|
US6835207B2
(en)
*
|
1996-07-22 |
2004-12-28 |
Fred Zacouto |
Skeletal implant
|
|
US20020194056A1
(en)
*
|
1998-07-31 |
2002-12-19 |
Summers Gary J. |
Management training simulation method and system
|
|
US7349838B2
(en)
*
|
1998-07-31 |
2008-03-25 |
Summers Gary J |
Management training simulation method and system
|
|
US7509245B2
(en)
*
|
1999-04-29 |
2009-03-24 |
Schlumberger Technology Corporation |
Method system and program storage device for simulating a multilayer reservoir and partially active elements in a hydraulic fracturing simulator
|
|
US8428923B2
(en)
|
1999-04-29 |
2013-04-23 |
Schlumberger Technology Corporation |
Method system and program storage device for simulating a multilayer reservoir and partially active elements in a hydraulic fracturing simulator
|
|
US7626594B1
(en)
*
|
1999-08-01 |
2009-12-01 |
Puredepth Limited |
Interactive three dimensional display with layered screens
|
|
EP1212744A4
(de)
*
|
1999-08-19 |
2006-06-14 |
Pure Depth Ltd |
Anzeigeverfahren für mehrfachschichtbildschirme
|
|
WO2001015132A1
(en)
|
1999-08-19 |
2001-03-01 |
Deep Video Imaging Limited |
Control of depth movement for visual display with layered screens
|
|
CA2419719C
(en)
*
|
1999-08-19 |
2011-03-29 |
Deep Video Imaging Limited |
Data display for multiple layered screens
|
|
US7542921B1
(en)
|
1999-09-30 |
2009-06-02 |
Jpmorgan Chase Bank, N.A. |
Network-based financial planning system and method
|
|
CN1386200A
(zh)
*
|
2000-06-29 |
2002-12-18 |
目标储油层公司 |
有限元模型中的特征建模方法
|
|
US7369973B2
(en)
*
|
2000-06-29 |
2008-05-06 |
Object Reservoir, Inc. |
Method and system for representing reservoir systems
|
|
US7031935B1
(en)
|
2000-07-31 |
2006-04-18 |
J.P. Morgan Advisory Services Inc. |
Method and system for computing path dependent probabilities of attaining financial goals
|
|
US20020177955A1
(en)
*
|
2000-09-28 |
2002-11-28 |
Younes Jalali |
Completions architecture
|
|
US7295999B1
(en)
|
2000-12-20 |
2007-11-13 |
Jpmorgan Chase Bank, N.A. |
System and method for determining eligibility and enrolling members in various programs
|
|
US7895098B2
(en)
|
2001-03-01 |
2011-02-22 |
Jpmorgan Chase Bank, N.A. |
System and method for measuring and utilizing pooling analytics
|
|
NZ511444A
(en)
|
2001-05-01 |
2004-01-30 |
Deep Video Imaging Ltd |
Information display
|
|
JP4720964B2
(ja)
*
|
2001-05-31 |
2011-07-13 |
日本電気株式会社 |
Fem解析方法、プログラム、およびシステム
|
|
US7359841B1
(en)
|
2001-06-21 |
2008-04-15 |
Hixon Technologies, Ltd. |
Method and system for the efficient calculation of unsteady processes on arbitrary space-time domains
|
|
US7363198B2
(en)
*
|
2001-10-29 |
2008-04-22 |
The Board Of Trustees Of The Leland Stanford Junior University |
Long elements method for simulation of deformable objects
|
|
US7930643B2
(en)
*
|
2002-01-29 |
2011-04-19 |
National Instruments Corporation |
System and method for previewing a sequence of motion control operations
|
|
US7756896B1
(en)
|
2002-03-11 |
2010-07-13 |
Jp Morgan Chase Bank |
System and method for multi-dimensional risk analysis
|
|
AU2003230751A1
(en)
|
2002-03-29 |
2003-10-13 |
Bank One, Delaware, N.A. |
System and process for performing purchase transaction using tokens
|
|
AU2003226336A1
(en)
*
|
2002-04-09 |
2003-10-27 |
University Of Iowa Research Foundation |
Reconstruction and motion analysis of an embryo
|
|
US7027048B2
(en)
*
|
2002-05-31 |
2006-04-11 |
Ugs Corp. |
Computerized deformation analyzer
|
|
US7222057B2
(en)
*
|
2002-05-31 |
2007-05-22 |
Ugs Corp. |
Topology modeler
|
|
US7606756B2
(en)
|
2002-08-02 |
2009-10-20 |
Jpmorgan Chase Bank, N.A. |
Synthetic funds having structured notes
|
|
US7358121B2
(en)
*
|
2002-08-23 |
2008-04-15 |
Intel Corporation |
Tri-gate devices and methods of fabrication
|
|
NZ521505A
(en)
|
2002-09-20 |
2005-05-27 |
Deep Video Imaging Ltd |
Multi-view display
|
|
US7725301B2
(en)
*
|
2002-11-04 |
2010-05-25 |
Welldynamics, B.V. |
System and method for estimating multi-phase fluid rates in a subterranean well
|
|
JP3840173B2
(ja)
*
|
2002-11-15 |
2006-11-01 |
キヤノン株式会社 |
三次元解析用メッシュ生成方法、三次元解析用メッシュ生成装置、プログラムおよび記憶媒体
|
|
US20040148566A1
(en)
*
|
2003-01-24 |
2004-07-29 |
Jp Morgan Chase Bank |
Method to evaluate project viability
|
|
US7096172B2
(en)
*
|
2003-01-31 |
2006-08-22 |
Landmark Graphics Corporation, A Division Of Halliburton Energy Services, Inc. |
System and method for automated reservoir targeting
|
|
US7200540B2
(en)
*
|
2003-01-31 |
2007-04-03 |
Landmark Graphics Corporation |
System and method for automated platform generation
|
|
GB2398900A
(en)
*
|
2003-02-27 |
2004-09-01 |
Schlumberger Holdings |
Identification of best production potential oil wells and identification of drilling strategy to maximise production potential
|
|
US7254523B2
(en)
*
|
2003-03-14 |
2007-08-07 |
