CH344100A - Device for central operational control and central operational monitoring on railway lines - Google Patents

Device for central operational control and central operational monitoring on railway lines

Info

Publication number
CH344100A
CH344100A CH344100DA CH344100A CH 344100 A CH344100 A CH 344100A CH 344100D A CH344100D A CH 344100DA CH 344100 A CH344100 A CH 344100A
Authority
CH
Switzerland
Prior art keywords
switching means
station
route
dependent
stations
Prior art date
Application number
Other languages
German (de)
Inventor
Sasse Hans-Wolfgang Ing Dr
Original Assignee
Siemens Ag
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Siemens Ag filed Critical Siemens Ag
Publication of CH344100A publication Critical patent/CH344100A/en

Links

Classifications

    • H—ELECTRICITY
    • H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02K—DYNAMO-ELECTRIC MACHINES
    • H02K27/00—AC commutator motors or generators having mechanical commutator
    • H02K27/12—AC commutator motors or generators having mechanical commutator having multi-phase operation

Landscapes

  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Train Traffic Observation, Control, And Security (AREA)

Description

       

  Einrichtung     für    zentrale Betriebsregelung und zentrale     Betriebsüberwachung          auf        Eisenbahnstrecken       Bei der Modernisierung von Signalanlagen für  Eisenbahnstrecken ergibt sich häufig die Frage, wie  mit einem Mindestaufwand an Mitteln eine     Strecken-          blockung,    eine zentrale Betriebsregelung und eine  zentrale Betriebsüberwachung erreicht werden kön  nen, ohne beachtliche     Veränderungen    an den vorhan  denen vorzugsweise von Wärtern bedienten Stellwer  ken vornehmen zu müssen.

   Die Anwendung der her  kömmlichen     Streckenblockeinrichtungen    in Verbin  dung mit     einer        Betriebsüberwachungszentrale    in be  kannter Ausführung ist mit einem grossen Leitungs  aufwand zwischen den Stationen untereinander wie  auch zwischen der Zentrale und den Stationen sowie  auch mit einem grossen Aufwand an     andern    Schalt  mitteln verbunden.  



  Gemäss der     Erfindung    lässt sich eine besonders  zweckmässige Einrichtung für eine zentrale Betriebs  regelung und zentrale Betriebsüberwachung auf Ei  senbahnstrecken mit     fernauftragsabhängigen,        wärter-          bedienten    Stationen zur Stellung von Weichen, Fahr  strassen und Signalen auf einfache Weise erreichen,  wenn in der     Betriebsüberwachungszentrale    Block  schaltmittel angeordnet sind, welche spätestens bei  dem Ansprechen von in der Zentrale angeordneten       Auftragsabgabeschaltmitteln    für das Freigeben einer  Ausfahrt von einer Station auf einen Strecken  abschnitt in eine Sperrstellung wechseln,

   in der sie  das Stellen von     Fahrtsignalen    für Folge-,     Flanken-          und    Gegenfahrten verhindern, und für die Strecken  abschnittsüberwachung in der Zentrale Meldungs  empfänger angeordnet sind, die beim Eintreffen der       Streckenräumungsmeldung    die     Blockschaltmittel    in  die Grundstellung zurückbewegen. .  



  Hierbei ist also die Einrichtung zweckmässiger  weise so getroffen, dass ein Wärter ein Signal nur  dann auf      Fahrt     stellen kann, wenn er hierzu von    der Zentrale einen entsprechenden Auftrag empfan  gen hat. Dies kann zum Beispiel dadurch geschehen,  dass auf jeder Station für jedes Signal mindestens ein       Auftragsempfangsrelais    vorgesehen ist, durch dessen  Ansprechen die     Signalstelleinrichtung    für die Fahrt  stellung freigegeben wird.

   Bei     vorteilhaften    Formen  der Einrichtung nach der Erfindung werden in der  Zentrale hierbei für die     Streckenblockabhängigkeiten     die verschiedenen Schaltmittel, durch welche die ver  schiedenen Aufträge an die einzelnen Stationen zum  Stellen dieses oder jenes Signals gegeben werden,       bedarfsweise    in Abhängigkeit vom Zuglauf gesperrt  oder freigegeben, so dass die sonst auf den ein  zelnen Bahnhöfen bzw. Blockstellen vorgesehenen  Blockeinrichtungen entbehrt werden können.

   Die       Einrichtung    in der Zentrale wirkt derart, dass, nach  dem ein Auftrag zum Stellen eines Signals gegeben  ist, ein Auftrag für ein feindliches Signal und eines  Signals für eine Folgefahrt so lange nicht gegeben  werden     kann;    bis die Strecke, in welche die freigege  bene Zugfahrt erfolgt, wieder freigemeldet ist. Die  Herstellung dieser Abhängigkeit in der Zentrale ist  nicht nur möglich für die Signale,. welche die     Strek-          kenabschnitte    zwischen den Bahnhöfen sichern, son  dern auch für die Signale, welche den     Fährstrassen     eines jeden     Bahnhofes    zugeordnet sind.

   Entscheidend  für die Anwendung der Abhängigkeit ist lediglich,  dass     Ausschlussbedingungen    für die Signale bestehen,  das heisst, dass Flanken-, Folge- und/oder Gegen  fahrten verhindert werden müssen. Durch Verlegung  der     Blockschaltmittel    in die Zentrale werden also  nicht nur Abhängigkeitsleitungen innerhalb und zwi  schen den Stationen erspart, sondern darüber hinaus  eine grundlegende Vereinfachung der gesamten  Blockeinrichtungen erreicht. Ausserdem ergeben sich  durch die Anwendung der zentralen Blockeinrichtung      noch betriebliche Vorteile für die zentrale     Zuglauf-          regelung    und     -überwachung.     



  Um die     Einrichtung    einfach zu halten, ist es für  Strecken mit weniger     dichtem    Zugverkehr zweck  mässig, auf den Stationen handbetätigte Schalter für  die     Zugschluss-    und     Streckenräumungsmeldung    anzu  ordnen, die vorzugsweise durch das     Stellwerksperso-          nal    bedient werden.

   Bei Strecken mit dichterem Ver  kehr ist es vorteilhafter, eine selbsttätige     Zugschluss-          und        Streckenräumungsmeldung    vorzusehen und durch  Gleisstromkreise,     induktive,        kapazitive    oder elektro  nische     Gleisschaltmittel    zustande zu bringen. Als       Blockschaltmittel        in    der     Betriebsüberwachungszen-          trale    können vorzugsweise Stützrelais,     Kipprelais,          Schrittschalter    oder     ähnlich    wirkende Schaltmittel  angeordnet werden.

   Für Durchfahrten empfiehlt es  sich, für jede Station in der     Betriebsüberwachungs-          zentrale    mindestens ein vorzugsweise als Stützrelais  oder dergleichen ausgebildetes Durchfahrtrelais anzu  ordnen, welches die den     einzelnen    Streckenabschnit  ten zugeordneten     Blockschaltmittel    in der Zentrale  bei Durchfahrten derart     miteinander    verbindet,

   dass  durch den Empfang     einer    auf dem jeweiligen Ziel  bahnhof vorzugsweise durch handbetätigte Tasten  oder dergleichen ausgelöste     Streckenräumungsmel-          dung    sich in der Zentrale eine gleichzeitige oder fort  laufende Rückschaltung der den     einzelnen    Strecken  abschnitten zugeordneten     Blockschaltmittel    in die  Grundstellung ergibt.  



