- Publication number
- WO2024014255A1 WO2024014255A1 PCT/JP2023/023181 JP2023023181W WO2024014255A1 WO 2024014255 A1 WO2024014255 A1 WO 2024014255A1 JP 2023023181 W JP2023023181 W JP 2023023181W WO 2024014255 A1 WO2024014255 A1 WO 2024014255A1
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- power generation
- amount
- processor
- abnormality
- actual value
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Ceased
Links
Images
Classifications
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02S—GENERATION OF ELECTRIC POWER BY CONVERSION OF INFRARED RADIATION, VISIBLE LIGHT OR ULTRAVIOLET LIGHT, e.g. USING PHOTOVOLTAIC [PV] MODULES
- H02S50/00—Monitoring or testing of PV systems, e.g. load balancing or fault identification
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B23/00—Testing or monitoring of control systems or parts thereof
- G05B23/02—Electric testing or monitoring
-
- G—PHYSICS
- G06—COMPUTING OR CALCULATING; COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/04—Forecasting or optimisation specially adapted for administrative or management purposes, e.g. linear programming or "cutting stock problem"
-
- G—PHYSICS
- G06—COMPUTING OR CALCULATING; COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
-
- G—PHYSICS
- G06—COMPUTING OR CALCULATING; COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/06—Energy or water supply
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—ELECTRIC POWER NETWORKS; CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J13/00—Circuit arrangements for providing remote monitoring or remote control of equipment in a power distribution network
- H02J13/12—Monitoring network conditions, e.g. electrical magnitudes or operational status
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—ELECTRIC POWER NETWORKS; CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for AC mains or AC distribution networks
- H02J3/001—Arrangements for handling faults or abnormalities, e.g. emergencies or contingencies
- H02J3/0012—Arrangements for handling faults or abnormalities, e.g. emergencies or contingencies characterised by the contingency detection means in AC networks, e.g. using phasor measurement units [PMU], synchrophasors or contingency analysis
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—ELECTRIC POWER NETWORKS; CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for AC mains or AC distribution networks
- H02J3/38—Arrangements for feeding a single network from two or more generators or sources in parallel; Arrangements for feeding already energised networks from additional generators or sources in parallel
- H02J3/381—Dispersed generators
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—ELECTRIC POWER NETWORKS; CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J2101/00—Supply or distribution of decentralised, dispersed or local electric power generation
- H02J2101/20—Dispersed power generation using renewable energy sources
- H02J2101/22—Solar energy
- H02J2101/24—Photovoltaics
Definitions
- the present invention relates to an operational system and a program.
- solar power generation equipment detects abnormal solar power generation equipment by collecting and comparing data on power generation from multiple solar power generation equipment installed in areas where the amount of solar radiation is considered to be the same.
- technologies related to management systems see, for example, Patent Document 1).
- Patent Document 1 it is possible to detect abnormal solar power generation equipment. However, the method of Document 1 does not reveal the cause of the abnormality. Furthermore, it is unclear how much loss will be caused by an abnormality.
- the present invention was made in view of this situation, and its purpose is to estimate the occurrence of abnormality in power generation equipment. Another object of the present invention is to estimate the loss due to the abnormality.
- a power generation equipment operation system includes: an acquisition unit that acquires the actual value of the power generation amount of the power generation equipment; an estimation unit that estimates the occurrence of the abnormal event using the actual value based on the characteristics of the amount of power generation corresponding to a predetermined abnormal event occurring in the power generation equipment; a power generation amount estimating unit that calculates an estimated value of the power generation amount of the power generation equipment if the abnormal event had not occurred; a loss estimation unit that estimates a loss amount due to the abnormal event by comparing the actual value and the estimated value; Equipped with
- the present invention can estimate the occurrence of an abnormality in power generation equipment. Furthermore, the present invention can estimate the loss due to the abnormality.
- FIG. 1 is a block diagram illustrating an example of an operational system according to an embodiment and a main configuration of components included in the operational system.
- 2 is a flowchart showing an example of processing by a processor of the operation device in FIG. 1.
- FIG. 2 is a flowchart showing an example of processing by a processor of the terminal device in FIG. 1.
- FIG. 1 is a block diagram illustrating an example of the main configuration of an operational system 1 and components included in the operational system 1 according to the embodiment.
- the operation system 1 is a system that operates the power generation equipment 200.
- the operation system 1 is capable of detecting when an abnormality occurs in the power generation equipment 200.
- the operation system 1 includes, as an example, an operation device 100, a power generation facility 200, and a terminal device 300.
- the operation system 1 typically includes a plurality of power generation facilities 200 and a plurality of terminal devices 300.
- the number of each device included in the operational system 1 is not limited.
- the operation device 100, power generation equipment 200, and terminal device 300 are connected to the network NW.
- the network NW is typically a communication network including the Internet.
- the network NW is typically a communication network including a WAN (wide area network).
- the network NW may be a communication network including a private network such as an intranet.
- the network NW may be a communication network including a LAN (local area network).
- the network NW may be a wireless line or a wired line, or may include a mixture of wireless lines and wired lines.
- the network NW may be a communication network including a leased line or a public mobile phone network.
- the operation device 100 is a device that operates the power generation equipment 200.
- the operation device 100 is, for example, a server device. Alternatively, the operation device 100 may be a PC (personal computer) or the like.
- the operation device 100 may consist of a plurality of devices.
- the operation device 100 is capable of detecting when an abnormality occurs in the power generation equipment 200.
- the operation device 100 includes, for example, a processor 101, a ROM (read-only memory) 102, a RAM (random-access memory) 103, an auxiliary storage device 104, an input device 105, a display device 106, and a communication interface 107.
- a bus 108 or the like connects these parts.
- the processor 101 is a central part of a computer that performs processing such as calculations and control necessary for the operation of the operation device 100, and performs various calculations and processing.
- the processor 101 is, for example, a CPU (central processing unit), MPU (micro processing unit), SoC (system on a chip), DSP (digital signal processor), GPU (graphics processing unit), ASIC (application specific integrated circuit), These include a PLD (programmable logic device) or an FPGA (field-programmable gate array).
- processor 101 is a combination of more than one of these.
- the processor 101 may be a combination of these and a hardware accelerator.
- the processor 101 controls each unit to realize various functions of the operation device 100 based on programs such as firmware, system software, and application software stored in the ROM 102 or the auxiliary storage device 104. Furthermore, the processor 101 executes processing to be described later based on the program. Note that part or all of the program may be incorporated into the circuit of the processor 101.
- ROM 102 and RAM 103 are main storage devices of a computer with processor 101 at its core.
- the ROM 102 is a nonvolatile memory used exclusively for reading data.