Seiko Epson Corporation |
Selectively reduced bi-cubic interpolation for ink-jet simulations on quadrilateral grids
|
|
US7117138B2
(en)
*
|
2003-03-14 |
2006-10-03 |
Seiko Epson Corporation |
Coupled quadrilateral grid level set scheme for piezoelectric ink-jet simulation
|
|
CA2518922A1
(en)
*
|
2003-03-14 |
2004-09-23 |
Cesar Castanon Fernandez |
Method of determining the physicochemical properties of a three-dimensional body
|
|
FI20030550A0
(fi)
*
|
2003-04-11 |
2003-04-11 |
Pajunen Petri |
Menetelmä numeerisen ratkaisun tarkkuuden arvioimiseksi
|
|
US7835893B2
(en)
*
|
2003-04-30 |
2010-11-16 |
Landmark Graphics Corporation |
Method and system for scenario and case decision management
|
|
NZ525956A
(en)
|
2003-05-16 |
2005-10-28 |
Deep Video Imaging Ltd |
Display control system for use with multi-layer displays
|
|
US7876705B2
(en)
*
|
2003-06-25 |
2011-01-25 |
Schlumberger Technology Corporation |
Method and apparatus and program storage device for generating a workflow in response to a user objective and generating software modules in response to the workflow and executing the software modules to produce a product
|
|
US7287231B2
(en)
*
|
2003-07-31 |
2007-10-23 |
The Boeing Company |
Logistics simulator
|
|
US7624068B1
(en)
|
2003-08-18 |
2009-11-24 |
Jpmorgan Chase Bank, N.A. |
Method and system for dynamically adjusting discount rates for a card transaction
|
|
US7251591B2
(en)
*
|
2003-08-29 |
2007-07-31 |
Seiko Epson Corporation |
Consistent back pressure for piezoelectric ink-jet simulation
|
|
CN100590637C
(zh)
|
2003-09-30 |
2010-02-17 |
埃克森美孚上游研究公司 |
使用最小阻力路径来特征化储层模型中的连通性
|
|
US7069148B2
(en)
*
|
2003-11-25 |
2006-06-27 |
Thambynayagam Raj Kumar Michae |
Gas reservoir evaluation and assessment tool method and apparatus and program storage device
|
|
US7725302B2
(en)
*
|
2003-12-02 |
2010-05-25 |
Schlumberger Technology Corporation |
Method and system and program storage device for generating an SWPM-MDT workflow in response to a user objective and executing the workflow to produce a reservoir response model
|
|
JP3889394B2
(ja)
*
|
2003-12-16 |
2007-03-07 |
株式会社スクウェア・エニックス |
画像描画装置及び方法、プログラム並びに記録媒体
|
|
GB2409304B
(en)
*
|
2003-12-19 |
2007-11-14 |
Westerngeco Ltd |
Processing geophysical data
|
|
US7379852B2
(en)
*
|
2004-02-18 |
2008-05-27 |
Chevron U.S.A. Inc. |
N-phase interface tracking method utilizing unique enumeration of microgrid cells
|
|
US7596481B2
(en)
*
|
2004-03-16 |
2009-09-29 |
M-I L.L.C. |
Three-dimensional wellbore analysis and visualization
|
|
US7657414B2
(en)
*
|
2005-02-23 |
2010-02-02 |
M-I L.L.C. |
Three-dimensional wellbore visualization system for hydraulics analyses
|
|
US7418370B2
(en)
*
|
2004-03-31 |
2008-08-26 |
International Business Machines Corporation |
Method, apparatus and computer program providing broadband preconditioning based on reduced coupling for numerical solvers
|
|
AU2005236775B2
(en)
*
|
2004-03-31 |
2011-03-10 |
Exxonmobil Upstream Research Company |
Method for simulating and estimating sandstone properties
|
|
FR2870621B1
(fr)
*
|
2004-05-21 |
2006-10-27 |
Inst Francais Du Petrole |
Methode pour generer un maillage hybride conforme en trois dimensions d'une formation heterogene traversee par une ou plusieurs discontinuites geometriques dans le but de realiser des simulations
|
|
WO2005120195A2
(en)
*
|
2004-06-07 |
2005-12-22 |
Brigham Young University |
Reservoir simulation
|
|
EP1759226A1
(de)
*
|
2004-06-07 |
2007-03-07 |
ExxonMobil Upstream Research Company |
Verfahren zum lösen einer impliziten reservoir-simulationsmatrixgleichung
|
|
US7974895B1
(en)
|
2004-07-16 |
2011-07-05 |
Jp Morgan Chase Bank |
System and method for developing finance rate information
|
|
US7516055B2
(en)
*
|
2004-08-20 |
2009-04-07 |
Chevron U.S.A. Inc |
Multiple-point statistics (MPS) simulation with enhanced computational efficiency
|
|
JP4714444B2
(ja)
*
|
2004-08-31 |
2011-06-29 |
国立大学法人北海道大学 |
四面体メッシュ生成方法およびプログラム
|
|
GB2464856B
(en)
*
|
2004-09-24 |
2010-06-30 |
Vision Rt Ltd |
Image processing system for use with a patient positioning device
|
|
US7676349B2
(en)
*
|
2004-12-06 |
2010-03-09 |
Exxonmobil Upstream Research Co. |
Integrated anisotropic rock physics model
|
|
US7890343B1
(en)
|
2005-01-11 |
2011-02-15 |
Jp Morgan Chase Bank |
System and method for generating risk management curves
|
|
WO2007001604A2
(en)
*
|
2005-06-28 |
2007-01-04 |
Exxonmobil Upstream Research Company |
High-level graphical programming language and tool for well management programming
|
|
WO2007008382A2
(en)
*
|
2005-07-13 |
2007-01-18 |
Exxonmobil Upstream Research Company |
Method for predicting the best and worst in a set of non-unique solutions
|
|
US20070036434A1
(en)
*
|
2005-08-15 |
2007-02-15 |
Peter Saveliev |
