WO2019203576A1 PCT/KR2019/004659 KR2019004659W WO2019203576A1 WO 2019203576 A1 WO2019203576 A1 WO 2019203576A1 KR 2019004659 W KR2019004659 W KR 2019004659W WO 2019203576 A1 WO2019203576 A1 WO 2019203576A1
Authority
WO
WIPO (PCT)
Prior art keywords
concrete
dismantling
bioprotective concrete
wall
power plant
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Ceased
Application number
PCT/KR2019/004659
Other languages
English (en)
French (fr)
Inventor
황석주
홍성훈
이미현
김천우
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Korea Hydro and Nuclear Power Co Ltd
Original Assignee
Korea Hydro and Nuclear Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Korea Hydro and Nuclear Power Co Ltd filed Critical Korea Hydro and Nuclear Power Co Ltd
Priority to US17/047,826 priority Critical patent/US11715573B2/en
Priority to EP19787622.0A priority patent/EP3783620A4/en
Priority to JP2020557149A priority patent/JP7052076B2/ja
Publication of WO2019203576A1 publication Critical patent/WO2019203576A1/ko
Anticipated expiration legal-status Critical
Ceased legal-status Critical Current

Links

Images

Classifications

    • G—PHYSICS
    • G21—NUCLEAR PHYSICS; NUCLEAR ENGINEERING
    • G21D—NUCLEAR POWER PLANT
    • G21D1/00—Details of nuclear power plant
    • G21D1/003—Nuclear facilities decommissioning arrangements
    • B—PERFORMING OPERATIONS; TRANSPORTING
    • B28—WORKING CEMENT, CLAY, OR STONE
    • B28D—WORKING STONE OR STONE-LIKE MATERIALS
    • B28D1/00—Working stone or stone-like materials, e.g. brick, concrete or glass, not provided for elsewhere; Machines, devices, tools therefor
    • B28D1/02—Working stone or stone-like materials, e.g. brick, concrete or glass, not provided for elsewhere; Machines, devices, tools therefor by sawing
    • B28D1/08—Working stone or stone-like materials, e.g. brick, concrete or glass, not provided for elsewhere; Machines, devices, tools therefor by sawing with saw-blades of endless cutter-type, e.g. chain saws, i.e. saw chains, strap saws
    • B28D1/088—Sawing in situ, e.g. stones from rocks, grooves in walls
    • G—PHYSICS
    • G21—NUCLEAR PHYSICS; NUCLEAR ENGINEERING
    • G21C—NUCLEAR REACTORS
    • G21C1/00—Reactor types
    • G21C1/04—Thermal reactors ; Epithermal reactors
    • G21C1/06—Heterogeneous reactors, i.e. in which fuel and moderator are separated
    • G21C1/08—Heterogeneous reactors, i.e. in which fuel and moderator are separated moderator being highly pressurised, e.g. boiling water reactor, integral super-heat reactor, pressurised water reactor
    • G21C1/086—Pressurised water reactors
    • G—PHYSICS
    • G21—NUCLEAR PHYSICS; NUCLEAR ENGINEERING
    • G21F—PROTECTION AGAINST X-RADIATION, GAMMA RADIATION, CORPUSCULAR RADIATION OR PARTICLE BOMBARDMENT; TREATING RADIOACTIVELY CONTAMINATED MATERIAL; DECONTAMINATION ARRANGEMENTS THEREFOR
    • G21F9/00—Treating radioactively contaminated material; Decontamination arrangements therefor
    • G21F9/28—Treating solids
    • G—PHYSICS
    • G21—NUCLEAR PHYSICS; NUCLEAR ENGINEERING
    • G21F—PROTECTION AGAINST X-RADIATION, GAMMA RADIATION, CORPUSCULAR RADIATION OR PARTICLE BOMBARDMENT; TREATING RADIOACTIVELY CONTAMINATED MATERIAL; DECONTAMINATION ARRANGEMENTS THEREFOR
    • G21F9/00—Treating radioactively contaminated material; Decontamination arrangements therefor
    • G21F9/28—Treating solids
    • G21F9/30—Processing
    • G—PHYSICS
    • G21—NUCLEAR PHYSICS; NUCLEAR ENGINEERING
    • G21C—NUCLEAR REACTORS
    • G21C17/00—Monitoring; Testing ; Maintaining
    • G21C17/10—Structural combination of fuel element, control rod, reactor core, or moderator structure with sensitive instruments, e.g. for measuring radioactivity, strain
    • G21C17/116—Passages or insulators, e.g. for electric cables
    • Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E30/00—Energy generation of nuclear origin
    • Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E30/00—Energy generation of nuclear origin
    • Y02E30/30—Nuclear fission reactors