  Im     Hinblick    auf besonders betriebsschwache Zei  ten, in denen die Stellwerke unbesetzt     sind,    sowie  auch auf etwaige Störungen der     Fernübertragungs-          einrichtung    ist es zweckmässig, auf den von der Zen  trale abhängigen Stationen handbetätigte Schalter  oder dergleichen anzuordnen, welche eine Abschal  tung der Station von der     Betriebsüberwachungszen-          trale    bzw. von der zentralen     Blockeinrichtung    ermög  lichen.

       Hierbei    ist es ferner zweckmässig, in Verbin  dung mit diesen Schaltmitteln bedarfsweise weitere  Schaltmittel zur Wirkung zu bringen, durch welche  für     Durchfahrten    durch die     abhängige    Station die       erforderlichen    Weichen, Schutzweichen und derglei  chen verschlossen, die Fahrstrassen festgelegt und die  am     Durchfahrgleis    angeordneten     Einfahr-    und Aus  fahrsignale     in    die Fahrtstellung gebracht und     in    die  ser gehalten werden.  



  Um bei etwaigen     Fernsteuerstörungen    den Signal  stellbetrieb aufrechtzuerhalten,     kann    es ausserdem       zweckmässig    sein, auf den     abhängigen    Stationen  Schaltmittel anzuordnen,

   welche vorzugsweise durch  Nottasten mit Zählwerken Schlüsselschalter oder der  gleichen     näch    Ausfall oder     Unwirksamschalten    der       Betriebsüberwachungszentrale        eine        Ersatzanschal-          tung    der     Auftragsgmpfangsmelder    zur Freigabe der       Fahrtstelleinrichtung    der entsprechenden Signale er  möglichen.  



  Für die Sicherheit des Betriebes ist es     weiterhin     von Vorteil, wenn auf den abhängigen Stationen Re  lais, Stützrelais, Schrittschalter oder gleichwertige  Schaltmittel angeordnet sind, welche     im.    Regelbetriebe    abhängig und bei Störungen unabhängig von den  zentralen     Blockschaltmitteln    für den     jeweils    zugehöri  gen Streckenabschnitt einen zusätzlichen Ausschluss  von Flanken-, Folge- und/oder Gegenfahrten sicher  stellen.

   Hierbei empfiehlt es sich, die als zusätzliche  örtliche     Streckenblockeinrichtung    vorgesehenen Re  lais, Stützrelais, Schrittschalter oder dergleichen  durch Stellen des jeweils zugehörigen Ausfahrsignals  oder eines eine Gegenfahrt freigebenden feindlichen  Signals in eine Sperrstellung zu bringen und durch  auf der jeweiligen Gegenstation angeordnete     Tast-          schalter    oder     Gleisschaltmittel    für die     Streckenräu-          mungsmeldung    in die Grundstellung zurückzubewe  gen.  



  Ausserdem ist es zweckmässig, im Bedarfsfalle  die in der Zentrale für die Auftragsabgabe und die  Rückmeldung sowie für die zentralen Blockabhängig  keiten     angeordneten    Schaltmittel auch für die Fern  steuerung und     Fernüberwachung    vorzugsweise unbe  setzter     elektrischer    Stellwerke zu benutzen.  



  An Hand der     Fig.    1 bis 6 sei ein     Ausführungs-          beispiel    der Einrichtung nach der Erfindung erläu  tert.  



       Fig.    1 zeigt den Ausschnitt eines Streckenbandes  einer eingleisigen Strecke, bei welcher auf jeder Sta  tion<I>A, B,</I> C beispielsweise ein mechanisches Stell  werk oder ein elektrisches Hebelwerk vorhanden  sein möge. Auf jeder der Stationen<I>A, B,</I> C sind  Wärter, welche die Signale 11.1, 11.2, 12 usw. bis  19.1, 19.2, 20 jeweils nach dem Empfang eines von  der Zentrale erteilten Auftrages stellen.

   Zwischen den  Ausfahrsignalen 11.1, 11.2 und dem     Einfahrsignal     12 der Station A, den Ausfahrsignalen 14.1, 14.2  bzw. 15.1, 15.2 und dem Einfahrsignal 13 bzw. 16  der Station B sind die Zugkontrollpunkte, an denen  die     Gleisschaltmittel    SA,     SB1,        SB2    angeordnet sind  und vorzugsweise für die     Streckenräumungsmeldung          wirksam    werden.

   Mit     Hilfe        dieser        Gleisschaltmittel     <I>SA,</I>     SB1    und     SB2    können auch     Streckenbesetzungs-          meldungen    an die Zentrale gegeben werden, wenn  die     Schaltanlage    entsprechend gestaltet ist. Vorteil  haft als     Gleisschaltmittel    sind Gleisstromkreise,  Achszähler oder dergleichen, insbesondere jedoch  selbsttätige     Zugschlussmelder,    die auf an sich be  kannte Weise mit induktiven,     kapazitiven    oder elek  tronischen     übertragungsmitteln    arbeiten.

   Ein Sender  am Zugende beeinflusst hierbei an jedem Zugkontroll  punkt mindestens einen     Empfänger   <I>SA,</I>     SB1,        SB2     usw., in welchem der durch den Sender ausgeübte  Impuls eine Änderung des stationären elektromagne  tischen Zustandes ergibt, die sich     in    der Schaltung  als Stromänderung, Kontaktwechsel oder dergleichen  bemerkbar macht.

   Anstelle     einer    selbsttätigen kann  auch eine manuelle     Streckenräumungs-    und Zug  schlussmeldung durch das     Stellwerkspersonal    auf je  der der Stationen<I>A, B,</I> C unter Benutzung der     Räu-          mungsmeldetasten    R 12, R 13, R 16, R 17, R 20 ge  geben werden. Erfolgt die Räumungsmeldung im  Regelbetrieb selbsttätig, so werden die     Räumungs-          meldetasten    nur bei Versagen der entsprechenden           Gleisschaltmittel   <I>SA,</I>     SB1,        SB2    usw. als Hilfstasten  benutzt. Die Signalmeldungen  Halt  bzw.

    Fahrt   sowie die     Streckenräumungsmeldungen    werden durch  die     Fernübertragungseinrichtungen        ÜA,        ÜB,        ÜC    an  die     Überwachungseinrichtung        UZ    der Zentrale ge  geben.

   Die gesamten     L7bertragungs-    und     überwa-          chungseinrichtungen    sind mit denjenigen für die Ab  gabe, die Übermittlung und den Empfang der Fern  aufträge zum Stellen der Signale baulich     zusammen-          gefasst    und entsprechen den für die Fernsteuerung  von Signalanlagen bekannten Ausführungen, so dass  bei Wahl eines geeigneten Systems, z. B. eines     Code-          Fernsteuersystems,    bereits schon zwei Leitungen  längs der Strecke genügen.  



