (both galvanized and un-galvanized).
- the corrugation created stiffness so that workers can walk on it, and concrete could be poured, as it spans between supports. Over time the corrugated metal sheet with deeper corrugations were used, which stiffens permanent formwork.
- Such permanent formwork was referred to as steel deck, which was used both in reinforced concrete construction, and in composite (steel and concrete) construction.
- the steel deck cannot be of any depth. Whilst making the permanent formwork corrugation deeper does improve the overall stiffness of the steel deck, the steel deck is, with deeper corrugation, subject to local buckling, which renders such formwork useless. There is an interplay between the stiffness of the formwork and local stability. To prevent local buckling, some products include local stiffeners. These stiffeners have to be deployed during construction of the formwork, which is a time-consuming process and requires quality control. It also introduces a further cost element to the construction process.
- a dimensionally adjustable self-supporting permanent formwork and support system which comprises a formwork section with integral support means for the formwork section,
- the formwork section comprising a plurality of formwork units each of which comprises an elongate open-ended trough having at least one operatively upper edge from which a flat section extends,
- each formwork unit being securable to an adjacent formwork unit for a plurality of the formwork units to be secured together by overlapping flat sections of adjoining formwork units and securing them to each other, with formwork units located at the operative sides of the formwork section being provided with upstanding rim to create the formwork section with a plurality of spaced-apart troughs joined by flat sections and bounded on its sides with rims, with the formwork section providing a support surface for a spacer to support reinforcing members spaced apart from an operatively upper surface of the formwork section and substantially below the rim level of the formwork section, and securing means allowing at least one of the reinforcing members and the spacer to be secured to the formwork section operatively to provide integral support to the system;
- the formwork section upon being provided with a upstanding perimeter rim, being locatable between end-supports to substantially close the open-ended troughs and support the formwork, and enable the formwork sections to be filled with a filler material to set in the formwork units and around the reinforcing members.
- the end-support to comprise a double-layer brick wall, with the ends of the formwork section being supported on the operatively inner brick layer and the open- ended troughs being contained by the operatively outer brick layer.
- the system to include an optional external shoring system operatively supporting the formwork section at least whilst the filler material sets, operatively to provide a reinforced filler material support structure.
- the securing means to comprise at least one tie.
- the filler material to comprise concrete
- the ties to include rebar lengths extending through the trough sections.
- each formwork unit to comprise a set of two troughs each with a flat section extending from an operatively upper edge thereof, with the two trough and flat sections being longitudinally slidingly adjustable relative to each other, operatively to adjust the length of the formwork unit.
- the depth of the trough is also provided for the depth of the trough to be set as a multiple of standard height of a layer of brick and mortar, operatively to enable a selection of trough depth to match a desired number of rows of bricks and mortar between the flat section and the bottom of the trough, operatively to enable a formwork unit’s flat sections and trough to be supported in a brick wall.
- a further feature of the invention provides for the formwork section to be provided with a mid span support between the overlapping flat sections of adjoining formwork units and the reinforcing members extending above it, with the mid-span support comprising at least a plurality of spaced apart ties extending substantially in a line between the centre of the overlapping flat sections and the reinforcing members above it, operatively to support the mid span between the troughs of two adjoining formwork units from deflection under the weight of filler material.
- the formwork section to be provided with a mid-span support between the overlapping flat sections of adjoining formwork units and the reinforcing members extending above it, with the mid-span support including a brace having a set two legs with a connecting portion between them, with one leg located in each trough on the sides of the overlapping flat sections, and the connecting portion extending between the upper ends of the legs over the mid-span and below the reinforcing members extending above the overlapping flat sections of adjoining formwork units, and with the connecting portion being secured by means of a tie to the overlapping flat section below it, operatively to support the mid-span between the troughs of two adjoining formwork units from deflection under the weight of filler material.
