AT42821B - Method of building bells and iron basins of gas containers. - Google Patents

Method of building bells and iron basins of gas containers.

Info

Publication number
AT42821B
AT42821B AT42821DA AT42821B AT 42821 B AT42821 B AT 42821B AT 42821D A AT42821D A AT 42821DA AT 42821 B AT42821 B AT 42821B
Authority
AT
Austria
Prior art keywords
bell
basin
bells
building
ring section
Prior art date
Application number
Other languages
German (de)
Inventor
Hugo Baumann
Original Assignee
Hugo Baumann
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hugo Baumann filed Critical Hugo Baumann
Application granted granted Critical
Publication of AT42821B publication Critical patent/AT42821B/en

Links

Landscapes

  • Filling Or Discharging Of Gas Storage Vessels (AREA)

Description

  

   <Desc/Clms Page number 1> 
 



  Verfahren zum Aufbauen von   Glocken   und eisernen Bassins von Gasbehältern. 
 EMI1.1 
 und Glocke   ermöglichen und   zwar sollen alle Arbeiten in oder doch nahezu in)   Manneshöhe   durchgeführt und Montierungsgerüste vermieden werden.

   Die gewöhnliche Art des Aufbaues von Gasbehältern mit eisernem Bassin besteht entweder
1. darin, dass das Bassin von unten nach oben aufgebaut, dann ein Gerüst für das Glockendach aufgestellt. der Fussring oder die Tasse der Glocke daraufgestellt und mit Hilfe der   Fühjungs-   Ständer die Glockenmantelschüsse von unten nach oben genietet und gesenkt werden, bis zum Schluss das Glockendach auf dem Gerüst montiert wird : oder 2. man montiert das Gloakerdach auf dem Boden des Bassins und hebt es mit Hilfe des unabhängig von der   Ba8sinwandu. ng gelagerten   oder am lertigen Bassinmantel angebrachten   Führungsgerüstes   oder mit eigenen, vom Führung gerüst   unabhängigen Hebevorrichtungen, während   das Bassin, wie unter 1 beschrieben, aufgebaut wird ;

   oder 3 man hebt den Bassinmantel mit besonders angebrachten   Rundgängen und   Unterteilen des Führungsgerüstes und baut nach Fertigstellung des Bassins die Glocke   wie in der unter t   oder 2 beschriebenen Weise auf. 



     Diese Aufstellungparten   haben folgende Nachteile : Das erste   Verfahren erfordert grot'   kostspielige Gerüste und Hebevorrichtungen, weil die Bestandteile der Glocke und der   Bassinwand   auf grosse Höhen gehoben werden müssen und erst in dieser Höhe die Verbindungen hergestellt werden können. wobei das teuere Holzgerüst für jeden Aufbau neu hergestellt wird ; ferner kann die Glocke erst nach Fertigstellung des Bassins aufgebaut werden. Wenn ferner bei dem zweiten Verfahren auch Gerüste für das Glockendach ganz oder zum Teil entfallen, so muss doch die   Hassinwand   auf die unter 1 beschriebene teuere und langwierige Art aufgebaut werden.

   Bei dem   dritten Verfahren endlich muss das Bassin, auch wenn die Glocke nach 3. aufgebaut wird. fertig vernietet sein. bevor das Glockendach gehoben und die Glocke aufgebaut werden kann. Das den     Gegenstand der Erfindung   bildende Verfahren   gestattet demgegenüber   das Aufbauen der Glocken   und     Bassinmäntel   in verhältnismässig viel kürzerer Zeit und unter Aufwendung von weniger 
 EMI1.2 
 
Arbeiten in grossen Höhen sich ergebenden Gefahren, da hierbei alle Arbeiter in, oder   doch nahezu     @ in Manneshöhe bewefrkstelligt werden.   Das Verfahren besteht darin, dass die Decke der   Glocke   samt dem obersten Glockenwandringschuss, unabhängig vom Bassinboden.

   unmittelbar über   diesem auf Böcken zusammengebaut   und fertiggestellt, sodann der oberste   Wandringschul. 1   durch vorläufig   angebrachte Verbindungsstücke   mit dem obersten Ringschuss der zu bauenden
Bassinwand verbunden wird und unter allmählicher Hebung des Ganzen die nach unten folgenden   Bassinwandringschüsse   angesetzt werden, wonach in bekannter Weise der Aufbau des Glocken-   mantels   durch Herstellung der Tasse oder des Fussringes, Anbringung der Vertikalversteifungen.
Lösen der Konsolen   1. tnd   Ansetzen der Ringschüsse von oben nach unter erfolgt. Nach Verbindung 
 EMI1.3 
 