Definitions

  • the present disclosure relates to a method of dismantling bioprotective concrete of a nuclear power plant, and more particularly, to a method of dismantling bioprotective concrete of a pressurized light-water reactor type nuclear power plant.
  • the pressurized water reactor (PWR) nuclear power plant commonly used in nuclear power generation is composed of a primary system for circulating a reactor, a secondary system for circulating a steam generator, and a tertiary system for circulating a condenser.
  • the primary system pressurizes the coolant in the reactor to maintain 150 atm and 300 ° C.
  • the coolant passes through the steam generator tubules and boils water on the steam generator to produce steam to run the turbine.
  • the steam from the turbine passes through the condenser and becomes water again and is sent to the steam generator.
  • the reactor of the pressurized light-water reactor-type nuclear power plant includes an outer vessel, a reactor vessel composed of a core barrel formed in a smaller diameter than the pressure vessel and installed at the center of the pressure vessel.
  • a core into which a nuclear fuel rod is charged is located in the core barrel, and a precipitation part, which is an annular space due to a diameter difference, is formed between the core barrel and the pressure vessel.
  • Leg a plurality of low temperature pipes connected to the pressure vessel to serve as circulation passages of the coolant, and high temperature pipes connected to the core barrel so that the heated coolant flows toward the steam generator while passing through the precipitation part and the core and flow through the low temperature pipes.
  • the pressurized water reactor-type nuclear power plant is a reinforced concrete structure for supporting a nuclear reactor and shielding neutrons to protect a worker from radiation exposure, and bioprotective concrete is installed.
  • Bioprotective concrete is a large cylindrical reinforced concrete structure formed by stacking a plurality of layers.Because bioprotective concrete is most heavily contaminated with radioactive materials, when dismantling a permanently stopped PWR nuclear power plant, Workers are likely to be exposed. When holes are formed in the bioprotective concrete to input the dismantling device to the bioprotective concrete, radioactive dust is generated, and thus there is a fear of radioactive exposure and movement of the radioactive dust. In addition, since the process of forming a hole in the bioprotective concrete is added, the dismantling process time is increased.
  • This embodiment relates to a method of dismantling bioprotective concrete of a nuclear power plant that can shorten the dismantling process time and minimize worker exposure.
  • Disassembling method of the bioprotective concrete of a nuclear power plant comprises the steps of disassembling the neutron sensing position adjuster installed in the bioprotective concrete surrounding the nuclear reactor to form a plurality of penetrations in the bioprotective concrete, cut into the plurality of penetrations Injecting a portion of the device, and using the cutting device may include the step of decomposing the bio-protective concrete into a plurality of sub-concrete.
  • the bioprotective concrete may have a cylindrical inner wall and a hexahedral outer wall, and the through part may extend from the cylindrical inner wall to the hexahedral outer wall.
  • the through portion may be smaller in diameter from the cylindrical inner wall to the hexahedral outer wall.
  • the neutron sensing position controller includes a neutron detector adjacent to the reactor, an external regulator for moving the neutron detector, and a connecting member connecting the neutron detector and the external controller to each other and penetrating the bioprotective concrete, Disassembling the neutron sensing position adjuster installed in the protective concrete includes the step of contacting the neutron detector to the inner wall of the bio-protective concrete using the external adjuster, cutting between the outer adjuster and the connecting member, and the connecting member Separating from the bio-protective concrete may include forming the through portion in the bio-protective concrete.
  • the neutron detection position adjuster may further include a transport unit installed below the neutron detector, and the neutron detector may be moved to the inner wall of the bioprotective concrete by using the transport unit.
  • the cutting device may comprise a wire saw.
  • the dismantling device without additional coring operation to the bio-protective concrete, by inserting the dismantling device into the penetrating portion of the neutron detection positioner installed inside the bio-protective concrete to proceed the cutting and dismantling process, there is no need for additional coring operation
  • the dismantling process time can be shortened.
  • FIG. 1 is a flowchart illustrating a method of dismantling bioprotective concrete of a nuclear power plant according to an embodiment.
  • FIG. 2 is a view illustrating a step of dismantling a nuclear reactor as a step of dismantling bioprotective concrete of a nuclear power plant according to an embodiment.
  • FIG. 3 is an enlarged view of a portion A of FIG. 2.
  • FIG. 4 is a plan view of FIG. 2.
  • FIG. 5 is a diagram illustrating a step of forming a penetration part in the bioprotective concrete by disassembling the neutron sensing position adjusting device from the bioprotective concrete as a next step of FIG. 2.
  • FIG. 6 is a view showing a step of cutting by inserting a cutting device into the penetrating portion of the bioprotective concrete as a next step of FIG.
  • FIG. 7 is a diagram illustrating bioprotective concrete decomposed according to a method of dismantling bioprotective concrete of a nuclear power plant according to an embodiment.
  • FIG. 1 is a flowchart of a method of dismantling bioprotective concrete of a nuclear power plant according to an embodiment