- the ROM 102 stores, for example, firmware among the above programs.
- the ROM 102 also stores data used by the processor 101 to perform various processes.
- RAM 103 is a memory used for reading and writing data.
- the RAM 103 is used as a work area for storing data temporarily used by the processor 101 to perform various processes.
- RAM 103 is typically volatile memory.
- the auxiliary storage device 104 is an auxiliary storage device of a computer with the processor 101 at its core.
- the auxiliary storage device 104 is, for example, an EEPROM (electric erasable programmable read-only memory), an HDD (hard disk drive), or a flash memory.
- the auxiliary storage device 104 stores, for example, system software and application software among the above programs. Further, the auxiliary storage device 104 stores data used by the processor 101 to perform various processes, data generated by processing by the processor 101, various setting values, and the like.
- the input device 105 accepts operations by the operator of the operation device 100.
- Input device 105 is, for example, a keyboard, keypad, touch pad, mouse, or controller.
- the input device 105 may be a device for voice input.
- the display device 106 displays a screen for notifying the operator of the operation device 100 of various information.
- the display device 106 is, for example, a display such as a liquid crystal display or an organic EL (electro-luminescence) display.
- a touch panel can also be used as the input device 105 and the display device 106. That is, the display panel included in the touch panel can be used as the display device 106, and the pointing device provided in the touch panel that performs touch input can be used as the input device 105.
- the communication interface 107 is an interface for the operation device 100 to communicate via the network NW or the like.
- the bus 108 includes a control bus, an address bus, a data bus, etc., and transmits signals sent and received by each part of the operation device 100.
- the power generation equipment 200 is equipment for performing solar power generation.
- the power generation equipment 200 includes, for example, a PCS (power conditioning subsystem) 201, a solar panel 202, a measuring device 203, a sensor 204, and a camera 205.
- Power generation equipment 200 typically includes a plurality of solar panels 202.
- the numbers of PCS 201, solar panels 202, measuring devices 203, sensors 204, and cameras 205 included in one power generation facility 200 are not limited. Note that at least one of the measuring device 203, the sensor 204, and the camera 205 may be located outside the power generation facility 200.
- the PCS 201 has a function of converting power generated by the connected solar panel 202 from direct current to alternating current.
- the PCS 201 has a function of outputting power generated by the connected solar panel 202 to a predetermined electrical system.
- the predetermined electrical system includes an electrical system for selling electricity, an electrical system for private use, and the like.
- the PCS 201 has a function of controlling the connected solar panel 202.
- the PCS 201 has a function of suppressing output.
- Output curtailment is a method by which electric power companies remotely control power generation equipment to reduce power generation output in order to maintain the balance between power supply and demand, and to limit the connection of solar power generation equipment and other equipment to the power grid.
- the PCS 201 has a function of measuring and storing various information about the connected solar panel 202.
- the various information includes, for example, various actual values (measured values) such as power generation amount and power generation output.
- the PCS 201 measures and stores various performance values at predetermined time intervals.
- the PCS 201 has a communication function.
- the PCS 201 connects to the network NW.
- the PCS 201 communicates with each device via the network NW.
- the solar panel 202 generates electricity by converting light such as sunlight into electricity.
- the measuring device 203 collects data measured by each sensor 204 and images captured by the camera 205. For this purpose, the measuring device 203 acquires measurement data from each sensor 204 and an image from the camera 205. Furthermore, the measurement device 203 inputs the collected measurement data and images to the PCS 201. The measuring device 230 may acquire various measurement data from an external device other than the sensor 204. Note that the PCS 201 may also serve as the measuring device 203.
- the measuring device 203 connects to the network NW. The measuring device 203 communicates with each device via the network NW.
- the sensor 204 measures various data. The sensor 204 then outputs the measured data.
- the sensor 204 is installed, for example, at a location where the solar panel 202 is installed.
- the data measured by the sensor 204 includes, for example, temperature, humidity, precipitation, snowfall, snowfall, sunshine hours, solar radiation, cloud cover, wind direction, wind speed, and weather. Therefore, the sensors 204 include, for example, a thermometer, a hygrometer, a rain gauge, a snow gauge, a snow gauge, a solar ray gauge, a pyranometer, a cloud gauge, a wind vane, an anemometer, a sensor for determining weather, and the like.
- the camera 205 photographs an image. Further, the camera 205 outputs captured image data. Camera 205 photographs a range including solar panel 202 .
- Camera 205 may be a surveillance camera.
- the camera 205 may be a camera capable of photographing infrared rays. Note that a moving image is a type of image.
- the terminal device 300 is a terminal used by the administrator of the power generation facility 200 and the like.
- the terminal device 300 is, for example, a smart phone, a tablet terminal, a PC, or a digital signage.
- Terminal device 300 includes, for example, a processor 301, ROM 302, RAM 303, auxiliary storage device 304, communication interface 305, input device 306, and display device 307.
- a bus 308 or the like connects these parts.
- the processor 301 is a central part of a computer that performs processing such as calculations and control necessary for the operation of the terminal device 300, and performs various calculations and processing.
- the processor 301 is, for example, a CPU, MPU, SoC, DSP, GPU, ASIC, PLD, or FPGA.
- processor 301 is a combination of more than one of these.
- the processor 301 may be a combination of these and a hardware accelerator.
- the processor 301 controls each part of the terminal device 300 to realize various functions based on programs such as firmware, system software, and application software stored in the ROM 302 or the auxiliary storage device 304. Further, the processor 301 executes processing to be described later based on the program. Note that part or all of the program may be incorporated into the circuit of the processor 301.
- the auxiliary storage device 304 is an auxiliary storage device of a computer in which the processor 301 is the core.
- the auxiliary storage device 304 is, for example, an EEPROM, an HDD, or a flash memory.
- the auxiliary storage device 304 stores, for example, system software and application software among the above programs. Further, the auxiliary storage device 304 stores data used by the processor 301 to perform various processes, data generated by processing by the processor 301, various setting values, and the like.
- the communication interface 305 is an interface for the terminal device 300 to communicate via the network NW or the like.
- the input device 306 accepts operations by the operator of the terminal device 300.
- Input device 306 is, for example, a keyboard, keypad, touch pad, mouse, or controller.
- the input device 306 may be a device for voice input.
- the display device 307 displays a screen for notifying the operator of the terminal device 300 of various information.
- the display device 307 is, for example, a display such as a liquid crystal display or an organic EL display.
- a touch panel can also be used as the input device 306 and the display device 307. That is, the display panel included in the touch panel can be used as the display device 307, and the pointing device provided in the touch panel for touch input can be used as the input device 306.
- the bus 308 includes a control bus, an address bus, a data bus, and the like, and transmits signals exchanged between each part of the terminal device 300.