Topology-Based Method of Partition, Analysis, and Simplification of Dynamical Images and its Applications
|
|
US8145463B2
(en)
|
2005-09-15 |
2012-03-27 |
Schlumberger Technology Corporation |
Gas reservoir evaluation and assessment tool method and apparatus and program storage device
|
|
FR2891383B1
(fr)
*
|
2005-09-26 |
2008-07-11 |
Inst Francais Du Petrole |
Methode pour simuler des ecoulements de fluides au sein d'un milieu discretise par un maillage hybride
|
|
US7962396B1
(en)
|
2006-02-03 |
2011-06-14 |
Jpmorgan Chase Bank, N.A. |
System and method for managing risk
|
|
US7707192B1
(en)
|
2006-05-23 |
2010-04-27 |
Jp Morgan Chase Bank, N.A. |
Confidence index for assets
|
|
EP2372398A3
(de)
*
|
2006-06-21 |
2012-04-11 |
Terraspark Geosciences, LLC |
Extraktion von Ablagerungssystemen
|
|
BRPI0713992A2
(pt)
*
|
2006-06-30 |
2012-11-20 |
Directv Group Inc |
canal de vÍdeo matriciado interativo exibido em um monitor de vÍdeo, aparelho para exibir um canal de vÍdeo em mosaico, sistema de exibiÇço seletiva de cÉlula de vÍdeo em um canal de vÍdeo
|
|
CA2655232C
(en)
*
|
2006-07-07 |
2015-11-24 |
Exxonmobil Upstream Research Company |
Upscaling of reservoir models by reusing flow solutions from geologic models
|
|
US7536285B2
(en)
*
|
2006-08-14 |
2009-05-19 |
Seiko Epson Corporation |
Odd times refined quadrilateral mesh for level set
|
|
CA2660444C
(en)
*
|
2006-08-14 |
2017-07-11 |
Exxonmobil Upstream Research Company |
Enriched multi-point flux approximation
|
|
US7657407B2
(en)
*
|
2006-08-15 |
2010-02-02 |
Landmark Graphics Corporation |
Method and system of planning hydrocarbon extraction from a hydrocarbon formation
|
|
GB2442496A
(en)
*
|
2006-10-02 |
2008-04-09 |
Univ Sheffield |
Evaluating displacements at discontinuities within a body
|
|
US20080088578A1
(en)
*
|
2006-10-16 |
2008-04-17 |
Immersion Corporation |
Flexible object simulator
|
|
US7565278B2
(en)
*
|
2006-12-04 |
2009-07-21 |
Chevron U.S.A. Inc. |
Method, system and apparatus for simulating fluid flow in a fractured reservoir utilizing a combination of discrete fracture networks and homogenization of small fractures
|
|
EP2118738A4
(de)
*
|
2006-12-28 |
2014-07-02 |
Chevron Usa Inc |
Verfahren, system und programmspeichereinrichtung zur vorgeschichteabstimmung und vorhersage von kohlenwasserstoff führenden reservoirs unter verwendung von proxi für wahrscheinlichkeitsfunktionen
|
|
US8607144B2
(en)
*
|
2007-01-08 |
2013-12-10 |
Apple Inc. |
Monitor configuration for media device
|
|
US8612857B2
(en)
|
2007-01-08 |
2013-12-17 |
Apple Inc. |
Monitor configuration for media device
|
|
GB0701202D0
(en)
*
|
2007-01-22 |
2007-02-28 |
Wanzke Detlev |
Data analysis
|
|
KR101407100B1
(ko)
*
|
2007-03-09 |
2014-06-16 |
엘지전자 주식회사 |
전자 기기 및 이를 이용한 아이템 표시 방법
|
|
US8346695B2
(en)
*
|
2007-03-29 |
2013-01-01 |
Schlumberger Technology Corporation |
System and method for multiple volume segmentation
|
|
GB0706659D0
(en)
*
|
2007-04-05 |
2007-05-16 |
Statoil Asa |
Reduction of airwave contribution in marine electromagnetic data
|
|
EP2156365B1
(de)
|
2007-05-24 |
2013-08-14 |
ExxonMobil Upstream Research Company |
Verfahren für verbesserte reservoirsimulation von fingersatzsystemen
|
|
US9175547B2
(en)
*
|
2007-06-05 |
2015-11-03 |
Schlumberger Technology Corporation |
System and method for performing oilfield production operations
|
|
WO2009035737A2
(en)
*
|
2007-06-13 |
2009-03-19 |
United States Of America As Represented By The Administrator Of The National Aeronautics And Space Administration |
Adaptive refinement tools for tetrahedral unstructured grids
|
|
US7813907B2
(en)
*
|
2007-07-12 |
2010-10-12 |
Seiko Epson Corporation |
Hybrid method for enforcing curvature related boundary conditions in solving one-phase fluid flow over a deformable domain
|
|
US8244509B2
(en)
*
|
2007-08-01 |
2012-08-14 |
Schlumberger Technology Corporation |
Method for managing production from a hydrocarbon producing reservoir in real-time
|
|
US8548782B2
(en)
*
|
2007-08-24 |
2013-10-01 |
Exxonmobil Upstream Research Company |
Method for modeling deformation in subsurface strata
|
|
US8768672B2
(en)
*
|
2007-08-24 |
2014-07-01 |
ExxonMobil. Upstream Research Company |
Method for predicting time-lapse seismic timeshifts by computer simulation
|
|
US8265915B2
(en)
*
|
2007-08-24 |
2012-09-11 |
Exxonmobil Upstream Research Company |
Method for predicting well reliability by computer simulation
|
|
US8423337B2
(en)
*
|
2007-08-24 |
2013-04-16 |
Exxonmobil Upstream Research Company |
Method for multi-scale geomechanical model analysis by computer simulation
|
|
US8495911B2
(en)
|
2007-08-31 |
2013-07-30 |
Vestas Wind Systems A/S |
Wind turbine siting and maintenance prediction
|
|
CA2705197C
(en)
*
|
2007-11-14 |
2015-11-10 |
Terraspark Geosciences, L.P. |
Seismic data processing
|
