BRPI1012813A2 - aparelho e método para modelar projetos de poço e desempenho de poço - Google Patents
aparelho e método para modelar projetos de poço e desempenho de poçoInfo
- Publication number
- BRPI1012813A2 BRPI1012813A2 BRPI1012813A BRPI1012813A BRPI1012813A2 BR PI1012813 A2 BRPI1012813 A2 BR PI1012813A2 BR PI1012813 A BRPI1012813 A BR PI1012813A BR PI1012813 A BRPI1012813 A BR PI1012813A BR PI1012813 A2 BRPI1012813 A2 BR PI1012813A2
- Authority
- BR
- Brazil
- Prior art keywords
- well
- modeling
- designs
- performance
- well performance
- Prior art date
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
Landscapes
- Geology (AREA)
- Life Sciences & Earth Sciences (AREA)
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Environmental & Geological Engineering (AREA)
- Fluid Mechanics (AREA)
- Physics & Mathematics (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
- Organic Low-Molecular-Weight Compounds And Preparation Thereof (AREA)
- Measuring Fluid Pressure (AREA)
- Aerodynamic Tests, Hydrodynamic Tests, Wind Tunnels, And Water Tanks (AREA)
- Flow Control (AREA)
- Physical Or Chemical Processes And Apparatus (AREA)
Applications Claiming Priority (2)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| US12/470,869 US8463585B2 (en) | 2009-05-22 | 2009-05-22 | Apparatus and method for modeling well designs and well performance |
| PCT/US2010/035758 WO2010135636A2 (en) | 2009-05-22 | 2010-05-21 | Apparatus and method for modeling well designs and well performance |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| BRPI1012813A2 true BRPI1012813A2 (pt) | 2018-01-16 |
Family
ID=43125155
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| BRPI1012813A BRPI1012813A2 (pt) | 2009-05-22 | 2010-05-21 | aparelho e método para modelar projetos de poço e desempenho de poço |
Country Status (7)
| Country | Link |
|---|---|
| US (1) | US8463585B2 (pt) |
| EP (1) | EP2432968B1 (pt) |
| BR (1) | BRPI1012813A2 (pt) |
| CA (1) | CA2762975C (pt) |
| RU (1) | RU2531696C2 (pt) |
| SA (1) | SA110310426B1 (pt) |
| WO (1) | WO2010135636A2 (pt) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN109577923A (zh) * | 2018-12-03 | 2019-04-05 | 重庆大学 | 一种用于计量煤层气开采试验时的倒灌量的装置 |
Families Citing this family (22)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US20120330466A1 (en) * | 2011-06-27 | 2012-12-27 | George Joel Rodger | Operational logic for pressure control of a wellhead |
| US9574433B2 (en) * | 2011-08-05 | 2017-02-21 | Petrohawk Properties, Lp | System and method for quantifying stimulated rock quality in a wellbore |
| US9261869B2 (en) * | 2012-02-13 | 2016-02-16 | Emerson Process Management Power & Water Solutions, Inc. | Hybrid sequential and simultaneous process simulation system |
| CA2808858C (en) * | 2012-03-16 | 2016-01-26 | Weatherford/Lamb, Inc. | Wellbore real-time monitoring and analysis of fracture contribution |
| US9470086B2 (en) * | 2013-12-18 | 2016-10-18 | King Fahd University Of Petroleum And Minerals | Inflow performance relationship for horizontal wells producing oil from multi-layered heterogeneous solution gas-drive reservoirs |
| MX2016009645A (es) * | 2014-01-24 | 2016-11-08 | Landmark Graphics Corp | Propiedades optimizadas de dispositivo de control de flujo para la inyeccion de gas acumulado. |
| US20150218939A1 (en) * | 2014-02-06 | 2015-08-06 | King Fahd University Of Petroleum And Minerals | Graphical method for assisting multi-zones commingling decision |
| US9471730B2 (en) | 2014-02-11 | 2016-10-18 | King Fahd University Of Petroleum And Minerals | Generalized inflow performance model for oil wells of any inclined angle and a computer-implemented method thereof |