- FIG. 2 is a flowchart illustrating an example of processing by the processor 101 of the operation device 100.
- the processor 101 executes the process shown in FIG. 2 based on a program stored in, for example, the ROM 102 or the auxiliary storage device 104.
- FIG. 3 is a flowchart illustrating an example of processing by the processor 301 of the terminal device 300.
- the processor 301 executes the process shown in FIG. 3 based on a program stored in, for example, the ROM 302 or the auxiliary storage device 304.
- the processor 101 periodically executes the process shown in FIG. 2 .
- the processor 101 executes the process shown in FIG. 2 when there is an input instructing to execute the process shown in FIG.
- the processor 101 executes the processing shown in FIG. 2 for each power generation facility 200.
- the processor 101 of the operation device 100 acquires the actual value of power generation amount, various measurement data, and images from the PCS 201 or the measurement device 203 of the power generation equipment 200 to be processed.
- the measurement data is, for example, data measured by the sensor 204.
- the image is, for example, an image photographed by the camera 205.
- the processor 101 instructs the PCS 201 or the measuring device 203 via the communication interface 107 and the network NW to transmit the actual value, the measurement data, and the image.
- the PCS 201 or the measurement device 203 that has received the instruction transmits the actual value, the measurement data, and the image.
- the communication interface 107 receives the performance value.
- the processor 101 acquires the received performance value, measurement data, and image.
- the processor 101 functions as an example of an acquisition unit that acquires the actual value of the power generation amount of the power generation equipment by performing the process of step ST11.
- step ST12 the processor 101 executes an abnormality discovery process using the actual value obtained in step ST11. Furthermore, the processor 101 may execute the abnormality discovery process using at least one of the various measurement data and images acquired in step ST11.
- the abnormality discovery process includes a process of checking whether an abnormality has occurred in the power generation equipment 200.
- the abnormality discovery process includes a process of estimating the cause of the abnormality occurring in the power generation equipment 200.
- the processor 101 executes an abnormality detection process using, for example, the change in the actual value of the power generation amount of the power generation equipment 200.
- the processor 101 may execute the abnormality detection process using other than the change in the actual value of the amount of power generation.
- the transition of the actual power generation amount during normal conditions will be explained using the shape of a graph.
- the graph here is a graph showing the actual value of the amount of power generation per hour for each day.
- the graph of the actual power generation amount on a sunny day has a mountain-like shape.
- the vertical axis is the amount of power generation and the horizontal axis is time.
- the shape of the graph of the actual power generation amount on a cloudy day is significantly different from that on a sunny day, and often has a meandering shape with large hourly fluctuations and many inflection points.
- the graph of the actual value of the power generation amount on a cloudy day generally shows a smaller amount of power generation than the graph on a sunny day.
- the graph of the actual amount of power generation on a rainy day shows that the amount of power generation is even smaller than on a cloudy day, and the graph curves downward.
- a failure of the power generation equipment 200 is mainly a failure of the solar panel 202. Note that the case where the solar panel 202 is dirty is also included in the case where some object is blocking the sunlight hitting the solar panel 202. Note that the classification of abnormality types is not limited to those shown here. Each type of abnormality is an example of a predetermined abnormal event.
- the graph of the amount of power generated when the power generation equipment 200 is out of order shows a peculiar drop in the amount of power generated, unlike when it is normal. For this reason, the shape of the graph at the time of a failure is different from that during normal times, and the amount of power generated drops directly below the moment a failure occurs, and thereafter the amount of power generated continues to be lower than during normal times. Or power generation will no longer occur. Therefore, the magnitude of the peak power generation amount during the day on a sunny day is also clearly smaller than during normal times. However, if a portion that continues to generate electricity remains, the area (time integrated value of the amount of power generation) will be smaller than the normal graph, but the shape will be similar to the normal graph.
- the graph of the amount of power generated when the sunlight hitting the solar panel 202 is blocked by some object has a peculiar way of decreasing the amount of power generated, unlike in normal times. For this reason, the shape of the graph when sunlight is blocked by some object is different from the normal shape, and if it is due to shadows, the degree of deviation from normal will change over time, or if it is due to the influence of shadows, If there is dirt on the surface of the solar panel, such as bird droppings, the amount of power generated will constantly decrease, and the area (time integrated value of the amount of power generated) will be smaller than the graph under normal conditions. However, in the latter case, the shape is similar to the normal state.
- the graph of the amount of power generation when output is suppressed is a graph in which the amount of power generation suddenly drops at the moment output suppression is started.
- the processor 101 estimates that an abnormality has occurred in the power generation equipment 200 when the trend of the actual value of the power generation amount has the graph shape as shown above when an abnormality occurs in the power generation equipment 200. do. Further, the processor 101 estimates that an abnormality has occurred in the power generation equipment 200 when the deviation between the actual value and the predicted value of the amount of power generation satisfies a predetermined condition. Further, the processor 101 estimates whether or not an abnormality has occurred in the power generation equipment 200 by analyzing the image using the image taken by the camera 205. For example, the processor 101 determines whether an abnormality has occurred in the power generation equipment 200 using the state of foreign objects such as fallen leaves and bird droppings that have fallen on the solar panel 202 and the state of the shadow cast on the solar panel 202.
- the processor 101 determines that an abnormality has occurred in the power generation equipment 200 when the amount of foreign matter is equal to or greater than a predetermined amount. For example, the processor 101 determines that an abnormality has occurred in the power generation equipment 200 when the area of the shadow cast on the solar panel 202 is equal to or larger than a predetermined value. If the area of the shadow is larger than a predetermined value, it is estimated that there is an obstacle between the sun and the solar panel 202. Note that the processor 101 may estimate whether or not an abnormality has occurred in the power generation equipment 200 using a plurality of the graph shape, deviation width, and image analysis described above.
- the processor 101 estimates that the power generation equipment 200 is out of order when the transition of the actual value of the power generation amount has a graph shape corresponding to the case where the power generation equipment 200 is out of order.
- the processor 101 determines whether or not the solar panel 202 hits the solar panel 202 when the trend of the actual power generation amount is in the graph shape as shown above where the sunlight hitting the solar panel 202 is blocked by some object. It is assumed that sunlight is blocked by some object.
- the processor 101 estimates that the output is being suppressed when the transition of the actual value of the power generation amount has the graph shape of the case where the output is suppressed as shown above.
- the processor 101 uses, for example, past performance values of the power generation equipment 200 to be processed for the transition of the amount of power generation during normal times used in the abnormality detection process.
- the processor 101 uses the actual value of a power generation facility 200 different from the power generation facility 200 to be processed.