 <Desc/Clms Page number 2> 

 
 EMI2.1 
 



   Die Herstellung etwaiger Telesklopmäntel, die nicht Gegenstand vorliegender Erfindung ist, erfolgt in der bisher üblichen Weise, indem nach Befestigen und Aufstellen der Führungs 
 EMI2.2 
   stielen Ausleger angebraclit   werden, an welchen Schraubenspindeln angreifen. Dann wird nut Hilfe kleiner Gerüste, die sich einerseits auf die Bassingallerie. andererseits auf die Glockendecke stützen der   unterste   Teil des ersten Teleskops aufgebaut ;

   dieser Teil wird mit dem oben erwähnten. an den Auslegern der   Fiihrungs8tlele   angebrachten Schraubenspindeln verbunden, herunter   gelassen, dann der nächste Ringschuss des Teleskops angesetzt usf., bis dieses Teleskop fertig   

 <Desc/Clms Page number 3> 

 
 EMI3.1 
 letzteren, sowie eine Anzahl von Böcken, Winden und Gerüsttellen am Umfang der Glocken decke und des Bassins erforderlich. 



   PATENT. ANSPRÜCHE : 
1. Verfahren zum Aufbauen von Glocken und eisernen Bassins von Gasbehältern, dadurch gekennzeichnet, dass (gemäss Fig. 1-7) die Decke (g) der Glocke samt dem obersten Glockenwandringschuss (c), unabhängig vom Bassinboden, unmittelbar über diesem auf   Böcken zusammen-   gebaut und fertiggestellt, sodann der oberste Olockenwandringschuss (c)   durch vorläufige konsol-   artige   Verbindu. ngsstiicke (i) mit   dem obersten Ringschu(. j) der zu bauenden Bassinwand verbunden wird und   unter allmählicher Hebung   des Ganzen die nach unten folgenden Bassin- 
 EMI3.2 
 erfolgt.



   <Desc / Clms Page number 1>
 



  Method of building bells and iron basins of gas containers.
 EMI1.1
 and bell enable and all work should be carried out at or almost at) man height and assembly scaffolding should be avoided.

   The usual type of construction of gas tanks with iron basin consists of either
1. that the basin was built from the bottom up, then a scaffolding for the bell roof was erected. the foot ring or the cup of the bell is placed on it and the bell casing sections are riveted and lowered from bottom to top with the help of the guide stand, until the bell roof is mounted on the scaffolding: or 2. the gloaker roof is mounted on the bottom of the basin and lifts it with the help of the independent of the Ba8sinwandu. ng mounted guide scaffolding or attached to the finished basin shell or with its own lifting devices independent of the guide structure, while the basin is being set up as described under 1;

   or 3 you lift the basin jacket with specially attached rounds and subdivisions of the guide structure and after completion of the basin the bell is erected as described under t or 2.



     These types of installation have the following disadvantages: The first method requires very expensive scaffolding and lifting devices, because the components of the bell and the basin wall must be lifted to great heights and the connections can only be made at this height. the expensive wooden framework being rebuilt for each structure; furthermore, the bell can only be set up after the pool has been completed. If, in the second method, scaffolding for the bell roof is completely or partially omitted, the Hassin wall must be erected in the expensive and tedious manner described under 1.

   With the third method, the pool must finally, even if the bell is built after the third. be finished riveted. before the bell roof can be raised and the bell assembled. By contrast, the method forming the subject of the invention allows the bells and basin jackets to be built up in a relatively much shorter time and with less expenditure
 EMI1.2
 
Working at great heights results in dangers, since all workers are at, or almost @ at man height. The procedure consists in that the ceiling of the bell including the uppermost bell wall ring section, independent of the basin floor.

   directly above this assembled on trestles and completed, then the uppermost wall ring school. 1 by temporarily attached connecting pieces with the uppermost ring section of the one to be built
The basin wall is connected and the basin wall ring sections that follow below are added with the gradual lifting of the whole, after which the construction of the bell shell by making the cup or the foot ring, attaching the vertical stiffeners in a known manner.
Loosening the consoles 1. and attaching the ring sections from top to bottom. After connection
 EMI1.3
 

 <Desc / Clms Page number 2>

 
 EMI2.1
 



   The production of any telescopic jackets, which is not the subject of the present invention, is carried out in the previously usual manner by, after fastening and setting up the guide
 EMI2.2
   stems brackets are attached to which screw spindles attack. Then only the help of small scaffolding, which is on the one hand on the basing gallery. on the other hand, the lowest part of the first telescope is built on the bell ceiling;

   this part will match the one mentioned above. The screw spindles attached to the arms of the guide elements are connected, lowered, then the next ring section of the telescope is attached, etc., until this telescope is finished

 <Desc / Clms Page number 3>

 
 EMI3.1
 the latter, as well as a number of trestles, winches and scaffolding around the perimeter of the bell ceiling and the basin are required.



