Method and device for pouring in-situ concrete piles for foundation purposes

Info

Publication number
CH331434A
CH331434A CH331434DA CH331434A CH 331434 A CH331434 A CH 331434A CH 331434D A CH331434D A CH 331434DA CH 331434 A CH331434 A CH 331434A
Authority
CH
Switzerland
Prior art keywords
pipe
ram
head
mold
concrete
Prior art date
Application number
Other languages
German (de)
Inventor
Robert Lidberg Artur
Original Assignee
Robert Lidberg Artur
Smith Bengt Johan Wilhelm
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Robert Lidberg Artur, Smith Bengt Johan Wilhelm filed Critical Robert Lidberg Artur
Publication of CH331434A publication Critical patent/CH331434A/en

Links

Classifications

    • E—FIXED CONSTRUCTIONS
    • E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/72—Pile shoes
    • E—FIXED CONSTRUCTIONS
    • E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22—Piles
    • E02D5/34—Concrete or concrete-like piles cast in position ; Apparatus for making same
    • E02D5/38—Concrete or concrete-like piles cast in position ; Apparatus for making same making by use of mould-pipes or other moulds
    • E02D5/385—Concrete or concrete-like piles cast in position ; Apparatus for making same making by use of mould-pipes or other moulds with removal of the outer mould-pipes
    • E—FIXED CONSTRUCTIONS
    • E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/66—Mould-pipes or other moulds
    • E02D5/665—Mould-pipes or other moulds for making piles

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Piles And Underground Anchors (AREA)

Description

  

  Verfahren und Vorrichtung zum Giessen von     Ortbetonpfählen    zu Gründungszwecken    Um die Kosten für das     Pfählerammen     beispielsweise bei einem Bauwerk zu vermin  dern, hat man bereits vorgeschlagen, den  Pfahl in einer     zementformährilichen    Vorrich  tung zu giessen, welche zunächst an Stelle  des Pfahles in das Erdreich gerammt wird.  Man hat zu diesem Zwecke ein Rohr mit einer  losen Spitze versehen und das Rohr bis zur  gewünschten Tiefe in den Boden getrieben  und danach mit Beton gefüllt. Während des  Füllens wurde das Rohr allmählich hoch  gezogen, so dass der das     Rohr    umgebende  Boden die Giessform darstellte. Es hat sich  jedoch herausgestellt, dass dieses Verfahren  einige Gefahren in sich birgt, da der Pfahl  z.

   B. durch Wasseradern führen kann, welche  das Bindemittel aus der Füllmasse weg  spülen, so dass der Pfahl unbrauchbar wird.  Anderseits hat dieses Verfahren recht zahl  reiche Vorteile, da man eine teure Bewehrung  des Pfahles und die ziemlich hohen Kosten  für seinen Transport sparen kann.  



  Die vorliegende Erfindung bezweckt ein  Ausschalten der Gefahrenmomente, die mit  dem obigen Verfahren verbunden sind. Die  Erfindung bezieht sich auf ein Verfahren zum  Giessen von     Ortbetonpfählen    zu Gründungs  zwecken, unter Verwendung eines längs  geteilten     Vortreibrohres.    Sie ist dadurch ge  kennzeichnet, dass das Rohr mit vorgesetz  tem Rammkopf derart eingerammt wird,     da,ss     zwischen seinem     untern    Rand und der Innen-         fläche    des Kopfes ein Zwischenraum ver  bleibt, worauf das     Vortreibrohr    mit Beton  mischung gefüllt,

   nach Erhärten des Beton  zwecks Lösung vom gebildeten Pfahl noch       mals    etwas eingeschlagen und schliesslich her  ausgezogen wird.  



  Die Erfindung wird nachstehend unter       Bezugnahme    auf beiliegende Zeichnungen  näher erläutert. Die Zeichnungen zeigen  einige Ausführungsbeispiele einer für die  Durchführung des erfindungsgemässen Ver  fahrens geeigneten Form, d. h.     einer        soge-          nannten    Verschalung.         Fig.    1 ist eine     Seitenansicht    einer Pfahl  giessform.

   Die     Fig.    2, 3 und 4 sind Quer  schnitte durch diese Form längs den Linien       II-II,        III-III    und     IV-IV    in     Fig.    1.     Fig.    5  ist ein Längsschnitt durch eine Giessform  nach     Fig.    1 zu einem gewissen Zeitpunkt  während des     Rammens.    Die     Fig.    6 und 7 sind  ein Längsschnitt bzw. ein     Querschnitt    eines  Teils der Giessform.     Fig.    8 zeigt die Form  nach Beendigung der Giessarbeit.

       Fig.    9 zeigt  eine bei der Form nach     Fig.    1 verwendete       Verschlussvorriehtung.        Fig.    10 ist ein Längs  schnitt durch eine andere Form zu einem ge  wissen     Zeitpunkt    während des     Rammens    der  Form.     Fig.    11 zeigt einige     Teile    derselben  Vorrichtung zu einem andern Zeitpunkt der  Arbeit.     Fig.    12 ist ein Schnitt entlang der  Linie     XII-XII    in     Fig.    10. Die     Fig.    13 und 14      zeigen schliesslich zwei verschiedene Ausfüh  rungen der Formspitzen.  