  Wird also beispielsweise ein Fahrtauftrag für das  Signal 11.1 an die Station A gegeben, so ist damit  bereits in der Zentrale eine Sperrung der feindlichen  Signale 11.2, 14.1, 14.2 durch ein als     Blockschalt-          mittel    benutztes Stützrelais gegeben, welches für diese  Signale eine weitere Kommandoabgabe so lange  sperrt, bis der auf Signal 11.1 aus der Station A aus  gefahrene Zug nach der Einfahrt in Station B die       Streckenräumungsmeldung    über den am Gleis ange  bauten Empfänger     SB1    zustande bringt.

   Das als  Blockschalter benutzte Stützrelais verhindert gleich  zeitig auch eine Wiederholung eines Fahrtauftrages  für das Signal 11.1 bis zum Empfang der entspre  chenden     Streckenräumungsmeldung.    Wenn auch die  Einfahrsignale durch die Zentrale freigegeben wer  den, so kann sich der     Blockverschluss    im vorliegen  den Falle auch auf das Einfahrsignal 12 erstrecken.  



  Die Anordnung und Wirkung der in der Zentrale  angeordneten     Blockschaltmittel    ist beispielsweise aus  den     Prinzipschaltbildern    nach     Fig.    2 bis 6 zu ent  nehmen.  



  Die Schaltbilder beziehen sich auf den Strecken  bandausschnitt nach     Fig.    1. Hierbei ist der Einfach  heit halber angenommen, dass nur für die Ausfahr  signale 11.1, 11.2 bis 18.2 Fernaufträge durch ent  sprechende     Auftragsempfangsrelais    auf den Stationen  <I>A, B,</I> C aufgenommen werden und damit die Signal  stelleinrichtung     bedienbar    machen. Für die Einfahr  signale ist grundsätzlich die gleiche Betriebsform  möglich, aber nicht notwendig und deshalb weg  gelassen.  



       Fig.2    zeigt die Stromkreise der     Anschaltrelais     <I>A</I> 11,<I>A 14,</I> A 15,<I>A</I> 18, welche den entsprechenden  Ausfahrsignalen 11.1, 11.2 bis 18.1, 18.2 zugeord  net sind. Soll zum Beispiel eine Ausfahrt aus Station  A auf Signal 11.1 erfolgen, so betätigt der Strecken  fahrdienstleiter in der Zentrale eine Gruppentaste       GrT,    welche den Kontakt     GrT   <I>1</I> schliesst, und  eine     Ausfahrsignaltaste   <I>AST</I> 11, die einen Kontakt  <I>AST</I> 11.1 schliesst,

   so dass das     Anschaltrelais   <I>A</I> 11  im Stromkreise       GrTl-AST11.1-BS11.2.2-BS14.2.2-          All        -A14.2-A15.2-A18.2     erregt wird und anspricht. Die Kontakte     BS    11.2.2  und     BS    14.2.2 werden von Blockschaltern gesteuert,    welche den Ausfahrsignalen 11.1, 11.2 bzw.     14-.1;     14.2 zugeordnet sind und die     Anschaltung    des An  schaltrelais A 11 nur     dann    freigeben, wenn kein Zug  im Streckenabschnitt zwischen den Stationen A und  B ist.

   Durch den Kontakt A 11.1 des     Anschaltrelais     A 11 werden die übrigen     Anschaltrelais    A 14, A 15,  <I>A</I> 18 abgeschaltet, solange die Tasten     GrT    und  <I>AST</I> 11 gedrückt sind und das     Anschaltrelais   <I>A</I> 11  erregt ist. Für den     gleichen    Zweck sind die     Anschalt-          relais   <I>A 14,</I> A 15 mit den Kontakten<I>A</I> 14.1,<I>A</I> 14.2  und<I>A<B>15.1,</B> A</I> 15.2 und das     Anschaltrelais   <I>A</I> 18 mit  dem Kontakt A 18.2 versehen. Hiermit ist sicherge  stellt, dass jeweils nur ein     Anschaltrelais    in die Wirk  stellung gelangen kann.  



  Die Kontakte     GrT   <I>2</I> und<I>A</I> 11.3 bringen in der  mit     Fig.    3 gezeigten Schaltung der     Wirkstellwicklun-          gen        BS    11.l,     BS    14.1,     BS    l5.1,     BS    18.1 der als Stütz  relais ausgebildeten Blockschalter im Stromzweige       GrT   <I>2 - A</I> 11.3<I>- SM</I> 11.1<I>- SM 14.2</I>     -          BS11.2.1        -BS11.1     die Wirkwicklung     BS    11.1 zum Ansprechen.

   Hier  durch wechseln auch der Anker der     Grundstellungs-          wicklung        BS    11.2 und seine Kontakte     BS    11.2.1 bis       BS    11.2.6. Der Blockschalter     BS11.1/BS11.2    befin  det sich also in der Sperrstellung. Durch den Kontakt       BS    11.2.1 ist die Wirkstellung     BS    11.1 wieder abge  schaltet. Der Kontakt     BS    11.1.1 hat die     Grundstel-          lungswicklung        BS    11.2     (Fig.    4) für die Rückstellung  vorbereitend angeschaltet.

   Der Kontakt     BS    11.2.2  schaltet das     Anschaltrelais   <B>All,</B> und der Kontakt       BS    11.2.3 schaltet das     Anschaltrelais   <I>A 14 ab</I>     (Fig.    2).

    Da jedoch im     Stromkreis    für die     Kommandoabgabe     nach     Fig.    6 der Kontakt A 11.4 des     Anschaltmagne-          ten    A 11 noch geschlossen sein muss, wenn das     Kom-          mando-Abgaberelais    KA 11 den     Fahrtstellauftrag    für  das Signal 11.1 an die Station A     übermitteln        bzw:

       auslösen soll, so muss für das     Anschaltrelais    A 11  eine entsprechend bemessene     Ankerabfallverzögerung     oder eine nicht dargestellte     Anschaltung    durch zu  sätzliche Kontakte     vorzugsweise    vorhandener Schalt  mittel vorgesehen sein. Das     Kommando-Abgaberelais     KA 11 wird im Stromkreis       GYT4    -<B>A 11.4</B><I>-</I>     BS14.2.4    -     BS11.2.4        -          KA    11  erregt.

   Durch den Kontakt     BS    11.2.4 wird hierbei  betriebsmässig überprüft, dass der Blockschalter SB 11  die Sperrung der     Strecke    für Folge- und     Flanken-          und/oder    Gegenfahrten übernommen hat und so lange  bestehen lässt, bis durch eine     Streckenräumungsmel-          dung    der Streckenabschnitt zwischen den Stationen  <I>A</I> und<I>B</I> wieder frei geworden ist.

   Folgefahrten sind  durch den Kontakt     BS    11.2.2,     Gegenfahrten    durch  den Kontakt     BS    11.2.3 im Stromkreise der     Anschalt-          relais   <I>A</I> 11,<I>A</I> 14, Gegenfahrten ausserdem noch durch  den Kontakt     BS    11.2.5 im Stromkreis des     Kom-          mando-Abgaberelais    KA 14 ausgeschlossen. Die ge  strichelten Linien der Schaltung nach     Fig.    6 kenn  zeichnen einen Teil der nicht dargestellten Fernwirk-           einrichtungen    in - der Zentrale, die für die Stations  wahl, Kommandoauswahl, Quittungsmeldungen usw.  erforderlich sind.  