- the mid-span support including a brace having a set two legs with a connecting portion between them, with one leg located in each trough on the sides of the overlapping flat sections, and the connecting portion extending between the upper ends of the legs over the mid-span and below the reinforc
- the formwork section to be provided with a mid-span support between the overlapping flat sections of adjoining formwork units and the reinforcing members extending above it, with the mid-span support comprising a strip of mesh arranged vertically to support the reinforcing members extending above the overlapping flat sections, and being secured by means of ties to the overlapping flat section below it, operatively to support the mid-spans between the troughs of adjoining formwork units from deflection under the weight of filler material.
- the support means to comprise one or more of scaffolding, props, or supports, alternatively self-spanning features of the formwork and support system.
- Figure 1 shows a cross section of a prior art concrete slab system consisting of “T” beams
- Figure 2 is a perspective view and sections of several embodiments of permanent formwork according to the invention.
- Figure 3 shows one important feature of the invention: the ability of the permanent formwork to telescope in and out along its length. A splice is shown;
- Figure 4a is an end view showing how telescoping the permanent formwork against a brick wall can create an effective mould for pouring concrete
- Figure 4b is a plan view of the permanent formwork shown in Fig 4a;
- Figure 5 shows how the permanent formwork can be adjusted in the width direction
- Figure 6 refers to an embodiment of the invention where the height of the permanent deck is dictated by the specific application in which it applied, in this case by the height of the bricks and mortar;
- Figure 7 shows several embodiments of how top steel mesh can be supported and correctly spaced, as well as be used to support the horizontal part of the permanent formwork deck. This support can be used to stiffen and“strap” several troughs together;
- Figure 8 shows several other embodiments of how to strengthen and stiffen the horizontal flat portion of the permanent formwork
- Figure 9 shows several embodiments of temporary shoring system.
- the system can be supported from the floor below, or itself suspended.
- the system can be made self-supporting in which case there is no need for shoring / support system;
- Figure 10 gives a way to make a beam which is stiffer and stronger part of the permanent formwork deck
- Figure 11 shows a way to make a down-stand beam and have a continuous concrete slab above it
- Figure 12 shows a way to make an up-stand beam and have it be continuous with the concrete slab
- Figure 13 shows two embodiments of a beam’s permanent formwork that requires shoring/support.
- Figure 14 shows several embodiments of a beam’s permanent formwork that is self- spanning and requires no shoring/support in its span.
- FIG. 1 A concrete slab constructed according to the prior art is shown in Figure 1.
- This slab (3) is made of concrete (1) in repeated T-forms (4).
- Reinforcing (2) is placed in the base of each T- form, and steel mesh (5) is embedded in the concrete (1) of the slab (3).
- the slab (3) has to be supported by shoring during curing of the concrete, and the slab requires formwork wihgtin which the reinforcing (2) and mesh (5), before concrete is cast into the formwork to fill it.
- the shape of the concrete slab (3) which incorporate the repeated T-form beams (4) is what is desired to be produced using the system of the invention.
- Preferred embodiments of the invention are described below with reference to Figures 2 to 14 and include dimensionally adjustable self-supporting permanent formwork and support systems, each comprising a formwork section with integral support means for the formwork section.
- Each formwork section comprises a plurality of formwork units, with each formwork unit comprising an elongate trough having at least one operatively upper edge from which a flat section extends.
- Each formwork unit is securable to an adjacent formwork unit, thus enabling a plurality of the formwork units to be secured together to create the formwork section.
- the formwork section provides a support surface for a spacer to support reinforcing spaced apart from an operatively upper surface of the formwork section.
- the securing means allows at least one of the reinforcing and the spacer to be secured to the formwork section.
- the formwork section upon being provided with an upstanding perimeter rim, is fillable with a filler material to fill the troughs to set around the reinforcing. This thus provides a self-supporting reinforced filler material permanent formwork and support system.
- An optional shoring system may be used to support the formwork section at least whilst the filler material sets.
- the permanent formwork in this invention can be made up of various repeated units made of folded, bent or rolled thin sheet metal pieces, or a mixture of such units.
- Figure 2(a) shows one embodiment of a fitted together and assembled permanent formwork made of several formwork units (100).