|
US8676556B2
(en)
|
2007-11-27 |
2014-03-18 |
Exxonmobil Upstream Research Company |
Method for determining the properties of hydrocarbon reservoirs from geophysical data
|
|
WO2009075945A1
(en)
|
2007-12-13 |
2009-06-18 |
Exxonmobil Upstream Research Company |
Parallel adaptive data partitioning on a reservoir simulation using an unstructured grid
|
|
BRPI0820830B1
(pt)
*
|
2007-12-14 |
2019-08-13 |
Exxonmobil Upstream Res Co |
método para modelar em um computador uma região física
|
|
GB0724366D0
(en)
*
|
2007-12-14 |
2008-01-23 |
Univ York |
Environment modelling
|
|
CA2705277C
(en)
*
|
2007-12-18 |
2017-01-17 |
Exxonmobil Upstream Research Company |
Determining connectivity architecture in 2-d and 3-d heterogeneous data
|
|
EP2232406A4
(de)
|
2007-12-21 |
2017-10-18 |
Exxonmobil Upstream Research Company |
Verfahren und vorrichtung zum analysieren dreidimensionaler daten
|
|
BRPI0820732A2
(pt)
*
|
2007-12-21 |
2015-06-16 |
Exxonmobil Upstream Res Co |
Método para modelar uma região física, produto de programa de computador, e, método para modelar uma bacia geológica subsuperficial em um computador
|
|
US8230360B2
(en)
*
|
2008-01-04 |
2012-07-24 |
Apple Inc. |
User interface for selection from media collection
|
|
EP2235566A1
(de)
*
|
2008-01-22 |
2010-10-06 |
Exxonmobil Upstream Research Company |
Dynamische konnektivitätsanalyse
|
|
CA2710607A1
(en)
*
|
2008-02-28 |
2009-09-03 |
Exxonmobil Upstream Research Company |
Rock physics model for simulating seismic response in layered fractured rocks
|
|
US7899654B2
(en)
*
|
2008-03-06 |
2011-03-01 |
Seiko Epson Corporation |
Hybrid front tracking algorithm for solving single phase fluid equations with a moving boundary on a quadrilateral grid
|
|
WO2009114211A1
(en)
|
2008-03-10 |
2009-09-17 |
Exxonmobil Upstream Research Company |
Method for determing distinct alternative paths between two object sets in 2-d and 3-d heterogeneous data
|
|
US8000944B2
(en)
*
|
2008-03-13 |
2011-08-16 |
Seiko Epson Corporation |
Non-finite element implementation of the finite element projection in two dimensions
|
|
US8190414B2
(en)
*
|
2008-03-26 |
2012-05-29 |
Exxonmobil Upstream Research Company |
Modeling of hydrocarbon reservoirs containing subsurface features
|
|
WO2009120409A1
(en)
*
|
2008-03-28 |
2009-10-01 |
Exxonmobil Upstream Research Company |
Computing a consistent velocity vector field from a set of fluxes
|
|
US8803878B2
(en)
*
|
2008-03-28 |
2014-08-12 |
Schlumberger Technology Corporation |
Visualizing region growing in three dimensional voxel volumes
|
|
US8478637B1
(en)
|
2008-04-08 |
2013-07-02 |
Jpmorgan Chase Bank, N.A. |
Index for assessing discount potential
|
|
CA2721008A1
(en)
*
|
2008-04-11 |
2009-10-15 |
Terraspark Geosciences, Llc |
Visulation of geologic features using data representations thereof
|
|
CN102007459B
(zh)
*
|
2008-04-17 |
2015-01-07 |
埃克森美孚上游研究公司 |
用于储层开发计划的鲁棒性基于优化的决策支持工具
|
|
CN102007485B
(zh)
*
|
2008-04-18 |
2014-06-25 |
埃克森美孚上游研究公司 |
储层开发计划的基于markov决策过程的决策支持工具
|
|
WO2009131761A2
(en)
*
|
2008-04-21 |
2009-10-29 |
Exxonmobile Upstream Research Company |
Stochastic programming-based decision support tool for reservoir development planning
|
|
US7930155B2
(en)
*
|
2008-04-22 |
2011-04-19 |
Seiko Epson Corporation |
Mass conserving algorithm for solving a solute advection diffusion equation inside an evaporating droplet
|
|
US20090276192A1
(en)
*
|
2008-05-05 |
2009-11-05 |
Uri Avraham |
Method and Computer Program Product for Visualizing Feature Model Information
|
|
US9733388B2
(en)
|
2008-05-05 |
2017-08-15 |
Exxonmobil Upstream Research Company |
Systems and methods for connectivity analysis using functional objects
|
|
US8095349B2
(en)
*
|
2008-05-30 |
2012-01-10 |
Kelkar And Associates, Inc. |
Dynamic updating of simulation models
|
|
WO2010039325A1
(en)
*
|
2008-09-30 |
2010-04-08 |
Exxonmobil Upstream Reseach Company |
Method for solving reservoir simulation matrix equation using parallel multi-level incomplete factorizations
|
|
CN102165413A
(zh)
*
|
2008-09-30 |
2011-08-24 |
埃克森美孚上游研究公司 |
自适应迭代求解器
|
|
EP2189918A1
(de)
*
|
2008-11-07 |
2010-05-26 |
Dassault Systèmes |
Computer-implementiertes Berechnungsverfahren einer Begrenzung eines modellierten Objekts in einem Computer-gestützten Designsystem
|
|
WO2010056427A1
(en)
|
2008-11-14 |
2010-05-20 |
Exxonmobil Upstream Research Company |
Forming a model of a subsurface region
|
|
CN102239507B
(zh)
*
|
2008-12-03 |
2016-02-24 |
雪佛龙美国公司 |
用于离散裂隙建模的网格生成系统和方法
|
|
GB2477901A
(en)
*
|
2008-12-03 |
2011-08-17 |
Chevron Usa Inc |
System and method for predicting fluid flow characteristics within fractured subsurface reservoirs
|
|
BRPI0923412A2
(pt)
*
|
2008-12-16 |
2016-05-24 |
Exxonmobil Upstream Res Co |
método, e, produto de programa de computador.