  • FIG. 2 is a step of dismantling bioprotective concrete of a nuclear power plant according to an embodiment, and illustrates a step of dismantling a nuclear reactor.
  • FIG. 1 is a flowchart of a method of dismantling bioprotective concrete of a nuclear power plant according to an embodiment
  • FIG. 2 is a step of dismantling bioprotective concrete of a nuclear power plant according to an embodiment, and illustrates a step of dismantling a nuclear reactor.
  • a reactor dismantling apparatus is introduced into the bioprotective concrete 200 to dismantle the reactor 100. (S10).
  • the neutron detector positioning device 300 installed in the bioprotective concrete 200 surrounding the reactor 100 is dismantled to form a plurality of through portions 210 in the bioprotective concrete 200. (S20).
  • FIG. 3 is an enlarged view of a portion A of FIG. 2, and FIG. 4 is a plan view of FIG. 2.
  • the plurality of neutron sensing position adjusters 300 may be installed in the bioprotective concrete 200. Specifically, it may be installed along four directions of the hexahedral shaped bioprotective concrete 200.
  • the neutron detection position controller 300 connects the neutron detector 310 adjacent to the reactor 100, the external controller 320 for moving the neutron detector 310, the neutron detector 310 and the external controller 320 to each other. It includes a connection member 330 penetrating the bioprotective concrete 200, and the transfer unit 340 installed on the lower portion of the neutron detector 310.
  • the neutron detector 310 is for measuring the neutrons of the reactor 100 and may be installed at the center of the reactor 100.
  • the external regulator 320 may be directly controlled by an operator outside the bioprotective concrete 200 or may use unmanned power.
  • connection member 330 is formed in a linear shape and may be smaller than the diameter of the through part 210 formed in the bioprotective concrete 200.
  • FIG. 5 is a diagram illustrating a step of forming a penetration part in the bioprotective concrete by disassembling the neutron sensing position controller from the bioprotective concrete as a next step of FIG. 2.
  • the bioprotective concrete 200 may have a cylindrical inner wall and a hexahedral outer wall.
  • Dismantling the neutron detection position controller 300 installed in the bio-protective concrete 200 is specifically as follows.
  • the neutron detector 310 is brought into close contact with the inner wall of the bioprotective concrete 200 using the external controller 320.
  • the neutron detector 310 may be moved to the inner wall of the bioprotective concrete 200 by using the transfer unit 340.
  • connection between the external regulator 320 and the connection member 330 is cut.
  • the connection to be cut may be located outside the bioprotective concrete 200.
  • various cutting tools may be used.
  • connection member 330 is separated from the bioprotective concrete 200 to form a penetrating portion 210 in the bioprotective concrete 200.
  • the neutron detector 310 connected to the connection member 330 may be disassembled from the bioprotective concrete 200 by moving upward from the inside of the bioprotective concrete 200.
  • the penetrating portion 210 may extend from the cylindrical inner wall to the hexahedral outer wall.
  • the through part 210 may have a smaller diameter from the cylindrical inner wall to the hexahedral outer wall.
  • the penetrating portion is formed in a step shape, but is not necessarily limited thereto, and may be formed in various shapes.
  • Decontamination apparatus for proceeding the decontamination process may be introduced into the bioprotective concrete (200).
  • the decontamination apparatus may comprise an inner wall hammering or a scabbler.
  • the inner wall hammering strikes the inner wall of the bioprotective concrete 200 to remove the radioactive waste 1 from the inner wall of the bioprotective concrete 200.
  • the scrubber scrapes the inner wall of the bioprotective concrete 200 to remove the radioactive waste 1 from the inner wall of the bioprotective concrete 200.
  • the inner wall hammering or scrabble has been described as an example of the decontamination apparatus, but is not necessarily limited thereto, and various apparatuses may be used as long as the apparatus is for removing the radioactive waste 1 from the inner wall of the bioprotective concrete 200. .
  • the bioprotective concrete 200 may be decomposed into a plurality of subconcrete.
  • FIG. 6 is a view showing a step of cutting by inserting a cutting device into the penetrating portion of the bioprotective concrete as a next step of FIG. 5,
  • FIG. 7 according to a method of dismantling bioprotective concrete of a nuclear power plant according to an embodiment. It is a figure which shows the disassembled bioprotective concrete.
  • the cutting device 400 may include a cutting part 410 that is introduced into the through part 210, a cutting control part 420 that controls the operation of the cutting part 410 and is connected to the cutting part 410. Since the penetrating portion 210 is smaller in diameter from the cylindrical inner wall to the hexahedral outer wall, the cutting portion 410 may be more easily introduced into the penetrating portion 210.
  • Such a cutting device 400 may comprise a wire saw.
  • a wire saw has been described as an example of a cutting device, but is not necessarily limited thereto, and various devices that may be inserted into the through part 210 may be applied.
  • the bioprotective concrete 200 is decomposed into a plurality of subconcrete 20 using the cutting device 400 (S40).
  • the bioprotective concrete 200 may be decomposed into a plurality of subconcrete 20 by the cutting line 21.
  • the dismantling device is put into the through part 210 formed in the bioprotective concrete 200 to proceed with the cutting and dismantling process.
  • the dismantling process can be shortened.