- Figure 2(b) shows various embodiments of the repeated units (100). Also shown in Figure 2(b- 5) is one embodiment that further separates the permanent formwork into a trough (101) and a flat section (102). The flat section can be corrugated as shown in Figure 2(b) to add stiffness to this section. These units, i.e. the trough (101) and flat section (102), can be mixed and matched or repeated as needed on the building site, as shown in Figure 2.
- the units can be clipped together via a lip and clip mechanism (105), or can be screwed, riveted, welded, spot welded, or crimped together (106).
- the lip and clip mechanism’s (105) main components are male and female parts that engage once pressed together.
- the lip-clip mechanism (105) can extend a portion or the full length of the permanent deck (the length of the deck is defined as perpendicular to the drawing in Figure 2(c)). Many embodiments of the lip-clip mechanism are possible.
- Figure 2(b-6) shows a stand-alone clip (1012) made of spring steel that clips the lips of the permanent formwork 101.
- a key aspect of the permanent formwork is its ability to be adjusted in one, two or three orthogonal directions: i.e. it is adjustable in the length and/or width and/or height directions.
- the adjustment in the length direction is achieved by inserting one length of the permanent formwork repeat unit (101) into another and telescoping the repeat unit in the length direction (201) to the desired length.
- Figure 3 shows one repeat unit being inserted into another.
- the inner unit has not been drawn to scale. In reality, the formwork is made of thin sheets and will lie snugly one within the other.
- the two (or more) repeat units are spliced together by means of screws, rivets, seam welding or spot welding, or crimping (202).
- Two repeat units can be spliced (210) together by a short portion of the repeat unit.
- the length adjustment (201) can be achieved by moving one or both pieces in the splice (210).
- the importance of the permanent formwork to be adjustable in the length direction is to extend the permanent formwork until both ends engage with either bricks, beams or other vertical structural members forming part of the structure. This engagement provides a good enough seal so that when concrete gets poured it is contained and does not pour out of the ends of the deck (100).
- FIG 4. The outer brick skin (1301) provides the concrete pour stop; the inner brick skin (1302) provides the end supports for the permanent formwork deck (100).
- the bottom of the trough (101) shown in Fig 4a rests on the top of the inner skin brick layer (1302) and abuts the inner surface of the outer skin brick layer (1301).
- the inner skin brick layer (1302) is completed to underneath the flat horizontal piece (102) to ensure the permanent formwork (100) is supported along its entire end (1303), as shown in Fig 4b.
- Adjustment in the width direction (301) is achieved by moving the troughs (101) one with respect to the other. This in turn is achieved by either having narrower horizontal pieces (102), or in one embodiment shown in Figure 5, the horizontal pieces (102) are shifted horizontally in the transverse width direction (301) and overlap a protruding lip (302). The overlap of part of the lip (302) can occur on either one edge or on both edges of the horizontal piece (102). None, one, or every repeat unit can be shifted in the width direction (301), one with respect to the other. Shifting many repeat units (100) with respect to each other can achieve a large increase in the overall width of the permanent formwork deck covering width.
- the repeat units are spliced together by means of screws, rivets, seam welding or spot welding, or crimping (304). Note that there is a balance between having each horizontal piece (102) adjustable in the width direction (301), which comes at a cost of difficulty of installation. In one embodiment there will be a mixture of un-adjustable repeat units (100) and adjustable horizontal pieces (102), to limit the impact of this.
- the width adjustment in the permanent formwork allows for wide tolerances in the building and support of the floor system.
- the width adjustment (301) obviates the necessity to “plug holes/areas” created by un-adjustable permanent formwork.
- the width adjustment by means of the moveable horizontal pieces (102) does not have to be constant along the length of the deck— as long as the flat section (102) rests on the lip/flange (302) and can be attached to it this will be sufficient to make the formwork effective.
- the vertical adjustment of the formwork (401) is achieved in the factory during the manufacturing process.
- the depth of the permanent formwork is dictated by the strength of the required reinforced concrete“T” beam’s strength and stiffness.