|
|
WO2010071722A1
(en)
|
2008-12-18 |
2010-06-24 |
Exxonmobil Upstream Reseach Company |
Overlapped multiple layer depth averaged flow model of a turbidity current
|
|
US8352228B2
(en)
*
|
2008-12-23 |
2013-01-08 |
Exxonmobil Upstream Research Company |
Method for predicting petroleum expulsion
|
|
US9552462B2
(en)
*
|
2008-12-23 |
2017-01-24 |
Exxonmobil Upstream Research Company |
Method for predicting composition of petroleum
|
|
WO2010104537A1
(en)
|
2009-03-11 |
2010-09-16 |
Exxonmobil Upstream Research Company |
Adjoint-based conditioning of process-based geologic models
|
|
WO2010104536A1
(en)
|
2009-03-11 |
2010-09-16 |
Exxonmobil Upstream Research Company |
Gradient-based workflows for conditioning of process-based geologic models
|
|
EP2406663A1
(de)
|
2009-03-13 |
2012-01-18 |
Exxonmobil Upstream Research Company |
Verfahren zur vorhersage von fluidströmung
|
|
BRPI0900908B1
(pt)
*
|
2009-03-31 |
2017-06-06 |
Faculdades Católicas Mantenedora Da Pontifícia Univ Católica Do Rio De Janeiro - Puc Rio |
método de acoplamento parcial entre um sistema de análise de tensões e um simulador convencional de reservatórios e sistema para aproximação da equação de fluxo
|
|
WO2010123596A1
(en)
|
2009-04-20 |
2010-10-28 |
Exxonmobil Upstream Research Company |
Method for predicting fluid flow
|
|
US8600708B1
(en)
|
2009-06-01 |
2013-12-03 |
Paradigm Sciences Ltd. |
Systems and processes for building multiple equiprobable coherent geometrical models of the subsurface
|
|
US8711140B1
(en)
|
2009-06-01 |
2014-04-29 |
Paradigm Sciences Ltd. |
Systems and methods for building axes, co-axes and paleo-geographic coordinates related to a stratified geological volume
|
|
US9418182B2
(en)
|
2009-06-01 |
2016-08-16 |
Paradigm Sciences Ltd. |
Systems and methods for building axes, co-axes and paleo-geographic coordinates related to a stratified geological volume
|
|
US9536022B1
(en)
|
2009-06-01 |
2017-01-03 |
Paradigm Sciences Ltd. |
Systems and methods for modeling faults in the subsurface
|
|
FR2948215B1
(fr)
*
|
2009-07-16 |
2011-06-24 |
Inst Francais Du Petrole |
Methode pour generer un maillage hexa-dominant d'un milieu souterrain faille
|
|
US20110071799A1
(en)
*
|
2009-09-21 |
2011-03-24 |
Per Arne Slotte |
Grid models
|
|
GB2470241A
(en)
*
|
2009-09-21 |
2010-11-17 |
Statoilhydro Asa |
Forming a grid model of a geological structure having discontinuities
|
|
US8494827B2
(en)
*
|
2009-09-25 |
2013-07-23 |
Exxonmobil Upstream Research Company |
Method of predicting natural fractures and damage in a subsurface region
|
|
WO2011043862A1
(en)
|
2009-10-07 |
2011-04-14 |
Exxonmobil Upstream Research Company |
Discretized physics-based models and simulations of subterranean regions, and methods for creating and using the same
|
|
AU2010308495A1
(en)
|
2009-10-20 |
2012-05-10 |
Exxonmobil Upstream Research Company |
Method for quantitatively assessing connectivity for well pairs at varying frequencies
|
|
US8743115B1
(en)
|
2009-10-23 |
2014-06-03 |
Paradigm Sciences Ltd. |
Systems and methods for coordinated editing of seismic data in dual model
|
|
EP2491516B1
(de)
|
2009-10-23 |
2018-09-12 |
Exxonmobil Upstream Research Company |
Optimierungsverfahren mit gradienteninformationen
|
|
EP2499567A4
(de)
|
2009-11-12 |
2017-09-06 |
Exxonmobil Upstream Research Company |
Verfahren und vorrichtung zur reservoirmodellierung und -simulation
|
|
US20120221302A1
(en)
*
|
2009-11-23 |
2012-08-30 |
Jerome Lewandowski |
Method and System For Modeling Geologic Properties Using Homogenized Mixed Finite Elements
|
|
US8271237B2
(en)
*
|
2010-02-02 |
2012-09-18 |
Livermore Software Technology Corporation |
Fully-integrated hexahedral elements configured for reducing shear locking in finite element method
|
|
US8428922B2
(en)
*
|
2010-02-05 |
2013-04-23 |
Seiko Epson Corporation |
Finite difference level set projection method on multi-staged quadrilateral grids
|
|
US9594186B2
(en)
|
2010-02-12 |
2017-03-14 |
Exxonmobil Upstream Research Company |
Method and system for partitioning parallel simulation models
