BE688603A - - Google Patents

Info

Publication number
BE688603A
BE688603A BE688603DA BE688603A BE 688603 A BE688603 A BE 688603A BE 688603D A BE688603D A BE 688603DA BE 688603 A BE688603 A BE 688603A
Authority
BE
Belgium
Prior art keywords
converter
station
refining
metal
turntable
Prior art date
Application number
Other languages
French (fr)
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed filed Critical
Publication of BE688603A publication Critical patent/BE688603A/fr

Links

Classifications

    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21CPROCESSING OF PIG-IRON, e.g. REFINING, MANUFACTURE OF WROUGHT-IRON OR STEEL; TREATMENT IN MOLTEN STATE OF FERROUS ALLOYS
    • C21C5/00Manufacture of carbon-steel, e.g. plain mild steel, medium carbon steel or cast steel or stainless steel
    • C21C5/28Manufacture of steel in the converter
    • C21C5/42Constructional features of converters
    • C21C5/46Details or accessories
    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21CPROCESSING OF PIG-IRON, e.g. REFINING, MANUFACTURE OF WROUGHT-IRON OR STEEL; TREATMENT IN MOLTEN STATE OF FERROUS ALLOYS
    • C21C5/00Manufacture of carbon-steel, e.g. plain mild steel, medium carbon steel or cast steel or stainless steel
    • C21C5/28Manufacture of steel in the converter
    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21CPROCESSING OF PIG-IRON, e.g. REFINING, MANUFACTURE OF WROUGHT-IRON OR STEEL; TREATMENT IN MOLTEN STATE OF FERROUS ALLOYS
    • C21C5/00Manufacture of carbon-steel, e.g. plain mild steel, medium carbon steel or cast steel or stainless steel
    • C21C5/28Manufacture of steel in the converter
    • C21C5/30Regulating or controlling the blowing
    • C21C5/32Blowing from above

Landscapes

  • Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Manufacturing & Machinery (AREA)
  • Materials Engineering (AREA)
  • Metallurgy (AREA)
  • Organic Chemistry (AREA)
  • Carbon Steel Or Casting Steel Manufacturing (AREA)

Description

  

   <Desc/Clms Page number 1> 
 



  Procédéset   appartins pour   affiner du métal. 



    La présenté invention concerne d'une manière générale un procédé d'affinage de métal (par exemple un procédé sidérur-     gique)   utilisant une cornue d'affinage mobile. Elle se rapporte en particulier à un procédé et un appareil qui utilisent au moins une cornue d'affinage montée de   manière   à pouvoir être   déplacée   entre plusieurs postes de tiavall ospacés, une opération , du processus d'affinage étant exécutée à un premier poste et plusieurs autres opérations de ce processus étant ex6cutées à un second poste. A titre d'exemple, l'invention   sera     d4crite   

 <Desc/Clms Page number 2> 

 ci-après avec référence à un procédé sidérurgique. 



   Dans un procédé sidérurgique qui utilise une cornue d'affinage, la cornue (qui est allongée   verticalement)et   qui est   piriforme)est   habituellement placée à l'intérieur   d'un     bâtiment   à un endroit fixe dont elle   ne   peut pas être enlevée,. Une série d'opérations, qui sont toutes en rapport avec le   procédé,   sont exécutées à cet endroit fixe.

   Par exemple, on charge la cornue de ferraille et de fonte en fusion, on affine le métal en soufflant de l'oxygène dans le métal en fusion pour en éliminer les impuretés oxydables et pour abaisser la teneur en carbone de la   fonte   en fusion, on coule le métal de la cornue après l'opération de soufflage   ou   d'affinage pour la vider du métal en fusion,   on   décrasse la cornue pour enlever la   laitier   résultant des opérations sidérurgiques,   on   effectue les petites réparations nécessaires au garnissage réfractaire interne de la   cornue,     après   les opérations de coulée et de décrassage, et on recharge la cornue de ferraille et de fonte en   fusion,,

   puis     on   répète le cycle d'opérations que   l'on     vient   de   décrire.   



   La ferraille contenue dans la cornue fond   tous   l'effet de la chaleur produite par les réactions   oxydantes   qui se produisent pendant l'opération de soufflage. Les   conditions   relativement rigoureuses qui existent pondant les opérations sidérurgiques usent la matière réfractaire qui   tapissa,   l'intérieur de la cornue de aorte que la cornue doit   Atre   périodiquement mise   hors circuit pour   regarnir complètement sa surface interne.

   Le   regarnissage   est une autre opération en rapport avec le processus   sidérurgique.   Pendant le   regarni.-sage   de la cornue,   on   laisse   ha-     bituellement   chômer les appareils qui sont utilisés pour l'opération de soufflage (qui   sont   placés à   un   endroit  fixe)   ainsi que certains des appareils qui ont été   utilisés   pour d'autres   opé-   rations sidérurgiques.

   De plus, mème lorsque la cornue est en circuit, pendant les opérations de chargement de coulée et de 

 <Desc/Clms Page number 3> 

 
 EMI3.1 
 décrassage, on gµ#À"ù#.hAhi"uoÀlomon% ohàmeP l'appareilla&a utilise pour le S96e pendant l'opération de soufflage, il en est de mbmg' 'd4.:.,.,.ta11J appareils prévus pour les autres opërations, ' .' .-' ' ,jlj' znvsfoù, ià ppi%1± processus sidérurgique typique ut111sant un Qonv,t11.eu et pr1s@pr 3opra.ti<m de soufflage gt IfAmtre moà%14 osc n%il18±T pour le reste des opérations. Ainsi, mémo Qu soM@ï'tiµ8euy est utilisa, on laisse , hàbi%uolloRon% ¯ÀbùnÉ  À'Ap9aPaillago . de sout:rlage pendant , li RQi%14 du 'fi1a9% envlrçn et l'apparlillase qu'on laisse oh6mor pond l'opération de soufflage n'est pas utilise pendant au mo la MQt4 du temps. 



  De pl'a8) pendent l'op6rat1on de soufflage, loo ouvrière qui "Côoupênt du oQnv.rt1"$ur nkont pratiquement rien à taire 40 aorte que Ce 6upf d'ouvriers qui sont payes relativement choe né travell$gt pratiquement pas pendant la moitié du temps. 



  Sans li g oQ4dà et l'appareil suivant l'invention, on 
 EMI3.2 
 
 EMI3.3 
 t1. ptotit au eaximug de l'appre111Qg. et des ouvrierb utilisé. pour des oPdegtÏOno qui font partis du processus siddrurgique et on élimine 1ftuell.mt tout chômage de l'appareillage et des ôuvMeï'8. 



  D'Autres particularités tt avantages de l'invention ronOoetiront clairement de la description donnée ci-aprês avec réfdeênoe aux dessins annexés dans lesquels ! la Pïgë 1 est une vue en perspective d'une forme d#exd- 
 EMI3.4 
 cution de l'appareil servant à mettre en -oeuvre une application du procède conforme à la présente invention la Fig. à est une vue en élévation de l'appareil re- 
 EMI3.5 
 présenta à la F1g. 1 ; 
 EMI3.6 
 la Fig. 3' est une vue en plan, en partie arrachée, 

 <Desc/Clms Page number 4> 

 
 EMI4.1 
 de l'appareil reprioentd à. la Pig. 1 ; la ?ig. 4 est une coupe verticale à plus grande dQ'hOlltt en partie arracha d'un, détail de l'appareil représente à la Fige 1;

   , la   rite 5   est une vue en   perspective   fragmentaire à plus grande   échelle   d'une partie du détail représenté à,la Fig. 4 ; 
 EMI4.2 
 led '11. 8 sont des 8oh'ma  de diverses appllcations du prooddé suivant l'1nvont1on , . la Pig, 9 ont un* vu. en >ian,4'una autre torme diz %ion do l'appa,'11 IU1VAnt l'invention ; lu yig. 10 est uno vue en 41êvatiQn, parti* , on coups  d'un. partie de l'appareil reprééenté à la plo# 9 et$ les tige Il et 12 sont dès sohémas "'."4\1111"18" ap- plïoationo du proo4di suivant l'1vènt1Qn.. 



  Corne indiqua aux Pigt l'h 3 doux soûles 10 et 11 re" posent sur le plancher 22 du b'timent dans lequel l'401er est élabora. Un palier horizontal monté sitr. le)!!;' sool4olOp Il est indiqué en 12 à la FiS. 2$ et porte 1.U1 plateau tournant qui tourne autour de   l'axe   vertical du palier 12.

   Le 
 EMI4.3 
 plateau tournant 13 preeente deux encoches diamétralement oppom odes 23 et 24 et un tonvertltaour à oxygène 14t Il est placd vertioalement dans chaque encoche et est monté sur le plateau tournant 13 de manière à pouvoir pivoter par rapport à ce dernier autour   d'un   axe horizontal tout en pouvant se déplacer avec le plateau qui tourne autour de l'axe vertical du palier 12. 
 EMI4.4 
 Chaque convertisseur 14e 1;

  ? est construit de la némo manière et est monté sur une ceinture à   tourillons 16   qui enoercle le convertisseur, Les extrémités internes de deux tourillons 
 EMI4.5 
 horizontaux 17 et 18 sont fixées à chaque ceintura de tourillono- ment, à deux endroits diamétralement opposés sur celle-ci) les 

 <Desc/Clms Page number 5> 

 
 EMI5.1 
 extr'm1téâ eztoxlieà'dêd tourillons étant mondes de manière Pouvoir tourner dans des paliers correspondants 19 et 20 fixes sur la face supér1éure'dU plateau tournant 13* Le palier 20 com- prend également un a1$pO1t1r servant à accoupler la tourillon 18 un arbre 27 entrain' par un   dispositif   21. 
 EMI5.2 
 ItOcsquUn convertisseur te trouve z 1 endroit occupé par le convertisseur 15   aux   Fig.