- the power generation equipment 200 different from the power generation equipment 200 to be processed is a power generation equipment 200 whose conditions are similar to those of the power generation equipment 200 to be processed.
- the conditions include the installation location of the solar panel 202, the year of use or degree of deterioration of the solar panel 202, the model number indicating the type of the solar panel 202, and the weather at the installation location of the solar panel 202.
- the closeness of the conditions is, for example, a numerical value that is the sum of the numerical values of the differences between the conditions. Note that when summing the numerical values, the processor 101 may weight the values according to the importance of each condition and then total the numerical values. Moreover, the condition is close, for example, when the numerical value is less than or equal to a predetermined threshold value.
- the processor 101 may execute the anomaly discovery process using trained AI (artificial intelligence) or the like. Learning of the AI for anomaly discovery processing (hereinafter referred to as "anomaly discovery AI") is performed by, for example, a device other than the processor 101 or the operation device 100.
- anomaly discovery AI learning of the AI for anomaly discovery processing
- the processor 101 acquires the anomaly detection AI from the other device.
- the other device may be included in the operational system 1.
- actual values of a plurality of power generation facilities 200 are used as explanatory variables used for learning of the abnormality detection AI.
- the explanatory variables used for learning the abnormality detection AI may include conditions at the time of power generation.
- the conditions at the time of power generation include the installation location of the solar panel 202, the age of use or degree of deterioration of the solar panel 202, the model number indicating the type of solar panel 202, and the weather at the installation location of the solar panel 202. be.
- the conditions during power generation may be any one or more of these conditions.
- the conditions during power generation may include other conditions.
- the objective variables used for learning the abnormality detection AI include, for example, whether each actual value used as an explanatory variable is in a state where an abnormality has occurred in the power generation equipment 200, and whether or not an abnormality has occurred. If so, use information indicating what kind of abnormality it is. Note that it is not necessary to use the objective variable for learning of the abnormality detection AI.
- the processor 101 may execute the abnormality discovery process by using a plurality of methods in combination.
- the processor 101 uses the actual value to It functions as an example of an estimator that estimates the occurrence of an abnormal event.
- the processor 101 functions as an example of an estimating unit that estimates the type of abnormal event in the power generation equipment 200 and uses actual values based on the characteristics of the power generation amount.
- step ST13 the processor 101 determines whether an abnormality has occurred in the power generation equipment 200 to be processed, based on the processing result in step ST12. If the processor 101 does not determine that an abnormality has occurred in the power generation equipment 200 to be processed, the processor 101 determines No in step ST13 and ends the process shown in FIG. 2. On the other hand, if the processor 101 determines that an abnormality has occurred in the power generation equipment 200 to be processed, the processor 101 determines Yes in step ST13 and proceeds to step ST14.
- the processor 101 estimates the amount of power generated by the power generation equipment 200 to be processed, assuming that no abnormality has occurred in the power generation equipment 200 to be processed.
- the processor 101 estimates, for example, the amount of power generation from the occurrence of the abnormality to the present time (the time of processing shown in FIG. 2).
- the processor 101 estimates the amount of power generation from the occurrence of the abnormality to the present for each time period, regardless of whether the unit price of electricity is fixed or the unit price of electricity varies.
- the unit price of electricity sold may be fixed or fluctuate depending on the contract.
- the case where the electricity sales unit price fluctuates means, for example, that electricity is sold in the wholesale power trading market each time there is no electricity sales contract at a fixed unit price.
- the processor 101 uses, for example, past performance values when the power generation equipment 200 to be processed was operating normally to estimate the amount of power generated when no abnormality had occurred. Note that the processor 101 may estimate by taking into account deterioration over time. Alternatively, the processor 101 uses the actual value of a power generation facility 200 different from the power generation facility 200 to be processed to estimate the amount of power generation in the case where no abnormality had occurred in the power generation facility 200 to be processed. At this time, it is preferable that the processor 101 uses actual values of the power generation equipment 200 whose conditions at the time of power generation are similar to those of the power generation equipment 200 to be processed.
- the conditions during power generation include the installation location of the solar panel 202, the age of use or degree of deterioration of the solar panel 202, the model number indicating the manufacturer and type of the solar panel 202, and the weather at the installation location of the solar panel 202. etc.
- the conditions during power generation may be any one or more of these conditions.
- the conditions during power generation may include other conditions.
- the processor 101 may use the normalized power generation amount of the solar panel (hereinafter referred to as "normalized power generation amount") to estimate the power generation amount in the case that no abnormality had occurred.
- the normalized power generation amount is the power generation amount per unit area of the solar panel for each condition such as the manufacturer and model number of the solar panel.
- the processor 101 determines a normalized power generation amount that has conditions similar to those of the power generation equipment 200 to be processed. Then, the processor 101 multiplies the determined normalized power generation amount by the panel area of the power generation equipment 200 to be processed, thereby estimating the power generation amount if no abnormality had occurred.
- the processor 101 may use learned AI or the like to estimate the amount of power generation that would have occurred if no abnormality had occurred.
- Learning of the AI for power generation amount estimation (hereinafter referred to as "power generation amount estimation AI") is performed by, for example, a device other than the processor 101 or the operation device 100.
- the processor 101 acquires the power generation amount estimation AI from the other device.
- the other device may be included in the operational system 1. Note that in the following description, it is assumed that the processor 101 performs the learning.
- the explanatory variable used for learning the power generation amount estimation AI is, for example, the conditions at the time of power generation.
- the conditions at the time of power generation include the installation location of the solar panel 202, the age of use or degree of deterioration of the solar panel 202, the model number indicating the type of solar panel 202, and the weather at the installation location of the solar panel 202. be.
- the conditions during power generation may be any one or more of these conditions.
- the conditions during power generation may include other conditions.
- the objective variable used for learning the power generation amount estimation AI is, for example, the actual value of the power generation amount of the power generation equipment 200.
- the processor 101 may use a combination of multiple methods to estimate the amount of power generated if no abnormality had occurred.
- the processor 101 uses data such as actual values during the period in which the abnormality occurs as an explanatory variable to be used for learning the power generation amount estimation AI. and not used as an objective variable.
- the processor 101 may correct data for a period in which an abnormality occurs and use the corrected data as an explanatory variable and an objective variable.
- the processor 101 may estimate the amount of power generation by normalizing the value used for estimating the amount of power generation.
- the value used for estimating the power generation amount may be a value used by the power generation amount estimation AI, a past actual value of the power generation equipment 200 to be processed, or an actual value of the power generation equipment 200 whose conditions at the time of power generation are similar to the power generation equipment 200 to be processed, etc. It is.
- the processor 101 functions as an example of a power generation amount estimating unit that obtains an estimated value of the power generation amount of the power generation equipment when no abnormal event has occurred.