| CN104405364B (zh) * | 2014-10-23 | 2017-06-13 | 中国石油天然气股份有限公司 | 一种油井生产特性评价方法及装置 |
| US9951581B2 (en) * | 2014-11-07 | 2018-04-24 | Baker Hughes | Wellbore systems and methods for supplying treatment fluids via more than one path to a formation |
| US10345764B2 (en) | 2015-04-27 | 2019-07-09 | Baker Hughes, A Ge Company, Llc | Integrated modeling and monitoring of formation and well performance |
| US10370941B2 (en) | 2015-04-27 | 2019-08-06 | Baker Hughes, A Ge Company, Llc | Well performance index method for evaluating well performance |
| WO2017106513A1 (en) | 2015-12-18 | 2017-06-22 | Baker Hughes Incorporated | Integrated modeling and simulation of formation and well performance |
| US10508521B2 (en) | 2017-06-05 | 2019-12-17 | Saudi Arabian Oil Company | Iterative method for estimating productivity index (PI) values in maximum reservoir contact (MRC) multilateral completions |
| CA3075989C (en) | 2017-11-13 | 2022-06-28 | Landmark Graphics Corporation | Simulating fluid production using a reservoir model and a tubing model |
| CN110608031B (zh) * | 2018-06-14 | 2023-03-17 | 中国石油化工股份有限公司 | 一种井下节流器选井方法 |
| US11326423B2 (en) * | 2019-05-16 | 2022-05-10 | Saudi Arabian Oil Company | Automated production optimization technique for smart well completions using real-time nodal analysis including recommending changes to downhole settings |
| US11499423B2 (en) | 2019-05-16 | 2022-11-15 | Saudi Arabian Oil Company | Automated production optimization technique for smart well completions using real-time nodal analysis including comingled production calibration |
| US11441395B2 (en) | 2019-05-16 | 2022-09-13 | Saudi Arabian Oil Company | Automated production optimization technique for smart well completions using real-time nodal analysis including real-time modeling |
| CN110593832B (zh) * | 2019-10-21 | 2021-12-28 | 中国石油化工股份有限公司 | 一种基于边底水油藏注水外溢的注采比优化方法 |
| US11821289B2 (en) | 2019-11-18 | 2023-11-21 | Saudi Arabian Oil Company | Automated production optimization technique for smart well completions using real-time nodal analysis |
| US12163411B2 (en) * | 2019-12-27 | 2024-12-10 | Saudi Arabian Oil Company | Intelligent completion control in reservoir modeling |
Family Cites Families (11)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US4442710A (en) * | 1982-03-05 | 1984-04-17 | Schlumberger Technology Corporation | Method of determining optimum cost-effective free flowing or gas lift well production |
| NO170037C (no) * | 1985-07-23 | 1992-09-02 | Flopetrol Services Inc | Fremgangsmaate for maaling av stroemningshastigheter i en borebroenn. |
| SU1820668A1 (ru) * | 1988-04-27 | 1995-09-20 | Самарский инженерно-строительный институт им.А.И.Микояна | Способ определения дебита скважины, оборудованной глубинным насосом |
| RU2067663C1 (ru) * | 1992-01-09 | 1996-10-10 | Василий Иванович Тищенко | Способ исследования газовых скважин при стационарных режимах фильтрации |
| RU2087704C1 (ru) * | 1992-11-03 | 1997-08-20 | Государственное предприятие по добыче газа "Ямбурггазодобыча" | Способ определения дебита действующей газовой скважины |
| RU2162939C1 (ru) * | 1999-06-23 | 2001-02-10 | Предприятие "Надымгазпром" | Способ газогидродинамических исследований скважин |
| US6980940B1 (en) * | 2000-02-22 | 2005-12-27 | Schlumberger Technology Corp. | Intergrated reservoir optimization |
| US7725301B2 (en) * | 2002-11-04 | 2010-05-25 | Welldynamics, B.V. | System and method for estimating multi-phase fluid rates in a subterranean well |