  Wie am deutlichsten aus den     Fig.    1 und 2  hervorgeht, weist die Form zwei halbzylin  drische Teile 1 und 2 auf, wovon der Teil 2  mit Längsflanschen 3 versehen ist, welche  über die Längskanten des Teils 1 übergreifen.  Jeder der Teile 1 und 2 ist bei dem hier be  schriebenen Beispiel in seiner Längsrichtung  wiederum aus zwei Bestandteilen zusammen  gesetzt, wovon der obere an beiden Enden  mit einer Art von Klauen 4 versehen ist,  welche in entsprechende     Klauen    5 bzw. 6  am untern     Bestandteil    bzw. an einem End  stück 7 eingreifen. Die     Klauen    4 und 5 sind  rundherum genutet.

   In diese     Klauennuten     sind halbkreisförmige     Verschlussbügel    8 ein  gelegt, welche die nacheinander angebrachten       Bestandteile    der Formteile miteinander ver  binden. Das Endstück 7 ist hingegen nur lose  am obern Ende der Form angebracht.  



  Die untern Enden der untern Bestand  teile 1 und 2 sind glatt und     sind    in eine kegel  förmige Formspitze 9 eingeschoben. Diese  Formspitze besitzt einen röhrenförmigen Teil  10 als Führung für     die    beiden Zylinderhälften  1 und 2. Letztgenannte stützen sich mit ihren  beiden     Endflächen    gegen     eine        in    die Form  spitze 9 eingelegte Platte 11, welche zweck  mässig aus federnd nachgiebigem Material  besteht. Ferner sind in der Formspitze 9  kreisbogenförmige Führungen 12 an der Ver  bindungsstelle zwischen den beiden Form  hälften 1 und 2 vorgesehen.  



  Die Form ist mit Hilfe eines Rammbären  in den Erdboden zu treiben und ist zu diesem  Zwecke mit einem Kopfstück 13 versehen,  welches seinerseits mit einer zum Einschieben  in die Form bestimmten zylindrischen Füh  rung 14 versehen ist.     Fig.    1 zeigt das Kopf  stück aus der Form herausgezogen. In seiner  Rammstellung umschliesst der nach unten  gerichtete Mantel     13a    des Kopfstückes den  obern Teil der beiden obern     Bestandteile    1  und 2 sowie das Endstück 7. Das Kopfstück  enthält ferner noch eine     Einlage    15 aus Blei  oder einem     ähnlichen    Material.

      Aus obigem geht hervor, dass die Giess  form während der Arbeit stückweise mit  mehreren Bestandteilen verlängert werden  kann, bis die vorgesehene Rammtiefe erreicht       wird.    Es kommt jedoch häufig vor, dass die  Bodenverhältnisse derart sind, dass das un  tere Pfahlende auf Felsen stösst. Wo dies zu  erwarten ist, ist es zweckmässig, die Pfahl  spitze im Felsen zu verankern, wie aus     Fig.    5  ersichtlich ist.  



  Beim Aufstossen der Formspitze 9 auf  einem Felsen wird die Rammarbeit abge  brochen, und die Platte 11 wird mit hierzu  geeignetem Werkzeug entfernt. Dies     kann     beispielsweise dadurch geschehen, dass man  in die Form einen     klauenähnlichen    Greifer  hinuntergleiten lässt, der die Platte 11 an  ihrem schmalsten Teil fasst. Beim Heraus  ziehen des     Gxreifers    rutscht die Platte infolge  ihrer Federung von den Enden der Form  hälften weg und kann dann aus der Form  herausgezogen werden. Hernach kann man in  die Form eine     Thermitladung        hinuntersenken     und diese in bekannter Weise zünden, wobei  der äusserste Teil der Formspitze 9 abge  brannt wird.

   Anschliessend wird in die Form  ein Führungsrohr 16 hinabgesenkt, welches  mit gegen die     Rohrinnenwand    anliegenden       Zentrierungsrippen    17 versehen ist, so dass es  koaxial liegt. Mit seinem etwas erweiterten  untern Ende     16a        (Fig.    6) liegt dann das Rohr  16 an der Innenseite des nunmehr stumpfen  Kegels an     (Fig.    5). Man führt dann durch das  Führungsrohr ein Bohrwerkzeug 18 nach  unten und bearbeitet damit in bekannter  Art den Felsen unter der Form, so dass ein  Bohrloch     (Fig.    5) entsteht.  



  Wenn dann das Bohrloch im Felsunter  grund die gewünschte Tiefe erreicht hat, wird  der Bohrer 18 wieder hochgezogen, und in das  in dieser Weise entstandene Bohrloch wird  ein Ankereisen 19 solcher Länge hinabge  lassen, dass es bis in die Form hinein hoch  steht     (Fig.    8). Dann wird das Führungsrohr  16 herausgezogen. Die Formteile sind am  besten schon von Anfang an innen mit Fett  oder einem andern Gleitmittel bestrichen, um  zu verhindern, dass die Betonmasse an der      Formwand haften bleibt. Man kann aber auch  erst zu dem jetzt erreichten Zeitpunkt der  Arbeiten diese Fettschicht mit     geeigneten     Vorrichtungen anbringen, woraufhin mit  dem Giessen des Pfahles begonnen werden  kann. Besonders wenn es sich um grössere  Tiefen handelt, ist es hierbei zweckmässig,  für das Füllen z.

