CH98679A - Low pressure pneumatic installation for the distribution of liquids by the use of conjugate measuring vessels. - Google Patents

Low pressure pneumatic installation for the distribution of liquids by the use of conjugate measuring vessels.

Info

Publication number
CH98679A
CH98679A CH98679DA CH98679A CH 98679 A CH98679 A CH 98679A CH 98679D A CH98679D A CH 98679DA CH 98679 A CH98679 A CH 98679A
Authority
CH
Switzerland
Prior art keywords
measuring
liquid
container
compressor
valve
Prior art date
Application number
Other languages
French (fr)
Inventor
Mauclere Pierre Andre P Victor
Original Assignee
Pierre Andre Paul Victor Maucl
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Pierre Andre Paul Victor Maucl filed Critical Pierre Andre Paul Victor Maucl
Publication of CH98679A publication Critical patent/CH98679A/en

Links

Landscapes

  • Filling Or Discharging Of Gas Storage Vessels (AREA)

Description

  

  Installation pneumatique à basse pression pour la     distribution    de liquides  par l'emploi de récipients jaugeurs conjugués.    La présente invention se rapporte à une  installation pneumatique à basse pression pour  la     distribution    de liquides par l'emploi de  récipients jaugeurs conjugués.

   Suivant l'in  vention, les récipients jaugeurs sont combinés  en circuit fermé avec deux     réservoirs    de gaz  entre lesquels est disposé un compresseur,  pouvant être actionné     mécaniquement    ou à  la main, ces parties étant interconnectées de  telle     manière    que le gaz destiné à la distri  bution du liquide puisse être amené à sortir  alternativement du récipient jaugeur en     cours     de remplissage pour venir se détendre dans  le réservoir placé du côté d'aspiration du  compresseur, ce gaz étant ensuite comprimé  par celui-ci     dans    le réservoir situé du côté de  refoulement du compresseur,

   d'où il sort à  la pression voulue pour provoquer le soutirage  du liquide dans l'autre récipient jaugeur, en  cours de vidage.  



  Les dessins ci-annexés montrent trois  formes d'exécution de l'objet de l'invention  La     fig.    1 est une vue schématique d'en  semble de la première forme d'exécution, dans    laquelle les récipients jaugeurs sont disposés  en contrebas d'un     réservoir-magasin;     La     fig.    2 est une vue semblable de la  seconde forme d'exécution, dans laquelle les  récipients jaugeurs sont situés à un niveau  supérieur à celui du     réservoir-magasin;     La     fig.    3 est une vue semblable de la  troisième forme d'exécution, dans laquelle le  fonctionnement des récipients jaugeurs est  dissymétrique;

    Les     fig.    4 à 7 montrent les quatre posi  tions différentes que peuvent occuper     des     robinets de commande de l'installation de la       fig.    3, respectivement pendant les périodes de  débit, de remplissage, d'attente et de repos.  



  La forme d'exécution de la     fig.    1 comporte  un     réservoir-magasin    1, deux récipients jau  geurs conjugués 2' et 22, un compresseur 4,  un réservoir de détente 46 en amont du com  presseur et un réservoir à basse pression 5  en aval du compresseur.  



  Le liquide à manipuler est fourni au ré  servoir-magasin 1 par le récipient d'amenée  9, duquel il peut s'écouler par une conduite 8      pourvue d'un robinet     d'ar#rêt    34. Une conduite  49, commandée par un robinet 50, permet de  faire communiquer les chambres     supérieures     du     réservoir-magasin    1 et du récipient d'a  menée 9 l'une avec l'autre.  



  Le remplissage des récipients jaugeurs 21  et 22 par le liquide du     réservoir-magasin    est       effectué    au moyen d'une conduite 3 commandée  par un robinet à trois voies 11. Les récipients  jaugeurs sont reliés, d'une part, au     réservoir     de détente 46 par une conduite 12 commandée  par un robinet à trois voies 15 et,     d'autre     part, au réservoir à basse pression 5 par une  conduite 14 pourvue d'un robinet à trois voies  17. Un détendeur 35 réglé pour la pression  de soutirage est disposé sur la conduite 14,  à la sortie du réservoir 5.