|
|
BR112012017278A2
(pt)
|
2010-02-12 |
2016-04-26 |
Exxonmobil Upstream Res Co |
método e sistema para criar modelos de simulação de ajuste de histórico
|
|
EP2545461A4
(de)
|
2010-03-12 |
2017-09-27 |
Exxonmobil Upstream Research Company |
Dynamische gruppierung von domain-objekten über intelligente gruppen
|
|
US8727017B2
(en)
*
|
2010-04-22 |
2014-05-20 |
Exxonmobil Upstream Research Company |
System and method for obtaining data on an unstructured grid
|
|
US8583410B2
(en)
*
|
2010-05-28 |
2013-11-12 |
Ingrain, Inc. |
Method for obtaining consistent and integrated physical properties of porous media
|
|
GB2498255B
(en)
|
2010-06-15 |
2018-11-14 |
Exxonmobil Upstream Res Co |
Method and system for stabilizing formulation methods
|
|
AU2011293804B2
(en)
|
2010-08-24 |
2016-08-11 |
Exxonmobil Upstream Research Company |
System and method for planning a well path
|
|
US20120136636A1
(en)
*
|
2010-11-26 |
2012-05-31 |
Adrian Kleine |
Finite element adjustment for basin faults
|
|
US8397800B2
(en)
|
2010-12-17 |
2013-03-19 |
Halliburton Energy Services, Inc. |
Perforating string with longitudinal shock de-coupler
|
|
US8397814B2
(en)
|
2010-12-17 |
2013-03-19 |
Halliburton Energy Serivces, Inc. |
Perforating string with bending shock de-coupler
|
|
US8985200B2
(en)
|
2010-12-17 |
2015-03-24 |
Halliburton Energy Services, Inc. |
Sensing shock during well perforating
|
|
US8393393B2
(en)
|
2010-12-17 |
2013-03-12 |
Halliburton Energy Services, Inc. |
Coupler compliance tuning for mitigating shock produced by well perforating
|
|
CN103282915A
(zh)
|
2010-12-30 |
2013-09-04 |
埃克森美孚上游研究公司 |
用于地下储层模拟的系统和方法
|
|
EP2668641B1
(de)
|
2011-01-26 |
2020-04-15 |
Exxonmobil Upstream Research Company |
Verfahren zur analyse eines reservoirkompartiments mit topologischer struktur bei 3d-erdmodellen
|
|
US9747393B2
(en)
|
2011-02-09 |
2017-08-29 |
Exxonmobil Upstream Research Company |
Methods and systems for upscaling mechanical properties of geomaterials
|
|
US20120241169A1
(en)
|
2011-03-22 |
2012-09-27 |
Halliburton Energy Services, Inc. |
Well tool assemblies with quick connectors and shock mitigating capabilities
|
|
US8881816B2
(en)
|
2011-04-29 |
2014-11-11 |
Halliburton Energy Services, Inc. |
Shock load mitigation in a downhole perforation tool assembly
|
|
US20140236558A1
(en)
*
|
2011-05-17 |
2014-08-21 |
Serguei Maliassov |
Method For Partitioning Parallel Reservoir Simulations In the Presence of Wells
|
|
CN102184298B
(zh)
*
|
2011-05-18 |
2013-06-19 |
山东大学 |
金属体积塑性成形中有限元分析刚度矩阵存储与生成方法
|
|
US9279314B2
(en)
|
2011-08-11 |
2016-03-08 |
Conocophillips Company |
Heat front capture in thermal recovery simulations of hydrocarbon reservoirs
|
|
US9091152B2
(en)
|
2011-08-31 |
2015-07-28 |
Halliburton Energy Services, Inc. |
Perforating gun with internal shock mitigation
|
|
US20130144583A1
(en)
*
|
2011-09-02 |
2013-06-06 |
Saudi Arabia Oil Company |
Hyper-dimensional simulation for reservoir engineering and geosciences
|
|
US9183328B2
(en)
|
2011-10-26 |
2015-11-10 |
Engine Simulation Partners, Llc |
Method and apparatus for modeling interactions of the fluid with system boundaries in fluid dynamic systems
|
|
EP2597253B1
(de)
*
|
2011-11-25 |
2015-10-07 |
Services Pétroliers Schlumberger |
Dynamische Vorhersage von Bohrloch-Temperaturverteilungen
|
|
US9055289B2
(en)
*
|
2011-11-23 |
2015-06-09 |
Korea Institute Of Science And Technology |
3D display system
|
|
US9405026B2
(en)
|
2011-12-12 |
2016-08-02 |
Exxonmobil Upstream Research Company |
Estimation of production sweep efficiency utilizing geophysical data
|
|
US9152740B1
(en)
*
|
2012-01-18 |
2015-10-06 |
Msc.Software Corporation |
Interactive simulation and solver for mechanical, fluid, and electro-mechanical systems
|
|
US10114134B2
(en)
|
2012-03-02 |
2018-10-30 |
Emerson Paradigm Holding Llc |
Systems and methods for generating a geological model honoring horizons and faults
|
|
FR2987903B1
(fr)
*
|
2012-03-09 |
2014-05-09 |
Schlumberger Services Petrol |
Structures de failles geologiques contenant des non-conformites.