   B. einen zylindrischen Be  hälter mit     auslösbarem    Boden zu verwenden,  welcher Behälter mit     Zementmasse    gefüllt  und bis zum untern Ende der Form hinab  gelassen wird. Dort wird die     Zementmasse     aus dem Behälter entleert und der Behälter  hochgezogen und neu gefüllt, worauf     dieses     Verfahren so lange wiederholt     wird,    bis die  Form bis zur     gewünschten    Höhe gefüllt. ist.  Sodann lässt man den Beton erhärten. Wäh  rend des Füllens der Form ist es     zweckmässig,     den Beton zu rütteln.  



  Nach dem Erhärten des Betons sind die  Formteile von dem gegossenen Pfahl abzu  lösen. Infolge der Platte 11 befindet sieh ein  kleiner Zwischenraum zwischen der Form  spitze 9 und den untern Formteilen 1 und     :3.     Wenn man das     Forrnkopfstück    13 durch eine  andere geeignete Auflage ersetzt, kann man  lediglich die eine Formhälfte mit dem Ramm  bären etwas bearbeiten und diese etwa 1 cm  tief     weiterrammen,    so dass sie sich vom Pfahl  löst.

   Nach Anbringen geeigneter Befestigun  gen an den obern Enden der Formhälften  kann man diese als Ganzes oder jede Hälfte  einzeln für sich herausziehen.     Fig.    8 zeigt  schematisch, wie die in der Abbildung links  dargestellte Formhälfte gelockert und bereits  teilweise herausgezogen wurde, ferner wie  das untere Pfahlende in     schiefliegendem     Felsen mit Hilfe eines Ankereisens 19 ver  ankert wurde.  



       @,NTie    aus den Abbildungen ersichtlich ist,  sind die     Verbindungsstellen    zwischen den  verschiedenen Bestandteilen der Formhälften  infolge der Klauen 4 und 5 dicker als die  übrige Form. Um das Rammen zu erleichtern,  ist das stärkere Ende der Formspitze 9 mit  etwas grösserem Durchmesser ausgeführt als  die genannten Verbindungsstellen. Hierdurch  entsteht, wenigstens theoretisch, rings um    den fertiggegossenen Pfahl ein schmaler  Zwischenraum, der sich aber beim Hoch  ziehen der Formteile mit nachrutschender  Erde oder Sand füllt.  



  Falls erwünscht, kann man die Form nur  etwa zu zwei Dritteln emporziehen, so dass  der Pfahl weiterhin an seinem obern Ende  geführt wird, worauf man ihn einige Tage so  stehen lässt, damit das den Pfahl umgebende  Erdreich sich entlang des grösseren Teils der  Pfahllänge genügend setzen kann.  



  In den meisten Fällen dürfte beim Ram  men der umgebende Erdboden die beiden  Formhälften mit genügender Kraft zusam  menhalten. Man kann jedoch die beiden  Formhälften auch miteinander verbinden.       Fig.    9 zeigt eine solche Verbindung hierfür.  Hier sind um die Form herum offene Ringe 20  angebracht, deren Enden durch ein     Auslö-          sungsorgan    21 lösbar miteinander vereint  sind. Sämtliche     Auslöseorgane    ? 1 sind unter  einander durch ein lose liegendes     Seil,    Draht  seil oder durch eine Kette     22    verbunden.

   Es  ist leicht einzusehen, dass die Ringe 20 nach  erfolgtem Giessen dadurch     geöffnet    werden  können, dass man das Seil oder die Kette 22  nach oben zieht, wobei sich die Ringe der  Reihe nach einzeln     öffnen,    angefangen am  obern Ende der Form. Die beiden Form  hälften werden dadurch voneinander frei.  



  Um das Rammen der Form zu erleichtern,  ist es zweckmässig, abwechselnd die Spitze  und das Rohr zu rammen, wie im folgenden  an Hand der     Fig.    10 bis 12 erläutert wird.  



       Fig.    10 zeigt einen längsgeteilten zylin  drischen     Röhrenformteil    31, dessen unteres  Ende mit einer Formspitze 32 versehen ist,  von der sich beiderseits des Rohres 31 zwei  koaxiale zylindrische Rohrteile 33 und 34  nach oben erstrecken, so dass die Spitze     tele-          skopähnlich    mit genanntem Rohr verbunden  ist. Am obern Ende des Rohres 31     ist    auf  dessen Rand ein Rammpuffer 35 aufgesetzt,  der mit einem Einlagering 36 aus Blei oder  ähnlichem Material versehen ist.  



  In das Rohr 31 ist eine Rammstange 37  eingeführt, deren unteres Ende mit einem  Schuh 38 versehen ist. Dieser Schuh     ist    so      ausgeführt, dass er zu der konischen Innen  seite der Spitze 32 passt und mit dieser zu  sammenarbeiten kann. Der Schuh besitzt zu  nachstehend angegebenem Zwecke dreieckige  Stützen 39. Auf dem obern Ende der Ramm  stange 37     ist    eine Platte 40 lose aufgesetzt  unter Zwischenlage einer Einlage 41 aus Blei  oder ähnlichem Material.  



  Bei 42 wird     schematisch    ein     Ramtnbär     oder eine andere Rammvorrichtung ange  deutet, die eine Bohrung 43 grösseren Durch  messers als der Durchmesser der Ramm  stange 37 besitzt. Der Rammbär ist mit den  üblichen, hier nicht     dargestellten    Aufhänge  vorrichtungen versehen. Bei der Vorrichtung  nach     Fig.    10 arbeitet der Rammbär 42 auf  die Platte 40 und über die Rammstange 37  auf die Formspitze 32.