- the permanent formwork’s depth also determines the stiffness and strength of the formwork itself.
- the permanent formwork’s depth will be dictated by the type of construction. For example, if it is used with a brick wall support, then the depth of the formwork should be a multiple of the brick plus mortar height (402), as shown in Figure 6.
- Another key aspect of the present invention is to utilize the steel used as reinforcing in a typical reinforced concrete beam as a support system for the permanent steel formwork to support the wet concrete.
- the horizontal portion of the permanent formwork deck can be supported when it is carrying the wet concrete by the steel reinforcement as shown in Figure 7.
- Figure 7 shows several embodiments of the support of the mid span of the flat portion of the deck (102).
- the support is provided by the mesh (500) that is required in the concrete slab as reinforcing and for shrinkage and creep control, and as wear or durability reinforcing.
- the concrete reinforcement needs to be spaced away from the formwork by a spacer (501).
- a tie (502) picks up the mid-span of the deck (102).
- the mid-span of flat portion of the deck (102) will deflect down, engage the tie (502), and transfer the load to the mesh (500), which in turn will transfer the load to the spacers (501) and to the stiff vertical portions of the trough (101). This effectively reinforces the flat section (102) against vertical deflection under weight of the concrete.
- FIG. 7b Another embodiment, shown in Figure 7b, consists of a“stool” (510) which is supported by the troughs (101).
- the stool sized correctly, serves a second function: it positions the mesh (500) in the vertical direction (505) correctly (to engineer’s drawings).
- a modification to the stool is to change its shape to (515), as shown in Figure 7c.
- the stool is converted into a truss by connecting it to the mesh (500).
- Other configurations of the truss (515) are possible utilizing the stool as the mesh spacer and as one portion of the truss, while the steel mesh (500) is utilized as another portion of the truss.
- FIG. 1 Another embodiment of the support system of the span of the flat portion of the deck (100) is a vertical mesh (550) positioned vertically between the upper mesh (500) and the deck (102), as shown in Figure 7d.
- This mesh’s function is to:
- the vertical mesh (550) connects to the reinforced mesh (500) at spaced apart intervals in the horizontal direction (555).
- the reinforced mesh (500) stabilizes the vertical mesh (550).
- the vertical mesh (550) locates the horizontal mesh (500) accurately in the horizontal direction (555).
- the vertical mesh (550) can be bent into several profiles (570), shown edge on, schematically in Figure 6.
- the vertical mesh (550) can be attached to the deck at several points (503). Not shown in the drawing in Figure 7 is how the stool (510), vertical mesh (550) and other support systems for the horizontal mesh (500) are positioned into the page, i.e. along the length of the deck 100.
- the support systems can be perpendicular to the length of the trough (101) or at any angle to the trough (101), along the length of the trough.
- the stool leg (511) can extend along the length of the troughs (101); alternatively one leg (511) of the same stool can extend into the page, while the other out of the page, as shown in Figure 7b.
- the vertical mesh (550) will be spaced into the page in the embodiment shown in Figure 7d. Neighbouring vertical meshes (550) can be configured continuously or in a checker pattern.
- the vertical spacer (550) has to be a mesh with large enough apertures to allow concrete to flow and set through it. Although a solid spacer is possible, the concrete has to be able to bind to it strongly enough to have no discontinuity in the concrete.
- Figure 7e and 7e(i) also shows how the horizontal deck (102) can be folded and used as a spacer for the reinforcement mesh 500.
- the horizontal folded deck (102) can be the standard inverted box rib or IBR, or can be custom made into a unique shape.
- portions of the permanent formwork may be corrugated (700), as shown in Figure 8a, with the corrugation deep enough so as to render the formwork stiff enough not to need any support or aid to carry the wet concrete and construction loads.
- the corrugation is in the flat portion of the permanent formwork (102).
- the corrugation profile rests on the lips of the troughs (101) and the corrugations span from trough to trough.
- the corrugation flattens out at the lips/walls of the troughs to allow for fastening.