|
|
US9759826B2
(en)
|
2012-04-03 |
2017-09-12 |
Paradigm Sciences Ltd. |
System and method for generating an implicit model of geological horizons
|
|
US9297228B2
(en)
|
2012-04-03 |
2016-03-29 |
Halliburton Energy Services, Inc. |
Shock attenuator for gun system
|
|
JP2015035006A
(ja)
*
|
2012-04-26 |
2015-02-19 |
インターナショナル・ビジネス・マシーンズ・コーポレーションInternational Business Machines Corporation |
複数の要素の結合結果を識別する情報処理装置、プログラムおよび方法
|
|
US10422922B2
(en)
|
2012-05-24 |
2019-09-24 |
Exxonmobil Upstream Research Company |
Method for predicting rock strength by inverting petrophysical properties
|
|
EP2856280A4
(de)
*
|
2012-06-01 |
2016-05-18 |
Sas Ip |
Benutzerschnittstelle und verfahren zur datennavigation in der benutzeroberfläche von technischen analyseanwendungen
|
|
CA2874978C
(en)
|
2012-06-15 |
2022-05-31 |
Landmark Graphics Corporation |
Methods and systems for non-physical attribute management in reservoir simulation
|
|
BR112015001936A2
(pt)
*
|
2012-08-07 |
2017-07-04 |
Halliburton Energy Services Inc |
métodos de predizer um comportamento do fluido no reservatório usando uma equação de estado
|
|
WO2014046655A1
(en)
|
2012-09-19 |
2014-03-27 |
Halliburton Energy Services, Inc. |
Perforation gun string energy propagation management with tuned mass damper
|
|
US9598940B2
(en)
|
2012-09-19 |
2017-03-21 |
Halliburton Energy Services, Inc. |
Perforation gun string energy propagation management system and methods
|
|
WO2014051904A1
(en)
|
2012-09-26 |
2014-04-03 |
Exxonmobil Upstream Research Company |
Conditional process-aided multiple-points statistics modeling
|
|
US9926777B2
(en)
|
2012-12-01 |
2018-03-27 |
Halliburton Energy Services, Inc. |
Protection of electronic devices used with perforating guns
|
|
ES2702648T3
(es)
*
|
2013-03-15 |
2019-03-04 |
Gambro Lundia Ab |
Interfaz extracorpórea de fluidos de tratamiento de la sangre
|
|
EP3418778B1
(de)
|
2013-03-15 |
2020-07-15 |
Emerson Paradigm Holding LLC |
Systeme und verfahren zum aufbauen sedimentärer attribute
|
|
US9613023B2
(en)
*
|
2013-04-04 |
2017-04-04 |
Wayne M. Kennard |
System and method for generating ethnic and cultural emoticon language dictionaries
|
|
US20140310634A1
(en)
*
|
2013-04-12 |
2014-10-16 |
Schlumberger Technology Corporation |
Dynamic fluid behavior display system
|
|
US10943037B2
(en)
*
|
2013-04-30 |
2021-03-09 |
Dassault Systemes Simulia Corp. |
Generating a CAD model from a finite element mesh
|
|
EP3008281A2
(de)
|
2013-06-10 |
2016-04-20 |
Exxonmobil Upstream Research Company |
Interaktive planung einer bohrstelle
|
|
EP3008285A4
(de)
*
|
2013-06-12 |
2017-04-05 |
Services Pétroliers Schlumberger |
Bohrlochverlaufsplanung mit bindungsrahmenerfassung zur antikollisionsanalyse
|
|
US9057795B2
(en)
|
2013-06-21 |
2015-06-16 |
Exxonmobil Upstream Research Company |
Azimuthal cement density image measurements
|
|
AU2014306018B2
(en)
*
|
2013-08-06 |
2018-05-17 |
Bp Corporation North America Inc. |
Image-based direct numerical simulation of petrophysical properties under simulated stress and strain conditions
|
|
US9864098B2
(en)
|
2013-09-30 |
2018-01-09 |
Exxonmobil Upstream Research Company |
Method and system of interactive drill center and well planning evaluation and optimization
|
|
MX2016002979A
(es)
|
2013-10-08 |
2016-09-21 |
Landmark Graphics Corp |
Predefinicion de elementos de un pozo cementado.