   Diese kann daher für  sich allein gerammt werden, wobei die Länge  der Rammstange so bemessen ist, dass diese  Stange     nicht    so tief gerammt werden kann,  dass das Rohr 31 aus dem Zwischenraum  zwischen den Rohrteilen 33 und 34 an der  Formspitze herausrutscht und somit ausser  Eingriff mit der Formspitze kommt. Wenn  dann die Platte 40 auf den Puffer 35 aufstösst,       wird    die Platte abgehoben und unmittelbar  gegen den Puffer 35 gerammt, wodurch das  Rohr 31 gerammt wird, siehe     Fig.    11. Wenn  das Rohr 31 den Boden des     zylindrischen          Zwischenraums    zwischen den     Rohrteilen    33  und 34 erreicht hat, wird wiederum die Platte  40 aufgelegt und der Vorgang wiederholt.  



  Aus obigem geht hervor, dass die Form  durch abwechselndes Rammen des Rohres 31  und der Formspitze 32 gerammt wird. Die       Wirkung    der Rammschläge wird hierdurch  erheblich verbessert, da beim Vorwärtstrei  ben nur der Spitze 32 die beträchtliche Rei  bung zwischen Rohr 31 und umgebendem  Erdboden wegfällt, und umgekehrt vermeidet  man beim darauffolgenden Rammen nur des  Rohres 31 den Widerstand, der beim Ram  men der Spitze 32 bei ihrem Eindringen in  den Boden vorhanden ist.  



       LTm    zu verhindern, dass die an der Innen  wand der Form 31 aufgestrichene und laut  obigem z. B. aus Fett bestehende Schutz-    Schicht dadurch entfernt wird, dass sich der       Rammstangenkopf   <B>3,9</B> in der Form auf und  ab bewegt, sind die bereits genannten     Stützen     39 angebracht, welche den Stangenkopf zen  trieren, dagegen die Fettschicht nicht nen  nenswert beeinflussen.  



  Auch hier sind     Massnahmen    zu     treffen,     damit die verschiedenen Teile des Form  rohres nach dem Erhärten des Betons durch  Rammschläge noch etwas weiter nach unten  getrieben werden können, wodurch die Form  teile sich vom Beton lösen, sofern sie mehr  oder weniger daran haften- oder     hängenblei-          ben.    Das Rohr 31     befindet    sich zu Beginn des  Giessens in einigem Abstand von seiner unter  sten Lage in der Formspitze 32. Nach dem  Erhärten des Betons werden die das Rohr 31  bildenden Teile ein Stück weit nach unten  geschlagen, gegebenenfalls jede Rohrhälfte  für sich, und schliesslich in Teilen heraus  gezogen.  



  Oben wurde angedeutet, wie man bei der  Ausführung nach     Fig.    1 die äusserste Spitze  der Formspitze beispielsweise mit Hilfe einer       Thermitmisehung    abbrennen kann. Die Fi  guren 13 und 14 zeigen Formköpfe, die so  ausgeführt sind, dass man ihre äussern Enden  absprengen kann.  



  Die     Fig.    13 zeigt zwei zylindrische Form  hälften 51 und     5\?,,    welche zusammen die  Form bilden und in einen Formkopf 53 ein  gesetzt sind. Dieser Formkopf ist in Form  eines stumpfen Kegels ausgeführt, der zwecks  Führung der beiden Formhälften 51 und 52  mit zwei Rohrteilen     5.1    und     55    versehen ist.  



  An den     schmäleren    Teil des     kegeligen     Formkopfes schliesst sich ein zylindrischer  Teil 56 an, der eine für den Sprengstoff be  stimmte Tasche darstellt und beispielsweise  aus Stahlrohr hergestellt ist, wobei die Wand  stärke dieses Stahlrohres geringer ist als die  jenige des eigentlichen Formkopfes. Im Teil  56 befindet sich in einigem Abstand von  seinem freien Ende ein nach aussen gewölbter  Boden 57, der aus Werkstoff geringerer  Festigkeit besteht als der Teil 56, z. B. aus  verhältnismässig schwachem Eisenblech.      Um das Sprengen des äussersten Endes  des Formkopfes zu erleichtern, ist der zylin  drische Teil 56 mit Längsschlitzen 58 ver  sehen, die sich von dem eingesetzten Boden  bis zum freien Rand des Teils erstrecken.  



  Bei der in     Fig.    14 dargestellten Ausfüh  rung der Formspitze schliesst sich an den  stumpfen Kegel 59 ein Kegel 60 an, dessen  Kegelwinkel derselbe ist wie derjenige des  Kegelstumpfes, aber dessen Material eine  geringere Festigkeit aufweist. Die in     Fig.    14  gezeigte Formspitze ist für solche Fälle ge  dacht, wo die Form nicht bis auf gewachsenen  Felsen gerammt wird, sondern wo man eine  Grundplatte,     d.h.    eine Art     Fundamentplatte,     für den Pfahl giessen will, was nach Entfernen  der Formspitze möglich ist.  