- the trough (101) and the horizontal corrugation piece (700) may be manufactured as one piece to form the repeat unit (100). It is also possible that the corrugation may be manufactured independently to the troughs and screwed to the lips of the troughs (101). The corrugation could be circular/sinusoidal, or folded into something similar to inverted box rib (IBR). The corrugated portion (700) can be manufactured in pieces for ease and lightness of installation with screws.
- the flat portion of the permanent formwork may be reinforced with horizontal bars (710), as shown in Figure 8b.
- the horizontal bars (710) are attached to the horizontal portion of the permanent formwork via connections (711) (e.g. ties, cable ties, wires, welding, etc.).
- the connectors (711) have to attach in the span (to pick up the wet concrete loads) and near the vertical portions of the troughs (101).
- Another aspect of the present invention is the temporary shoring system (800) used in conjunction with the permanent formwork, as shown in Figure 9.
- the temporary shoring system has to be positioned either underneath the splice area (210), or close to where the telescoping decks attach.
- the shoring (800) has to support the outermost permanent formwork deck (100).
- Several shoring systems (800) might be required in the long span of the permanent formwork.
- Figure 9b shows the temporary formwork in span (longitudinal direction) and the shoring system (800) is shown in Fig 9a in section— transverse to the long direction of the permanent formwork (100). It is important to note that the temporary shoring system (800) can support many troughs of (100).
- the shoring system (800) consists of a beam (801).
- the beam is made of two lipped channels back to back. This beam is supported by two or more props (805) along the beam length.
- the props have to be adjustable vertically (806) to support the permanent deck in a level or even pre-camber manner.
- the props are supported by the ground, a floor, a beam, or another support underneath.
- the shoring system (850) includes a set of braces () which are connected to a bottom bracket (855). At their other ends the braces () are each connected to a tube () which is provided with apertures proximate its open ends. Two adjacent sets of braces are connected to each other by means an inner tube (852) that is slidingly received with the open ends of the adjoining brace tubes (). The distance between two adjacent sets of braces () can be adjusted by telescopic movement of the inner tube () within the brace tubes (), in the width of the permanent formwork direction (301). The telescoping action is achieved via holes (851) with pegs placed through the two brace tubes ().
- the inner tube (852) forms part of the telescope.
- the shoring system includes a bottom chord (853), of which the length can be set by adjusting a nut on a threaded rod, by means of a turnbuckle, or by means of a ratcheting cable mechanism (for example as used in the transportation industry to secure tarpaulins on trucks). It is possible that the bottom chord may also be made of an inner pipe that is slidingly received within an outer pipe with holes and pegs, in a manner that is similar to the top chord (852) in construction.
- the permanent formwork troughs (101) be stiff enough to span their required distances without any shoring or support.
- Figure 9(c) shows how the troughs (101) can be made up of two lipped Z or C sections or purlins to form a steel structural section. The two steel sections can be clipped together, strapped together (178), bolted together or welded together. Each purlin can be light enough to be installed by only two men and assembled when on its supports. The main point is that no shoring or support is required in such instance.
- a key part of this invention is that the vertical troughs (101) can be moved very close to each other and attached together (106), as show in Figure 10.
- the beams (1000) can be highly reinforced and can thus be stiffer and stronger than the regular repeated unit (100) of the slab system. These beams (1000) can support more load. Further these beams (1000) form a continuous, same-thickness structure with the suspended slab system (100).
- a downward standing beam is shown in Figure 11.
- the beam (1000) which is stiffer and stronger than the ribs formed by the troughs (101), is shown. If the beam is too deep, and/or if it is on the edge, a strap (1010) can be attached to the lips of the beam via attachments (1006). In general the straps (1010) can be narrow to allow pouring of concrete.
- the beam (1000) interacts with the repeated floor formwork (100) as above.
- FIG. 12 An upstand-beam formwork is shown in Figure 12.
- the beam (1000) which is stiffer and stronger than the ribs formed by the troughs (101), is shown.