   Le refoulement du  liquide hors de l'un ou l'autre des récipients  jaugeurs se fait par la conduite 13, pourvue  d'un robinet à trois voies 16 et prolongée  par la conduite de décharge 27 pourvue du  robinet de débit 37.  



  Le compresseur 4 est relié au réservoir 46  par la conduite 31 et au réservoir 5 par la  conduite. 18.  



  Le fonctionnement de l'installation est le  suivant:       Emmagasinage.    La simple ouverture des  robinets 34 et 50 permet le remplissage direct  du     réservoir-magasin    1 par le liquide du ré  cipient 9 au moyen de la conduite 8. Grâce  à l'ouverture du robinet 50, il y a déplace  ment de l'atmosphère supérieure du réservoir  1 par le liquide et le gaz passe directement  par la conduite 49 dans le récipient 9, de       manière    à maintenir constamment la pression  atmosphérique dans ces deux capacités et  leurs conduites de communication, sans admis  sion d'air ni échappement de gaz.  



       Soutirage.    L'ouverture du robinet 11 per  met le remplissage de l'un oui l'autre des  deux récipients jaugeurs par le liquide venant  du réservoir 1 et s'écoulant par gravité par  la conduite 3. Les robinets 11, 16, 17 et 15  étant dans les positions représentées, le réci  pient jaugeur 22 est en cours de remplissage  et le récipient jaugeur 21 en cours de vidage.    Le gaz sous pression du réservoir 5 affluant  par le tuyau 14 dans le récipient jaugeur 21  refoule le liquide par la conduite 13 et la  conduite 27. Le gaz contenu dans le récipient  jaugeur 22 passe par la conduite 12 dans le  réservoir 46 d'où il est aspiré par le com  presseur 4 qui refoule ce gaz dans le réser  voir 5 par la conduite 18.  



  Lorsque le récipient jaugeur 21 a été vidé  et le récipient jaugeur 22 rempli, la simple  inversion des robinets 11, 16, 17 et 15 dé  termine l'inversion automatique du fonction  nement des récipients jaugeurs, le récipient       jaugeur    21 se remplissant, tandis que le ré  cipient jaugeur 22 se vide.  



  Dans ces conditions, le gaz servant à la  protection du liquide contenu dans les réci  pients jaugeurs est utilisé     cri    cycle fermé et  peut donc servir indéfiniment.  



  Dans la forme d'exécution     représentée    sur  la     fig.    2, l'on retrouve les mêmes organes que  dans la disposition précédente et ceux-ci sont  désignés par les mêmes     chiffres    de référence.  La     différence    est qu'ici les récipients jaugeurs  21 et 22 sont disposés à un niveau supérieur à  celui du réservoir-magasin 1 et que le. liquide  passe dans les récipients jaugeurs par aspi  ration, le compresseur créant dans le réservoir  46 la dépression voulue pour provoquer cette  aspiration.  



       !1    tous autres égards, le fonctionnement  est le     même    que dans le premier cas.  L'installation simplifiée montrée sur la       fig.    3 comporte, comme dans la disposition  des     fig.    1 et 2, un     réservoir-magasin    1, deux  récipients jaugeurs 21 et 22, un     compresseur     4 et un réservoir 46.    L'un des récipients jaugeurs 21 constitue  ici un jaugeur auxiliaire pour le récipient  jaugeur 22 qui constitue le récipient jaugeur  principal. Le récipient jaugeur 21 est fixé  dans une partie formant dôme du     réservoir-          magasin    1.