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • General Engineering & Computer Science (AREA)
  • High Energy & Nuclear Physics (AREA)
  • Plasma & Fusion (AREA)
  • Mining & Mineral Resources (AREA)
  • Mechanical Engineering (AREA)
  • Working Measures On Existing Buildindgs (AREA)
  • Measurement Of Radiation (AREA)

Abstract

일 실시예에 따른 원자력 발전소의 생체 보호 콘크리트의 해체 방법은 원자로를 둘러싸는 생체 보호 콘크리트에 설치된 중성자 감지 위치 조절기를 해체하여 상기 생체 보호 콘크리트에 복수개의 관통부를 형성하는 단계, 상기 복수개의 관통부로 절단 장치의 일부를 투입하는 단계, 그리고 상기 절단 장치를 이용하여 상기 생체 보호 콘크리트를 복수개의 서브 콘크리트로 분해하는 단계를 포함한다.

Description

가압 경수로형 원자력 발전소의 생체 보호 콘크리트의 해체 방법
본 개시는 원자력 발전소의 생체 보호 콘크리트의 해체 방법에 관한 것으로서, 보다 상세하게는 가압 경수로형 원자력 발전소의 생체 보호 콘크리트의 해체 방법에 관한 것이다.
전세계적으로 화석 에너지가 고갈됨에 따라, 주요한 에너지원으로서 원자력발전을 사용하고 있다. 이러한 원자력 발전에서 일반적으로 사용되는 가압 경수로형(Pressurized Water Reactor, PWR) 원자력 발전소는 원자로를 순환하는 1차 계통, 증기 발생기를 순환하는 2차 계통, 그리고 복수기를 순환하는 3차 계통으로 구성된다. 구체적으로 1차 계통에서는 원자로 속에 들어 있는 냉각재에 압력을 가해 150 기압 300℃ 정도를 유지하고, 2차 계통에서는 이 냉각재가 증기 발생기 세관을 통과하면서 증기 발생기 측의 물을 끓여 수증기를 만들어 터빈을 돌린다. 그리고, 3차 계통에서는 터빈을 돌리고 난 증기는 복수기를 통과하면서 다시 물이 되어 증기 발생기로 보낸다.
이러한 가압 경수로형 원자력 발전소의 원자로는 외부의 압력 용기, 압력 용기보다 작은 직경으로 형성되어 압력 용기의 중심에 설치되는 노심 베럴로 구성되는 원자로 용기를 포함한다. 노심 배럴의 내부에는 핵연료봉이 장입되는 노심(Core)이 위치하며, 노심 베럴과 압력 용기 사이에는 직경차이에 의한 고리형상의 공간인 강수부가 형성된다. 그리고, 압력 용기에 연결되어 냉각수의 순환통로가 되는 다수의 저온관과, 저온관을 통해 유입되어 강수부와 노심을 지나면서 가열된 냉각수가 증기 발생기쪽으로 흐르도록 노심 베럴에 연결되는 고온관(Hot Leg)을 포함한다.
이러한 가압 경수로형 원자력 발전소에는 원자로를 지지하고 중성자를 차폐하여 작업자의 방사선 피폭을 방어하기 위한 철근 콘크리트 구조물로서, 생체 보호 콘크리트가 설치된다.
생체 보호 콘크리트는 복수개의 층의 적층하여 형성된 대형의 원통형 철근 콘크리트 구조물로서, 생체 보호 콘크리트는 방사성 물질로 가장 심하게 오염되므로, 수명이 만료되어 영구 정지된 가압 경수로형(PWR) 원자력 발전소의 해체 시, 작업자가 피폭되기 쉽다. 해체 장치를 생체 보호 콘크리트에 투입하기 위해 생체 보호 콘크리트에 홀을 형성하는 경우에 방사성 분진이 발생되므로 방사성 피폭 및 방사성 분진의 이동 우려가 있다. 또한, 생체 보호 콘크리트에 홀을 형성하는 공정이 추가되므로, 해체 공정 시간이 증가하게 된다.
본 실시예는 해체 공정 시간을 단축하고 작업자의 피폭을 최소화할 수 있는 원자력 발전소의 생체 보호 콘크리트의 해체 방법에 관한 것이다.
일 실시예에 따른 원자력 발전소의 생체 보호 콘크리트의 해체 방법은 원자로를 둘러싸는 생체 보호 콘크리트에 설치된 중성자 감지 위치 조절기를 해체하여 상기 생체 보호 콘크리트에 복수개의 관통부를 형성하는 단계, 상기 복수개의 관통부로 절단 장치의 일부를 투입하는 단계, 그리고 상기 절단 장치를 이용하여 상기 생체 보호 콘크리트를 복수개의 서브 콘크리트로 분해하는 단계를 포함할 수 있다.
상기 생체 보호 콘크리트의 내부에 원자로 해체 장치를 투입하여 상기 원자로를 해체하는 단계를 더 포함할 수 있다.
상기 생체 보호 콘크리트는 원통형 내벽과 육면체형 외벽을 가지며, 상기 관통부는 상기 원통형 내벽으로부터 상기 육면체형 외벽까지 연장될 수 있다.
상기 관통부는 상기 원통형 내벽에서 상기 육면체형 외벽으로 갈수록 직경이 작아질 수 있다.
상기 중성자 감지 위치 조절기는 상기 원자로에 인접하는 중성자 감지기, 상기 중성자 감지기를 이동시키는 외부 조절기, 그리고 상기 중성자 감지기와 상기 외부 조절기를 서로 연결시키며 상기 생체 보호콘크리트를 관통하는 연결 부재를 포함하고, 상기 생체 보호 콘크리트에 설치된 중성자 감지 위치 조절기를 해체하는 단계는 상기 외부 조절기를 이용하여 상기 중성자 감지기를 상기 생체 보호 콘크리트 내벽에 밀착시키는 단계, 상기 외부 조절기와 상기 연결 부재 사이를 절단하는 단계, 그리고 상기 연결 부재를 상기 생체 보호 콘크리트로부터 분리하여 상기 생체 보호 콘크리트에 상기 관통부를 형성하는 단계를 포함할 수 있다.