|
|
EP2869096B1
(de)
|
2013-10-29 |
2019-12-04 |
Emerson Paradigm Holding LLC |
Systeme und verfahren zur multiskalaren vermaschung von geologischer zeitmodellierung
|
|
US10241232B2
(en)
|
2014-02-03 |
2019-03-26 |
Halliburton Energy Services, Inc. |
Geomechanical and geophysical computational model for oil and gas stimulation and production
|
|
US10422923B2
(en)
|
2014-03-28 |
2019-09-24 |
Emerson Paradigm Holding Llc |
Systems and methods for modeling fracture networks in reservoir volumes from microseismic events
|
|
CN105013032B
(zh)
|
2014-03-31 |
2018-06-22 |
甘布罗伦迪亚股份公司 |
体外血液处理系统及用于该系统的方法
|
|
CA2948667A1
(en)
*
|
2014-07-30 |
2016-02-04 |
Exxonmobil Upstream Research Company |
Method for volumetric grid generation in a domain with heterogeneous material properties
|
|
US9934339B2
(en)
|
2014-08-15 |
2018-04-03 |
Wichita State University |
Apparatus and method for simulating machining and other forming operations
|
|
US10108762B2
(en)
*
|
2014-10-03 |
2018-10-23 |
International Business Machines Corporation |
Tunable miniaturized physical subsurface model for simulation and inversion
|
|
CA2963928C
(en)
*
|
2014-11-12 |
2019-06-25 |
Halliburton Energy Services, Inc. |
Reservoir mesh creation using extended anisotropic, geometry-adaptive refinement of polyhedra
|
|
US10242136B2
(en)
*
|
2015-05-20 |
2019-03-26 |
Saudi Arabian Oil Company |
Parallel solution for fully-coupled fully-implicit wellbore modeling in reservoir simulation
|
|
US9690002B2
(en)
|
2015-06-18 |
2017-06-27 |
Paradigm Sciences Ltd. |
Device, system and method for geological-time refinement
|
|
CN104915216A
(zh)
*
|
2015-07-03 |
2015-09-16 |
中国电力工程顾问集团东北电力设计院有限公司 |
实现由pdms软件到midas软件间的数据转化系统及方法
|
|
JP6034936B1
(ja)
*
|
2015-09-28 |
2016-11-30 |
富士重工業株式会社 |
荷重特性の解析方法及び解析モデル生成装置
|
|
WO2017068382A1
(en)
|
2015-10-21 |
2017-04-27 |
Lemma |
Method for determining at least one characteristic value of a multiphase flow at each instant, associated system and computer product program
|
|
US10176631B2
(en)
|
2015-11-10 |
2019-01-08 |
Landmark Graphics Corporation |
Target object simulation using undulating surfaces
|
|
US11250182B2
(en)
|
2015-11-10 |
2022-02-15 |
Landmark Graphics Corporation |
Target object simulation using orbit propagation
|
|
US10388065B2
(en)
|
2015-11-10 |
2019-08-20 |
Landmark Graphics Corporation |
Fracture network triangle mesh adjustment
|
|
CN105677965B
(zh)
*
|
2016-01-04 |
2018-09-18 |
北京航空航天大学 |
一种板式卫星结构共节点网格快速生成方法
|
|
US10685482B2
(en)
*
|
2016-05-13 |
2020-06-16 |
Chevron U.S.A. Inc. |
System and method for 3D restoration of complex subsurface models
|
|
CN106055768A
(zh)
*
|
2016-05-26 |
2016-10-26 |
秦晓亮 |
一种基于云计算的高安全性数值模拟方法、求解器及系统
|
|
CN106126794B
(zh)
*
|
2016-06-17 |
2019-07-05 |
北京航空航天大学 |
一种三角网格曲面下切割面动态调整的射线寻迹方法
|
|
US10803661B1
(en)
*
|
2016-09-06 |
2020-10-13 |
Ansys, Inc. |
Adaptive polyhedra mesh refinement and coarsening
|
|
US10466388B2
(en)
|
2016-09-07 |
2019-11-05 |
Emerson Paradigm Holding Llc |
System and method for editing geological models by switching between volume-based models and surface-based structural models augmented with stratigraphic fiber bundles
|
|
CN106443824B
(zh)
*
|
2016-09-19 |
2018-05-11 |
中国地质大学(北京) |
基于有限元法的非均质储层地质-力学建模方法
|
|
CA3047723C
(en)
*
|
2016-12-19 |
2024-06-18 |
Conocophillips Company |
Subsurface modeler workflow and tool
|
|
CN108228938A
(zh)
*
|
2016-12-21 |
2018-06-29 |
欢鼎科技成都有限公司 |
一种时域电磁场计算方法与装置
|
|
US11041976B2
(en)
|
2017-05-30 |
2021-06-22 |
Exxonmobil Upstream Research Company |
Method and system for creating and using a subsurface model in hydrocarbon operations
|
|
US20200059539A1
(en)
*
|
2018-08-20 |
2020-02-20 |
Landmark Graphics Corporation |
Cloud-native reservoir simulation
|
|
WO2020047671A1
(en)
*
|
2018-09-06 |
2020-03-12 |
Aquanty Inc. |
Method and system of integrated surface water and groundwater modelling using a dynamic mesh evolution
|
|
US11719855B2
(en)
*
|
2018-11-29 |
2023-08-08 |
Schlumberger Technology Corporation |
Volumetric well production user interface components
|
|
US10520644B1
(en)
|
2019-01-10 |
2019-12-31 |
Emerson Paradigm Holding Llc |
Imaging a subsurface geological model at a past intermediate restoration time
|
|
US11156744B2
(en)
|
2019-01-10 |
2021-10-26 |
Emerson Paradigm Holding Llc |
Imaging a subsurface geological model at a past intermediate restoration time
|
|
US11762634B2
(en)
*
|
2019-06-28 |
2023-09-19 |
Asg Technologies Group, Inc. |
Systems and methods for seamlessly integrating multiple products by using a common visual modeler
|
|
US11699008B2
(en)
*
|
2019-08-23 |
2023-07-11 |
Ansys, Inc. |
Non-conformal domain decomposition with imprints at interfaces with boundaries for finite element analysis
|
|
US11353622B2
(en)
*
|
2020-01-06 |
2022-06-07 |
Saudi Arabian Oil Company |
Systems and methods for hydrocarbon reservoir three dimensional unstructured grid generation and development
|
|
CN111274530B
(zh)
*
|
2020-01-19 |
2021-12-31 |
北京理工大学 |
一种容器云资源的预测方法
|
|
CN111814384B
(zh)
*
|
2020-09-01 |
2020-12-11 |
北京应用物理与计算数学研究所 |
高性能数值模拟的前后处理低开销连接数据结构及方法
|
|
US11852774B2
(en)
*
|
2020-11-11 |
2023-12-26 |
Halliburton Energy Services, Inc. |
Evaluation and visualization of well log data in selected three-dimensional volume
|
|
CN112949135B
(zh)
*
|
2021-03-12 |
2022-04-12 |
湖南科技大学 |
一种双倾斜工作唇面表镶金刚石钻头模型的网格划分方法
|
|
CN116486022B
(zh)
*
|
2023-03-23 |
2024-06-28 |
北京山水美生态环境科技有限公司 |
一种三维地质模型的构建方法
|