   1 à 3, on peut le charger de tonte en fusion ou de,ferraille ou on peut   procéder   à la coulée et 
 EMI5.3 
 au ddoeauoagos Lorsqu'un convertisseur ne trouve à l'endroit ocoupé par le convertisseur 14 aux 7ig* 1 à 3m on peut le aoumettre z   une   opération de pour diminuer la teneur on carbone du 
 EMI5.4 
 métal en fusion contenu dans le convertisoeur. 



  LA Fîgo 6 contre lohdmat1quement une application du procède conforme la prdotntt invention. Comaa indiqué à la Fig. 6, on peut présider au,chargement (ou à la coulé* et au d6or&llae) d'un convertlonour sur le plates tournant 13 lorsqu'il ne trouve tout près du bloc 25 à la ' 7ig. 6 et le sonvertisaaur est prtt pour   l'épuration   de   soufflage   lorsqu'il est tout près du bloc 26 à la. 
 EMI5.5 
 Fige 6, A titre doexemploe les convertisseurs 14 et.15 Boni re- présentés   près   des   blocs   26 et 25,   respectivement,   à la Fie. 6..

   Après avoir chargé le   convertisseur   15 et aohevé l'opération de 
 EMI5.6 
 -soufflage du oonvertig89ur 14, on fait tourner le plat ou 13 au- tour de son axe vertical et on inverse les positions des 
 EMI5.7 
 convertisseurs 14 et le* Le convertioaeur 15 se trouve alors près du bloc 26 sur 14 1$. 6 et le convertïoseur 14 près du bloc 25. Le convertisseur Il est donc soumia z une QP6rnt1on de souttlage tandis que le convertisseur 14 est loumi. à des opérations de coulée et de décrassage.

   Après la coulée et le décrassage ( et après avoir. effectué de petites répara- 
 EMI5.8 
 tions au garniosage)o on charge Io convertisiseur 14 de tonte en fusion et de ferraille pendant que le convertioseur 15 subit   encore     l'opération   de soufflage, Lorsque le chargement 

 <Desc/Clms Page number 6> 

 
 EMI6.1 
 du convertisseur 14 ét le soufflage du convertisseur 15 sont 
 EMI6.2 
 achevés, on lait 4 nouveau tourner le plateau pour inverser les 
 EMI6.3 
 positions des convertisaeurs 14 et 15 afin de ramener' le conver- tisseur 15 près du bloc 25 et la convertisseur 14 près du bloc 26. ! On ottle âltJrs le u4t&l contenu. dans le convertisseur 13, on décrasse le conver- tisseur 15 et un le rooharp tandis que le converti 6seur 14 subit à nouveau) un soufflage* On répète ce cycle doopèratïons oontinuelletaent.

   /l Comme indiqua aux Fig. 2 et .3, le poste de chargement, de soûlée, de ddoressage et de réparation du convertisseur ne trouve'à droite sur les Fige 2 et 3 et la poste de soufflage se trouve L auQh' 1 IUr 0#0 mtmes tig. 'et orme Indïqud aux Fis. 1<k 3, lorsqu'il faut oharger ' la qonvertogeur 11) on l'incline auto= de l'axe de* tourillons 17 et 18 vers la Poiltion reprdsontde aux Fige 1 4 31 puis on le change de métal en tusion provenant d'une poçlie de coulée 30 (P9- 2) suspendue par des crochet# 28 et 31 à la traverse 32 (Fïg.l) d'un pont roulant qui se déplace sur des rails 36 (dont un seulement est reyr4o#ntê 4 la Fïg, 1) Montas sur eon colonnes 37 qui se dressent sur le plancher 22,

   On charge de la ferraille dans le oonverbloitur 15 au moyen de wagonnets 33 qui se déplacent sur des rails 34 posés sur une platt"torme 29 supportée par une charpente 35 qui est mont6o sur lo plancher 22. 



  Une hQt# d.'tSvaous,tion 39 est placée directement au-dessus de l'orifice supérieur 40 du convertisseur 14 et un conduit 
 EMI6.4 
 41 prolonge la hotte 39 pour évacuer du convertisseur 14 et de la 
 EMI6.5 
 hotte 39  les t=4eae produites dans le convertioseur pendant le soufflage,L'op4ration de soufflage O$otteotuo Avec une lance à 
 EMI6.6 
 oxygène 38 de construction classique. 'Un dispositif classique 62 . 
 EMI6.7 
 porte la lance 38 de manière à lui permettre de se déplacer vot- tîoalement entre une position active dans laquelle elle passe à travers la hotte 39 dans la - convertisseur- 140 et une position re" 

 <Desc/Clms Page number 7> 

 tractée dans laquelle elle se trouve au-dessus de   orifice   supérieur 40 du convertisseur. 



   Une plate-forme 42 est prévue pour les ouvriers le long.du convertisseur   14 lorsque   celui-ci se trouve au poste de soufflage. 



   Des rails 43 sont places en dessous du plateau tournant 13, à partir de la droite sur la Fig.   3,et   passent entre les socles 10 et 11 et des wagonnets, tels que 44,se déplacent sur ces rails et portent un pot 45 destiné à recevoir le laitier enlevé d'un convertisseur pendant   l'opération   de décrassage. En   va-   riante, un wagonnet tel que 44 peut porter un récipient (non représenté) destiné à contenir du métal en fusion affine (souffle) déversé d'un convertisseur pendant la coulée*
Pendant une opération de   coulée,   on fait basculer le convertisseur   15 autour   de l'axe de tour   illons   17 et 18,dans le sens inverse des aiguilles d'une montre sur la Fig. 2.

   Pendant une   opération   de   décrassage)   on fait pivoter le   convertisseur   15 autour de l'axe des tourillons 17 et   18,dans   le   sens   des aiguilles d'une montre sur la Fig. 2. Pendant   l'opération   de coulée, le métal sort du convertisseur par une buse de   coulé@   46 et,pendant l'opération de décrassage, le   laitier   est évacué du convertisseur 15 par   l'orifice   supérieur 40. 



   La ceinture 16 peut être fixée de façon amovible aux tourillons 17 et 18, la construction d'un tel montage est décrite en détail dans la demande de brevet américain de Donald C. Stafford et autres n 437.128 déposéele 4 mars 1965. 



  En variante, la ceinture 16 peut être   fixée   sur les tourillons 17 et 18   de'n'importe   quelle façon classique. 



   Un pupitre 48 est monté sur la face supérieure du plateau tournant 13 et   contient   les dispositifs de commande de l'ap-   pareillage   utilisé pour effectuer les diverses opérations   aidé.   

 <Desc/Clms Page number 8> 

 rurgiques. 



   Le procédé et l'appareil décrite plus haut ont   plusieurs :   avantages ; par exemple, toute la matière à charger dans les deux convertisseurs 14 et 15 est amenée aux convertisseurs et chargée dans   ceux-ci à   un seul poste, pour les deux convertisseurs et tout le métal en fusion affiné ainsi que tout le laitier enlevé des deux convertisseurs est recueilli et évacué au même endroit. Ceci facilite la circulation des matières dans le bâtiment contenant les convertisseurs 14 et 15 et permet d'utiliser une disposition plus compacte de l'installation dans ce   bâtiment.   



   De   plue,   on peut utiliser une seule équipe pour con- 
 EMI8.1 
 duire les deux convertisseurs 14 et le, La lance à oxygène tix8, la hotte d'évaouation et le conduit d'évacuation sont toujours en fonctionnement. De marne, l'équipe de conduite des convertis- . saurs n'est jamail au repos et peut ètre occupde par la coulée; . le décrassage, les réparations mineures et le chargement d'un des Convertisseurs pendant que l'autro sonvwrtioaeuï' ose en soufflage.

   Certains travaux sont toujours en cours au poste . de couleej, de dècrassage et de chargement# ' .,' La r11. 4 est une vue en coupe transversale vertioale dêtalllée d'un palier horizontal annulaire 12 portant le plateau tournant 13 de m=îêro 4 lui permettre de tournsy autour d'un saxo verticale Le plateau tournant 13 repose sur un anneau supérieur 50 (Fig. 2 et 3) monté sur un élément supérieur 51 du chemin de roulement externe du palier 12.   L'aliment   51 présente une surface interne 
 EMI8.2 
 inclinée 52 qui vient en contact avpo une série de galetojaolîndâ 53   disposes   en   cercle.   Chaque galet 53 est monté   sur   un élément 54   présentant   une section transversale verticale en   zigzag   et com- 
 EMI8.3 
 portant des ouvertures 46 (Fig.

   5) destinées à recevoir les galets 53 qui peuvent tourner autour d'un axe indiqué par la ligne en traits de chaînette 55. 

 <Desc/Clms Page number 9> 

 
 EMI9.1 
 i'é14men%>pn zigzag 4 comporte également des ouver- tures 47 (Fig.   9) destines   à recevoir et à monter une   série   de galets 58 susceptibles de tourner autour d'un axe transversal à l'axe 55 des galets 53. Les galets 58 sont en contact avec   une        
 EMI9.2 
 surface interne inolinée ;7 prévue sur un élément inférieur 56 du chemin de roulement externe du palier. 



   Le palier 12 comporte également un chemin de roule- 
 EMI9.3 
 ment interne 59 quit gveç l'élément Intérieur 55 du chemin de roulement externe, est   supporte   sur un anneau inférieur 49 monté 
 EMI9.4 
 sur les socles 10 ot 11 (Pîo. 2). 