상기 중성자 감지 위치 조절기는 상기 중성자 감지기 하부에 설치된 이송부를 더 포함하고, 상기 이송부를 이용하여 상기 중성자 감지기를 상기 생체 보호 콘크리트 내벽까지 이동시킬 수 있다.
상기 절단 장치는 와이어 쏘를 포함할 수 있다.
일 실시예에 따르면, 생체 보호 콘크리트에 추가 코어링 작업 없이, 생체 보호 콘크리트 내부에 설치된 중성자 감지 위치 조절기의 관통부로 해체 장치를 투입하여 절단 및 해체 공정을 진행함으로써, 별도의 코어링 작업이 없어도 되므로 해체 공정 시간을 단축시킬 수 있다.
또한, 별도의 코어링 작업이 없으므로 방사성 분진의 발생을 최소화시킬 수 있어 작업자의 피폭을 최소화할 수 있다.
도 1은 일 실시예에 따른 원자력 발전소의 생체 보호 콘크리트의 해체 방법의 순서도이다.
도 2는 일 실시예에 따른 원자력 발전소의 생체 보호 콘크리트의 해체 방법의 일 단계로서, 원자로를 해체하는 단계를 도시한 도면이다.
도 3은 도 2의 A 부분의 확대도이다.
도 4는 도 2의 평면도이다.
도 5는 도 2의 다음 단계로서, 중성자 감지 위치 조절 장치를 생체 보호 콘크리트로부터 분해하여 생체 보호 콘크리트에 관통부를 형성하는 단계를 도시한 도면이다.
도 6은 도 5의 다음 단계로서, 생체 보호 콘크리트의 관통부에 절단 장치를 투입하여 절단하는 단계를 도시한 도면이다.
도 7은 일 실시예에 따른 원자력 발전소의 생체 보호 콘크리트의 해체 방법에 따라 분해된 생체 보호 콘크리트를 도시한 도면이다.
이하, 첨부한 도면을 참고로 하여 본 발명의 여러 실시예들에 대하여 본 발명이 속하는 기술 분야에서 통상의 지식을 가진 자가 용이하게 실시할 수 있도록 상세히 설명한다. 본 발명은 여러 가지 상이한 형태로 구현될 수 있으며 여기에서 설명하는 실시예들에 한정되지 않는다.
본 발명을 명확하게 설명하기 위해서 설명과 관계없는 부분은 생략하였으며, 명세서 전체를 통하여 동일 또는 유사한 구성요소에 대해서는 동일한 참조 부호를 붙이도록 한다.
또한, 도면에서 나타난 각 구성의 크기 및 두께는 설명의 편의를 위해 임의로 나타내었으므로, 본 발명이 반드시 도시된 바에 한정되지 않는다.
도면에서 여러 층 및 영역을 명확하게 표현하기 위하여 두께를 확대하여 나타내었다. 그리고 도면에서, 설명의 편의를 위해, 일부 층 및 영역의 두께를 과장되게 나타내었다. 층, 막, 영역, 판 등의 부분이 다른 부분 "위에" 또는 "상에" 있다고 할 때, 이는 다른 부분 "바로 위에" 있는 경우뿐 아니라 그 중간에 또 다른 부분이 있는 경우도 포함한다.
또한, 명세서 전체에서, 어떤 부분이 어떤 구성요소를 "포함" 한다고 할 때, 이는 특별히 반대되는 기재가 없는 한 다른 구성요소를 제외하는 것이 아니라 다른 구성요소를 더 포함할 수 있는 것을 의미한다. 또한, 명세서 전체에서, "~상에"라 함은 대상 부분의 위 또는 아래에 위치함을 의미하는 것이며, 반드시 중력 방향을 기준으로 상 측에 위치하는 것을 의미하는 것은 아니다.
도 1은 일 실시예에 따른 원자력 발전소의 생체 보호 콘크리트의 해체 방법의 순서도이고, 도 2는 일 실시예에 따른 원자력 발전소의 생체 보호 콘크리트의 해체 방법의 일 단계로서, 원자로를 해체하는 단계를 도시한 도면이다.
도 1 및 도 2에 도시한 바와 같이, 일 실시예에 따른 원자력 발전소의 생체 보호 콘크리트의 해체 방법은 우선, 생체 보호 콘크리트(200)의 내부에 원자로 해체 장치를 투입하여 원자로(100)를 해체한다(S10).
다음으로, 원자로(100)를 둘러싸는 생체 보호 콘크리트(200)에 설치된 중성자 감지 위치 조절기(Neutron Detector Positioning Device)(300)를 해체하여 생체 보호 콘크리트(200)에 복수개의 관통부(210)를 형성한다(S20).
이하에서 중성자 감지 위치 조절기(300)의 구체적인 구조에 대해 상세히 설명한다.
도 3은 도 2의 A 부분의 확대도이고, 도 4는 도 2의 평면도이다.
도 2 내지 도 4에 도시한 바와 같이, 복수개의 중성자 감지 위치 조절기(300)는 생체 보호 콘크리트(200)에 설치될 수 있다. 구체적으로 육면체 형상의 생체 보호 콘크리트(200)의 4 방향을 따라 설치될 수 있다.
중성자 감지 위치 조절기(300)는 원자로(100)에 인접하는 중성자 감지기(310), 중성자 감지기(310)를 이동시키는 외부 조절기(320), 중성자 감지기(310)와 외부 조절기(320)를 서로 연결시키며 생체 보호 콘크리트(200)를 관통하는 연결 부재(330), 그리고, 중성자 감지기(310)의 하부에 설치된 이송부(340)를 포함한다.
중성자 감지기(310)는 원자로(100)의 중성자를 계측하기 위한 것으로서, 원자로(100)의 중심부(Belt-Line) 위치에 설치될 수 있다.