- the processor 101 does not use data such as the actual value of the power generation equipment 200 determined to have an abnormality in learning the power generation amount estimation AI, so that the power generation amount estimation unit estimates the power generation amount. It functions as an example of a learning unit that excludes actual values when an abnormal event occurs in learning data for generating a trained model used to output values.
- step ST15 the processor 101 estimates the amount of loss due to the abnormality of the power generation equipment 200.
- the processor 101 estimates the loss amount using the following formula, for example.
- (Loss amount) ((Expected amount of electricity sold if no abnormality occurs) - (Actual amount of electricity sold)) ⁇ (Unit price of electricity sold) (1)
- the actual value of the power generation amount here is the actual value of the power generation amount for the same period as the expected amount of electricity sold if no abnormality had occurred. Further, the actual value of the amount of power generation is, for example, acquired in step ST11.
- the processor 101 calculates the amount of loss by referring to the power unit price in the wholesale power trading market in each time period. Note that, for example, the processor 101 refers to the power unit price in each time period for each predetermined time.
- the predetermined time is, for example, 30 minutes.
- the processor 101 can use, for example, any of the following (A1) to (A4) as the power unit price when the power selling unit price changes. Among these, it is most preferable to use (A1).
- the processor 101 may use (A2), for example, when estimating a loss amount simply.
- the processor 101 may determine which power unit price to use, for example, according to a contract regarding the sale of power.
- (A1) Spot market area price.
- the area price of the area where the power generation equipment 200 to be processed is located.
- the processor 101 calculates the loss amount using equation (1) for each time period, and calculates the total loss amount by adding up the loss amounts for all time periods within the period for which the loss amount is calculated.
- the calculation target period is, for example, from the occurrence of an abnormality to the present.
- the processor 101 may calculate the amount of loss by incorporating an imbalance charge that occurs when selling electricity in a wholesale power trading market or the like.
- the imbalance charge in this case is an imbalance charge for the surplus or deficiency of the planned submitted value of electric power.
- the processor 101 uses, for example, the unit price of the past imbalance fee.
- the processor 101 uses the unit price of the imbalance fee predicted using AI or other program for predicting the imbalance unit price. If the unit price of the imbalance fee has already been determined, the processor 101 uses that unit price.
- the processor 101 calculates the amount of loss, taking into account the imbalance charge, using the following formula, for example.
- the processor 101 may exclude the period during which output suppression was implemented from the period for which the loss amount is calculated. As a result, the amount of loss during the period when output curtailment was implemented will be 0 yen.
- the processor 101 functions as an example of a loss estimation unit that estimates the amount of loss due to an abnormal event by comparing the actual value and the estimated value by performing the process of step ST15.
- the processor 101 determines whether measures should be taken against the abnormality occurring in the power generation equipment 200.
- the countermeasures include maintenance, cleaning, repair, or replacement of the power generation equipment 200.
- the processor 101 determines that it is better to take measures when the amount of loss if no measures are taken for a predetermined period of time exceeds the cost of taking measures.
- the processor 101 determines that it is better to take measures, for example, when the amount of loss if no measures are taken for a predetermined period of time exceeds the cost of taking measures by more than a predetermined amount.
- the processor 101 determines that it is better to take measures when, for example, the amount of loss multiplied by a predetermined value if no measures are taken for a predetermined period exceeds the cost of taking measures.
- the processor 101 uses the loss amount estimated in step ST15 to estimate the loss amount assuming that no countermeasures are taken for a predetermined period of time.
- the amount of loss if no countermeasures are taken for a predetermined period of time is the amount of loss from now until after the predetermined period.
- the processor 101 may use AI or the like to estimate the amount of loss if no countermeasures are taken for a predetermined period of time.
- the processor 101 estimates the amount of countermeasure costs based on the type of abnormality and the degree of the abnormality. The amount of countermeasure costs may be determined in advance depending on the type of abnormality, for example.
- the auxiliary storage device 104 and the like store a predetermined amount of countermeasure costs.
- the processor 101 obtains the amount from the auxiliary storage device 104 or the like. If the processor 101 does not determine that countermeasures should be taken against the abnormality occurring in the power generation equipment 200, the processor 101 determines No in step ST16 and ends the process shown in FIG. 2. On the other hand, if the processor 101 determines that countermeasures should be taken for the abnormality occurring in the power generation equipment 200, the processor 101 determines Yes in step ST16 and proceeds to step ST17.
- the processor 101 functions as an example of a determining unit that determines that measures should be taken to remove the abnormal event by performing the process in step ST16.
- step ST17 the processor 101 determines when to take countermeasures.
- the processor 101 determines, for example, the next day or later when the loss amount if no countermeasure is taken exceeds the cost of the countermeasure by more than a predetermined value as the time to take the countermeasure.
- the processor 101 determines, for example, the next day or later when the amount of loss if no countermeasure is taken multiplied by a predetermined value exceeds the cost of the countermeasure multiplied by a predetermined value as the time to take the countermeasure.
- the processor 101 may determine the frequency at which countermeasures should be taken. For example, in the case of an abnormality that occurs regularly, countermeasures against the abnormality should also be taken regularly. Therefore, the processor 101 determines how often countermeasures should be taken in such cases.
- the frequency is determined in advance for each type of abnormality, for example.
- the auxiliary storage device 104 and the like store the predetermined frequency.
- the processor 101 acquires the frequency from the auxiliary storage device 104 or the like. Alternatively, processor 101 may calculate the frequency.
- the processor 101 functions as an example of a timing determining unit that determines the timing or frequency at which measures should be taken to remove the abnormal event.
- step ST18 the processor 101 generates an image corresponding to the countermeasure notification screen.
- the processor 101 then instructs the display device 106 to display the generated image.
- the display device 106 displays a countermeasure notification screen.
- the countermeasure notification screen includes, for example, content indicating that countermeasures should be taken for the power generation equipment 200, content indicating what countermeasures should be taken, and content indicating the timing at which the countermeasures should be taken.
- the processor 101 cooperates with the display device 106 to perform the process of step ST18, thereby notifying the user that the countermeasure should be taken when the determining unit determines that the countermeasure should be taken. It functions as an example of a decision notification section. Alternatively, the processor 101 functions as an example of a decision notification section by performing the process of step ST18.
- the processor 101 functions as an example of a timing notification unit that notifies the timing or frequency by performing the process of step ST18 in cooperation with the display device 106.
- the processor 101 functions as an example of a timing notification section by performing the process of step ST18.
- step ST19 the processor 101 generates proposal information.
- the suggestion information is information that instructs the terminal device 300 to display a countermeasure notification screen.