  , Le 9Aii## tp:;,4$'nt. :la J1:1.4 est un palier à galets dit en X et ont oon9U pour ,bBQrb. non soalem4nt les poues6ce radiales mia également les pousedes verticales agissant de bas en haut ou de haut en bas* , Li surface externe de l'annoau supérieur 50 présente une Qouronnt de dents 4'énénona,ie 60 (?le. 2 4 4) qui viennent on prise avoo un pignon 61 (Fig. 3) entrai par un Not9U?,non reprdoontd.

   Le plateau tournant 13 Sa% entraîna en rotation par la liaison Mécanique que l'on vient de 44crîroâ Comme Indiqué 4 la Pis* 3 des rails 61 sont pr4vuo eux le plancher 22 et   disposes.transversalement aux   rails 43, ces rails 65   s'étendant   en dessous du plateau tournant 13 et servant à détacher un convertisseur 14 ou 15 du plateau tournant 13 au moment où   'intérieur   de ces convertisseurs doit être regarni. 



  L'enlèvement d'un convertisseur en vue de le regarnir évite la mise hors circuit de la   totalité   du plateau tournant lorsqu'un des deux convertisseurs doit être regarni. Le convertisseur est enlevé au moyen   d'un   appareillage décrit dans la demande de bre- 
 EMI9.5 
 vet américain Staff ord et autres l1ot.37.128. A cet effet, on fait tourner le plateau jusqu'à ce que le convertisseur à   regarnir   soit place au-dessus des rails 65 et le reste des opérations 

 <Desc/Clms Page number 10> 

 visant à enlever le convertisseur est décrit dans la demande de brevet américain précitée. 
 EMI10.1 
 



  Les FiS' 6 à a montrent schématiquement diverses for- 'mes'd'exécution du procédé de l'Appareil suivant l'invention, 
Dans la forme d'exécution représentée à la Fig. 6, un second plateau tournant 113 est   placé   à   côté   du plateau 13 et est espacé de ce dernier. Le fonctionnement du plateau   tournant ,   13 représenté à la Fig. 6 a déjà été décrit. Le plateau tournant 
 EMI10.2 
 Ile porte deux hQnV%P%iS%ORP% l14 et Ils et chaque oonvtrt1saeur subit des opéra11ofia de chargement de coulée et de dégrasoaso# ' lorsqu'il se prouve prbo du bloc 12 et est loum1 À une opè. ration de mouttlage lorsqu'il se trouve prêe du bloo 1!26.

   Loro. qu'un 14o le sur le plateau 13 et un oonverti$eur ,' ' ) 114p 11' sur le p1at..u 11) doivent ttre roga=iop on fait tour. ner le plateau teurnt 13 ou Ile 4uoqulâ ce que le convertloasur à   regarnir   se trouve tout près du bloc 165. On   enlevé   alors le 
 EMI10.3 
 convertisseur et en le resarnit à un endroit correspondant au bloc 16e. Lorsque le convertisseur a été enlevé de son plateau tournant, en vue d'%%ro regarîtij, on peut le remplacer par un autre convertîoâêue que 1'on monte alors sur le plateau tournant à l'endroit mtme ot le convertisseur à regarnir à été en1evé 'j on peut   également   faire fonctionner le plateau tournant avec le seul convertisseur'restant. 



   Dans la forme d'exécution représentée à la Fig. 7, un plateau tournant 213 porte deux convertisseurs 214, 215. Chaque convertisseur est chargé de métal en fusion lorsqu'il se trouve à un endroit proche   du bloc   225 et est   soumis   à une opération de soufflage lorsqu'il se trouve à un endroit proche du bloc 226, et à des opérations de coulée et de décrassage lorsqu'il se trouve tout près, du bloc 227. Lorsque le convertisseur se trouve à un endroit proche du bloc 226, on ajoute de la ferraille et la ferraille est soumise 

 <Desc/Clms Page number 11> 

 à une opération de préchauffage au même endroit.

   L'opération de 
 EMI11.1 
 ; .:"r t. préchauffage   utiliser un brûleur   (non représenté) monté de manière 
 EMI11.2 
 pouvoir 's"f..'''' entre une position active pouvoir se   déplacer     verticalement     entre une   position   active   'inférieure dans   .'.laquelle   il plonge dans le convertisseur   et une position supérieure rétractée dans laquelle il est écarté du convertisseur.

   Le montage du brûleur est essentiel-   lement identique   au'Montage   de la lance à oxygène 38 représentée aux Fig. 1 et 2.   Pour l'opération   de préchauffage, le   brûleur   dé. bite de préférence .un mélange de combustible liquide et d'air 
 EMI11.3 
 ou dâoxygne et ce mélange brûle dans le convertisseur pour pré- chauffer la foraîlle Lê combustible liquide peut contenir de l'oxyde de carbone gazeux chaud provenant des fumées produites 
 EMI11.4 
 pendant 1'opérât1Ódè soufflage de loutre convertisseur monté sur le même plateau tournant 213. 



   Un   convertisseur   215 sur le plateau tournant 
 EMI11.5 
 213 est ê6um11 à Urte opért1on de préchauffage de la ferraille peMant que I$autVî3 214 est soumis à une opération de soufflage. àvTsiÙà l&pération de soufflage dans le convertitoe= 914 est achevée on fait tourner le plateau de 900, en $Ont ihvepaà des avilies d'une montre sur la F1. 7,et on soumet 16 convert1sd8U: 2 a. dos opérations de coulée et de dderaodag tandis que le'convertisseur 215 est charcé de fonte en fusion. 



  Lorsque le chargement du métal en fusion dans le convertisseur 215 et que la coulée ôt le décrassage (ainsi que l'exécution de petites réparations) dans le convertisseur 214 sont   achevés,   on fait tourner le plateau 213 à nouveau de 90 , en sens inverse des aiguilles d'une montre sur la Fig. 7, et on soumet ensuite le convertisseur 215 à une opération de soufflage pendant que le convertisseur 214 est chargé-de ferraille qui est ensuite soumise à une   opération,/de   préchauffage. 
 EMI11.6 
 



  Dans la forme d'exécution de la F1g. 7t on peut uti- liser davantage de ferraille et moins de fonte en fusion quo dans 

 <Desc/Clms Page number 12> 

   les autres formes d'exécution. Ceci diminue le prix de revient de la matière chargée dans le convertisseur et réduit le temps   nécessaire pour   'opération   de soufflage ce qui augmente donc      la   production,  
Dans la torme d'exécution représentée à la Fig. 8, deux plateaux tournants 313, 413 sont disposés   côte   à   côte   et   à   distance   l'un   de   1?autre.   Chaque plateau 313, 413 porte un   seul convertisseur 315. 415 respectivement.

   Le convertisseur 415 est soumis à des opérations de coulée, de décrassage et de char-   
 EMI12.1 
 geMnt loriitq,uf;L ;JI. trouve prés du boc 43? et le convertisses - -,..-.;- est aoum1.. des opïrations de coulda de décrassage etde j>1 # =:¯p ',. ':"1\':;"', chargement U,),Ïe "$*'trouve prés bloc 325 Les convier  /ohargeMent iôràju>ii'a4 trouva près du bloc 3a5, L'as cieux oonveï"* tisseurs 31j et 4l? sont soumis à une opération de soufflage lorsqu'ils se trouvent prés du bloc 326, En d'autres termes, la lance à medènet la hotte et le conduit d'dvaountion des tumêl. qui sont utilités pendant une opération de  oufflago ettectude avoe le oon.V'.t1"t\U' )1' ,nrve1'3.t également pendant l'op'rat1a'1. de .' ëoufflage effectuée avec le convertisseur '+:

  1.,. to .lohvar%isJobàtg 3le subit 160 opérations de 40Ul4e, de ddôeaëoago ot de chars.#ent t pendant que Io convertisse= 415 subit un soufflage,et :1.1'3.v.1.'.6- ment. Lorsque le 6Qh'V'trt1..8ur 4le doit être regarni, on fait tourner le plateau 313 jusque ce que le convertisseur 315 se   ,. trouve   près du bloc 365 et on soumet alors le convertisseur 315 
 EMI12.2 
 ]à une opération dé rîgarnïssage. Si on le désire, on peut enlever le convertisseur 315 pour le regarnir et on peut le remplacer   par '     , un   autre convertisseur sur le plateau tournant 313. Lorsque le convertisseur 415 doit être regarni, on fait tourner le plateau
413 jusque ce que le convertisseur 415 se trouve tout près du bloc 465.

   On   effectue   alors le   regarnissage   du convertisseur 415 
 EMI12.3 
 ' Ou on exécute les opérations conaîstant à enlever le convertisseur 415, à le remplacer par un autre convertisseur et   à   le regarnir ensuite à un endroit   éloigné   du plateau 413. 

 <Desc/Clms Page number 13> 

 



   Les Fig. 9   et'10   représentent une autre forme d'exécu- tion de   l'appareil utilisant   un plateau tournant indiqué en 513 à la Fig. 9, Le plateau tournant 513 comprend trois sections mo- biles 530, 531, 532 portant chacune un convertisseur 514, 515, 
516 de la même façon que celle'décrite plus haut avec référence à la forme d'exécution des Fig. 1 à 3. 



   Chaque section de plateau tournant (par exemple 530) comprend une   plate-forme   517 montée sur un châssis 518. Des roues internes 519 et 520 et des roues externes 521 sont montées indépendamment les unes des autres sur chaque section. Les roues internes 519, 520 roulent sur des voies de roulement circulaires intérieures 522 et 523 fixées dans un renfoncement circulaire interne 524 situé en dessous du niveau du plancher 22 du bâti- ment et les roues externes 521 roulent sur une voie de roulement ciroulaire externe 525 montée dans un renfoncement circulaire ex- terne 526 placé en dessous du riveau du plancher 22. Chaque con- vertisseur (par exemple 514) s'étend vers le bas dans une   fosse   circulaire 527 qui s'étend en dessous des renfoncements 524 et 
526 et qui est placée entre ceux-ci. 