- Inserts such as wood, sheet metal
- (1100) are inserted into the regular trough (101).
- the insert might have to be attached (1106).
- the vertical inserts extend upwards, and are strapped together at the top via a strap (1110).
- the strap (1110) is narrow to allow for pouring and vibrating of concrete.
- the inserts and the straps can be one piece, or can be attached.
- the inner insert (1100) can be fenestrated (1115) in order to allow poured concrete in the (100) area to be continuous with the concrete in the upstanding beam (1000).
- a strap (1010) can be attached to the lips of the beam by means of attachments (1006). In general the straps (1010) can be narrow to allow pouring of concrete.
- the beam (1000) interacts with the repeated floor formwork (100) as above.
- the permanent formwork (2010) of the beam (2000) can be made of several pieces, or one piece (1001 in Figure 11).
- the pieces can be a top hat (2011) as (101) of the permanent slab formwork, channels (2012) (either straight or lipped) as is shown in Figure 13, or a Z-section (2013) (either straight or lipped) also shown in Figure 13.
- the pieces are connected together via any one or more of welding, screwing, bolting, riveting (2005).
- a strap(s) (2015) can be used to tie the two lips of (2012) or (2013) together.
- the strap (2015) is attached via any one or more of screws, welding, rivets, bolts (2005).
- the pieces that are outside the concrete can either be cut off, or bent towards the concrete beam. It is possible to have the lips of the top hat (2011) and the flanges of the channel (2012) directed into the concrete beam (2000) during the setup of the permanent formwork (2010).
- Figure 14 shows several embodiments of a stand-alone beam made up of thin sections (3020).
- the sections can be light enough as to be lifted into position by several men.
- the sections (3020) can be made of folded plate or be standard/custom made structural steel sections such as purlins.
- the various sections (3020) are bolted/riveted/welded screwed or attached (3106).
- the attachment can occur on site or in the factory. If each structural sub-component (3020) is lifted into position by hand the attachment will be made up in the air. In such a way a strong and stiff steel girder can be created.
- Such beams do not require shoring/support and can span appreciable distances. Reinforcing (3010) can be placed into the formed section.
- Concrete (3000) can be poured in; the concrete can then be vibrated from the inside or the outside.
- the concrete can be poured via fenestration in the section at the top flange(s).
- Pour stops made of thing metal sheet or wood (3027) can be added to the section to have concrete poured on top of the beams.
- the pour stops (3027) can be made telescoping in nature (length telescoping). Similar pour stops can be used on the ends of the beams.
- the beams can be designed as steel and reinforced concrete sections.
- the beams can support the permanent formwork deck (100).
- the features of the permanent formwork-deck can be introduced to the permanent formwork beams.
- the features of the permanent formwork beams can be introduced to the permanent formwork troughs (101).
- the construction loads can be carried only by the steel; the service loads can be carried either by the steel or by the steel and concrete beams. It is however not a requisite for the beams to be filled with concrete.
- the present invention can also be used to cast not only suspended slabs, staircases, but also beams.
- the beams can form part of the suspended slab/ staircase system, or be stand alone.
- a further advantage of the present invention is that the use of a permanent formwork to create effectively a permanent steel encased beam enables fire-proofing to be done much easier.
- the fire proofing of the steel beam may be done with bricks and mortar instead of expensive encasing methods or use of special and expensive paints, foams or chemicals.
- the use of bricks and mortar is easier and cheaper. It can be done by bricklayers, who would already be working on site, and using materials, which would also already be on site.
- the beam and the deck-trough permanent formwork can rest on masonry and steel support components. Spaces can be left open in the masonry to accommodate the permanent formwork deck-trough and/ or beam.
- the beams and deck- trough permanent formwork can be retrofitted to existing masonry walls by cutting fenestration opening in one of the skins of the masonry walls and resting the permanent formwork troughs/ beams on the created bottom ledges.