  Das     Ansprechen    der     Blockschalter-Wirkwicklung          BS    11.1 und damit auch     das        Ansprechen        des        Kom-          mando-Abgaberelais        KA    11 ist davon abhängig, dass  für die     feindlichen        Signale    11.2, 14.1, 14.2 die Halt  meldung besteht.

   Zu diesem Zweck sind im Strom  kreis der     Blockschalter-Wirkwicklung        BS    11.1 ein       Signalmelderkontakt    SM 11.1 und ein     Signahnelder-          kontakt    SM 14.2 angeordnet, durch welche das Be  stehen der     Haltstellung    bzw. das Nichtbestehen der       Fahrtstellung    an den Signalen 11.2, 14.1, 14.2     kon-          trolliert    wird.

   Ein zum Beispiel     jeweils    für zwei Aus  fahrsignale angeordneter gemeinsamer     Signalmelder          überprüft    hierbei gleichzeitig die     Haltstellung    des auf  Fahrt zu stellenden Ausfahrsignals; so wird beispiels  weise durch den Kontakt SM 11.1     eines    nicht dar  gestellten     Signalmelders    SM 11 für beide Signale 11.1  und 11.2 die     Haltstellung    im     BS        11.1-Stromzweig    und  durch den Kontakt<I>-SM</I> 11.2 -im     BS        14.1-Stromzweig     überprüft.  



  In     Fig.    4 sind die Stromkreise der Blockschal  ter-Rückstellwicklungen     BS    11.2,     BS   <I>14.2,</I>     BS    15.2,       BS    18.2 gezeigt. Die Rückstellung wird durch die       Streckenräumungsmelderkontakte        StYR/AB,        StYR/CD,          StrR/BA,        StYR/DC    ausgelöst, und zwar für     BS    11..2  durch     StrR/AB    usw.

   Die nicht dargestellten Strecken  räumungsmelder in der Zentrale können sowohl  durch die selbsttätigen     Zugschlussmelder   <I>SA, SB 1,</I>  <I>SB 2, SC 1</I> usw. als auch durch die     Zugschlussmelde-          tasten    R 12, R 13, R 16, R 17 usw. auf den Stationen  <I>A, B,</I> C     angesteuert    werden.  



  Soll eine Durchfahrt auf vorübergehend unbesetz  ten Bahnhöfen erfolgen, so ist in dem Falle, wo die       Streckenräumungsmeldung    nur mit Schlüsseltasten  oder dergleichen gegeben wird, noch     ein    Schaltungs  zusatz notwendig, damit die     Sperrung    sämtlicher  durchfahrenden     Streckenabschnitte    vom Zielbahnhof  aus wieder aufgehoben werden     kann.    Zu diesem  Zweck ist für jeden Bahnhof ein vorzugsweise als  Stützrelais oder     ähnlich    wirkendes Schaltmittel aus  gebildetes     Durchfahrtrelais    vorgesehen,

   welches' die  den einzelnen aufeinanderfolgenden Streckenabschnit  ten zugeordneten     Blockschalter-Rückstellwicklungen     bei Durchfahrten so     miteinander    verbindet, dass durch  Abgabe der     Streckenräumungsmeldung    auf dem Ziel  bahnhof bzw. nach deren Empfang in der Zentrale  sich eine gleichzeitige oder fortlaufende Rückschal  tung der     einzelnen    Blockschalter ergibt. Die Schal  tung des beispielsweise für die Station B vorgesehe  nen Durchfahrtrelais mit der Wirkwicklung     DFIB   <I>1</I>  und der     Rückstellwicklung        DFIB   <I>2</I> zeigt     Fig.    5.

   Hat       zum    Beispiel eine Fahrt von Station A nach Station C  stattgefunden, so sind die beiden Blockschalter  Grundstellungswicklungen     BS    11.2 und     BS    15.2 für  die Aufhebung der     Streckensperrungen    anzuschalten.

    Zu diesem Zweck ist für die Durchfahrt durch den       Bahnhof   <I>B</I> durch Betätigung der Gruppentaste     GrT       und der     Bahnhofswahltaste   <I>B</I>     f        WT/B    das Durchfahrt  relais im Stromkreis       GrT   <I>3 - B f</I>     WT/B    -     BS    11.2.6<I>-</I>     DFIB   <I>2.1</I>     -          DFIB   <I>1</I>  durch Ansprechen seiner Wicklung     DFIB   <I>1</I> in die  Wirkstellung gebracht worden.

   Hierdurch sind in der  Schaltung der     Blockschalter-Rückstellwicklungen          (Fig.    4) die     Blockschalter-Rückstellwicklung        BS    15.2  durch den Kontakt     DFIB   <I>1.2</I> und der     Streckenräu-          mungsmelderkontakt        StYR/AB    durch den Kontakt       DFIB    1.3 unwirksam geschaltet und die Blockschal  ter-Rückstellwicklung     BS    11.2 durch den Kontakt       DFIB   <I>2.2</I> an den     Streckenräumungsmelderkontakt          StYRICD        

  angeschlossen    worden. Im Stromkreis der       Durchfahrrelais-Rückstellwicklung        DFIB   <I>2</I> ist der       Blockschalterkontakt        BS    11.1.3 geöffnet und der Kon  takt     DFIB    1.1 geschlossen.

   Wird jetzt nach der Ein  fahrt des Zuges in Station C die Räumungsmelder  taste R 17 betätigt, so spricht in der Zentrale der       Streckenräumungsmelder        StrR/CD    an, so dass in       Fig.    4 im Stromkreis       StrR/CD   <I>-</I>     DFIB   <I>2.2 -</I>     HSM    13<I>-</I>     BS    11.1.1  -     BS    11.2  die     Blockschalter-Rückstellwicklung        BS    11.2 an  spricht. Hiermit ist die Sperrung für den zwischen  den Stationen<I>A</I> und<I>B</I> liegenden Streckenabschnitt  aufgehoben.

   Der Kontakt     BS    11.1.3     (Fig.    5)     schliesst     wieder, so dass sich die Rückstellung des Durch  fahrtrelais durch Ansprechen der     Rückstellwicklung          DF/B   <I>2</I> im Stromkreis       DF/B    1.1<I>-</I>     BS    11.1.3 -     BS    18.1.3<I>-</I>     DF/B   <I>2</I>  ergibt.

   Im     Blockschalter-Rückstellstromkreis        (Fig.    4)  sind nunmehr     die    Kontakte     DFIB    1.3 und     DFIB   <I>1.2</I>  wieder geschlossen und der Kontakt     DF/B   <I>2.2</I> wie  der     geöffnet.    Dadurch spricht die     Blockschalter-          Rückstellwicklung        BS    15.2 im     Stromkreis          StYR/CD   <I>-</I>     DFIB   <I>1.2 -</I>     HSM   <I>17</I> -     BS    11.1.2  -     BS    15.1.1 -  <RTI  

   ID="0004.0134">   BS    15.2  an, so dass auch die Sperrung des zwischen     den    Sta  tionen B und C liegenden     Streckenabschnittes    auf  gehoben ist. Wesentlich ist hierbei aus     betriebssicher-          heitlichen    Gründen, dass insbesondere auf dem Bahn  hof, in welchem der Zug gerade eingefahren ist,

   die       Streckenräumungsmeldung    von der vorzugsweise  durch Befahren von     Gleisschaltmitteln    wiedererreich  ten     Haltstellung    des     jeweils    passierten Einfahrsignals  abhängig gemacht ist und durch entsprechende Kon  takte im Stromkreis der     Blockschalter-Rückstellwick-          lungen    überprüft wird (z. B. durch     HSM   <I>17</I>     beim     Ansprechen von     BS    15.2).  