   Chaque section de plateau tournant 530, 531, 532 peut être déplacée indépendamment des autres et peut être entraînée par un dispositif   moteur   interne ou externe classique (non repré-   . santé).   Dans une forme d'exécution, pendant un cycle d'opérations, chaque section de plateau tournant parcourt un cercle complet et un des   convertisseurs 514   à 516 peut subir une opération de soufflage pendant que le second subit des opérations de coulée et , de décrassage et que l'on charge le troisième. Le quadrant inoccupé (Fig. 9) peut être utilisé pour certaines opérations faisant partie du processus sidérurgique (par exemple l'enlèvement du, convertie   sur   en vue de le regarnir) comme décrit plus-haut. 



   La   face   supérieure de chaque plate-forme 517 des sec- tions de platéau tournant .se trouve au même niveau que le plancher 

 <Desc/Clms Page number 14> 

 22. Ceci facilite le chargement   direct   du métal en fusion dans   un. convertisseur   à partir   d'un   wagonnet contenant du métal en fusion et se déplaçant sur des rails (non   représentés)   fixés 
 EMI14.1 
 sur le plancher 22, Dans ce cas, il suffit d'incliner un conver- tisseur afin 'de le charger de métal en fusion au moyen du wagonnet. 
 EMI14.2 
 La Pîgè Îl montre sehdmatîquoment une autre forme diexé.

   cution d'un procédé suivant l'invention qui utilise des sections de plateau tournant mobiles indépendamment les unes des autres 630 à   6,2,de   construction correspondant aux sections de plateau tournant 530 à   ,32 de   la forme   d'exécution   représentée aux Fig. 9   -'et 10.   



   Chaque section de plateau tournant 630 à 632 porte un convertisseur 614 à 616. Une opération de soufflage peut 
 EMI14.3 
 être exécutée chaque fois qu'un aonveti8'eUr se trouve près d'un endroit déterminé par les blocs 606 ou 636. Les opérations de coul4oi dée2asSage et otwrgézent ainsi que les petites ed. parafions peuvent être effectuées chaque fois qu'un   convertis-     ,soue   se trouve près d'un endroit déterminé par les blocs 625 ou 
 EMI14.4 
 6el et le eegarnlosage peut être effectué chaque fois qu'un   convertisseur   se trouve près   d'un     endroit   déterminé par le   bloo ' '   665. 
 EMI14.5 
 



  Dans le cas de la Pig. 11, il est supposé que"le"Qon'V,er.. tisseur 16 subit un regarnissage au bloc 665>Welesconverbioseura 614 et' 615 subissent un soufflage respeàtivem.ent.en.626,'636j puis une OO"un décrassage., de petites réparations et un 4haegement respectivement en.623, 626,après quoi les convertîte seUrs 614j 6le sont tamonés vers leurs positions, pr1 ,des blocs 66, 636jtr@sp$etivemeattpoUr souffler la nouvelle shârget En supposant que le 'convertisseu'r-"616"alt' été regarni et soit prêt pour les aùtf'éS" opérat1onlS, 'haque .convertisseur Subit une rép6tit1Óft de la séquence dfopdratiotis 

 <Desc/Clms Page number 15> 

 suivante et parcourt un cercle complet (dans la forme d'exé-   eu tien   de la Fig.    Il)   pendant le cycle   suivant :   chargement en
625; soufflage en 636;

   coulée, décrassage, petites réparations et   chargement   en 635; soufflage en 626 et coulée, décrassage et petites réparations en 625. On recommence ensuite cette sé-   quence   par un chargement   en   625. 



   On avantagé,de cette forme d'exécution ainsi que   d'au-.     très   formes   d'exécution   décrites plus haut dans lesquelles le chargement et la coulée   s'effectuent   au même endroit est que   'l'on Utilise   la même zone (dans le   bâtiment   dans lequel les opé- ratiohs sont effectuées) pour transporter la matière de charge- ment vers un convertisseur et pour évaouer le métal en fusion   affine   du 'convertisseur. 



   Dans la forme   d'exécution   représentée à la   Fig.   12, un convertisseur   714   est monté de manière à pouvoir se déplacer en   va-et-vient   suivant un trajet rectiligne   723   (qui peut   être '   constitué par des rails d'acier classiques) entre une position   adjacente 4   un bloc 726 où s'effectue le soufflage et une pool- tion adjacente à un bloc 725 où s'effectuent la coulée, le décrassage, les petites réparations et le chargement. 



   Lorsqu'un   regarnissage   est nécessaire, on amène le convertisseur   714   vers une position 765   où.   on peut l'enlever et le regarnir. Le convertisseur 714 peut rester en 765 pour être   regarnie dans   une variante de cette forme d'exécution dans laquelle un autre convertisseur indiqué en traits de chaînette en 715 est maintenu en réserve à l'extrémité éloignée d'une partie du tra- jet (indiquée en traits de chaînette en 722) dont l'extrémité proche communique'avec le trajet 723. 



   D'autres variantes de l'invention restent possibles   .'et   apparaîtront clairement aux yeux des spécialistes. Par exemple, lorsqu'un plateau tournant porte deux convertisseurs, ces doux convertisseurs peuvent être disposés autrement qu'à des endroits 

 <Desc/Clms Page number 16> 

 diamétralement opposés   l'un   à   l'autre*  
Une autre variant utilise, sur un plateau tournant, deux convertisseurs dont   l'un   subit toutes les opérations à   l'exception   du regarnissage à un enduit et dont l'autre est en réserve à   l'autre   endroit.

   Lorsque le premier convertisseur est usé, on fait tourner le plateau tournant pour inverser les positions des deux   convertissours de   sorte que le second convertisseur occupe alors une potion dans, laquelle toutes les opération sidérurgiques peuvent   être   effectuées alors que le premier convertisseur est en   réserve   et subit un rearnissage. 



   La considération importante dans   toutesces   formes d'exécution est que le convertisseur d'affinage est monté de manière à se déplacer entre plusieurs   positions,dans   l'une desquelles une opération au   moin.s   du processus sidérurgique est   exécutée$   tandis que plusieurs autres opérations sont exécutées dans une seconde position espacée de la première. 



   La description détaillée qui précède n'a été donnée   ,qp'à   titre d'exemple et ne limite   1'* invention   en aucune façon. 



  Par exemple,   l'invention   peut être appliquée , à d'autres opéra-' %ions d'affinage métallurgiques en vue de produire des métaux ou des alliages autres que de l'acier. 



    REVENDICATIONS.   

**ATTENTION** fin du champ DESC peut contenir debut de CLMS **.



   <Desc / Clms Page number 1>
 



  Processes and components for refining metal.



    The present invention relates generally to a metal refining process (eg, a steel process) using a mobile refining retort. In particular, it relates to a method and apparatus which utilizes at least one refining retort mounted so as to be movable between several spaced workstations, one operation of the refining process being performed at a first station and several. other operations of this process being carried out at a second station. By way of example, the invention will be described

 <Desc / Clms Page number 2>

 below with reference to a steel process.



   In a steel-making process which uses a refining retort, the retort (which is lengthened vertically and which is pear-shaped) is usually placed inside a building at a fixed location from which it cannot be removed. A series of operations, all of which are process related, are performed at this fixed location.

   For example, the retort is loaded with scrap and molten iron, the metal is refined by blowing oxygen into the molten metal to remove oxidizable impurities therefrom and to lower the carbon content of the molten iron, we the retort metal flows after the blowing or refining operation to empty it of the molten metal, the retort is scoured to remove the slag resulting from the iron and steel operations, the small repairs necessary for the internal refractory lining of the retort are carried out , after the pouring and stripping operations, and the retort is recharged with scrap iron and molten iron,

   then the cycle of operations which has just been described is repeated.



   The scrap contained in the retort all melts the effect of heat produced by the oxidative reactions that occur during the blowing operation. The relatively harsh conditions which exist laying down the iron and steel operations wear out the refractory material which lined the interior of the aorta retort which the retort must be periodically taken off to completely replenish its internal surface.

   Relining is another operation related to the iron and steel process. During the relining of the retort, the devices which are used for the blowing operation (which are placed in a fixed location) as well as some of the devices which have been used for other operations are usually left idle. - iron and steel rations.

   In addition, even when the retort is on, during the casting and loading operations.

 <Desc / Clms Page number 3>

 
 EMI3.1
 scrubbing, we gµ # À "ù # .hAhi" uoÀlomon% ohàmeP the apparatus & a used for the S96e during the blowing operation, it is for mbmg '' d4.:.,.,.ta11J devices planned for the others operations, '.' .- '', jlj 'znvsfoù, ià ppi% 1 ± typical steel process using a Qonv, t11.eu and pr1s @ pr 3opra.ti <m blowing gt IfAmtre moà% 14 osc n% il18 ± T for the rest of the operations. Thus, memo Qu soM @ ï'tiµ8euy is used, we leave, hàbi% uolloRon% ¯ÀbùnÉ À'Ap9aPaillago. The blowing operation is not used for at least one month of the time. The blowing operation is not used for at least one month of the time.



  In addition, during the blow molding operation, loo worker who "coaxes the uOQnv.rt1" have almost nothing to say about 40 aorta that 6upf of workers who are relatively paid for nothing during the period. half the time.



  Without li g oQ4dà and the apparatus according to the invention, we
 EMI3.2
 
 EMI3.3
 t1. ptotit to the eaximug of the app111Qg. and workers used. for oPdegtÏOno which are part of the siddrurgical process and one eliminates 1ftuell.mt any unemployment of the apparatus and the workings8.



