|
US6853922B2
(en)
*
|
2001-07-20 |
2005-02-08 |
Tracy Joseph Stark |
System for information extraction from geologic time volumes
|
|
US7899657B2
(en)
|
2003-01-24 |
2011-03-01 |
Rockwell Automoation Technologies, Inc. |
Modeling in-situ reservoirs with derivative constraints
|
|
US7283911B2
(en)
*
|
2004-10-22 |
2007-10-16 |
Landmark Graphics Corporation |
System and method for interpreting reverse faults and multiple z-valued seismic horizons
|
|
DE602004015297D1
(de)
*
|
2004-10-26 |
2008-09-04 |
Total Sa |
Verfahren und Computerprogramm zur Fehleroberflächenkonstruktion
|
|
BRPI0708449B1
(pt)
*
|
2006-03-02 |
2019-01-22 |
Exxonmobil Upstream Res Co |
métodos para produção de hidrocarbonetos
|
|
US9074454B2
(en)
*
|
2008-01-15 |
2015-07-07 |
Schlumberger Technology Corporation |
Dynamic reservoir engineering
|
|
AU2009244726B2
(en)
*
|
2008-05-05 |
2014-04-24 |
Exxonmobil Upstream Research Company |
Modeling dynamic systems by visualizing and narrowing a parameter space
|
|
US7916576B2
(en)
|
2008-07-16 |
2011-03-29 |
Westerngeco L.L.C. |
Optimizing a seismic survey for source separation
|
|
AU2009314461B2
(en)
|
2008-11-14 |
2015-11-05 |
Exxonmobil Upstream Research Company |
Forming a model of a subsurface region
|
|
WO2010104535A1
(en)
|
2009-03-13 |
2010-09-16 |
Exxonmobil Upstream Research Company |
Method for predicting fluid flow
|
|
US8395966B2
(en)
*
|
2009-04-24 |
2013-03-12 |
Westerngeco L.L.C. |
Separating seismic signals produced by interfering seismic sources
|
|
US8600708B1
(en)
|
2009-06-01 |
2013-12-03 |
Paradigm Sciences Ltd. |
Systems and processes for building multiple equiprobable coherent geometrical models of the subsurface
|
|
US8275593B2
(en)
*
|
2009-07-16 |
2012-09-25 |
University Of Regina |
Reservoir modeling method
|
|
US8743115B1
(en)
|
2009-10-23 |
2014-06-03 |
Paradigm Sciences Ltd. |
Systems and methods for coordinated editing of seismic data in dual model
|
|
EP2317348B1
(de)
*
|
2009-10-30 |
2014-05-21 |
Services Pétroliers Schlumberger |
Verfahren für den Aufbau eines Ablagerungsraumes entsprechend einem geologischen Bereich
|
|
EP2507738B1
(de)
|
2009-11-30 |
2019-05-01 |
Exxonmobil Upstream Research Company |
Adaptives newton-verfahren für reservoirsimulation
|
|
WO2011100002A1
(en)
|
2010-02-12 |
2011-08-18 |
Exxonmobil Upstream Research Company |
Method and system for partitioning parallel simulation models
|
|
BR112012025995A2
(pt)
|
2010-04-30 |
2016-06-28 |
Exxonmobil Upstream Res Co |
método e sistema para simulação de fluxo de volume finito
|
|
US20110310101A1
(en)
*
|
2010-06-22 |
2011-12-22 |
Schlumberger Technology Corporation |
Pillar grid conversion
|
|
FR2962835B1
(fr)
*
|
2010-07-16 |
2013-07-12 |
IFP Energies Nouvelles |
Methode pour generer un maillage hexa-dominant d'un bassin geometriquement complexe
|
|
EP2599029A4
(de)
|
2010-07-29 |
2014-01-08 |
Exxonmobil Upstream Res Co |
Verfahren und systeme für eine auf maschinenlernen beruhende flusssimulation
|
|
CA2803068C
(en)
|
2010-07-29 |
2016-10-11 |
Exxonmobil Upstream Research Company |
Method and system for reservoir modeling
|
|
EP2599023B1
(de)
|
2010-07-29 |
2019-10-23 |
Exxonmobil Upstream Research Company |
Verfahren und systeme für eine auf maschinenlernen beruhende flusssimulation
|
|
WO2012039811A1
(en)
|
2010-09-20 |
2012-03-29 |
Exxonmobil Upstream Research Company |
Flexible and adaptive formulations for complex reservoir simulations
|
|
WO2012071090A1
(en)
|
2010-11-23 |
2012-05-31 |
Exxonmobil Upstream Research Company |
Variable discretization method for flow simulation on complex geological models
|
|
US9534485B2
(en)
|
2011-04-18 |
2017-01-03 |
Halliburton Energy Services, Inc. |
Method for real-time downhole processing and detection of bed boundary for geosteering application
|
|
US8731892B2
(en)
|
2011-08-02 |
2014-05-20 |
Saudi Arabian Oil Company |