외부 조절기(320)는 생체 보호 콘크리트(200)의 외부에서 작업자가 직접 조절하거나, 무인 동력을 이용할 수 있다.
연결 부재(330)는 선형으로 형성되며, 생체 보호 콘크리트(200)에 형성되는 관통부(210)의 직경보다 작을 수 있다.
도 5는 도 2의 다음 단계로서, 중성자 감지 위치 조절기를 생체 보호 콘크리트로부터 분해하여 생체 보호 콘크리트에 관통부를 형성하는 단계를 도시한 도면이다.
생체 보호 콘크리트(200)는 원통형 내벽과 육면체형 외벽을 가질 수 있다.
이러한 생체 보호 콘크리트(200)에 설치된 중성자 감지 위치 조절기(300)를 해체하는 단계는 구체적으로 아래와 같다.
도 5에 도시한 바와 같이, 외부 조절기(320)를 이용하여 중성자 감지기(310)를 생체 보호 콘크리트(200) 내벽에 밀착시킨다. 이 때, 이송부(340)를 이용하여 중성자 감지기(310)를 생체 보호 콘크리트(200) 내벽까지 이동시킬 수 있다.
그리고, 외부 조절기(320)와 연결 부재(330) 사이의 연결부를 절단한다. 절단되는 연결부는 생체 보호 콘크리트(200)의 외부에 위치할 수 있다. 절단하는 장치는 다양한 절단 도구가 사용될 수 있다.
그리고, 연결 부재(330)를 생체 보호 콘크리트(200)로부터 분리하여 생체 보호 콘크리트(200)에 관통부(210)를 형성한다. 이 때, 연결 부재(330)에 연결된 중성자 감지기(310)는 생체 보호 콘크리트(200)의 내부에서 상부로 이동시켜 생체 보호 콘크리트(200)로부터 해체할 수 있다.
따라서, 관통부(210)는 원통형 내벽으로부터 육면체형 외벽까지 연장될 수 있다. 이러한 관통부(210)는 원통형 내벽에서 육면체형 외벽으로 갈수록 직경이 작아질 수 있다. 본 실시예에서는 관통부가 계단형으로 형성되어 있으나 반드시 이에 한정되는 것은 아니며, 다양한 형상으로 형성될 수 있다.
생체 보호 콘크리트(200)의 내벽은 방사성 물질로 심하게 오염되므로, 생체 보호 콘크리트(200) 내벽을 제염하는 공정이 추가될 수 있다. 제염 공정을 진행하기 위한 제염 장치(도시하지 않음)는 생체 보호 콘크리트(200)의 내부에 투입될 수 있다. 제염 장치는 내벽 해머링(hammering) 또는 스캐블러(scabbler)를 포함할 수 있다. 내벽 해머링은 생체 보호 콘크리트(200)의 내벽을 타격하여 생체 보호 콘크리트(200)의 내벽으로부터 방사성 폐기물(1)을 제거한다. 그리고, 스캐블러는 생체 보호 콘크리트(200)의 내벽을 긁어서 생체 보호 콘크리트(200)의 내벽으로부터 방사성 폐기물(1)을 제거한다. 본 실시예에서는 제염 장치의 예로서 내벽 해머링 또는 스캐블러를 설명하였으나, 반드시 이에 한정되는 것은 아니며, 생체 보호 콘크리트(200)의 내벽으로부터 방사성 폐기물(1)을 제거하기 위한 장치라면 다양한 장치가 가능하다.
제염 공정이 완료된 후에 생체 보호 콘크리트(200)를 복수개의 서브 콘크리트로 분해할 수 있다.
도 6은 도 5의 다음 단계로서, 생체 보호 콘크리트의 관통부에 절단 장치를 투입하여 절단하는 단계를 도시한 도면이고, 도 7은 일 실시예에 따른 원자력 발전소의 생체 보호 콘크리트의 해체 방법에 따라 분해된 생체 보호 콘크리트를 도시한 도면이다.
도 6에 도시한 바와 같이, 복수개의 관통부(210)로 절단 장치(400)의 일부를 투입한다(S30). 이러한 절단 장치(400)는 관통부(210)로 투입되는 절단부(410), 절단부(410)의 동작을 조절하며 절단부(410)에 연결되는 절단 조절부(420)를 포함할 수 있다. 관통부(210)는 원통형 내벽에서 육면체형 외벽으로 갈수록 직경이 작아지므로, 절단부(410)는 보다 용이하게 관통부(210)로 투입될 수 있다
이러한 절단 장치(400)는 와이어 쏘(wire saw)를 포함할 수 있다. 본 실시예에서는 절단 장치의 예로 와이어 쏘를 설명하였으나, 반드시 이에 한정되는 것은 아니며, 관통부(210)로 투입될 수 있는 다양한 장치가 적용 가능하다.
다음으로, 도 7에 도시한 바와 같이, 절단 장치(400)를 이용하여 생체 보호 콘크리트(200)를 복수개의 서브 콘크리트(20)로 분해한다(S40). 생체 보호 콘크리트(200)는 절단선(21)에 의해 복수개의 서브 콘크리트(20)로 분해될 수 있다.
이와 같이, 생체 보호 콘크리트(200)에 추가 코어링 작업 없이, 중성자 감지 위치 조절기를 해체하여 생체 보호 콘크리트(200) 내부에 형성된 관통부(210)로 해체 장치를 투입하여 절단 및 해체 공정을 진행함으로써, 별도의 코어링 작업이 없어도 되므로 해체 공정 시간을 단축시킬 수 있다.
또한, 별도의 코어링 작업이 없으므로 방사성 분진의 발생을 최소화시킬 수 있어 작업자의 피폭을 최소화할 수 있다.
본 개시를 앞서 기재한 바에 따라 바람직한 실시예를 통해 설명하였지만, 본 발명은 이에 한정되지 않으며 다음에 기재하는 특허청구범위의 범위를 벗어나지 않는 한, 다양한 수정 및 변형이 가능하다는 것을 본 발명이 속하는 기술 분야에 종사하는 자들은 쉽게 이해할 것이다.