  Other peculiarities tt advantages of the invention ronOoetir clearly from the description given below with refdeênoe to the accompanying drawings in which! Pïgë 1 is a perspective view of a form of exd-
 EMI3.4
 cution of the apparatus for carrying out an application of the process according to the present invention, FIG. to is an elevational view of the apparatus re-
 EMI3.5
 presented to the F1g. 1;
 EMI3.6
 Fig. 3 'is a plan view, partly broken away,

 <Desc / Clms Page number 4>

 
 EMI4.1
 from the device reprioentd to. the Pig. 1; the? ig. 4 is a larger vertical section of Olltt partly broken away from a detail of the apparatus shown in Fig. 1;

   , rite 5 is a fragmentary perspective view on a larger scale of part of the detail shown in, FIG. 4;
 EMI4.2
 led '11. 8 are 8oh'ma of various appllcations of the prooddé according to the envont1on,. the Pig, 9 have a * saw. in> ian, 4'una other torme diz% ion of the appa, '11 IU1VAnt the invention; read yig. 10 is a view in 41êvatiQn, party *, we shots of a. part of the apparatus represented in plo # 9 and $ the rods Il and 12 are from sohémas "'." 4 \ 1111 "18" application of the proo4di following the 1vènt1Qn ..



  Corne indicated to the Pigts the 3 soft sockets 10 and 11 re "pose on the floor 22 of the building in which the 401st is built. A horizontal landing mounted on the) !!; ' sool4olOp It is indicated in 12 at FiS. 2 $ and carries 1.U1 turntable which turns around the vertical axis of bearing 12.

   The
 EMI4.3
 turntable 13 presents two diametrically oppom odes 23 and 24 notches and a 14t oxygen tonvertltaour It is placed vertically in each notch and is mounted on the turntable 13 so as to be able to pivot relative to the latter around a horizontal axis while being able to move with the plate which turns around the vertical axis of the bearing 12.
 EMI4.4
 Each 14th converter 1;

  ? is constructed in the nemo manner and is mounted on a 16-trunnion belt which encircles the converter, The inner ends of two trunnions
 EMI4.5
 horizontals 17 and 18 are fixed to each trunnion belt, at two diametrically opposed places on it) the

 <Desc / Clms Page number 5>

 
 EMI5.1
 end of the journals being world-wide to be able to rotate in corresponding bearings 19 and 20 fixed on the upper face of the turntable 13 * The bearing 20 also includes a a1 $ pO1t1r used to couple the journal 18 to a shaft 27 entrain 'by a device 21.
 EMI5.2
 ItOcsquA converter finds you 1 place occupied by converter 15 in Figs.

   1 to 3, it can be loaded with molten mowing or scrap, or it can be poured and
 EMI5.3
 to the ddoeauoagos When a converter does not find at the place ocouped by the converter 14 to 7ig * 1 to 3m it can be submitted to an operation to reduce the carbon content of the
 EMI5.4
 molten metal contained in the converter.



  Fîgo 6 lohdmat1quement against an application of the process in accordance with the prdotntt invention. Comaa shown in Fig. 6, it is possible to preside over the loading (or the casting * and the d6or & llae) of a convertlonour on the turning plates 13 when it is not found very close to the block 25 at the '7ig. 6 and the sonvertisaaur is ready for the blast cleaning when it is very close to block 26 at a.
 EMI5.5
 Fig. 6, For example converters 14 and 15 Boni shown near blocks 26 and 25, respectively, at Fie. 6 ..

   After loading the converter 15 and completing the operation of
 EMI5.6
 -blowing oonvertig89ur 14, the dish or 13 is rotated around its vertical axis and the positions of the
 EMI5.7
 converters 14 and * Convertioaeur 15 is then located near block 26 on $ 14 1. 6 and converter 14 near block 25. Converter 11 is therefore subjected to a discharge while converter 14 is on. to casting and stripping operations.

   After pouring and cleaning (and after carrying out small repairs)
 EMI5.8
 tions at the filling) o Io converter 14 is charged with molten shearing and scrap while the converter 15 is still undergoing the blowing operation, When the loading

 <Desc / Clms Page number 6>

 
 EMI6.1
 of converter 14 and the blowing of converter 15 are
 EMI6.2
 finished, we milk 4 again turn the plate to reverse the
 EMI6.3
 positions of converters 14 and 15 in order to bring converter 15 near block 25 and converter 14 near block 26.! We ottle the u4t & l content. in converter 13, converter 15 is scuffed and rooharp while converter 14 is again blown. This cycle of operations is repeated continuously.

   / l As indicated in Figs. 2 and .3, the converter loading, exhausting, de-cooling and repair station is not located on the right on Figs 2 and 3 and the blowing station is located L auQh '1 IUr 0 # 0 even tig. 'and Indïqud elm at the Fis. 1 <k 3, when it is necessary to load the qonvertogeur 11) it is tilted automatically = from the axis of * journals 17 and 18 towards the Poiltion shown in Figs 1 4 31 then it is changed to tusion metal coming from 'a casting machine 30 (P9- 2) suspended by hooks # 28 and 31 to the cross member 32 (Fig.l) of an overhead crane which moves on rails 36 (only one of which is reyr4o # ntê 4 la Fïg, 1) Montas on eon columns 37 which stand on the floor 22,

   Scrap is loaded into the oonverbloitur 15 by means of wagons 33 which move on rails 34 placed on a platform 29 supported by a frame 35 which is mounted on the floor 22.



  A hQt # d.'tSvaous, tion 39 is placed directly above the upper port 40 of the converter 14 and a duct
 EMI6.4
 41 extends the hood 39 to evacuate the converter 14 and the
 EMI6.5
 hood 39 the t = 4eae produced in the converter during blowing, The blowing operation O $ otteotuo With a lance at
 EMI6.6
 oxygen 38 of conventional construction. 'A classic device 62.
 EMI6.7
 carries the lance 38 so as to allow it to move votely between an active position in which it passes through the hood 39 in the converter 140 and a re "position.

 <Desc / Clms Page number 7>

 towed in which it is located above the upper port 40 of the converter.



   A platform 42 is provided for workers alongside converter 14 when the latter is at the blowing station.



   Rails 43 are placed below the turntable 13, from the right in FIG. 3, and pass between the bases 10 and 11 and wagons, such as 44, move on these rails and carry a pot 45 intended to receive the slag removed from a converter during the cleaning operation. Alternatively, a wagon such as 44 may carry a container (not shown) for containing affine molten metal (blast) discharged from a converter during casting *
During a casting operation, the converter 15 is tilted about the tower axis illons 17 and 18, in the counterclockwise direction in FIG. 2.

   During a cleaning operation) the converter 15 is rotated around the axis of the journals 17 and 18, in a clockwise direction in FIG. 2. During the casting operation, the metal exits the converter through a casting nozzle @ 46 and, during the slagging operation, the slag is discharged from the converter 15 through the upper port 40.



   Belt 16 can be removably attached to journals 17 and 18, the construction of such an assembly is described in detail in Donald C. Stafford et al. U.S. Patent Application No. 437,128 filed March 4, 1965.



  Alternatively, the belt 16 can be attached to the journals 17 and 18 in any conventional manner.



   A console 48 is mounted on the upper face of the turntable 13 and contains the control devices for the apparatus used to perform the various assisted operations.

 <Desc / Clms Page number 8>

 rurgical.



   The method and apparatus described above have several: advantages; for example, all of the material to be loaded into the two converters 14 and 15 is fed to the converters and loaded into them at a single station, for both converters and all the molten metal refined as well as all slag removed from the two converters is collected and evacuated at the same location. This facilitates the circulation of materials in the building containing the converters 14 and 15 and allows a more compact arrangement of the installation in this building to be used.



   In addition, a single team can be used to con-
 EMI8.1
 reduce the two converters 14 and the, The tix8 oxygen lance, the exhaust hood and the exhaust duct are still in operation. De Marne, the Converts Leadership Team. the child is never at rest and can be occupied by the casting; . the cleaning, the minor repairs and the loading of one of the Converters while the auto sonvwrtioaeuï 'dares in blowing.

   Some work is still in progress at the station. of pouring, de-fouling and loading # '.,' La r11. 4 is a dêtalllée vertical cross-sectional view of an annular horizontal bearing 12 carrying the turntable 13 of m = îêro 4 allowing it to rotate around a vertical sax The turntable 13 rests on an upper ring 50 (Fig. 2 and 3) mounted on an upper element 51 of the outer raceway of the bearing 12. The food 51 has an inner surface
 EMI8.2
 inclined 52 which comes into contact with a series of galetojaolîndâ 53 arranged in a circle. Each roller 53 is mounted on an element 54 having a vertical zigzag cross section and com-
 EMI8.3
 bearing openings 46 (Fig.

   5) intended to receive the rollers 53 which can rotate around an axis indicated by the chain line 55.

 <Desc / Clms Page number 9>

 
 EMI9.1
 i'é14men%> pn zigzag 4 also comprises openings 47 (Fig. 9) intended to receive and mount a series of rollers 58 capable of rotating about an axis transverse to the axis 55 of the rollers 53. The rollers 58 are in contact with a
 EMI9.2
 non-linear inner surface; 7 provided on a lower element 56 of the outer raceway of the bearing.



   The bearing 12 also has a rolling path
 EMI9.3
 internal element 59 quit gveç the inner element 55 of the outer raceway, is supported on a lower ring 49 mounted
 EMI9.4
 on the bases 10 ot 11 (Pîo. 2).



  , The 9Aii ## tp:;, 4 $ 'nt. : J1: 1.4 is an X roller bearing and have oon9U for, bBQrb. not soalem4nt the radial thumbs also have the vertical pushes acting from bottom to top or top to bottom *, the outer surface of the upper ring 50 has a quadruple of teeth 4'énénon, ie 60 (? le. 2 4 4) which come one taken avoo a pinion 61 (Fig. 3) entered by a Not9U?, not reprdoontd.