Systems and program product for performing a fully automated workflow for well performance model creation and calibration
|
|
US8688426B2
(en)
|
2011-08-02 |
2014-04-01 |
Saudi Arabian Oil Company |
Methods for performing a fully automated workflow for well performance model creation and calibration
|
|
BR112014005794A2
(pt)
|
2011-09-15 |
2017-03-28 |
Exxonmobil Upstream Res Co |
operações matriciais e vetoriais otimizadas em algoritmos de instrução limitada que executam cálculos de equação de estado
|
|
US9759826B2
(en)
*
|
2012-04-03 |
2017-09-12 |
Paradigm Sciences Ltd. |
System and method for generating an implicit model of geological horizons
|
|
AU2013324162B2
(en)
|
2012-09-28 |
2018-08-09 |
Exxonmobil Upstream Research Company |
Fault removal in geological models
|
|
CN105659292A
(zh)
*
|
2013-11-26 |
2016-06-08 |
界标制图有限公司 |
复杂断层网络拓扑的全局网格建立无断层序列
|
|
US10319143B2
(en)
|
2014-07-30 |
2019-06-11 |
Exxonmobil Upstream Research Company |
Volumetric grid generation in a domain with heterogeneous material properties
|
|
US10359523B2
(en)
|
2014-08-05 |
2019-07-23 |
Exxonmobil Upstream Research Company |
Exploration and extraction method and system for hydrocarbons
|
|
CA2963092C
(en)
|
2014-10-31 |
2021-07-06 |
Exxonmobil Upstream Research Company |
Methods to handle discontinuity in constructing design space for faulted subsurface model using moving least squares
|
|
CA2963416A1
(en)
|
2014-10-31 |
2016-05-06 |
Exxonmobil Upstream Research Company |
Handling domain discontinuity in a subsurface grid model with the help of grid optimization techniques
|
|
US10107938B2
(en)
|
2014-10-31 |
2018-10-23 |
Exxonmobil Upstream Research Company |
Managing discontinuities in geologic models
|
|
US10215886B2
(en)
*
|
2016-02-19 |
2019-02-26 |
Baker Hughes, A Ge Company, Llc |
Plane-surface intersection algorithm with consistent boundary support
|
|
US10466388B2
(en)
|
2016-09-07 |
2019-11-05 |
Emerson Paradigm Holding Llc |
System and method for editing geological models by switching between volume-based models and surface-based structural models augmented with stratigraphic fiber bundles
|
|
WO2018093599A1
(en)
*
|
2016-11-17 |
2018-05-24 |
Landmark Graphics Corporation |
Multi-z horizon interpretation and editing within seismic data
|
|
WO2018093597A1
(en)
*
|
2016-11-17 |
2018-05-24 |
Landmark Graphics Corporation |
Multi-z horizon interpretation and visualization from seismic data
|
|
HUE064459T2
(hu)
|
2016-12-23 |
2024-03-28 |
Exxonmobil Technology & Engineering Company |
Eljárás és rendszer stabil és hatékony tározó szimulációhoz stabilitási proxyk alkalmazásával
|
|
US10209380B2
(en)
*
|
2016-12-30 |
2019-02-19 |
Schlumberger Technology Corporation |
Methods and systems for juxtaposition across geological discontinuities
|
|
CA3065179A1
(en)
|
2017-05-31 |
2018-12-06 |
Exxonmobil Upstream Research Company |
Constructing structural models of the subsurface
|
|
US20200309991A1
(en)
*
|
2017-09-11 |
2020-10-01 |
Landmark Graphics Corporation |
Topologically correct horizons for complex fault network
|
|
CN109519169A
(zh)
*
|
2018-10-25 |
2019-03-26 |
广东石油化工学院 |
复杂断块油藏分类评价方法
|
|
US10520644B1
(en)
|
2019-01-10 |
2019-12-31 |
Emerson Paradigm Holding Llc |
Imaging a subsurface geological model at a past intermediate restoration time
|
|
US11156744B2
(en)
|
2019-01-10 |
2021-10-26 |
Emerson Paradigm Holding Llc |
Imaging a subsurface geological model at a past intermediate restoration time
|
|
CN114114404B
(zh)
*
|
2020-08-25 |
2024-09-13 |
中国石油化工股份有限公司 |
一种用于挤压盆地的古地貌恢复方法
|
|
CN112505758B
(zh)
*
|
2020-11-17 |
2021-10-26 |
中国石油集团工程咨询有限责任公司 |
一种基于断层分叉结构模型的复杂地质构造地震断层图像处理方法
|
|
CN114519784B
(zh)
*
|
2022-02-14 |
2023-11-24 |
煤炭科学研究总院有限公司 |
三维断层的建模方法及其装置
|
|
EP4581404B1
(de)
*
|
2022-09-19 |
2026-08-05 |
Services Pétroliers Schlumberger |
Automatische maschinenlernfehlermodellierung mit gruppierung
|