   PATENT. EXPECTATIONS :
1. A method for building bells and iron basins of gas containers, characterized in that (according to Fig. 1-7) the ceiling (g) of the bell together with the uppermost bell wall ring section (c), independent of the basin floor, directly above this on trestles - built and completed, then the uppermost Olockenwand ring section (c) by provisional console-like connection. ngsstiicke (i) is connected to the uppermost ring (.j) of the basin wall to be built and, gradually lifting the whole, the following basin
 EMI3.2
 he follows.

 

Claims (1)

2. Verfahren nach Anspruch 1, dadurch gekennzeichnet, dass (gemäss Fig. 8-12) nach Verbindung des obersten Glockenwandringschll. sses (c) mit dem obersten Wandringschusse (j) der Bassinwand durch die Konsolen (i) zunächst der obere Teil der entsprechend der Höhe der Bassinwandringschüsse geteilten, Vertikalversteifungen angesetzt und dann, nach Heben des Ganzen, der nächst untere Bassinwandringschuss und zugleich der oder die nächst unteren Glockenmantelringschüsse hergestellt werden, worauf dann der nächste Teil der Vertikalversteifungen angesetzt, das Ganze wieder gehoben wird, und gleichzeitig der nächste Bassinwandund Qlockenmantelringschuss angesetzt werden. 2. The method according to claim 1, characterized in that (according to Fig. 8-12) after connecting the uppermost Glockenwandringschll. sses (c) with the uppermost wall ring section (j) of the basin wall through the brackets (i) first the upper part of the vertical stiffeners, which are divided according to the height of the basin wall ring sections, and then, after lifting the As a whole, the next lower basin wall ring section and at the same time the next lower bell shell ring section (s) are made, whereupon the next part of the vertical stiffeners is attached, the whole thing is lifted again, and at the same time the next basin wall and bell shell ring section are attached.
AT42821D 1907-11-21 1907-11-21 Method of building bells and iron basins of gas containers. AT42821B (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
AT42821T 1907-11-21

Publications (1)

Publication Number Publication Date
AT42821B true AT42821B (en) 1910-06-25

Family

ID=3561973

Family Applications (1)

Application Number Title Priority Date Filing Date
AT42821D AT42821B (en) 1907-11-21 1907-11-21 Method of building bells and iron basins of gas containers.

Country Status (1)

Country Link
AT (1) AT42821B (en)

Similar Documents

Publication Publication Date Title
DE1759835B2 (en) Hollow steel column
DE1138208B (en) Method and device for setting up multi-storey buildings with a basement
AT42821B (en) Method of building bells and iron basins of gas containers.
DE2233632A1 (en) METHOD OF CONSTRUCTING A HIGH-RISE BUILDING FROM A CENTRAL STEM WITH THESE SURROUNDING STORAGE CEILINGS
DE219501C (en)
DE1684430C3 (en) Method for building high-rise buildings or the like. and device for carrying out the method
DE1434466A1 (en) Method for erecting tall concrete structures, e.g. of high-rise residential buildings
DE1534972A1 (en) Procedure for the lateral guidance of ceilings when lifting them during the erection of a building
DE557473C (en) Method of manufacturing reinforced concrete chimneys with rigid iron inserts
DE719119C (en) Wide-span sawn roof made of reinforced concrete
DE2756390C3 (en) Climbing armor for building cooling tower shells made of reinforced concrete with horizontal stiffening rings
AT38332B (en) Process for the production of gas containers with a guide frame mounted independently of the pool wall.
DE202127C (en)
DE817207C (en) Process for the production of reinforced concrete skeleton structures from prefabricated parts
CH170294A (en) Process for the production of structures from concrete.
AT167316B (en) Process for the production of concrete ceilings, especially in high-rise buildings
DE533973C (en) Steel framework for high-rise buildings
DE1128114B (en) Process for erecting buildings with the help of assembly supports
DE2652783C3 (en) Wooden skeleton for a multi-storey building
AT265593B (en) Multi-storey building
CH85691A (en) Process for the production and lowering of reinforced concrete caissons for compressed air foundations.
DE3446037A1 (en) Method of assembling prefabricated compound units produced on a base slab
CH153127A (en) Hollow ceiling with a reinforced concrete supporting structure consisting of ribs and a pressure plate.
AT296130B (en) Method and device for the production of concrete poles
AT78089B (en) Procedure for the installation of gas containers with a pane closure.