Claims (7)

  1. 원자로를 둘러싸는 생체 보호 콘크리트에 설치된 중성자 감지 위치 조절기를 해체하여 상기 생체 보호 콘크리트에 복수개의 관통부를 형성하는 단계,
    상기 복수개의 관통부로 절단 장치의 일부를 투입하는 단계, 그리고
    상기 절단 장치를 이용하여 상기 생체 보호 콘크리트를 복수개의 서브 콘크리트로 분해하는 단계
    를 포함하는 원자력 발전소의 생체 보호 콘크리트의 해체 방법.
  2. 제1항에서,
    상기 생체 보호 콘크리트의 내부에 원자로 해체 장치를 투입하여 상기 원자로를 해체하는 단계를 더 포함하는 원자력 발전소의 생체 보호 콘크리트의 해체 방법.
  3. 제1항에서,
    상기 생체 보호 콘크리트는 원통형 내벽과 육면체형 외벽을 가지며, 상기 관통부는 상기 원통형 내벽으로부터 상기 육면체형 외벽까지 연장되는 원자력 발전소의 생체 보호 콘크리트의 해체 방법.
  4. 제3항에서,
    상기 관통부는 상기 원통형 내벽에서 상기 육면체형 외벽으로 갈수록 직경이 작아지는 원자력 발전소의 생체 보호 콘크리트의 해체 방법.
  5. 제1항에서,
    상기 중성자 감지 위치 조절기는
    상기 원자로에 인접하는 중성자 감지기,
    상기 중성자 감지기를 이동시키는 외부 조절기, 그리고
    상기 중성자 감지기와 상기 외부 조절기를 서로 연결시키며 상기 생체 보호콘크리트를 관통하는 연결 부재를 포함하고,
    상기 생체 보호 콘크리트에 설치된 중성자 감지 위치 조절기를 해체하는 단계는
    상기 외부 조절기를 이용하여 상기 중성자 감지기를 상기 생체 보호 콘크리트 내벽에 밀착시키는 단계,
    상기 외부 조절기와 상기 연결 부재 사이를 절단하는 단계, 그리고
    상기 연결 부재를 상기 생체 보호 콘크리트로부터 분리하여 상기 생체 보호 콘크리트에 상기 관통부를 형성하는 단계
    를 포함하는 원자력 발전소의 생체 보호 콘크리트의 해체 방법.
  6. 제5항에서,
    상기 중성자 감지 위치 조절기는 상기 중성자 감지기 하부에 설치된 이송부를 더 포함하고,
    상기 이송부를 이용하여 상기 중성자 감지기를 상기 생체 보호 콘크리트 내벽까지 이동시키는 원자력 발전소의 생체 보호 콘크리트의 해체 방법.
  7. 제1항에서,
    상기 절단 장치는 와이어 쏘를 포함하는 원자력 발전소의 생체 보호 콘크리트의 해체 방법.
PCT/KR2019/004659 2018-04-17 2019-04-17 가압 경수로형 원자력 발전소의 생체 보호 콘크리트의 해체 방법 Ceased WO2019203576A1 (ko)

Priority Applications (3)

Application Number Priority Date Filing Date Title
US17/047,826 US11715573B2 (en) 2018-04-17 2019-04-17 Decommissioning method of biodegradable concrete of PWR type nuclear power plant
EP19787622.0A EP3783620A4 (en) 2018-04-17 2019-04-17 PROCESS FOR DISMANTLING BIOLOGICAL PROTECTIVE CONCRETE IN A PRESSURIZED WATER REACTOR TYPE NUCLEAR POWER PLANT
JP2020557149A JP7052076B2 (ja) 2018-04-17 2019-04-17 加圧軽水炉型原子力発電所の生体保護コンクリートの解体方法

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
KR10-2018-0044579 2018-04-17
KR1020180044579A KR102061286B1 (ko) 2018-04-17 2018-04-17 가압 경수로형 원자력 발전소의 생체 보호 콘크리트의 해체 방법

Publications (1)

Publication Number Publication Date
WO2019203576A1 true WO2019203576A1 (ko) 2019-10-24

Family

ID=68238985

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/KR2019/004659 Ceased WO2019203576A1 (ko) 2018-04-17 2019-04-17 가압 경수로형 원자력 발전소의 생체 보호 콘크리트의 해체 방법

Country Status (5)

Country Link
US (1) US11715573B2 (ko)
EP (1) EP3783620A4 (ko)
JP (1) JP7052076B2 (ko)
KR (1) KR102061286B1 (ko)
WO (1) WO2019203576A1 (ko)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101942997B1 (ko) * 2018-07-27 2019-01-28 한국원자력연구원 원전 방사화 구조물 제거 방법
KR102592766B1 (ko) 2021-07-16 2023-10-20 한국수력원자력 주식회사 원자력 발전소 전열관 세정시스템 및 방법
CN118881208B (zh) * 2024-09-23 2024-12-17 上海建工四建集团有限公司 一种既有混凝土构件的临时支撑拆除方法