- the suggestion information includes information necessary to display the countermeasure notification screen.
- the processor 101 instructs the communication interface 107 to transmit the proposal information to the terminal device 300.
- the communication interface 107 transmits the proposed information to the terminal device 300.
- the transmitted proposal information is received by the communication interface 305 of the terminal device 300.
- step ST21 in FIG. 3 the processor 301 of the terminal device 300 waits for the communication interface 305 to receive proposal information. If the proposal information is received, the processor 301 determines Yes in step ST21 and proceeds to step ST22.
- step ST22 the processor 301 generates an image corresponding to the countermeasure notification screen.
- the processor 301 then instructs the display device 307 to display the generated image.
- the display device 307 displays a countermeasure notification screen.
- the processor 301 returns to step ST21.
- the processor 301 cooperates with the display device 307 to perform the process of step ST22, thereby functioning as an example of a decision notification section.
- the processor 301 functions as an example of a decision notification section by performing the process of step ST22.
- the processor 101 functions as an example of a decision notification section by performing the process of step ST19 in FIG.
- the processor 101 cooperates with the communication interface 107 to perform the process of step ST19, thereby functioning as an example of a decision notification section.
- the processor 301 functions as an example of a timing notification section by performing the process of step ST22 in FIG. 3 in cooperation with the display device 307.
- the processor 101 functions as an example of a timing notification section by performing the process of step ST22.
- the processor 101 functions as an example of a timing notification section by performing the process of step ST19 in FIG.
- the processor 101 cooperates with the communication interface 107 to perform the process of step ST19, thereby functioning as an example of a timing notification section.
- the operation system 1 of the embodiment acquires the actual value of the power generation amount of the power generation equipment 200. Then, the operation system 1 of the embodiment estimates the occurrence of an abnormality using the characteristics of the power generation amount when an abnormality occurs and the actual value. Furthermore, the operation system 1 of the embodiment estimates the amount of loss due to the occurrence of an abnormality by obtaining an estimated value of the amount of power generation when no abnormality has occurred. Therefore, by using the operation system 1 of the embodiment, the manager of the power generation equipment 200 can know the amount of opportunity loss caused by the occurrence of an abnormality in the power generation equipment 200.
- the operation system 1 of the embodiment identifies the type of abnormality using the characteristics and actual value of the amount of power generation when an abnormality occurs. Thereby, by using the operation system 1 of the embodiment, the administrator of the power generation equipment 200 can identify the type of abnormality when an abnormality occurs in the power generation equipment 200.
- the operation system 1 of the embodiment uses AI to obtain an estimated value of the amount of power generation when no abnormality has occurred. Moreover, the operation system 1 of the embodiment does not use data such as the actual value of the power generation amount of the power generation equipment 200 in which the abnormality has occurred for learning of the AI. This improves the accuracy of the AI. Alternatively, the operation system 1 of the embodiment corrects and uses data such as the actual value of the power generation amount of the power generation equipment 200 in which the abnormality has occurred for the learning of the AI. This improves the accuracy of the AI.
- the operation system 1 of the embodiment uses at least one of AI, past performance values of the power generation equipment 200 to be processed, and performance values of other power generation equipment with similar conditions to estimate the power generation amount. Thereby, the operation system 1 of the embodiment can estimate the amount of power generation with higher accuracy.
- the operational system 1 of the embodiment estimates whether or not countermeasures should be taken when an abnormality has occurred. Thereby, by using the operation system 1 of the embodiment, the administrator of the power generation equipment 200 can understand whether or not countermeasures should be taken for the power generation equipment 200 in which an abnormality has occurred.
- the operational system 1 of the embodiment determines when or how often countermeasures should be taken when an abnormality occurs. Thereby, by using the operation system 1 of the embodiment, the manager of the power generation facility 200 and the like can know when or how often to take countermeasures when an abnormality occurs.
- the operation device 100 uses the shape of the graph to determine the occurrence of an abnormality and the type of abnormality.
- the operation device 100 may determine the occurrence of an abnormality and the type of abnormality using characteristics of the amount of power generation other than the shape of the graph.
- the operation device 100 performs abnormality discovery processing using the amount of power generation.
- the operation device 100 may perform abnormality detection processing using power generation output (power generation amount per unit time) instead of power generation amount.
- the operation device 100 may acquire the actual value of the power generation amount of the power generation equipment 200 from a source other than the PCS 201 and the measurement device 203.
- the power generation equipment 200 performs solar power generation.
- the power generation equipment of the embodiment may be equipment that performs wind power generation, hydroelectric power generation, thermal power generation, nuclear power generation, geothermal power generation, or other power generation other than solar power generation.
- the processor 101 may implement part or all of the processing implemented by the program in the above embodiments using a circuit hardware configuration.
- the program that implements the processing of the embodiment is transferred, for example, while being stored in the device. However, the device may be transferred without the program stored therein. Then, the program may be separately transferred and written into the device. Transfer of the program at this time can be realized, for example, by recording it on a removable storage medium or by downloading it via a network such as the Internet or LAN.