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
Abstract
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| ZA2020/05297A ZA202005297B (en) | 2017-11-27 | 2020-08-25 | Permanent formwork and support system |
Applications Claiming Priority (2)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| ZA2017/05242 | 2017-11-27 | ||
| ZA201705242 | 2017-11-27 |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| WO2019102438A1 true WO2019102438A1 (fr) | 2019-05-31 |
Family
ID=66630531
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| PCT/IB2018/059344 Ceased WO2019102438A1 (fr) | 2017-11-27 | 2018-11-27 | Coffrage perdu et système de support |
Country Status (2)
| Country | Link |
|---|---|
| WO (1) | WO2019102438A1 (fr) |
| ZA (1) | ZA202005297B (fr) |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN112064856A (zh) * | 2020-07-31 | 2020-12-11 | 浙江双友物流器械股份有限公司 | 一种吊顶预挂件及其建筑物的楼板结构 |
| JP2021042568A (ja) * | 2019-09-10 | 2021-03-18 | Vuild株式会社 | 型枠、建築物及び建築方法 |
Citations (9)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US3113402A (en) * | 1960-12-09 | 1963-12-10 | Donald H Butler | Slab construction |
| DE2503132A1 (de) * | 1975-01-27 | 1976-07-29 | Aloys Bastgen | Verbundelemente fuer stahlbeton oder andere erhaertungsmassen |
| JPH04149347A (ja) * | 1990-10-11 | 1992-05-22 | Ota Kizai Kk | デッキプレート用スペーサ |
| JP2004036292A (ja) * | 2002-07-05 | 2004-02-05 | Tm Giken Kk | 鉄筋コンクリート製仕切部材用間隔保持金具 |
| KR20100055759A (ko) * | 2008-11-18 | 2010-05-27 | 이창남 | 역삼각강선트러스와 박강판골데크 거푸집 바닥판 제조공법 |
| JP2010121271A (ja) * | 2008-11-17 | 2010-06-03 | Nikken Build:Kk | 鉄筋網用スペーサ、及びこれを用いた鉄筋網支持方法 |
| KR20150090659A (ko) * | 2014-01-29 | 2015-08-06 | 최완규 | 건축물의 콘크리트바닥 형성용 데크구조체 |
| WO2016183639A1 (fr) * | 2015-05-21 | 2016-11-24 | Lifting Point Pre-Form Pty Limited | Module pour structure |
| KR20160145261A (ko) * | 2015-06-09 | 2016-12-20 | (주)엔아이스틸 | 역삼각트러스와 배력근이 일체화된 합성골데크 |
-
2018
- 2018-11-27 WO PCT/IB2018/059344 patent/WO2019102438A1/fr not_active Ceased
-
2020
- 2020-08-25 ZA ZA2020/05297A patent/ZA202005297B/en unknown
Patent Citations (9)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US3113402A (en) * | 1960-12-09 | 1963-12-10 | Donald H Butler | Slab construction |
| DE2503132A1 (de) * | 1975-01-27 | 1976-07-29 | Aloys Bastgen | Verbundelemente fuer stahlbeton oder andere erhaertungsmassen |
| JPH04149347A (ja) * | 1990-10-11 | 1992-05-22 | Ota Kizai Kk | デッキプレート用スペーサ |
| JP2004036292A (ja) * | 2002-07-05 | 2004-02-05 | Tm Giken Kk | 鉄筋コンクリート製仕切部材用間隔保持金具 |
| JP2010121271A (ja) * | 2008-11-17 | 2010-06-03 | Nikken Build:Kk | 鉄筋網用スペーサ、及びこれを用いた鉄筋網支持方法 |
| KR20100055759A (ko) * | 2008-11-18 | 2010-05-27 | 이창남 | 역삼각강선트러스와 박강판골데크 거푸집 바닥판 제조공법 |
| KR20150090659A (ko) * | 2014-01-29 | 2015-08-06 | 최완규 | 건축물의 콘크리트바닥 형성용 데크구조체 |
| WO2016183639A1 (fr) * | 2015-05-21 | 2016-11-24 | Lifting Point Pre-Form Pty Limited | Module pour structure |
| KR20160145261A (ko) * | 2015-06-09 | 2016-12-20 | (주)엔아이스틸 | 역삼각트러스와 배력근이 일체화된 합성골데크 |
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2021042568A (ja) * | 2019-09-10 | 2021-03-18 | Vuild株式会社 | 型枠、建築物及び建築方法 |