  Die Schaltung kann auch so aufgebaut werden, dass  nach Durchfahrten die Blockschalter auch gleichzei  tig oder nacheinander entgegengesetzt der Fahrtrich  tung in die Grundstellung     zurückwechseln.    Ferner       kann    zur Vergrösserung des Sicherheitswertes der  Schaltung eine Verdoppelung     mindestens    der für  einen Zustandswechsel entscheidenden Kontakte  vorgesehen werden.

   Zweckmässig kann auch eine      Verdoppelung der Blockschalter, der     Durchfahrt-          und    der     Anschaltrelais    sein, damit sich nicht durch  einen versehentlichen Wechsel eines Relaisankers bei  Unterhaltungseingriffen ein betrieblich unbeabsichtig  ter Zustandswechsel der Kommandoabgabe bzw. der  zentralen Blockeinrichtung ergibt. Eine andere Mög  lichkeit, um einen ungewollten Zustandswechsel der  Schaltung unter allen Umständen auszuschliessen, be  steht darin, dass auf an sich bekannte Weise die  Schaltung der Stützrelais derart gestaltet wird, dass  jeweils beim Andrücken bzw. Anziehen (z.

   B. durch  Fremdstrom) eines abgefallenen     Stützrelaisankers    der  sich in angezogener Lage befindliche Anker der an  dern     Stützrelaiswicklung    in seiner Stellung verharrt,  und zwar entweder durch Einschalten oder aber  durch Weiterbestehen eines     Festhaltestromes.    Wesent  lich ist hierbei nur, dass in jedem Störungsfalle ent  weder eine mechanische oder eine elektrische Fixie  rung des jeweils bestehenden Betriebszustandes ge  währleistet ist. Eine Relaisverdoppelung erübrigt sich  bei dieser Schaltungsart.



  Equipment for central operational control and central operational monitoring on railway lines When modernizing signaling systems for railway lines, the question often arises of how a line blockage, central operational control and central operational monitoring can be achieved with a minimum of resources, without significant changes to the existing interlockings which are preferably operated by guards.

   The use of the conventional line block devices in connection with an operations monitoring center in a known design is associated with a large amount of wiring between the stations and between the control center and the stations and also with a large amount of other switching means.



  According to the invention, a particularly expedient device for central operational control and central operational monitoring on railway lines with remote order-dependent, guard-operated stations for setting points, routes and signals can be achieved in a simple manner if block switching means are arranged in the operational monitoring center, which switch to a blocking position at the latest when the order submission switching means arranged in the control center respond to enable an exit from a station on a route section,

   in which they prevent the setting of travel signals for following, flanking and opposing journeys, and are arranged for route section monitoring in the central message receiver that move the block switching means back to the basic position when the route evacuation report arrives. .



  In this case, the device is expediently designed in such a way that a guard can only set a signal to move if he has received a corresponding order from the control center. This can be done, for example, by providing at least one order receiving relay for each signal on each station, the response of which releases the signal setting device for the travel position.

   In advantageous forms of the device according to the invention, the various switching means, through which the various orders are given to the individual stations for setting this or that signal, are blocked or released as required depending on the train path in the center for the route block dependencies, so that the block facilities otherwise provided at the individual stations or block locations can be dispensed with.

   The facility in the control center works in such a way that after an order to set a signal has been given, an order for a hostile signal and a signal for a follow-up trip cannot be given for so long; until the route in which the approved train journey takes place is cleared again. The creation of this dependency in the control center is not only possible for the signals. which secure the route sections between the stations, but also for the signals that are assigned to the ferry routes of each station.

   The only decisive factor for the application of the dependency is that exclusion conditions exist for the signals, that is, that edge, follow-up and / or counter-movements must be prevented. By moving the block switching means to the control center, not only are dependency lines within and between the stations saved, but also a fundamental simplification of the entire block facilities is achieved. In addition, the use of the central block device results in operational advantages for the central train control and monitoring.



  In order to keep the facility simple, it is advisable for routes with less dense train traffic to arrange manually operated switches for the end of train and route evacuation reports on the stations, which are preferably operated by the signal box staff.

   On routes with denser traffic, it is more advantageous to provide an automatic train closure and route evacuation message and to bring it about using track circuits, inductive, capacitive or electronic track switching devices. Support relays, toggle relays, step switches or similarly acting switching means can preferably be arranged as block switching means in the operation monitoring center.

   For passages, it is advisable to arrange at least one drive-through relay, preferably designed as a backup relay or the like, for each station in the operations monitoring center, which connects the block switching means assigned to the individual route sections in the control center during passages in such a way that

   that when a route evacuation message is received at the respective destination station, preferably by manually operated buttons or the like, the control center results in a simultaneous or continuous switching back of the block switching means assigned to the individual route sections to the basic position.



  With regard to particularly weak times, in which the interlockings are unoccupied, as well as any faults in the remote transmission device, it is advisable to arrange manually operated switches or the like on the stations dependent on the central station, which enable the station to be switched off Operational monitoring center or from the central block facility.

       Here, it is also useful in connection with these switching means, if necessary, to bring further switching means into effect, by means of which the necessary switches, safety switches and the like are closed for passage through the dependent station, the routes are determined and the entry and exit points arranged on the through track Driving signals are brought into the driving position and held in this water.



  In order to maintain the signal control operation in the event of any remote control malfunctions, it can also be useful to arrange switching means on the dependent stations,

   which, preferably by means of emergency buttons with counters, key switches or the same next failure or ineffective switching of the operations monitoring center, enable a replacement switch-on of the order reception alarms for releasing the corresponding signals to the travel control unit.



  For the security of the operation, it is also advantageous if the dependent stations Re relays, backup relays, step switches or equivalent switching means are arranged, which in the. Depending on regular operations and, in the event of faults, independent of the central block switching means, ensure an additional exclusion of flank, follow-up and / or counter-journeys for the respective associated route section.

   It is recommended that the relays, support relays, step switches or the like provided as an additional local section block device be brought into a blocked position by setting the associated exit signal or a hostile signal enabling an opposing drive and using pushbutton switches or track switching means for to move the route evacuation report back to its home position.



  In addition, it is useful, if necessary, to use the switching means arranged in the control center for submitting orders and feedback as well as for the central block dependencies also for remote control and remote monitoring, preferably unbe set electrical interlockings.



  An exemplary embodiment of the device according to the invention will be explained with reference to FIGS.



       Fig. 1 shows the section of a line belt of a single-track line, in which at each station <I> A, B, </I> C, for example, a mechanical control mechanism or an electrical lever mechanism may be present. At each of the stations <I> A, B, </I> C there are guards who set the signals 11.1, 11.2, 12 etc. to 19.1, 19.2, 20 after receiving an order issued by the control center.

   Between the exit signals 11.1, 11.2 and the entry signal 12 of station A, the exit signals 14.1, 14.2 or 15.1, 15.2 and the entry signal 13 or 16 of station B are the train control points at which the track switching means SA, SB1, SB2 are arranged and preferably take effect for the evacuation report.