| EA008321B1 (ru) * | 2002-11-23 | 2007-04-27 | Шлумбергер Текнолоджи Корпорейшн | Способ и устройство для объединённых моделирований пластов-коллекторов и поверхностных сетей трубопроводов производственного оборудования |
| US7172020B2 (en) * | 2004-03-05 | 2007-02-06 | Tseytlin Software Consulting Inc. | Oil production optimization and enhanced recovery method and apparatus for oil fields with high gas-to-oil ratio |
| US8170801B2 (en) * | 2007-02-26 | 2012-05-01 | Bp Exploration Operating Company Limited | Determining fluid rate and phase information for a hydrocarbon well using predictive models |
-
2009
- 2009-05-22 US US12/470,869 patent/US8463585B2/en active Active
-
2010
- 2010-05-21 EP EP10778460.5A patent/EP2432968B1/en active Active
- 2010-05-21 WO PCT/US2010/035758 patent/WO2010135636A2/en not_active Ceased
- 2010-05-21 CA CA2762975A patent/CA2762975C/en active Active
- 2010-05-21 RU RU2011152240/03A patent/RU2531696C2/ru not_active IP Right Cessation
- 2010-05-21 BR BRPI1012813A patent/BRPI1012813A2/pt not_active IP Right Cessation
- 2010-05-22 SA SA110310426A patent/SA110310426B1/ar unknown
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN109577923A (zh) * | 2018-12-03 | 2019-04-05 | 重庆大学 | 一种用于计量煤层气开采试验时的倒灌量的装置 |
Also Published As
| Publication number | Publication date |
|---|---|
| SA110310426B1 (ar) | 2013-12-29 |
| EP2432968A4 (en) | 2015-10-28 |
| CA2762975A1 (en) | 2010-11-25 |
| RU2011152240A (ru) | 2013-06-27 |
| CA2762975C (en) | 2016-07-05 |
| US20100299124A1 (en) | 2010-11-25 |
| RU2531696C2 (ru) | 2014-10-27 |
| EP2432968B1 (en) | 2017-08-16 |
| EP2432968A2 (en) | 2012-03-28 |
| WO2010135636A3 (en) | 2011-03-03 |
| US8463585B2 (en) | 2013-06-11 |
| WO2010135636A2 (en) | 2010-11-25 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| BRPI1012813A2 (pt) | aparelho e método para modelar projetos de poço e desempenho de poço | |
| BRPI0907812A2 (pt) | Aparelho e método para produzir uréia | |
| IT1396233B1 (it) | Apparato e metodo di taglio | |
| BRPI1013624A2 (pt) | aparelho de exibição e método para fabricação do aparelho de exibição | |
| BRPI1010670A8 (pt) | método e aparelho para sensoriamento óptico | |
| BR112012004707A2 (pt) | método | |
| BR112012000624A2 (pt) | método | |
| BRPI1008617A2 (pt) | método e aparelho para lipoaspiração | |
| FI20090389A0 (fi) | Menetelmä | |
| BRPI0912934A2 (pt) | aparelho e método | |
| BRPI0910587A2 (pt) | método e aparelho para eletrogalvanização | |
| BRPI0910713A2 (pt) | método e aparelhos | |
| BR112013016969A2 (pt) | aparelho e método | |
| BR112012015031A2 (pt) | aparelho e método | |
| BRPI0918294A2 (pt) | dispositivo e método para produzir explosões | |
| BRPI1012148A2 (pt) | método e equipamento para preparar dentadura | |
| BR112012011910A2 (pt) | dispositivo e método | |
| BR112012001100A2 (pt) | aparelho e método para construções de estrutura e tijolo | |
| BR112012028015A2 (pt) | aparelho e método | |
| BRPI1012526A2 (pt) | método | |
| BRPI1007587A2 (pt) | dispositivo de bomba e método para fazê-lo | |
| BRPI1008402A2 (pt) | método e aparelho para gerenciamento de informação de texto | |
| BR112012008229A2 (pt) | método, e aparelho | |
| BRPI1010705A2 (pt) | método | |
| BRPI0914120A2 (pt) | método e aparelho para determinação estrutural |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| B08F | Application dismissed because of non-payment of annual fees [chapter 8.6 patent gazette] |
Free format text: REFERENTE A 8A ANUIDADE. |
|
| B08K | Patent lapsed as no evidence of payment of the annual fee has been furnished to inpi [chapter 8.11 patent gazette] |