- Operation system 100 Operation device 101,301 Processor 102,302 ROM 103,303 RAM 104,304 Auxiliary storage device 105,306 Input device 106,307 Display device 107,305 Communication interface 108,308 Bus 200 Power generation equipment 201 PCS 202 Solar panel 203 Measuring device 204 Sensor 205 Camera 300 Terminal device
Landscapes
- Engineering & Computer Science (AREA)
- Business, Economics & Management (AREA)
- Human Resources & Organizations (AREA)
- Economics (AREA)
- Strategic Management (AREA)
- General Physics & Mathematics (AREA)
- Physics & Mathematics (AREA)
- Theoretical Computer Science (AREA)
- Power Engineering (AREA)
- General Business, Economics & Management (AREA)
- Tourism & Hospitality (AREA)
- Entrepreneurship & Innovation (AREA)
- Marketing (AREA)
- Development Economics (AREA)
- Quality & Reliability (AREA)
- Operations Research (AREA)
- Game Theory and Decision Science (AREA)
- Health & Medical Sciences (AREA)
- Automation & Control Theory (AREA)
- Educational Administration (AREA)
- Public Health (AREA)
- Water Supply & Treatment (AREA)
- General Health & Medical Sciences (AREA)
- Primary Health Care (AREA)
- Supply And Distribution Of Alternating Current (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
Description
発電設備の発電量の実績値を取得する取得部と、
前記発電設備に発生する所定の異常事象に対応する発電量の特徴に基づき、前記実績値を用いて前記異常事象の発生を推定する推定部と、
前記異常事象が生じていなかった場合の前記発電設備の発電量の推定値を求める発電量推定部と、
前記実績値と前記推定値とを比較することにより、前記異常事象による損失額を推定する損失推定部と、
を備える。
図1は、実施形態に係る運用システム1及び運用システム1に含まれる構成要素の要部構成の一例を示すブロック図である。運用システム1は、発電設備200の運用を行うシステムである。運用システム1は、発電設備200に異常が発生した場合の検知などが可能である。運用システム1は、一例として、運用装置100、発電設備200及び端末装置300を含む。運用システム1は、典型的には複数の発電設備200及び複数の端末装置300を含む。ただし、運用システム1に含まれる各装置の数は限定しない。
ROM102は、専らデータの読み出しに用いられる不揮発性メモリである。ROM102は、上記のプログラムのうち、例えばファームウェアなどを記憶する。また、ROM102は、プロセッサー101が各種の処理を行う上で使用するデータなども記憶する。
RAM103は、データの読み書きに用いられるメモリである。RAM103は、プロセッサー101が各種の処理を行う上で一時的に使用するデータを記憶するワークエリアなどとして利用される。RAM103は、典型的には揮発性メモリである。
また、プロセッサー101は、それぞれの発電設備200を対象に図2に示す処理をそれぞれ実行する。
晴れている日の発電量の実績値のグラフは、山のような形状となる。当該グラフは、例えば、縦軸が発電量で横軸が時間である。また、曇りの日の発電量の実績値のグラフは、形状は晴れの日とは形状が大きく異なり、時間単位での変動が大きく変曲点が多い蛇行した形状になることが多い。かつ、曇りの日の発電量の実績値のグラフは、晴れている日のグラフに比べて一般に発電量が小さくなる。また、雨の日の発電量の実績値のグラフは、曇りの日よりもさらに発電量が小さく、下部を這うようなグラフとなる。
(損失額)=((異常が発生していない場合の売電期待量)-(実際の売電量))×(売電単価) (1)
(異常が発生していなかった場合の売電期待量)=(異常が発生していなかった場合の発電量)-(実績値) (2)
ここでの発電量の実績値は、異常が発生していなかった場合の売電期待量と同一期間の発電量の実績値である。また、発電量の実績値は、例えば、ステップST11で取得されたものである。
(A1)スポット市場のエリアプライス。好ましくは、処理対象の発電設備200の所在エリアのエリアプライス。
(A2)スポット市場のシステムプライス。
(A3)スポット市場と時間前市場の価格を加重平均した価格。
(A4)上記(A1)~(A3)以外の電力単価。
(インバランス料金を加味した損失額)=(上記の損失額)+(発電計画提出値に対する発電実績の不足電力量)×(インバランス料金の単価)-(発電計画提出値に対する発電実績の余剰電力量)×(インバランス料金の単価) (3)
上記の実施形態では、運用装置100は、グラフの形状を用いて異常の発生の判定及び異常の種類の判定を行う。しかしながら、運用装置100は、グラフの形状以外の発電量の特徴を用いて異常の発生の判定及び異常の種類の判定を行っても良い。
100 運用装置
101,301 プロセッサー
102,302 ROM
103,303 RAM
104,304 補助記憶装置
105,306 入力デバイス
106,307 表示デバイス
107,305 通信インターフェース
108,308 バス
200 発電設備
201 PCS
202 太陽光パネル
203 計測装置
204 センサー
205 カメラ
300 端末装置
Claims (9)
- 発電設備の発電量の実績値を取得する取得部と、
前記発電設備に発生する所定の異常事象に対応する発電量の特徴に基づき、前記実績値を用いて前記異常事象の発生を推定する推定部と、
前記異常事象が生じていなかった場合の前記発電設備の発電量の推定値を求める発電量推定部と、
前記実績値と前記推定値とを比較することにより、前記異常事象による損失額を推定する損失推定部と、
を備える運用システム。 - 前記推定部は、前記特徴に基づき、前記実績値を用いて前記異常事象の種類を推定する、
請求項1に記載の運用システム。 - 前記発電量推定部が前記発電量の推定値を出力するために使用する学習済みモデルを生成するための学習データにおいて前記異常事象が発生している場合の前記実績値を除外する学習部、
をさらに備える請求項1に記載の運用システム。 - 前記発電量推定部は、AI、前記発電設備の過去の実績値、及び前記発電設備と近い条件で運転していた他の発電設備の発電量の実績値の少なくともいずれかを用いて推定する、
請求項1に記載の運用システム。 - 前記異常事象を取り除くための対策を取るべきであることを決定する決定部、
をさらに備える請求項1に記載の運用システム。 - 前記決定部が前記対策を取るべきであることを決定した場合、前記対策を取るべきであることを報知する決定報知部、
をさらに備える請求項5に記載の運用システム。 - 前記異常事象を取り除くための対策を取るべき時期又は頻度を決定する時期決定部、
をさらに備える請求項1に記載の運用システム。 - 前記時期又は前記頻度を報知する時期報知部、
をさらに備える請求項7に記載の運用システム。 - 運用装置が備えるプロセッサーを、
発電設備の発電量の実績値を取得する取得部と、
前記発電設備に発生する所定の異常事象に対応する発電量の特徴に基づき、前記実績値を用いて前記異常事象の発生を推定する推定部と、
前記異常事象が生じていなかった場合の前記発電設備の発電量の推定値を求める発電量推定部と、
前記実績値と前記推定値とを比較することにより、前記異常事象による損失額を推定する損失推定部、
として機能させるプログラム。
Priority Applications (2)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| US18/879,392 US20260005648A1 (en) | 2022-07-15 | 2023-06-22 | Operating System and Program |
| EP23839429.0A EP4557574A4 (en) | 2022-07-15 | 2023-06-22 | OPERATING SYSTEM AND PROGRAM |
Applications Claiming Priority (4)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2022-113864 | 2022-07-15 | ||
| JP2022113864 | 2022-07-15 | ||
| JP2023028310A JP7677653B2 (ja) | 2022-07-15 | 2023-02-27 | 運用システム及びプログラム |
| JP2023-028310 | 2023-02-27 |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| WO2024014255A1 true WO2024014255A1 (ja) | 2024-01-18 |
Family
ID=89536688
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| PCT/JP2023/023181 Ceased WO2024014255A1 (ja) | 2022-07-15 | 2023-06-22 | 運用システム及びプログラム |
Country Status (4)
| Country | Link |
|---|---|
| US (1) | US20260005648A1 (ja) |
| EP (1) | EP4557574A4 (ja) |
| JP (1) | JP2025013650A (ja) |
| WO (1) | WO2024014255A1 (ja) |
Citations (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2003259551A (ja) * | 2002-03-01 | 2003-09-12 | Sharp Corp | 太陽光発電管理サーバ、太陽光発電管理システム、太陽光発電管理方法およびその方法を実現するプログラムを記録した機械読取可能な記録媒体 |