   With the help of these track switching means <I> SA, </I> SB1 and SB2, line occupancy reports can also be sent to the control center if the switchgear is designed accordingly. Track circuits, axle counters or the like are advantageous as track switching means, in particular, however, automatic traction detectors that work in a manner known per se with inductive, capacitive or electronic transmission means.

   A transmitter at the end of the train influences at least one receiver <I> SA, </I> SB1, SB2, etc. at each train control point, in which the pulse exerted by the transmitter results in a change in the steady electromagnetic state, which results in the circuit as a change in current, contact change or the like noticeable.

   Instead of an automatic, manual route evacuation and train closure report can also be sent by the signal box staff at each of the stations <I> A, B, </I> C using the evacuation buttons R 12, R 13, R 16, R 17, R 20 are given. If the evacuation notification occurs automatically during normal operation, the evacuation notification buttons are only used as auxiliary buttons if the corresponding track switching means <I> SA, </I> SB1, SB2 etc. fail. The signal messages stop or

    The journey as well as the clearing reports are given by the remote transmission devices ÜA, ÜB, ÜC to the monitoring device UZ of the headquarters.

   The entire transmission and monitoring facilities are structurally combined with those for the submission, transmission and reception of remote orders for setting the signals and correspond to the designs known for remote control of signal systems, so that when a suitable system is selected , e.g. B. a code remote control system, two lines along the route are sufficient.



  If, for example, a travel order for signal 11.1 is given to station A, the hostile signals 11.2, 14.1, 14.2 are blocked by a back-up relay used as a block switch, which sends further commands for these signals blocks for a long time until the train leaving station A on signal 11.1 brings about the evacuation message via the SB1 receiver installed on the track after entering station B.

   The back-up relay used as a block switch also prevents a repetition of a travel order for signal 11.1 until the corresponding clearance message is received. If the entry signals are also released by the control center, the block lock can also extend to the entry signal 12 in the present case.



  The arrangement and effect of the block switching means arranged in the control center can be taken from the basic circuit diagrams according to FIGS. 2 to 6, for example.



  The circuit diagrams refer to the section of the line according to FIG. 1. For the sake of simplicity, it is assumed that only for the exit signals 11.1, 11.2 to 18.2 remote orders through corresponding order reception relays on stations <I> A, B, </ I > C are recorded and thus make the signal setting device operable. The same operating mode is basically possible for the entry signals, but not necessary and has therefore been omitted.



       2 shows the circuits of the connection relays <I> A </I> 11, <I> A 14, </I> A 15, <I> A </I> 18, which correspond to the corresponding extension signals 11.1, 11.2 to 18.1 , 18.2 are assigned. If, for example, an exit from station A is to take place on signal 11.1, the route dispatcher in the control center presses a group key GrT, which closes the contact GrT <I> 1 </I>, and an exit signal key <I> AST </I> 11, which closes a contact <I> AST </I> 11.1,

   so that the connection relay <I> A </I> 11 in the circuit GrTl-AST11.1-BS11.2.2-BS14.2.2-All -A14.2-A15.2-A18.2 is excited and responds. The contacts BS 11.2.2 and BS 14.2.2 are controlled by block switches, which correspond to the extension signals 11.1, 11.2 and 14-1; 14.2 and only enable the connection of the A 11 switching relay when there is no train in the section between stations A and B.

   Contact A 11.1 of connection relay A 11 switches off the other connection relays A 14, A 15, <I> A </I> 18 as long as the GrT and <I> AST </I> 11 buttons are pressed and the connection relay < I> A </I> 11 is excited. The connection relays <I> A 14, </I> A 15 with contacts <I> A </I> 14.1, <I> A </I> 14.2 and <I> A <B are used for the same purpose > 15.1, </B> A </I> 15.2 and the connection relay <I> A </I> 18 with contact A 18.2. This ensures that only one connection relay can reach the active position.



  The contacts GrT <I> 2 </I> and <I> A </I> 11.3 bring the active control windings BS 11.1, BS 14.1, BS 15.1, BS 18.1 in the circuit shown in FIG Block switch designed as a backup relay in the branch GrT <I> 2 - A </I> 11.3 <I> - SM </I> 11.1 <I> - SM 14.2 </I> - BS11.2.1 -BS11.1 the active winding BS 11.1 to address.

   This also changes the armature of the basic position winding BS 11.2 and its contacts BS 11.2.1 to BS 11.2.6. The block switch BS11.1 / BS11.2 is therefore in the locked position. The active position BS 11.1 is switched off again by the contact BS 11.2.1. The contact BS 11.1.1 has switched on the home position winding BS 11.2 (Fig. 4) in preparation for the reset.

   Contact BS 11.2.2 switches off the connection relay <B> All, </B> and contact BS 11.2.3 switches off the connection relay <I> A 14 </I> (Fig. 2).

    However, since the contact A 11.4 of the connecting magnet A 11 in the circuit for the command output according to Fig. 6 must still be closed when the command output relay KA 11 transmits the driving command for the signal 11.1 to the station A or:

       should trigger, a correspondingly dimensioned armature drop-out delay or a connection (not shown) through additional contacts of preferably available switching means must be provided for the connection relay A 11. The command output relay KA 11 is excited in the circuit GYT4 - <B> A 11.4 </B> <I> - </I> BS14.2.4 - BS11.2.4 - KA 11.

   The contact BS 11.2.4 checks that the block switch SB 11 has taken over the blocking of the route for following, flanking and / or opposing journeys and that it remains until the route section between the stations is cleared by a route evacuation message <I> A </I> and <I> B </I> has become free again.

   Follow-up journeys are made through contact BS 11.2.2, counter journeys through contact BS 11.2.3 in the circuit of the connection relays <I> A </I> 11, <I> A </I> 14, counter journeys also through the contact BS 11.2.5 in the circuit of the command output relay KA 14 excluded. The dashed lines of the circuit according to FIG. 6 mark part of the telecontrol devices (not shown) in the control center, which are required for station selection, command selection, acknowledgment messages, etc.



  The response of the block switch active winding BS 11.1 and thus also the response of the command output relay KA 11 depends on the stop message for the hostile signals 11.2, 14.1, 14.2.

   For this purpose, a signal indicator contact SM 11.1 and a signal indicator contact SM 14.2 are arranged in the circuit of the block switch active winding BS 11.1, through which the existence of the stop position or the non-existence of the drive position on the signals 11.2, 14.1, 14.2 controlled becomes.

   A common signal indicator arranged, for example, for two exit signals at the same time checks the stop position of the exit signal to be set to travel; for example, the stop position in the BS 11.1 current branch and the contact <I> -SM </I> 11.2 -in the BS 14.1 current branch is checked by the contact SM 11.1 of a signal indicator SM 11, not shown, for both signals 11.1 and 11.2 .



  4 shows the circuits of the block switch reset windings BS 11.2, BS 14.2, BS 15.2, BS 18.2. The reset is triggered by the evacuation detector contacts StYR / AB, StYR / CD, StrR / BA, StYR / DC, for BS 11..2 by StrR / AB etc.

   The route evacuation detectors (not shown) in the control center can be activated both by the automatic train closure detectors <I> SA, SB 1, </I> <I> SB 2, SC 1 </I> etc. as well as by the train closure buttons R 12, R 13, R 16, R 17 etc. can be controlled at stations <I> A, B, </I> C.