   The turntable 13 Sa% rotated by the mechanical link which has just been crîroâ As indicated 4 the udder * 3 of the rails 61 are provided for them on the floor 22 and arranged transversely to the rails 43, these rails 65 extending below the turntable 13 and serving to detach a converter 14 or 15 from the turntable 13 at the time when the interior of these converters is to be replenished.



  Removing a converter for reloading avoids shutting down the entire turntable when one of the two converters needs to be reloading. The converter is removed by means of an apparatus described in the patent application.
 EMI9.5
 American vet Staff ord and others l1ot.37.128. To this end, the plate is rotated until the converter to be relined is placed above the rails 65 and the rest of the operations

 <Desc / Clms Page number 10>

 to remove the converter is described in the aforementioned US patent application.
 EMI10.1
 



  The FiS '6 to a schematically show various embodiments of the method of the apparatus according to the invention,
In the embodiment shown in FIG. 6, a second turntable 113 is placed next to the plate 13 and is spaced therefrom. The operation of the turntable, 13 shown in FIG. 6 has already been described. The turntable
 EMI10.2
 Ile wears two hQnV% P% iS% ORP% l14 and Ils and each oonvtrt1saeur undergoes loading, pouring and de-grooming operations when proving himself a prbo of block 12 and being subjected to an operation. grinding ration when it is near bloo 1! 26.

   Loro. that a 14o le on the plate 13 and an oonverti $ eur, '') 114p 11 'on the p1at..u 11) must be roga = iop we go around. n the plateau teurnt 13 or Ile 4uoqulâ what the convertloasur to be replenished is very close to the block 165. We then remove the
 EMI10.3
 converter and resurfacing it at a location corresponding to block 16e. When the converter has been removed from its turntable, with a view to %% ro regarîtij, it can be replaced by another converter which is then mounted on the turntable in the same place where the converter to be reloaded was the turntable can also be operated with the only converter left.



   In the embodiment shown in FIG. 7, a turntable 213 carries two converters 214, 215. Each converter is charged with molten metal when it is at a location close to the block 225 and is subjected to a blowing operation when it is at a nearby location. of block 226, and to casting and slagging operations when it is nearby, of block 227. When the converter is in a location close to block 226, scrap is added and the scrap is subjected

 <Desc / Clms Page number 11>

 to a preheating operation at the same location.

   The operation of
 EMI11.1
 ; .: "r t. preheating use a burner (not shown) mounted so
 EMI11.2
 power 's "f ..' '' 'between an active position being able to move vertically between a' lower active position in which it plunges into the converter and an upper retracted position in which it is moved away from the converter.

   The burner assembly is essentially the same as the oxygen lance assembly 38 shown in Figs. 1 and 2. For the preheating operation, the burner de. bite preferably a mixture of liquid fuel and air
 EMI11.3
 or oxygen and this mixture burns in the converter to preheat the fuel liquid fuel may contain hot carbon monoxide gas from the fumes produced.
 EMI11.4
 during the operation of the blowing otter converter mounted on the same turntable 213.



   A 215 converter on the turntable
 EMI11.5
 213 is an urgent scrap preheating operation while autVî3 214 is subjected to a blowing operation. If the blowing operation in the convertitoe = 914 is completed, the plate is rotated by 900, in $ Ont ihvepaà debased from a watch on the F1. 7, and we submit 16 convert1sd8U: 2 a. the casting and dderaodag operations while the converter 215 is butchered with molten iron.



  When the loading of molten metal into converter 215 and the pouring removes scouring (as well as carrying out small repairs) in converter 214 are completed, plate 213 is rotated again 90, counterclockwise. clockwise in Fig. 7, and then the converter 215 is subjected to a blowing operation while the converter 214 is loaded with scrap which is then subjected to a preheating operation.
 EMI11.6
 



  In the embodiment of the F1g. 7t more scrap and less molten iron can be used than in

 <Desc / Clms Page number 12>

   other forms of execution. This decreases the cost price of the material loaded into the converter and reduces the time required for the blowing operation which therefore increases production,
In the embodiment shown in FIG. 8, two turntables 313, 413 are arranged side by side and at a distance from one another. Each plate 313, 413 carries a single converter 315, 415 respectively.

   The 415 converter is subjected to casting, slagging and char-
 EMI12.1
 geMnt loriitq, uf; L; JI. found near boc 43? and the converts - -, ..-.; - is aoum1 .. scrapping coulda and j> 1 # =: ¯p ',. ': "1 \' :;" ', loading U,), Ïe "$ *' found near block 325 Invite / charge them iôràju> ii'a4 found near block 3a5, L'as cieux oonveï" * weavers 31j and 4l? are subjected to a blowing operation when they are near the block 326, In other words, the lance through the hood and the duct of tumêl dvaountion. which are used during an operation of oufflago andtectude avoe le oon.V'.t1 "t \ U ') 1', nrve1'3.t also during the op'rat1a'1. blowing carried out with the converter '+:

  1.,. to .lohvar% isJobàtg 3le undergoes 160 operations of 40Ul4e, ddôeaëoago ot of tanks. # ent t while Io converts = 415 undergoes a blowing, and: 1.1'3.v.1. '. 6-. When the 6Qh'V'trt1..8ur 4le must be replenished, the plate 313 is rotated until the converter 315 is,. found near block 365 and we then submit converter 315
 EMI12.2
 ] to a stripping operation. If desired, the converter 315 can be removed for relining and it can be replaced by ', another converter on the turntable 313. When the converter 415 has to be relined, the plate is rotated.
413 until converter 415 is very close to block 465.

   The converter 415 is then relined
 EMI12.3
 'Or the operations are carried out to remove the converter 415, replace it with another converter and then reload it at a location remote from the plate 413.

 <Desc / Clms Page number 13>

 



   Figs. 9 and 10 show another embodiment of the apparatus using a turntable indicated at 513 in FIG. 9, The turntable 513 comprises three movable sections 530, 531, 532 each carrying a converter 514, 515,
516 in the same way as that described above with reference to the embodiment of Figs. 1 to 3.



   Each turntable section (e.g. 530) includes a platform 517 mounted on a frame 518. Inner wheels 519 and 520 and outer wheels 521 are mounted independently of each other on each section. The internal wheels 519, 520 roll on inner circular tracks 522 and 523 fixed in an internal circular recess 524 located below the level of the floor 22 of the building and the outer wheels 521 roll on an outer circular track 525 mounted in an outer circular recess 526 placed below the floor rivet 22. Each converter (eg 514) extends downward into a circular pit 527 which extends below the recesses 524 and
526 and which is placed between them.



   Each turntable section 530, 531, 532 can be moved independently of the others and can be driven by a conventional internal or external motor device (not shown). In one embodiment, during a cycle of operations, each turntable section travels a full circle and one of converters 514 to 516 may undergo a blowing operation while the second undergoes casting and slagging and cleaning operations. that we load the third. The unoccupied quadrant (Fig. 9) can be used for certain operations part of the steelmaking process (eg removal of, converted to for relining) as described above.



   The upper face of each platform 517 of the turntable sections is at the same level as the floor

 <Desc / Clms Page number 14>

 22. This facilitates the direct loading of molten metal into a. converter from a wagon containing molten metal and moving on fixed rails (not shown)
 EMI14.1
 on the floor 22. In this case, it suffices to tilt a converter in order to load it with molten metal by means of the wagon.
 EMI14.2
 The Pîgè Îl shows sehdmatîquoment another diexed form.

   A method according to the invention which uses independently movable turntable sections 630-6,2, of construction corresponding to turntable sections 530 through, 32 of the embodiment shown in Figs. 9 -'and 10.



   Each turntable section 630 to 632 carries a converter 614 to 616. A blowing operation can
 EMI14.3
 be executed whenever an avonveti8'eUr is near a location determined by blocks 606 or 636. The dée2asSage and otwrgézent coul4oi operations as well as the small eds. parafions can be made whenever a convert is found near a location determined by blocks 625 or
 EMI14.4
 6el and eegarnlosage can be done whenever a converter is near a location determined by bloo '' 665.
 EMI14.5
 



  In the case of the Pig. 11, it is assumed that "the" Qon'V, er .. weaver 16 undergoes relining at block 665> Welesconverbioseura 614 and '615 undergo respeàtivem.ent.en.626,' 636j then an OO "scrubbing. , small repairs and a 4haegement respectively in 623, 626, after which the converters 614j 6le are calibrated to their positions, pr1, blocks 66, 636jtr @ sp $ etivemeattpoUr to blow the new shârget Assuming the 'converter' - "616" has been refilled and is ready for further operation, each converter undergoes repetition of the dopdratiotis sequence.

 <Desc / Clms Page number 15>

 following cycle and traverses a complete circle (in the form of execution of Fig. II) during the following cycle: loading in
625; blowing in 636;

   casting, stripping, small repairs and loading in 635; blowing in 626 and casting, cleaning and small repairs in 625. This sequence is then repeated by loading in 625.



   Advantage is given to this embodiment as well as to other. very embodiments described above in which the loading and the casting take place in the same place is that one uses the same area (in the building in which the operations are carried out) to transport the load material - ment to a converter and to evacuate the refined molten metal from the converter.



   In the embodiment shown in FIG. 12, a converter 714 is mounted so as to be able to move back and forth along a rectilinear path 723 (which may be constituted by conventional steel rails) between an adjacent position 4 a block 726 where takes place. the blowing and a pooling adjacent to a block 725 where casting, cleaning, minor repairs and loading take place.



   When relining is necessary, the converter 714 is brought to a position 765 where. we can remove it and reline it. The converter 714 may remain at 765 for relining in a variation of this embodiment in which another converter indicated in chain lines at 715 is held in reserve at the far end of a portion of the path (indicated in chain lines in 722) the near end of which communicates with the path 723.