| JP2011147340A (ja) | 2000-09-11 | 2011-07-28 | Sharp Corp | 太陽光発電装置の管理システムおよび管理方法 |
| JP2015047030A (ja) * | 2013-08-29 | 2015-03-12 | 大日本印刷株式会社 | 太陽光発電管理装置、太陽光発電管理システム、太陽光発電管理方法、プログラム、記録媒体 |
| JP2019208350A (ja) * | 2018-05-29 | 2019-12-05 | 株式会社Nttファシリティーズ | 太陽光発電設備の診断装置 |
| WO2020148813A1 (ja) * | 2019-01-15 | 2020-07-23 | 株式会社 東芝 | 異常要因診断装置及びその方法、並びに異常要因診断システム |
Family Cites Families (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPH06101079B2 (ja) * | 1988-11-09 | 1994-12-12 | 三菱電機株式会社 | プラント異常診断装置 |
| WO2019066934A1 (en) * | 2017-09-29 | 2019-04-04 | Siemens Energy, Inc. | WIND YIELD MONITORING |
-
2023
- 2023-06-22 US US18/879,392 patent/US20260005648A1/en active Pending
- 2023-06-22 WO PCT/JP2023/023181 patent/WO2024014255A1/ja not_active Ceased
- 2023-06-22 EP EP23839429.0A patent/EP4557574A4/en active Pending
-
2024
- 2024-11-11 JP JP2024196908A patent/JP2025013650A/ja active Pending
Patent Citations (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2011147340A (ja) | 2000-09-11 | 2011-07-28 | Sharp Corp | 太陽光発電装置の管理システムおよび管理方法 |
| JP2003259551A (ja) * | 2002-03-01 | 2003-09-12 | Sharp Corp | 太陽光発電管理サーバ、太陽光発電管理システム、太陽光発電管理方法およびその方法を実現するプログラムを記録した機械読取可能な記録媒体 |
| JP2015047030A (ja) * | 2013-08-29 | 2015-03-12 | 大日本印刷株式会社 | 太陽光発電管理装置、太陽光発電管理システム、太陽光発電管理方法、プログラム、記録媒体 |
| JP2019208350A (ja) * | 2018-05-29 | 2019-12-05 | 株式会社Nttファシリティーズ | 太陽光発電設備の診断装置 |
| WO2020148813A1 (ja) * | 2019-01-15 | 2020-07-23 | 株式会社 東芝 | 異常要因診断装置及びその方法、並びに異常要因診断システム |
Non-Patent Citations (1)
| Title |
|---|
| See also references of EP4557574A4 |
Also Published As
| Publication number | Publication date |
|---|---|
| US20260005648A1 (en) | 2026-01-01 |
| JP2025013650A (ja) | 2025-01-24 |
| EP4557574A1 (en) | 2025-05-21 |
| EP4557574A4 (en) | 2025-11-05 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN118410445B (zh) | 分布式光伏异常数据检测方法、系统、电子设备及存储介质 | |
| US10962576B2 (en) | Estimation of shading losses for photovoltaic systems from measured and modeled inputs | |
| US10956629B2 (en) | Estimation of soiling losses for photovoltaic systems from measured and modeled inputs | |
| CN110161860B (zh) | 一种光伏组件智能清扫策略的方法及控制系统 | |
| US11022720B2 (en) | System for forecasting renewable energy generation | |
| JP5940922B2 (ja) | 自然エネルギー量予測装置 | |
| JP5746098B2 (ja) | 自然エネルギーを利用した発電システムの劣化診断装置 | |
| US20110276269A1 (en) | Systems and methods for forecasting solar power | |
| TW201901590A (zh) | 適應性發電管理 | |
| KR20230164782A (ko) | 가뭄진단예측 방법 및 그 시스템 | |
| KR102524158B1 (ko) | 디지털 트윈 기반 태양광 발전소 관리 솔루션 제공 방법 및 장치 | |
| JP2023151049A (ja) | 太陽光発電量予測システム、太陽光発電量予測方法、太陽光発電量予測プログラム、過去予報推定装置、過去予報推定方法、および過去予報推定プログラム | |
| JP7677653B2 (ja) | 運用システム及びプログラム | |
| WO2024014255A1 (ja) | 運用システム及びプログラム | |
| CN119519594B (zh) | 一种利用光伏供能的防火预警系统 | |
| JP7454998B2 (ja) | 保守支援装置、保守支援方法、および保守支援プログラム | |
| JP7508922B2 (ja) | 予測システム、及び予測値の算出方法 | |
| EP3885860B1 (en) | Method, computer-implemented tool and power plant control device for detecting power production degradation of solar power plants | |
| US20200304058A1 (en) | Smart shingles | |
| Solano et al. | The performance ratio of a grid-connected photovoltaic system: An experimental and calculative analysis | |
| JP2021145509A (ja) | 異常検知装置、異常検知方法、および異常検知プログラム | |
| JP2025085390A (ja) | 太陽光発電管理装置、太陽光発電管理方法および太陽光発電管理プログラム | |
| CN116974188A (zh) | 用于控制微电网中热电联产装置的方法和系统 | |
| JP7224640B2 (ja) | 気象情報を用いない太陽光発電装置の異常判定方法及び装置 | |
| Pepe et al. | Estimating PV forecasting models from power data |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| 121 | Ep: the epo has been informed by wipo that ep was designated in this application |
Ref document number: 23839429 Country of ref document: EP Kind code of ref document: A1 |
|
| WWE | Wipo information: entry into national phase |
Ref document number: 18879392 Country of ref document: US |
|
| REG | Reference to national code |
Ref country code: BR Ref legal event code: B01A Ref document number: 112025000563 Country of ref document: BR |
|
| WWE | Wipo information: entry into national phase |
Ref document number: 202537009934 Country of ref document: IN |
|
| WWE | Wipo information: entry into national phase |
Ref document number: 2023839429 Country of ref document: EP |
|
| WWP | Wipo information: published in national office |
Ref document number: 202537009934 Country of ref document: IN |
|
| NENP | Non-entry into the national phase |
Ref country code: DE |
|
| ENP | Entry into the national phase |
Ref document number: 2023839429 Country of ref document: EP Effective date: 20250212 |
|
| WWP | Wipo information: published in national office |
Ref document number: 2023839429 Country of ref document: EP |
|
| ENP | Entry into the national phase |
Ref document number: 112025000563 Country of ref document: BR Kind code of ref document: A2 Effective date: 20250113 |
|
| WWP | Wipo information: published in national office |
Ref document number: 18879392 Country of ref document: US |