  If a transit is to take place at temporarily unoccupied stations, then in the case where the route evacuation message is only given with key buttons or the like, an additional circuit is necessary so that the blocking of all route sections from the destination station can be lifted again. For this purpose, a drive-through relay, preferably designed as a backup relay or similarly acting, is provided for each station,

   which connects the block switch resetting windings assigned to the individual successive route sections when passing through so that the individual block switches are switched back simultaneously or continuously by submitting the route evacuation report at the destination station or after receiving it at the control center. The circuit of the drive-through relay provided, for example, for station B with the active winding DFIB <I> 1 </I> and the reset winding DFIB <I> 2 </I> is shown in FIG. 5.

   If, for example, a trip from station A to station C has taken place, the two block switch home position windings BS 11.2 and BS 15.2 are to be switched on to lift the line closures.

    For this purpose, the transit relay in the circuit GrT <I> 3 - B is required for passage through the station <I> B </I> by pressing the group key GrT and the station selection key <I> B </I> f WT / B f </I> WT / B - BS 11.2.6 <I> - </I> DFIB <I> 2.1 </I> - DFIB <I> 1 </I> by addressing its winding DFIB <I> 1 < / I> has been brought into the operative position.

   As a result, in the circuit of the block switch reset windings (Fig. 4), the block switch reset winding BS 15.2 through the contact DFIB <I> 1.2 </I> and the evacuation detector contact StYR / AB through the contact DFIB 1.3 switched ineffective and the block shell ter reset winding BS 11.2 through the contact DFIB <I> 2.2 </I> to the route evacuation detector contact StYRICD

  been connected. In the circuit of the drive-through relay reset winding DFIB <I> 2 </I>, the block switch contact BS 11.1.3 is open and the contact DFIB 1.1 is closed.

   If the evacuation alarm button R 17 is now actuated after the train has entered station C, the route evacuation alarm StrR / CD responds in the control center, so that in FIG. 4 in the circuit StrR / CD <I> - </I> DFIB <I> 2.2 - </I> HSM 13 <I> - </I> BS 11.1.1 - BS 11.2 the block switch reset winding BS 11.2 responds. The blockage for the route section between stations <I> A </I> and <I> B </I> is hereby lifted.

   The contact BS 11.1.3 (Fig. 5) closes again, so that the reset of the transit relay can be achieved by the response of the reset winding DF / B <I> 2 </I> in the circuit DF / B 1.1 <I> - </ I > BS 11.1.3 - BS 18.1.3 <I> - </I> DF / B <I> 2 </I> results.

   In the block switch reset circuit (Fig. 4) the contacts DFIB 1.3 and DFIB <I> 1.2 </I> are now closed again and the contact DF / B <I> 2.2 </I> is open again. As a result, the block switch reset winding BS 15.2 speaks in the circuit StYR / CD <I> - </I> DFIB <I> 1.2 - </I> HSM <I> 17 </I> - BS 11.1.2 - BS 15.1.1 - <RTI

   ID = "0004.0134"> BS 15.2, so that the blockage of the route section between stations B and C is lifted. For operational safety reasons, it is essential that, particularly at the station where the train has just entered,

   the evacuation report is made dependent on the stopping position of the respective entry signal passed, preferably by driving on track switching means, and is checked by appropriate contacts in the circuit of the block switch reset windings (e.g. by HSM <I> 17 </I> at Addressing BS 15.2).



  The circuit can also be set up in such a way that the block switches also change back to the basic position simultaneously or one after the other in opposite directions to the direction of travel. Furthermore, in order to increase the safety value of the circuit, at least the contacts that are decisive for a change of state can be doubled.

   It can also be useful to duplicate the block switches, the drive-through relays and the connection relays so that an inadvertent change of a relay armature during maintenance interventions does not result in an operationally unintentional change of state of the command delivery or the central block device. Another possibility to rule out an unwanted change of state of the circuit under all circumstances is that the circuit of the backup relay is designed in a manner known per se in such a way that when it is pressed or tightened (e.g.

   B. by external current) of a dropped support relay armature which is in the attracted position armature of the other support relay winding remains in its position, either by switching on or by the continued existence of a holding current. The only important thing here is that in each malfunction, either a mechanical or an electrical fixation of the respectively existing operating state is guaranteed. A doubling of the relays is not necessary with this type of connection.


    

Claims (1)