   Other variants of the invention are still possible and will appear clearly to the eyes of specialists. For example, when a turntable carries two converters, these soft converters can be arranged other than in places

 <Desc / Clms Page number 16>

 diametrically opposed to each other *
Another variant uses, on a turntable, two converters, one of which undergoes all the operations except the relining with a coating and the other of which is in reserve at the other place.

   When the first converter is worn out, the turntable is rotated to reverse the positions of the two converters so that the second converter then occupies a potion in which all steel operations can be performed while the first converter is in reserve and undergoes a rearnissage.



   The important consideration in all these embodiments is that the refining converter is mounted to move between several positions, in one of which one operation in the middle of the steel process is performed while several other operations are performed. performed in a second position spaced from the first.



   The foregoing detailed description has not been given by way of example and does not limit the invention in any way.



  For example, the invention can be applied to other metallurgical refining operations to produce metals or alloys other than steel.



    CLAIMS.

** ATTENTION ** end of DESC field can contain start of CLMS **.

 

Claims (1)

1.- Procédé pour affiner du métal dans un convertisseur d'affinage mobile., caractérisé en ce que : on déplace le convertisseur entra .plusieurs posées espacés ; on exéoute, à un premier poste, une opération faisant partie dU processus d'affinage du métal; 1.- A process for refining metal in a mobile refining converter, characterized in that: the converter is moved between several spaced places; an operation forming part of the metal refining process is carried out at a first station; et on exécute à un second' poste 'plusieurs' autres -.opérations faisant partie du processus d'affinage* <Desc/Clms Page number 17> 2.- Procédé suivant la revendication 1, caractérisé .en ce que : -au premier poste, on sépare les impuretés du métal, par oxydation et. au second, on charge le convertisseur de métal avant l'opération d'oxydation, on procède à la coulée et au décrassage du convertisseur après l'opération d'oxydation et on recharge le convertisseur de métal âpres les opérations de coulée et de dé- crassage. and we execute at a second 'station' several 'other operations that are part of the refining process * <Desc / Clms Page number 17> 2. A method according to claim 1, characterized .in that: at the first station, the impurities are separated from the metal, by oxidation and. in the second, the metal converter is charged before the oxidation operation, the converter is cast and scoured after the oxidation operation and the metal converter is recharged after the casting and de-scouring operations. fouling. 3.- Procédé suivant la revendication 2, caractérisé en ce que : on regarnit le convertisseur à un autre poste es- pacé du premier et du second* 4.- Procédé suivant la revendication 1, caractérisé en ce que t au premier poste, on sépare les impuretés du métal, par oxydation ; 3.- A method according to claim 2, characterized in that: the converter is replenished at another station spaced from the first and second * 4.- A method according to claim 1, characterized in that t at the first station, we separates the impurities from the metal, by oxidation; au second poste$ on procède à la coulée et au décras- sage du convertisseur après l'opération d'oxydation à un troisième poste espacé du second, on charge du métal en fusion dans le convertisseur et, à un endroit espacé du second et du troisième poste, on charge puis on préchauffe de la ,ferraille dans le convertisseur à un moment situé entre (1) la . coulée et le décrassage et (2) le chargement de métal en fusion. at the second station $ the converter is poured and descaled after the oxidation operation at a third station spaced from the second, molten metal is loaded into the converter and, at a place spaced from the second and the second third station, we load and then preheat scrap in the converter at a time between (1) la. pouring and slagging and (2) loading molten metal. 5.- Procédé pour affiner du métal utilisant plusieurs convertisseurs d'affinage mobiles, caractérisé en ce que : on charge un premier convertisseur de métal à un pre- mier poste ; on sépare les impuretés par oxydation, du métal dans un second convertisseur à un second poste espacé du premier ; on inverse les positions du premier et du second con- <Desc/Clms Page number 18> EMI18.1 v#'rtisseur ? on sépare les impuretés par oxydation, du métal dans le premier convertisseur au second poste ; et on procède à la coulée et au décrassage du second convertisseur au premier poste. 5. A process for refining metal using several mobile refining converters, characterized in that: a first metal converter is loaded at a first station; separating the impurities by oxidation from the metal in a second converter at a second station spaced from the first; the positions of the first and second con- <Desc / Clms Page number 18> EMI18.1 v # 'rtisseur? the impurities are separated by oxidation from the metal in the first converter at the second station; and the second converter is cast and cleaned at the first station. 6.- Procédé pour affiner dumétal utilisant'plusieurs convertisseurs d'affinage mobiles, caractétisé en ce que : on charge un premier convertisseur de métal en fusion EMI18.2 à un px e.nier poste,- , on amené le convertisseur à un second poste espace du premier on sépare les impuretés par oxydation, du métal en fusion lorsque le premier convertisseur se trouve au second poste on charge un second convertisseur de métal en fusion à un poste autre que le second pendant que le premier conver- tisseur se trouve au second poste ; 6.- Process for refining the metal using several mobile refining converters, characterized in that: a first converter is charged with molten metal EMI18.2 at a px e.nier station, -, we bring the converter to a second station space of the first one separates the impurities by oxidation, from the molten metal when the first converter is at the second station we charge a second converter with molten metal at a station other than the second while the first converter is at the second station; on déplace le premier convertisseur vers un poste autre que le second, après l'opération de soufflage en vue de procéder à la coulée, au décrassage et au rechargement du premier convertisseur ; on amené le second convertisseur au second poste lorsque le premier convertisseur en a été écarté ; et on sépare les impuretés par oxydation, du métal en fusion dans le second convertisseur lorsque ce dernier se trouve au second poste. the first converter is moved to a station other than the second, after the blowing operation in order to proceed with the casting, the cleaning and the recharging of the first converter; the second converter is brought to the second station when the first converter has been removed therefrom; and separating the impurities by oxidation from the molten metal in the second converter when the latter is at the second station. 7.- Procédé suivant la revendication 6, caractérisé en ce qu'on déplace les deux convertisseurs simultanément. 7. A method according to claim 6, characterized in that the two converters are moved simultaneously. 8.- Appareil servant à effectuer des opérations faisant partie d'un processus d'affinage de métal, caractérisé en ce qu'il comprend : un convertisseur d'affinage mobile ; un dispositif pour déplacer le convertisseur entre plusieurs postes ; <Desc/Clms Page number 19> un dispositif, à un des postes, pour exécuter, en coopération avec le convertisseur, une opération qui fait partie du processus d'affinage ; EMI19.1 et un dispositif, h-un autre poste, servant à ex(JOU- ter, en coopération avec le convertisseur, plusieursautres opératiens également partie du processus d'affinage. 8.- Apparatus for performing operations forming part of a metal refining process, characterized in that it comprises: a mobile refining converter; a device for moving the converter between several stations; <Desc / Clms Page number 19> a device, at one of the stations, for performing, in cooperation with the converter, an operation which is part of the refining process; EMI19.1 and a device, h-another station, used to ex (PLAY, in cooperation with the converter, several other operators also part of the refining process. 9.- Appareil servant à exécuter des opérations faisant partie d'un processus d'affinage de métal., caractérisa en ce qu'il comprend! un plateau tournant comprenant plusieurs sections de EMI19.2 plateau qui peuvent chacune être déplacées :Lnc1épondul\1mt'nt des autres ; un convertisseur d'affinage allonge ver t:LC!4i41oJu'i.lnt mont' sur chaque action de plateau; 9.- Apparatus used to perform operations forming part of a metal refining process., Characterized in that it includes! a turntable comprising several sections of EMI19.2 tray that can each be moved: Lnc1épondul \ 1mt'nt others; a refining converter lengthens ver t: LC! 4i41oJu'i.lnt mounted on each platter action; des moyens de montage, pour chaque section de pla- EMI19.3 T$AUP Permettant la ddplaoemont de celle-ci suivant au moln', une partie d'un trajet circulaire entre plusieurs poster pp&<s des moyens, au premier pc'stCj, servant ex4cutur un coopération avec un convertisseur d'affinage, une opOI.'at.Ll1l1. 4111 fait partie du processus d'affinage et des moyens, à un autre pontewoorvant à ex6citter en coopération avec un oonvsrtisseur d'4tt1nu"o, pluuleura autres opérations qui font également partie du processus d.' a t.t'1ullCO. mounting means, for each section of ceiling EMI19.3 T $ AUP Allowing the displacement of this following to the moln ', a part of a circular path between several poster pp & <s of the means, at the first pc'stCj, serving as an execution of a cooperation with a refining converter, an opOI .'at.Ll1l1. 4111 is part of the refining process and means, to another bridge before to be performed in cooperation with a 4tt1nu "o contractor, several other operations which are also part of the process. at t.t'1ullCO. 10.- En ootnbinalson avec l'appareil suivant la re- vendication 9 un bâtiment contenant l'appareil ; ce bâtiment comportant un plancher destina à supporter des récipients mobiles contenant du métal en fusion à charger dans un convertisseur d'affinage ; chaque section du plateau tournant présentant une surface supérieure sur laquelle le convertisseur d'affinés est monté ; <Desc/Clms Page number 20> la surface supérieure de la section de plateau,tournant se trouvant au même niveau que le plancher. 10.- In ootnbinalson with the apparatus according to claim 9 a building containing the apparatus; this building comprising a floor intended to support mobile containers containing molten metal to be loaded into a refining converter; each section of the turntable having an upper surface on which the refiner converter is mounted; <Desc / Clms Page number 20> the upper surface of the turntable section being at the same level as the floor. 11.- Appareil à affiner des métaux, caractérisé en ce qu'il comprend : un convertisseur d'affinage allongé verticalement; des moyens pour charger le convertisseur de métal en fusion à un premier poste; des moyens à un second poste décalé du premier pour séparer, par oxydation, les impuretés du métal en fusion; 11. An apparatus for refining metals, characterized in that it comprises: a vertically elongated refining converter; means for loading the molten metal converter at a first station; means at a second station offset from the first for separating, by oxidation, the impurities from the molten metal; et un plateau tournant portant le convertisseur de manière qu'il puisse être déplacé entre le premier et le second polit@@ 12.- Appareil à affiner des métaux suivant la reven- dioation 11, caractérisé en ce qu'il comprends des moyens pour procéder a la coulée et au décrassât*'du ! convertisseur lorsqu'il se trouve à un poste autre que le second. and a turntable carrying the converter so that it can be moved between the first and second poles @@ 12.- Apparatus for refining metals according to claim 11, characterized in that it comprises means for proceeding to the casting and the cleansing of the! converter when it is at a station other than the second. 13.- Appareil suivant la revendication 11, caractérisé en ce qu'il comprend des moyens pour enlever le convertisseur du plateau tournant lorsque ce convertisseur se trouve . un poste situé entre le premier et le second. 13.- Apparatus according to claim 11, characterized in that it comprises means for removing the converter from the turntable when this converter is located. a post located between the first and the second. 14.- Appareil suivant la revendication 11, caractérisé en ce qu'il comprend : un second convertisseur d'affinage allongé verticale- ment} et des moyens par lesquels le second convertisseur est monté sur le plateau tournant à un endroit espacé du premier convertisseur.' 15.- Appareil à affiner du métal, caractérisé en ce qu'il comprend un convertisseur d'affinage allongé verticalement comprenant des moyens destinés à contenir du métal en fusion; des moyens portant le convertisseur d'affinage de ma. nière qu'il puisse se déplacer entre plusieurs postes espaces <Desc/Clms Page number 21> EMI21.1 les uns des autres; 14.- Apparatus according to claim 11, characterized in that it comprises: a second refining converter elongated vertically} and means by which the second converter is mounted on the turntable at a location spaced from the first converter. ' 15. Apparatus for refining metal, characterized in that it comprises a vertically elongated refining converter comprising means for containing molten metal; means carrying the ma refining converter. deny that it can move between several space stations <Desc / Clms Page number 21> EMI21.1 one another; des moyens, à un premier poste, P 1:.I' ;..at.= ''.'''' - .f,aag'' tdsp par oxydation, du métal. en fusion con tenu 1:1 ., con' '" ;,! [ :.j et des moyens,à u'n second poste espace du xy. ,. - '., pour enlever Le convertisseur (3,1 affinage de son f;.L'pi.ni,1."1" '' support mobile. means, at a first station, P 1: .I '; .. at. =' '.' '' '- .f, aag' 'tdsp by oxidation, of the metal. in molten content 1: 1., con '' ";,! [: .j and means, at a second post space of xy.,. - '., to remove the converter (3.1 refining of its f; .L'pi.ni, 1. "1" '' mobile support. 16.... Appareil servant li, exécuter deu og,x; 4sk; .,:.D,5 un processus d'affinage de métal.1, oanEio%4ris6 en ac j,3 ocmprend : deux plateaux tournants espaaa deux convertisseurs dL" a1':f':a.ca i.t.l1oncús va ,4ro, x a,i. 16 .... Device serving li, execute deu og, x; 4sk; .,:. D, 5 a metal refining process.1, oanEio% 4ris6 en ac j, 3 ocmprend: two turntables espaaa two converters dL "a1 ': f': a.ca itl1oncús va, 4ro, xa, i. Nantis chacun sur un plateau ia".Nni.YFAÎAS et comprenant 4,id"k';t,, 1;1,);; moyens destiné. à contenir du métal en fusion; deux d:Laposit1f. pnrtant cha-aun tin l'J.rtt'I,j ;:;râ avea son convertisseur de manière qu'ils puissent !;1u:t;tI'J'f' un trajet circulaire respectif ; des moyono, à un premier poste le jolie, de .)1J:'nIJ trajet cîroulaïve,pour exécuter une preliio'o opt,t'..: ,:t:, /1. nage en coopération aveo le convertisseur tFÜ1',i:' 'J'C":; et des moyens, à un endroit fixe C01';1,1,11:.,1:; " ;'( ... cond poste le long de chaque trajet e:1.roulai:C'( y v. r,tsir pour exécuter une seconde opération d'affinago 'J:t;:.l'(j:",1JI., bzz, raz première en coopération avec chaque convertisseur djj'tU:\.f:'1<1 17.-' Appareil à affiner des mdtaux, car(\c1a:1 ": r;, ce qu'il comprend deux plateaux tournants espaces]; deux convertisseurs d'affinage allonge ve: Each one on a plateau ia ".Nni.YFAÎAS and comprising 4, id" k '; t ,, 1; 1,) ;; means intended. to contain molten metal; two d: Laposit1f. pnrtant cha-aun tin l'J.rtt'I, j;:; râ avea its converter so that they can!; 1u: t; tI'J'f 'a respective circular path; of moyono, at a first post the pretty one, of.) 1J: 'nIJ cîroulaïve path, to perform a preliio'o opt, t' ..:,: t :, / 1. swims in cooperation with the converter tFÜ1 ', i:' 'J'C ":; and means, at a fixed location C01'; 1,1,11:., 1 :;"; '(... cond post along each path e: 1.rollai: C '(y v. r, tsir to perform a second affinago operation' J: t;:. l '(j: ", 1JI., bzz, raz first en cooperation with each converter already U: \. f: '1 <1 17.-' Device for refining metals, because (\ c1a: 1 ": r ;, which it includes two rotating plates spaces]; two converters ripening length ve: !;iI:1.,)jIj( {} t montés chacun sur un plateau tournant et Gompxa,K9 f.It ,'1,,, ..',:. moyens destinés à contenir du métal en iusion; deux dispositifs portant chacun un plateau ;:OH."ll',,;,, avec son aonvertisseurt do manière qU"ils puissent É h:=; lP\ trajet circulaire respectif ; <Desc/Clms Page number 22> des moyens, à un premier poste- le long de Chaque trajet circulaire, pour exécuter une opération d'affûtage en coopé ration avec le convertisseur d'affinages des moyens, à un second poste le long de chaque trajet circulaire, pour enlever un ,convertisseur d'affinage de son plateau tournant} le second poste d'un trajet circulaire étant plaoé en face du second poste, de 'autre trajet; !; iI: 1.,) jIj ({} t each mounted on a turntable and Gompxa, K9 f.It, '1 ,,, ..',:. means intended to contain metal in iusion; two devices carrying each a plate;: OH. "ll ',,; ,, with its inverter so that they can E h: =; lP \ respective circular path; <Desc / Clms Page number 22> means, at a first station along each circular path, for performing a sharpening operation in cooperation with the converter sharpening means, at a second station along each circular path, for removing a converter refining of its turntable} the second station of a circular path being plaoé in front of the second station, of 'other path; et un poste, situé entre les 'seconds postes préoités, pour regarnir les convertissours enlevas de leur plateau tournant. and a station, located between the 'second preoées stations, to replenish the convertors removed from their turntable. 18.- Toutes les nouvelles décrites Avec référence aux dessins annexés. 18.- All news described With reference to the accompanying drawings.
BE688603D 1965-10-20 1966-10-20 BE688603A (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
US49831265A 1965-10-20 1965-10-20

