|
US6853922B2
(en)
*
|
2001-07-20 |
2005-02-08 |
Tracy Joseph Stark |
System for information extraction from geologic time volumes
|
|
US7899657B2
(en)
*
|
2003-01-24 |
2011-03-01 |
Rockwell Automoation Technologies, Inc. |
Modeling in-situ reservoirs with derivative constraints
|
|
US7283911B2
(en)
*
|
2004-10-22 |
2007-10-16 |
Landmark Graphics Corporation |
System and method for interpreting reverse faults and multiple z-valued seismic horizons
|
|
DE602004015297D1
(de)
*
|
2004-10-26 |
2008-09-04 |
Total Sa |
Verfahren und Computerprogramm zur Fehleroberflächenkonstruktion
|
|
US8776895B2
(en)
*
|
2006-03-02 |
2014-07-15 |
Exxonmobil Upstream Research Company |
Method for quantifying reservoir connectivity using fluid travel times
|
|
US9074454B2
(en)
*
|
2008-01-15 |
2015-07-07 |
Schlumberger Technology Corporation |
Dynamic reservoir engineering
|
|
EP2291790B1
(de)
*
|
2008-05-05 |
2020-04-29 |
Exxonmobil Upstream Research Company |
Modellierung von dynamischen geologischen systemen durch visualisierung und verschmälerung eines parameterraums
|
|
US7916576B2
(en)
|
2008-07-16 |
2011-03-29 |
Westerngeco L.L.C. |
Optimizing a seismic survey for source separation
|
|
CA2743479C
(en)
|
2008-11-14 |
2016-06-28 |
Exxonmobil Upstream Research Company |
Forming a model of a subsurface region
|
|
CA2753131A1
(en)
|
2009-03-13 |
2010-09-16 |
Exxonmobil Upstream Research Company |
Method for predicting fluid flow
|
|
US8395966B2
(en)
*
|
2009-04-24 |
2013-03-12 |
Westerngeco L.L.C. |
Separating seismic signals produced by interfering seismic sources
|
|
US8600708B1
(en)
|
2009-06-01 |
2013-12-03 |
Paradigm Sciences Ltd. |
Systems and processes for building multiple equiprobable coherent geometrical models of the subsurface
|
|
US8275593B2
(en)
*
|
2009-07-16 |
2012-09-25 |
University Of Regina |
Reservoir modeling method
|
|
US8743115B1
(en)
|
2009-10-23 |
2014-06-03 |
Paradigm Sciences Ltd. |
Systems and methods for coordinated editing of seismic data in dual model
|
|
EP2317348B1
(de)
*
|
2009-10-30 |
2014-05-21 |
Services Pétroliers Schlumberger |
Verfahren für den Aufbau eines Ablagerungsraumes entsprechend einem geologischen Bereich
|
|
WO2011066021A1
(en)
|
2009-11-30 |
2011-06-03 |
Exxonmobil Upstream Research Company |
Adaptive newton's method for reservoir simulation
|
|
US9594186B2
(en)
|
2010-02-12 |
2017-03-14 |
Exxonmobil Upstream Research Company |
Method and system for partitioning parallel simulation models
|
|
BR112012025995A2
(pt)
|
2010-04-30 |
2016-06-28 |
Exxonmobil Upstream Res Co |
método e sistema para simulação de fluxo de volume finito
|
|
US20110310101A1
(en)
*
|
2010-06-22 |
2011-12-22 |
Schlumberger Technology Corporation |
Pillar grid conversion
|
|
FR2962835B1
(fr)
*
|
2010-07-16 |
2013-07-12 |
IFP Energies Nouvelles |
Methode pour generer un maillage hexa-dominant d'un bassin geometriquement complexe
|
|
AU2011283196B2
(en)
|
2010-07-29 |
2014-07-31 |
Exxonmobil Upstream Research Company |
Method and system for reservoir modeling
|
|
US10087721B2
(en)
|
2010-07-29 |
2018-10-02 |
Exxonmobil Upstream Research Company |
Methods and systems for machine—learning based simulation of flow
|
|
EP2599023B1
(de)
|
2010-07-29 |
2019-10-23 |
Exxonmobil Upstream Research Company |
Verfahren und systeme für eine auf maschinenlernen beruhende flusssimulation
|
|
BR112013002114A2
(pt)
|
2010-09-20 |
2016-05-17 |
Exxonmobil Upstream Res Co |
formulações flexíveis e adaptáveis para simulações de reservatório complexas
|
|
CA2814669A1
(en)
|
2010-11-23 |
2012-05-31 |
Exxonmobil Upstream Research Company |
Variable discretization method for flow simulation on complex geological models
|
|
WO2012144981A1
(en)
*
|
2011-04-18 |
2012-10-26 |
Halliburton Energy Services, Inc. |
Method for real-time downhole processing and detection of bed boundary for geosteering application
|
|
US8731892B2
(en)
|
2011-08-02 |
2014-05-20 |
Saudi Arabian Oil Company |
Systems and program product for performing a fully automated workflow for well performance model creation and calibration
|
|
US8688426B2
(en)
|
2011-08-02 |
2014-04-01 |
Saudi Arabian Oil Company |
Methods for performing a fully automated workflow for well performance model creation and calibration
|
|
CA2843929C
(en)
|
2011-09-15 |
2018-03-27 |
Exxonmobil Upstream Research Company |
Optimized matrix and vector operations in instruction limited algorithms that perform eos calculations
|
|
US9759826B2
(en)
*
|
2012-04-03 |
2017-09-12 |
Paradigm Sciences Ltd. |
System and method for generating an implicit model of geological horizons
|
|
WO2014051903A1
(en)
|
2012-09-28 |
2014-04-03 |
Exxonmobil Upstream Research Company |
Fault removal in geological models
|
|
MX2016003912A
(es)
*
|
2013-11-26 |
2016-10-28 |
Landmark Graphics Corp |
Secuencia de eliminacion de fallas de construccion de una cuadricula global para topologias de red de fallas complejas.