  Die Vorrichtung     ist    derart ausgeführt,  dass sie folgendermassen     wirkt:    Um die Be  schaffenheit der verschiedenen Erdschichten  und allenfalls auch um die Bodentiefe     bis    zu  etwa vorhandenem Felsen festzustellen, wird  im Boden ein Loch grösseren Durchmessers  als der geschwächte Spitzenteil der Form  spitze     geschaffen,    und die Giessform wird     bis     zur gewünschten Tiefe     hinuntergetrieben,     wobei die Formspitze sich den örtlich gelten  den Bodenverhältnissen anpasst. Dann wird  in die äusserste Spitze der Form eine durch  praktische Erfahrung ermittelte Menge  Sprengstoff, z. B.

   Dynamit, hinabgelassen und  dort gesprengt, wobei der geschwächte Teil  der Formspitze abgesprengt wird. Die Spreng  ladung ist vorher abzudecken, was am besten  dadurch geschieht, dass man wenigstens den  untern     \feil    der Formspitze mit Wasser füllt.  Man kann anschliessend mit optischen Be  trachtungsgeräten feststellen, ob die Spren  gung die gewünschte Wirkung gezeitigt hat,  und wenn dies der Fall ist, wird im Felsen in  bekannter Weise gebohrt. In das dadurch  erhaltene Bohrloch wird ein Ankereisen ein  gesetzt und dann der Betonpfahl in der in  Zusammenhang mit den     Fig.    1-7 beschrie  benen Art gegossen.  



  Die Erfindung ist nicht auf die oben be  schriebenen und in den Zeichnungsblättern  dargestellten Ausführungen beschränkt.



  Method and device for pouring in-situ concrete piles for foundation purposes In order to reduce the costs of the impeller ramming, for example, in a building, it has already been proposed to pour the pile in a cement form-making device, which is first rammed into the ground instead of the pile. For this purpose, a pipe was provided with a loose tip and the pipe was driven into the ground to the desired depth and then filled with concrete. During the filling, the pipe was gradually pulled up so that the soil surrounding the pipe represented the mold. However, it has been found that this method involves some dangers, as the stake e.g.

   B. can lead through water veins, which wash away the binder from the filling compound, so that the pile is unusable. On the other hand, this method has quite a number of advantages, since you can save expensive reinforcement of the pile and the rather high costs of its transport.



  The present invention aims to eliminate the hazards associated with the above method. The invention relates to a method for pouring in-situ concrete piles for foundation purposes, using a longitudinally divided propellant pipe. It is characterized by the fact that the pipe is rammed in with the ram head in front of it in such a way that a gap remains between its lower edge and the inner surface of the head, whereupon the driving pipe is filled with concrete mixture,

   After the concrete has hardened, something is hammered in again for the purpose of loosening the formed pile and finally pulled out.



  The invention is explained in more detail below with reference to the accompanying drawings. The drawings show some exemplary embodiments of a form suitable for carrying out the method according to the invention; H. a so-called cladding. Fig. 1 is a side view of a pile mold.

   2, 3 and 4 are cross-sections through this mold along lines II-II, III-III and IV-IV in FIG. 1. FIG. 5 is a longitudinal section through a casting mold according to FIG. 1 at a certain point in time during ramming. Figures 6 and 7 are a longitudinal section and a cross section of part of the casting mold, respectively. Fig. 8 shows the mold after the casting work has been completed.

       FIG. 9 shows a locking device used in the form of FIG. 1. Fig. 10 is a longitudinal section through another shape at a ge know time during the ramming of the shape. Fig. 11 shows some parts of the same device at a different point in the work. 12 is a section along the line XII-XII in FIG. 10. Finally, FIGS. 13 and 14 show two different designs of the mold tips.



  As can be seen most clearly from FIGS. 1 and 2, the shape has two semi-cylindrical parts 1 and 2, of which part 2 is provided with longitudinal flanges 3, which overlap over the longitudinal edges of part 1. Each of the parts 1 and 2 is in the example described here be in turn composed of two components in its longitudinal direction, of which the upper is provided at both ends with a type of claws 4, which in corresponding claws 5 and 6 on the lower component or . Engage at one end piece 7. The claws 4 and 5 are grooved all around.

   In this claw grooves semicircular locking bracket 8 are placed, which bind the successively attached components of the moldings with each other. The end piece 7, however, is only loosely attached to the upper end of the mold.



  The lower ends of the lower constituent parts 1 and 2 are smooth and are inserted into a cone-shaped tip 9. This tip has a tubular part 10 as a guide for the two cylinder halves 1 and 2. The latter are supported with their two end faces against a tip in the shape 9 inserted plate 11, which is expediently made of resilient material. Furthermore, in the tip of the mold 9 circular guides 12 at the connection point between the two mold halves 1 and 2 are provided.



  The form is to be driven into the ground with the help of a ram and for this purpose is provided with a head piece 13, which in turn is provided with a cylindrical guide 14 intended for insertion into the form. Fig. 1 shows the head piece pulled out of the mold. In its ramming position, the downwardly directed jacket 13a of the head piece encloses the upper part of the two upper components 1 and 2 as well as the end piece 7. The head piece also contains an insert 15 made of lead or a similar material.

      From the above it can be seen that the casting mold can be extended piece by piece with several components during work until the intended driving depth is reached. It often happens, however, that the soil conditions are such that the lower end of the pile hits rocks. Where this is to be expected, it is advisable to anchor the pole tip in the rock, as can be seen from FIG.