Publications (1)

Publication Number Publication Date
BE688603A true BE688603A (en) 1967-03-31

Family

ID=23980519

Family Applications (1)

Application Number Title Priority Date Filing Date
BE688603D BE688603A (en) 1965-10-20 1966-10-20

Country Status (2)

Country Link
BE (1) BE688603A (en)
NL (1) NL6614631A (en)

Also Published As

Publication number Publication date
NL6614631A (en) 1967-04-21

Similar Documents

Publication Publication Date Title
RU2530578C2 (en) Flexible electric arc furnace with minimum electric power consumption and method of steel products fabrication
CA2743102A1 (en) Transport and storage device for ladle pipe for transferring liquid metal
BE688603A (en)
FR1465796A (en) Process for extending the life of refractory linings in kaldo, linz donawitz, demay or acid or base converter type furnaces
KR100325696B1 (en) casting machine of turntable type and casting method of the same
EP0785402B1 (en) Heat treatment installation for metallic article loads
EP0734458A1 (en) Loading device for feeding liquid metal into an electric furnace
JP5703717B2 (en) Apparatus for removing deposits from inclined pouring rod for blast furnace and method for removing deposits
EP0536185B1 (en) Liquid steel bath reheating method
CA2059438A1 (en) Process and device for the production of mineral fibers
CN220300817U (en) Slag clamping device capable of uniformly discharging slag
WO1996013349A1 (en) Liquid metal heating and casting ladle
BE558076A (en)
FR2488911A1 (en) Basic oxygen furnace lining repair - using vertical relining lance between charging and oxygen blowing stages
BE1005461A3 (en) PROCESS AND INSTALLATION FOR REFINING FERROMANGANESE CARBIDE.
LU87857A1 (en) METHOD FOR REGULATING THE CAST REFINING OPERATION
FR2669041A1 (en) Process for the treatment of a molten metal and its transfer into a receiving cavity and system for making use of this process
BE557072A (en)
LU88628A1 (en) Device for manufacturing a low sulfur iron sponge
JPS63128111A (en) Method for treating molten steel in remaining ladle
JP3666750B2 (en) Graphite spheroidizing equipment
BE633812A (en)
BE511480A (en)
FR2499887A1 (en) CONTINUOUS CASTING INSTALLATION IN ONE WORKSHOP
JPS63297519A (en) Method for repairing molten iron carrying car