| JP7270930B2 (ja) | 2019-09-10 | 2023-05-11 | Vuild株式会社 | 型枠、建築物及び建築方法 |
| CN112064856A (zh) * | 2020-07-31 | 2020-12-11 | 浙江双友物流器械股份有限公司 | 一种吊顶预挂件及其建筑物的楼板结构 |
Also Published As
| Publication number | Publication date |
|---|---|
| ZA202005297B (en) | 2024-08-28 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US11384527B2 (en) | Corrugated metal plate and overhead structure incorporating same | |
| US8919727B2 (en) | Elevated floor and ceiling slab formwork system | |
| GB2475138A (en) | Modular flooring panel | |
| US3276171A (en) | Self-supporting paneled structure and method of constructing same | |
| JP2017503942A (ja) | 双方向連続二重梁によって形成される三次元軽量鋼骨組 | |
| US6755001B2 (en) | Suspended concrete flooring system and method | |
| SG185132A1 (en) | A building structure | |
| KR20200104108A (ko) | 자립형 거푸집을 이용한 합벽 순타 시공용 무지주 거푸집 시스템 및 이의 시공 방법 | |
| EP0096118B1 (fr) | Bâtiment | |
| RU2552506C1 (ru) | Способ возведения монолитных конструкций зданий и несъёмная универсальная модульная опалубочная система | |
| KR20050054407A (ko) | ㄱ형강 콘크리트구조 | |
| KR20060011235A (ko) | 장스팬용 보강데크식 바닥 구조물 및 그 축조 방법 | |
| US20050066609A1 (en) | Preassembled roof and floor deck panel system | |
| US12421711B2 (en) | Method for using aerated autoclaved concrete in residential and commercial construction | |
| RU2484217C1 (ru) | Опалубка для монолитной железобетонной плиты перекрытия | |
| GB2534033A (en) | Casting concrete steps or stairs | |
| KR101056395B1 (ko) | 조립식 저류조 구조물 및 상기 저류조 구조물의 시공방법 | |
| RU2669635C1 (ru) | Опалубочный элемент сталежелезобетонных перекрытий | |
| EP1394330A1 (fr) | Structures de plancher composites | |
| RU2121047C1 (ru) | Способ ремонта перекрытий по металлическим балкам | |
| RU2756638C1 (ru) | Эксплуатируемая крыша | |
| RU2383692C1 (ru) | Стыковое соединение монолитного перекрытия с колонной | |
| WO2012108779A1 (fr) | Bâtiment et procédé de construction d'un bâtiment | |
| KR200366581Y1 (ko) | 장스팬용 보강데크식 바닥 구조물 | |
| GB2376478A (en) | A method of laying a suspended concrete floor |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| 121 | Ep: the epo has been informed by wipo that ep was designated in this application |
Ref document number: 18880358 Country of ref document: EP Kind code of ref document: A1 |
|
| DPE1 | Request for preliminary examination filed after expiration of 19th month from priority date (pct application filed from 20040101) | ||
| NENP | Non-entry into the national phase |
Ref country code: DE |
|
| 122 | Ep: pct application non-entry in european phase |
Ref document number: 18880358 Country of ref document: EP Kind code of ref document: A1 |
|
| 122 | Ep: pct application non-entry in european phase |
Ref document number: 18880358 Country of ref document: EP Kind code of ref document: A1 |
|
| 32PN | Ep: public notification in the ep bulletin as address of the adressee cannot be established |
Free format text: NOTING OF LOSS OF RIGHTS PURSUANT TO RULE 112(1) EPC (EPO FORM 1205 DATED 10.03.2021) |
|
| 122 | Ep: pct application non-entry in european phase |