|
|
EP3175265A1
(de)
|
2014-07-30 |
2017-06-07 |
ExxonMobil Upstream Research Company |
Verfahren zur erzeugung eines volumetrischen gitters in einem bereich mit heterogenen materialeigenschaften
|
|
US10359523B2
(en)
|
2014-08-05 |
2019-07-23 |
Exxonmobil Upstream Research Company |
Exploration and extraction method and system for hydrocarbons
|
|
AU2015339884B2
(en)
|
2014-10-31 |
2018-03-15 |
Exxonmobil Upstream Research Company |
Handling domain discontinuity in a subsurface grid model with the help of grid optimization techniques
|
|
CA2961923A1
(en)
|
2014-10-31 |
2016-05-06 |
Exxonmobil Upstream Research Company |
Managing discontinuities in geologic models
|
|
EP3213125A1
(de)
|
2014-10-31 |
2017-09-06 |
Exxonmobil Upstream Research Company Corp-urc-e2. 4A.296 |
Verfahren zur handhabung von diskontinuität beim aufbau eines entwurfsraums für ein fehlerhaftes unterirdisches modell mit beweglichen kleinsten quadraten
|
|
US10215886B2
(en)
*
|
2016-02-19 |
2019-02-26 |
Baker Hughes, A Ge Company, Llc |
Plane-surface intersection algorithm with consistent boundary support
|
|
US10466388B2
(en)
|
2016-09-07 |
2019-11-05 |
Emerson Paradigm Holding Llc |
System and method for editing geological models by switching between volume-based models and surface-based structural models augmented with stratigraphic fiber bundles
|
|
US11340369B2
(en)
|
2016-11-17 |
2022-05-24 |
Landmark Graphics Corporation |
Multi-Z horizon interpretation and editing within seismic data
|
|
FR3058798A1
(fr)
*
|
2016-11-17 |
2018-05-18 |
Landmark Graphics Corporation |
Interpretation et visualisation d'horizon a valeurs z multiples a partir de donnees sysmiques
|
|
CA3043231C
(en)
|
2016-12-23 |
2022-06-14 |
Exxonmobil Upstream Research Company |
Method and system for stable and efficient reservoir simulation using stability proxies
|
|
US10209380B2
(en)
*
|
2016-12-30 |
2019-02-19 |
Schlumberger Technology Corporation |
Methods and systems for juxtaposition across geological discontinuities
|
|
EP3631528A1
(de)
|
2017-05-31 |
2020-04-08 |
ExxonMobil Upstream Research Company |
Konstruktion von strukturellen modellen des untergrunds
|
|
US20200309991A1
(en)
*
|
2017-09-11 |
2020-10-01 |
Landmark Graphics Corporation |
Topologically correct horizons for complex fault network
|
|
CN109519169A
(zh)
*
|
2018-10-25 |
2019-03-26 |
广东石油化工学院 |
复杂断块油藏分类评价方法
|
|
US10520644B1
(en)
|
2019-01-10 |
2019-12-31 |
Emerson Paradigm Holding Llc |
Imaging a subsurface geological model at a past intermediate restoration time
|
|
US11156744B2
(en)
|
2019-01-10 |
2021-10-26 |
Emerson Paradigm Holding Llc |
Imaging a subsurface geological model at a past intermediate restoration time
|
|
CN114114404B
(zh)
*
|
2020-08-25 |
2024-09-13 |
中国石油化工股份有限公司 |
一种用于挤压盆地的古地貌恢复方法
|
|
CN112505758B
(zh)
*
|
2020-11-17 |
2021-10-26 |
中国石油集团工程咨询有限责任公司 |
一种基于断层分叉结构模型的复杂地质构造地震断层图像处理方法
|
|
CN114519784B
(zh)
*
|
2022-02-14 |
2023-11-24 |
煤炭科学研究总院有限公司 |
三维断层的建模方法及其装置
|
|
EP4581404A4
(de)
*
|
2022-09-19 |
2025-10-15 |
Services Petroliers Schlumberger |
Automatische maschinenlernfehlermodellierung mit gruppierung
|