Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Priority claimed from JP58194102Aexternal-prioritypatent/JPS6086045A/ja
Priority claimed from JP19410383Aexternal-prioritypatent/JPS6086046A/ja
Application filed by Sumitomo Electric Industries, Nippon Telegraph & TelephonefiledCriticalSumitomo Electric Industries
Priority claimed from EP84307168Aexternal-prioritypatent/EP0140651B1/de
Application grantedgrantedCritical
Publication of ATE34164T1publicationCriticalpatent/ATE34164T1/de
Verfahren zur Herstellung einer integrierten optischen Baugruppe mit einer Wellenleiterlinse zur Kopplung von optischen Fasern mit integrierten Bauelementen