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5923298A (ja) * 1982-07-30 1984-02-06 清水建設株式会社 原子炉配管切断方法
JPH04158297A (ja) * 1990-10-22 1992-06-01 Takenaka Komuten Co Ltd 原子炉生体遮蔽体構造物における放射化部分の大ブロック化切取り方法
JPH05196797A (ja) * 1992-01-22 1993-08-06 Shimizu Corp 原子力施設における生体遮蔽壁の解体方法
JPH08194097A (ja) * 1995-01-18 1996-07-30 Toshiba Eng Co Ltd 原子炉遮蔽壁の切断装置及び切断方法
JP2005083923A (ja) * 2003-09-09 2005-03-31 Ohbayashi Corp 生体遮蔽壁の解体方法

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6117696A (ja) 1984-07-05 1986-01-25 株式会社大林組 地下坑道の構築工法
JPS6117696U (ja) * 1984-07-06 1986-02-01 三菱重工業株式会社 炉外中性子束検出器の保持装置
JP2969222B2 (ja) * 1990-06-07 1999-11-02 清水建設株式会社 原子炉の生体遮蔽コンクリート壁の解体装置および原子炉の生体遮蔽コンクリート壁の解体工法
FR2707418B1 (fr) * 1993-07-07 1995-09-22 Framatome Sa Dispositif d'extraction et d'évacuation d'un doigt de gant de mesure de paramètres dans le cÓoeur d'un réacteur nucléaire.
US9268043B2 (en) 2012-09-27 2016-02-23 Alexander DeVolpi Radiation-monitoring system with correlated hodoscopes
FR3038444B1 (fr) * 2015-06-30 2017-08-11 Soc Technique Pour L'energie Atomique Assemblage de penetration electrique de cuve d'un reacteur nucleaire

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5923298A (ja) * 1982-07-30 1984-02-06 清水建設株式会社 原子炉配管切断方法
JPH04158297A (ja) * 1990-10-22 1992-06-01 Takenaka Komuten Co Ltd 原子炉生体遮蔽体構造物における放射化部分の大ブロック化切取り方法
JPH05196797A (ja) * 1992-01-22 1993-08-06 Shimizu Corp 原子力施設における生体遮蔽壁の解体方法
JPH08194097A (ja) * 1995-01-18 1996-07-30 Toshiba Eng Co Ltd 原子炉遮蔽壁の切断装置及び切断方法
JP2005083923A (ja) * 2003-09-09 2005-03-31 Ohbayashi Corp 生体遮蔽壁の解体方法

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
See also references of EP3783620A4 *

Also Published As

Publication number Publication date
US20210158981A1 (en) 2021-05-27
KR102061286B1 (ko) 2019-12-31
KR20190121078A (ko) 2019-10-25
JP7052076B2 (ja) 2022-04-11
JP2021518911A (ja) 2021-08-05
EP3783620A4 (en) 2022-01-05
US11715573B2 (en) 2023-08-01
EP3783620A1 (en) 2021-02-24

Similar Documents

Publication Publication Date Title
JP3121077B2 (ja) 加圧水型原子炉における炉心計装装置
US20250364149A1 (en) Dismantling and decontamination system and method of bioprotective concrete of pwr type nuclear power plant
KR102061286B1 (ko) 가압 경수로형 원자력 발전소의 생체 보호 콘크리트의 해체 방법
WO2020166945A1 (ko) 중수로 시설의 방사화 구조물 해체 방법
Kershaw et al. Design development for the beam dump facility target complex at CERN
WO2018232526A1 (en) Calandria tube insert release and removal tool and method
KR102035852B1 (ko) 가압 경수로형 원자력 발전소의 생체 보호 콘크리트의 해체 방법
WO2020009476A1 (ko) 원자로의 해체 시스템
JPH0727066B2 (ja) 放射線源用、特に原子炉用の吸収ケーシング及びその使用方法
US9543047B2 (en) System and method for storing fresh and irradiated nuclear fuel
WO2019203578A1 (ko) 원자력 시설의 해체 방법
Cheng et al. Development and Application of High Temperature and Radiation Protection Equipment for Spent Fuel Dry Storage System
WO2019203582A1 (ko) 원자력 시설의 해체 방법
Möslang et al. Overview of the IFMIF test facility
Van den Eynde et al. Progress of the MYRRHA ADS Project in Belgium
Kim et al. A Study on Methods to Prevent Contamination From Spreading When Dismantling Calandria Vessel in PHWR NPPs
Cross et al. Progress in the development of tooling and dismantling methodologies for the Windscale advanced gas cooled reactor (WAGR)
WO2019203581A1 (ko) 원자력 시설의 해체 방법
Rupani et al. Improvement of lifetime availability through design, inspection, repair and replacement of coolant channels of Indian Pressurized Heavy Water Reactors
Ryazantsev et al. The first results of the research reactor MR decommissioning
Guillou et al. Preliminary basic design of astrid hot cells
Kishimoto et al. Decommissioning activity of phase 2 in JRR-2
Kishimoto et al. Decommissioning plan and current status of JRR-2
Matsui et al. Irradiation–coupling techniques using JMTR and another facility
WO2020060331A1 (ko) 중수로용 차폐 슬랩의 분리 장치

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 19787622

Country of ref document: EP

Kind code of ref document: A1

ENP Entry into the national phase

Ref document number: 2020557149

Country of ref document: JP

Kind code of ref document: A

NENP Non-entry into the national phase

Ref country code: DE

ENP Entry into the national phase

Ref document number: 2019787622

Country of ref document: EP

Effective date: 20201117