  When the tip 9 is pushed onto a rock, the ramming work is broken off and the plate 11 is removed with a suitable tool. This can be done, for example, by allowing a claw-like gripper to slide down into the mold, which grasps the plate 11 at its narrowest part. When pulling out the gripper, the plate slips as a result of its springiness from the ends of the mold halves away and can then be pulled out of the mold. Afterwards you can lower a thermite charge into the mold and ignite it in a known manner, the outermost part of the mold tip 9 being burned off.

   A guide tube 16, which is provided with centering ribs 17 resting against the inner wall of the tube, so that it lies coaxially, is then lowered into the mold. With its somewhat widened lower end 16a (FIG. 6), the tube 16 then rests on the inside of the now truncated cone (FIG. 5). A drilling tool 18 is then passed down through the guide tube and used in a known manner to machine the rock under the mold, so that a borehole (FIG. 5) is created.



  When the borehole in the bedrock has reached the desired depth, the drill 18 is pulled up again, and an anchor iron 19 is lowered into the borehole created in this way so that it protrudes into the mold (Fig. 8 ). Then the guide tube 16 is pulled out. The molded parts are best coated with grease or another lubricant from the very beginning to prevent the concrete from sticking to the wall of the mold. But you can only apply this layer of fat with suitable devices at the point in time that the work has now reached, after which the pouring of the pile can begin. Especially when it comes to greater depths, it is useful here to fill z.

   B. to use a cylindrical loading container with a releasable bottom, which container is filled with cement paste and let down to the lower end of the mold. There the cement mass is emptied from the container and the container is pulled up and refilled, whereupon this process is repeated until the mold is filled to the desired height. is. The concrete is then allowed to harden. During the filling of the form, it is useful to shake the concrete.



  After the concrete has hardened, the molded parts must be removed from the cast pile. As a result of the plate 11 there is a small space between the tip of the mold 9 and the lower mold parts 1 and: 3. If you replace the Forrnkopfstück 13 by another suitable support, you can only edit one half of the mold with the piling bear something and continue to ram about 1 cm deep so that it detaches from the post.

   After attaching suitable fastenings to the upper ends of the mold halves, you can pull them out as a whole or each half individually. Fig. 8 shows schematically how the mold half shown in the figure on the left has been loosened and already partially pulled out, furthermore how the lower end of the pile was anchored ver in crooked rock with the help of an anchor iron 19.



       As can be seen from the figures, the connection points between the various components of the mold halves are thicker than the rest of the mold due to the claws 4 and 5. In order to facilitate the ramming, the stronger end of the mold tip 9 is designed with a slightly larger diameter than the mentioned connection points. This creates, at least in theory, a narrow space around the finished pile, which, however, is filled with soil or sand when the molded parts are pulled up.



  If desired, the form can only be pulled up about two-thirds so that the post continues to be guided at its upper end, after which it is left for a few days so that the soil surrounding the post is sufficiently settled along the greater part of the length of the post can.



  In most cases, the surrounding soil should hold the two halves of the mold together with sufficient force when ramming. However, the two mold halves can also be connected to one another. Fig. 9 shows such a connection for this. Here open rings 20 are attached around the mold, the ends of which are detachably united with one another by a release element 21. All trigger organs? 1 are connected to each other by a loose rope, wire rope or chain 22.

   It is easy to see that after casting, the rings 20 can be opened by pulling the rope or chain 22 upward, the rings opening one at a time, starting at the top of the mold. The two halves of the mold are thereby free from each other.



  In order to facilitate the ramming of the mold, it is advisable to ram the tip and the tube alternately, as explained below with reference to FIGS. 10 to 12.



       Fig. 10 shows a longitudinally divided cylin drical tubular molding 31, the lower end of which is provided with a molding tip 32, from which on both sides of the tube 31 two coaxial cylindrical tube parts 33 and 34 extend upwards, so that the tip telescope-like connected to said tube is. At the upper end of the tube 31, a ram buffer 35 is placed on its edge, which is provided with an insert ring 36 made of lead or similar material.



  A ram rod 37 is inserted into the tube 31, the lower end of which is provided with a shoe 38. This shoe is designed so that it fits the conical inside of the tip 32 and can work with this. The shoe has triangular supports 39 for the purposes indicated below. On the upper end of the ram rod 37, a plate 40 is loosely placed with the interposition of an insert 41 made of lead or similar material.



  At 42, a Ramtnbär or some other ramming device is indicated schematically, which has a bore 43 of larger diameter than the diameter of the ram rod 37 has. The ram is provided with the usual, not shown hanging devices. In the device according to FIG. 10, the ram 42 works on the plate 40 and via the ram 37 on the forming tip 32.

   This can therefore be rammed on its own, the length of the ram rod being dimensioned so that this rod cannot be rammed so deep that the tube 31 slips out of the space between the tube parts 33 and 34 at the tip of the mold and thus out of engagement with the tip of the mold comes. When the plate 40 then hits the buffer 35, the plate is lifted and rammed directly against the buffer 35, whereby the pipe 31 is rammed, see FIG. 11. When the pipe 31 hits the bottom of the cylindrical space between the pipe parts 33 and 34 has reached, the plate 40 is again placed and the process repeated.



  It can be seen from the above that the mold is rammed by alternately ramming the tube 31 and the mold tip 32. The effect of the ramming is hereby significantly improved, since when Vorwärtsstrei ben only the tip 32, the considerable friction between the pipe 31 and the surrounding ground is omitted, and conversely, in the subsequent ramming of only the pipe 31, the resistance that arises when ramming the tip 32 is avoided is present when they penetrate the soil.