PATENTANSPRUCH Einrichtung für zentrale Betriebsregelung und zentrale Betriebsüberwachung auf Eisenbahnstrecken, deren Weichen, Fahrstrassen und Signale von wärter- bedienten Stationen aus gestellt werden, wenn diese einen entsprechenden Auftrag von der Zentrale er halten, dadurch gekennzeichnet, dass in der Betriebs überwachungszentrale (UZ) Blockschaltmittel ange ordnet sind, welche spätestens bei dem Ansprechen von in der Zentrale angeordneten Auftragsabgabe schaltmitteln für das Freigeben einer Ausfahrt von einer Station auf einen Streckenabschnitt in eine Sperrstellung wechseln, in der sie das Stellen von Fahrtsignalen für Folge-, Flanken- und Gegenfahr ten verhindern, PATENT CLAIM Device for central operational control and central operational monitoring on railway lines, whose points, routes and signals are set by guard-operated stations when they receive a corresponding order from the control center, characterized in that block switching means are provided in the operational control center (UZ) are arranged, which switch to a blocked position at the latest when the order submission arranged in the control center responds to the release of an exit from a station on a route section, in which they prevent the setting of travel signals for following, flanking and opposing journeys, und dass für die Streckenabschnitts überwachung in der Zentrale Meldungsempfänger an geordnet sind, die beim Eintreffen der Streckenräu- mungsmeldung die Blockschaltmittel in die Grund stellung zurückbewegen. UNTERANSPRÜCHE 1. Einrichtung nach Patentanspruch, dadurch ge kennzeichnet, dass auf den abhängigen Stationen (A, B, C) handbetätigte Schalter (R12, R13, R16) für die Zugschluss- und Streckenräumungsmeldung an geordnet sind. 2. and that message receivers are arranged for the route section monitoring in the central station, which move the block switching means back into the basic position when the route evacuation report arrives. SUBClaims 1. Device according to claim, characterized in that manually operated switches (R12, R13, R16) for the end of train and route evacuation reports are arranged on the dependent stations (A, B, C). 2. Einrichtung nach Patentanspruch, dadurch ge kennzeichnet, dass für eine selbsttätige Streckenräu- mungs- und Zugschlussmeldung auf den abhängigen Stationen<I>(A, B,</I> C) durch Gleisstromkreise gesteuerte Schaltmittel<I>(SA, SB 1, SB 2,</I> SC 1, SC 2) angeordnet sind. 3. Einrichtung nach Patentanspruch, dadurch ge kennzeichnet, dass die selbsttätige Streckenräumungs- und Zugschlussmeldung von magnetisch gesteuerten Schaltmitteln abhängig ist. 4. Device according to patent claim, characterized in that for an automatic route evacuation and train closing report on the dependent stations <I> (A, B, </I> C) by track circuits controlled switching means <I> (SA, SB 1, SB 2, </I> SC 1, SC 2) are arranged. 3. Device according to claim, characterized in that the automatic evacuation and train closure message is dependent on magnetically controlled switching means. 4th Einrichtung nach Patentanspruch und Unter anspruch 1, dadurch gekennzeichnet, dass für jede abhängige Station in der Betriebsüberwachungszen- trale ein als Stützrelais ausgebildetes Durchfahrt relais angeordnet ist, welches die den einzelnen Streckenabschnitten zugeordneten Blockschaltmittel in der Zentrale bei Durchfahrten derart miteinander verbindet, dass durch den Empfang einer auf dem jeweiligen Zielbahnhof durch die handbetätigten Schalter ausgelösten Streckenräumungsmeldung sich eine Rückschaltung der den einzelnen Strecken abschnitten (S1, S2) zugeordneten Blockschaltmittel in die Grundstellung ergibt. 5. Device according to patent claim and sub-claim 1, characterized in that a transit relay designed as a support relay is arranged for each dependent station in the operational monitoring center, which connects the block switching means assigned to the individual route sections in the center with each other during transit so that the reception a route evacuation message triggered by the manually operated switch at the respective destination station results in the block switching means assigned to the individual route sections (S1, S2) being switched back to the basic position. 5. Einrichtung nach Patentanspruch, dadurch ge kennzeichnet, dass auf den abhängigen Stationen (A, B, C) Schaltmittel angeordnet sind, welche eine Ab schaltung der Station von der Betriebsüberwachungs- zentrale (UZ) ermöglichen. 6. Device according to patent claim, characterized in that switching means are arranged on the dependent stations (A, B, C) which enable the station to be switched off from the operational monitoring center (UZ). 6th Einrichtung nach Patentanspruch und Unter anspruch 5, dadurch gekennzeichnet, dass in Ver bindung mit den Schaltmitteln, welche jeweils eine abhängige Station von der Zentrale abschalten, wei tere Schaltmittel angeordnet sind, durch welche für Durchfahrten durch die abhängige Station die erfor derlichen Weichen und Schutzweichen erschlossen, die Fahrstrassen festgelegt und die am Durchfahrgleis angeordneten Einfahr- und Ausfahrsignale in die Fahrtstellung gebracht und in dieser gehalten wer den können. 7. Device according to claim and sub-claim 5, characterized in that in connection with the switching means, which each switch off a dependent station from the control center, further switching means are arranged through which the necessary switches and safety points are opened up for passage through the dependent station , the routes are set and the entry and exit signals arranged on the drive-through track are brought into the travel position and kept in this position. 7th Einrichtung nach Patentanspruch, dadurch ge kennzeichnet, dass auf den abhängigen Stationen (A, B, C) Relais angeordnet sind, welche im Regelbetrieb abhängig und bei Störungen unabhängig von den zentralen Blockschaltmitteln auf dem jeweils zugehö rigen Streckenabschnitt einen Ausschluss von Folge-, Flanken- und Gegenfahrten sicherstellen. B. Device according to patent claim, characterized in that relays are arranged on the dependent stations (A, B, C), which in normal operation depend on and in the event of faults independently of the central block switching means on the respective associated route section, an exclusion of subsequent, edge and ensure oncoming journeys. B. Einrichtung nach Patentanspruch und den Un teransprüchen 1 und 7, dadurch gekennzeichnet, dass die als zusätzliche örtliche Streckenblockeinrichtung vorgesehenen Relais durch das Stellen eines Ausfahr signals in eine Sperrstellung und durch die auf der Gegenstation angeordneten Tastschalter für die Strek- kenräumungsmeldung in die Grundstellung steuerbar sind. 9. Device according to patent claim and the sub-claims 1 and 7, characterized in that the relays provided as additional local section block device can be controlled by setting an exit signal to a locked position and by the pushbutton on the opposite station for the route evacuation signal in the basic position. 9. Einrichtung nach Patentanspruch, dadurch ge kennzeichnet, dass auf den abhängigen Stationen (A, B, C) mit besonderen Überwachungseinrichtungen versehene Schaltmittel angeordnet sind, welche nach Ausfallen der Betriebsüberwachungszentrale (UZ) eine Ersatzanschaltung der Auftragsempfangsmelder zur Freigabe entsprechender Ausfahrten ermöglichen. 14. Einrichtung nach Patentanspruch, dadurch gekennzeichnet, dass von den in der Zentrale (UZ) für die Auftragsabhängigkeiten und die Rückmeldun gen angeordneten Schaltmitteln auch die Fernsteue rung und Fernüberwachung unbesetzter Stationen ab hängig ist. Device according to patent claim, characterized in that switching means provided with special monitoring devices are arranged on the dependent stations (A, B, C), which, if the operations monitoring center (UZ) fail, enable the order reception indicators to be switched on to enable corresponding exits. 14. Device according to claim, characterized in that the remote control and remote monitoring of unoccupied stations is dependent on the switching means arranged in the control center (UZ) for the order dependencies and the feedback conditions.
CH344100D 1955-01-15 1956-01-12 Device for central operational control and central operational monitoring on railway lines CH344100A (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DE344100X 1955-01-15

Publications (1)

Publication Number Publication Date
CH344100A true CH344100A (en) 1960-01-31

Family

ID=6249927

Family Applications (1)

Application Number Title Priority Date Filing Date
CH344100D CH344100A (en) 1955-01-15 1956-01-12 Device for central operational control and central operational monitoring on railway lines

Country Status (2)

Country Link
CH (1) CH344100A (en)
FR (1) FR344100A (en)

Also Published As

Publication number Publication date
FR344100A (en) 1904-10-24

Similar Documents

Publication Publication Date Title
DE974788C (en) Device for central operational control and central operational monitoring on railway lines for setting points, routes, signals and the like. like
DE969816C (en) Facility for several remote controlled stations from a central station
DED0019569MA (en)
DE507432C (en) Electric remote monitoring system
DE903345C (en) Switch circuit for electrical signal boxes in railway safety
DE861263C (en) Arrangement at railway signal boxes, with command boxes being provided in addition to the goods signal boxes
AT234761B (en) Circuit arrangement for the individual release of the locks of points on a route in railway signal boxes
DE902390C (en) Monitoring device for overhead warning signal systems
DE973300C (en) Flashing lights at Weguebergaengen
DE1002783B (en) Circuit arrangement for signal boxes with electrical locks, especially for track diagram signal boxes
DE2129127C (en) Circuit arrangement for controlling points from the vehicle
DE82412C (en)
DE881800C (en) Warning signal system for crossings
DE484182C (en) Electrically controlled barrier protection for railway crossings
DE950856C (en) Circuit for setting routes
DE917373C (en) Switching of axle counting systems in the railway security system
AT18559B (en) Route closure for electrical railway safety systems.
DE1091146B (en) Circuit arrangement in interlockings with a collective indicator for point faults
DE734121C (en) Circuit for electrical interlocking and block systems
DE275529C (en)
AT81761B (en) Device for triggering signals and brakes Device for triggering signals and brakes on a moving train. on a moving train.
AT113042B (en) Circuit arrangement for block relays.
DE953353C (en) Circuit for automatic railway safety systems on double-track lines
CH366850A (en) Circuit arrangement in signal boxes for electrical railway systems with different types of current and / or contact wire voltages
CH334898A (en) Installation in railway systems with a central signal box