       To prevent LTm that the painted on the inner wall of the form 31 and according to the above z. B. made of fat protective layer is removed in that the ram rod head <B> 3,9 </B> moves up and down in the form, the aforementioned supports 39 are attached, which trier the rod head zen, however Do not affect the fat layer significantly.



  Here, too, measures must be taken so that the various parts of the shaped pipe can be driven a little further down after the concrete has hardened by ramming, whereby the shaped parts detach from the concrete if they more or less stick or stick to it. ben. The pipe 31 is at a certain distance from its lowest position in the mold tip 32 at the beginning of the casting. After the concrete has hardened, the parts forming the pipe 31 are knocked down a little, possibly each pipe half separately, and finally in Parts pulled out.



  Above it was indicated how the outermost tip of the tip of the mold can be burned off in the embodiment according to FIG. 1, for example with the aid of a thermite inspection. The Fi gures 13 and 14 show forming heads that are designed so that you can blow off their outer ends.



  Fig. 13 shows two cylindrical mold halves 51 and 5 \? ,, which together form the shape and in a mold head 53 are set. This forming head is designed in the form of a truncated cone which is provided with two pipe parts 5.1 and 55 for the purpose of guiding the two mold halves 51 and 52.



  At the narrower part of the conical head is followed by a cylindrical part 56, which is a specific pocket for the explosives and is made, for example, of steel pipe, the wall thickness of this steel pipe is less than that of the actual head. In part 56 there is at some distance from its free end an outwardly curved base 57, which consists of material of lower strength than part 56, for. B. made of relatively weak sheet iron. In order to facilitate the blasting of the outermost end of the forming head, the cylin drical part 56 is seen with longitudinal slots 58 ver, which extend from the inserted bottom to the free edge of the part.



  In the embodiment of the mold tip shown in FIG. 14, the truncated cone 59 is adjoined by a cone 60, the cone angle of which is the same as that of the truncated cone, but the material of which has a lower strength. The tip of the mold shown in Fig. 14 is intended for those cases where the mold is not rammed down into natural rock, but where a base plate, i.e. a kind of foundation plate for which the pile wants to pour, which is possible after removing the shaped tip.



  The device is designed in such a way that it works as follows: In order to determine the nature of the various layers of earth and possibly also to determine the depth of the soil up to any existing rock, a hole with a larger diameter than the weakened tip part of the form tip is created in the soil, and the casting mold is driven down to the desired depth, whereby the tip of the mold adapts to the local soil conditions. Then a quantity of explosives determined by practical experience, e.g. B.

   Dynamite, let down and blown there, whereby the weakened part of the tip of the mold is blown off. The explosive charge must first be covered, which is best done by filling at least the lower part of the tip of the mold with water. You can then use optical observation devices to determine whether the blasting has had the desired effect, and if this is the case, the rock is drilled in a known manner. In the borehole thus obtained, an anchor iron is set and then the concrete pile is poured in the manner described in connection with FIGS. 1-7.



  The invention is not limited to the embodiments described above and shown in the drawing sheets.

 

Claims (1)

P ATENTANSPRÜCHE I. Verfahren zum Giessen von Ortbeton- pfählen zu Gründungszwecken unter Ver wendung eines längsgeteilten Vortreibrohres, dadurch gekennzeichnet, dass das Rohr mit vorgesetztem Rammkopf derart eingerammt wird, dass zwischen seinem untern Rand und der Innenfläche des Kopfes ein Zwischenraum verbleibt, worauf das Vortreibrohr mit Beton mischung gefüllt, nach Erhärten des Betons zwecks Lösung vom gebildeten Pfahl noch mals etwas eingeschlagen und schliesslich herausgezogen wird. P ATENT CLAIMS I. A method for pouring in-situ concrete piles for foundation purposes using a longitudinally split driving pipe, characterized in that the pipe with the ram head in front is rammed in such a way that a gap remains between its lower edge and the inner surface of the head, whereupon the driving pipe filled with concrete mixture, after the concrete has hardened to loosen the pile that has formed, it is hammered in a little more and then pulled out. II. Vorrichtung zur Durchführung des Verfahrens nach Patentanspruch I mit einem in der Längsrichtung aufgeteilten Vortreib- rohr, an dessen unterem Ende ein das Hinab treiben des Rohres in den Boden erleichtern der, die Teile zusammenhaltender Beschlag in Form eines kegeligen Kopfes angebracht ist, dadurch gekennzeichnet, dass zwischen dem untern Ende des Rohres und dem Kopf eine Zwischenplatte eingelegt ist, welche nach dem Hinabtreiben des Rohres heraus nehmbar ist, um die Teile des Rohres nach beendetem Giessen jedes für sich noch ein Stück tiefer treiben zu können, II. Device for carrying out the method according to claim I with a longitudinally divided propellant pipe, at the lower end of which it is easier to drive the pipe down into the ground, the fitting holding the parts together is attached in the form of a conical head, characterized that an intermediate plate is inserted between the lower end of the pipe and the head, which can be removed after the pipe has been driven down in order to be able to drive the parts of the pipe a little deeper after the pouring is complete, damit sich die Teile vom Pfahl lösen. UNTERANSPRÜCHE 1. Verfahren nach Patentanspruch I, da durch gekennzeichnet, dass das Rohr und der Kopf getrennt durch abwechselndes Rammen nach unten getrieben werden. 2. Verfahren nach Patentanspruch I, da durch gekennzeichnet, dass das Vortreibrohr vor dem Einfüllen des Betons mit einem eine Verbindung zwischen Rohr und Beton ver hindernden Stoff bestrichen wird. 3. so that the parts come off the post. SUBClaims 1. Method according to claim I, characterized in that the pipe and the head are driven down separately by alternating ramming. 2. The method according to claim I, characterized in that the propulsion pipe is coated with a connection between the pipe and concrete preventing material before filling the concrete. 3. Vorrichtung nach Patentanspruch II, dadurch gekennzeichnet, dass der Kopf aus einem stumpfen Kegel besteht, dessen schma leres Ende durch einen zylindrischen Teil verlängert ist, wobei die Wandstärke dieses Teils geringer ist als diejenige des Kegel stumpfes, und dass in diesem Teil ein Boden geringerer Festigkeit als die des Teils ein gesetzt ist. 4. Vorrichtung nach Unteranspruch 3, dadurch gekennzeichnet, dass der Boden im Abstand vom freien Ende des Teils eingesetzt Ist. 5. Vorrichtung nach Unteranspruch 4, dadurch gekennzeichnet, dass der Boden gegen das freie Ende gewölbt ist. 6. Device according to claim II, characterized in that the head consists of a truncated cone, the narrower end of which is extended by a cylindrical part, the wall thickness of this part being less than that of the truncated cone, and that in this part a bottom of lower strength than that of the part is set. 4. Device according to dependent claim 3, characterized in that the bottom is inserted at a distance from the free end of the part. 5. Device according to dependent claim 4, characterized in that the bottom is curved towards the free end. 6th Vorrichtung nach Patentanspruch II, gekennzeichnet durch eine durch das Vor- treibrohr in der Längsrichtung gehende, den Kopf zu betätigen bestimmte Rammstange, einen Rammbär, der mit einer Mittelbohrung grösserer Breite als die der Rammstange ver sehen ist, um ein Rammen nur des Rohres allein zu ermöglichen, und zwar durch Schla gen des Rammbären auf einen auf der obern Kante des Rohres angebrachten Ramm puffer, durch den die Rammstange nach oben ragt, sowie durch eine am obern Ende der Rammstange anbringbare Platte, um ein Rammen nur der Rammstange ohne Beein trächtigung des Vortreibrohres zu ermög lichen. Device according to claim II, characterized by a ram rod which goes through the propulsion tube in the longitudinal direction and is intended to operate the head, a ram, which is provided with a central hole larger than that of the ram rod, in order to only ram the tube allow, namely by Schla conditions of the piling ram on a mounted on the upper edge of the pipe ram buffer, through which the ram rod protrudes upwards, as well as a plate that can be attached to the top end of the ram rod to allow ramming only the ram rod without impairment of the To make jacking pipe possible.
CH331434D 1954-03-06 1954-03-06 Method and device for pouring in-situ concrete piles for foundation purposes CH331434A (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CH331434T 1954-03-06

Publications (1)

Publication Number Publication Date
CH331434A true CH331434A (en) 1958-07-31

Family

ID=4502059

Family Applications (1)

Application Number Title Priority Date Filing Date
CH331434D CH331434A (en) 1954-03-06 1954-03-06 Method and device for pouring in-situ concrete piles for foundation purposes

Country Status (1)

Country Link
CH (1) CH331434A (en)

Similar Documents

Publication Publication Date Title
DE1303828C2 (en) MEASURING POINT MARKING FOR UNDERGROUND MARKING
DE2711979A1 (en) GROUND ANCHORS FOR ANCHORING ROPES AND THE LIKE
DE10158524A1 (en) Pile device and method for the construction of concrete piles in soft ground
DE2800971A1 (en) DEVICE AND METHOD FOR INSERTING MULTIPARTIC OBJECTS INTO THE SOIL
DE2245076A1 (en) METHOD AND DEVICE FOR MANUFACTURING POST AND UNDERGROUND PILE WALLS
DE1110092B (en) Method and device for the production of reinforced in-situ concrete foundation piles
DE3339965A1 (en) METHOD AND DEVICE FOR PRODUCING A CONCRETE PILE
DE971834C (en) Method and device for the production of in-situ concrete piles
DE293396C (en)
DE19708807A1 (en) Method for installing tubular dowel pins into ground
CH373326A (en) Method and device for the manufacture of concrete cast-in posts
DE2952973A1 (en) IMPROVEMENTS TO AND ON AN EMBEDDABLE ANCHOR AND A METHOD FOR EMBEDDING ANCHORS OF THIS ANCHOR
DE232309C (en)
DE417326C (en) Device for the production of concrete stakes in a driving pipe
DE308749C (en)
DE2626762C2 (en) Method of making pile foundations using precast concrete piles
DE201272C (en)
DE2948879A1 (en) METHOD FOR PRODUCING IN-PLACE CONCRETE PUMPS
DE231033C (en)
DE1259254B (en) Device for producing an in-situ concrete pile
AT206823B (en) Method of manufacturing sleeve piles
EP3228750A1 (en) Method, device and floor dowel system for post fixing
AT123907B (en) Method and device for the production of concrete bored piles.
EP3351687B1 (en) Method of making a pile
DE2612813A1 (en) FOUNDATION POST