   Un tuyau 3, qui plonge dans le  liquide de ce réservoir 1, traverse le récipient  21 et aboutit à une soupape 11 se fermant  de haut en bas; un tuyau 31 part de la      soupape 11, traverse le sommet du récipient  jaugeur 21 et débouche dans la partie infé  rieure de ce dernier. Le tuyau 3 et le tuyau       3a    peuvent être amenés à communiquer l'un  avec l'autre, au-dessous de la soupape 11,  par un tuyau de connexion muni d'une vanne  51. Un tuyau 13 part du bas du récipient  jaugeur auxiliaire 21 et aboutit à la partie  inférieure du second récipient jaugeur, ou  jaugeur principal 22, dont la capacité est  légèrement plus petite que celle du récipient  jaugeur 21 et qui est muni d'un     tube    en  verre 52 permettant de se rendre compte du  niveau du liquide dans le récipient jaugeur 21.

         Sur    ce tuyau 13 est monté un robinet à trois  voies 53, dont la troisième tubulure est reliée  au tuyau de décharge 27 constitué par un  tuyau flexible terminé par une canne de dis  tribution pourvue d'un robinet de commande<B>37.</B>  



  A la partie inférieure du récipient jau  geur 22 est disposée une soupape à flotteur  61 qui obture le tuyau 13 lorsque ledit ré  cipient est vide.  



  A la partie supérieure des récipients jau  geurs 21 et 22 sont disposées deux soupapes  à flotteur 26, des sièges desquelles partent  les deux conduites 12 et 14 aboutissant à deux  tubulures     différentes    d'un robinet à quatre  voies 54. Les deux autres tubulures de ce  dernier robinet sont réunies par les conduites  12 et     14a    aux réservoirs 46 et 5 de part et  d'autre, du compresseur 4, qui peut être à  commande mécanique ou à main. Les clés  des deux robinets 53 et 54 sont reliées en  semble, de telle sorte qu'une seule commande  produit leur     manaeuvre    simultanée et leur  permet d'occuper les positions indiquées sur  les     fig.    4 à 7.

   On remarquera sur ces dernières       figures        que    la clé du robinet 54 est percée  de deux     canaux    de faible diamètre 55 et 56.    Sur la conduite 14 est fixé un manomètre  contrôleur de pression et de vide 57 et un  ajutage à robinet témoin 58. Les conduites  12 et     14a    peuvent être amenées à communi  quer l'une avec l'autre par l'intermédiaire  d'une soupape 59 convenablement tarée, s'ou  vrant de     14a    sur 12. Sur la conduite     14a    est    placée une tubulure avec robinet d'arrêt 60,  permettant de brancher une bouteille à gaz  comprimé 28.  



  Le     fonctionnement    de cette -installation  est le suivant:  <I>Préparation de</I>     l'installation   <I>avant la nuise</I>  <I>en route.</I> La bouteille 28 étant branchée et  le robinet 60 fermé, la vanne 51 étant fer  mée, on place les robinets 53 et 54 dans la  position de la     fig.4    et     cri    met en marche le  compresseur 4, de telle sorte qu'il aspire dans  le récipient 21 et qu'il - refoule dans le réci  pient 22. Pendant cette opération on laisse  ouvert le robinet 37 de telle sorte que-tout  l'air aspiré dans le récipient 21 se trouve  expulsé à l'extérieur par ce robinet 37.

   Le  liquide du     résérvoir-magasin    1 s'élève par le  tuyau 3, traverse la soupape 11 et remplit  le récipient 21, dans lequel il s'élève jusqu'au  flotteur 26 qu'il soulève en obturant la con  duite 12. Quand on estime que ce résultat  est obtenu, on ouvre le robinet 60 par lequel  la bouteille 28 débite le gaz inerte dans la  conduite     14a.    Le compresseur 4 se remplit de  gaz inerte, ainsi que le récipient 22. On     péut     se rendre compte, à la sortie du robinet 37,  de la teneur en oxygène du gaz expulsé.

         Quand    on juge que cette     teneur    est suffi  samment faible, on arrête le     compresseur,    on  ferme le robinet 60 et on place les robinets  53 et 54 dans la position représentée sur la  <B><I>fi</I></B>     g'    7. On ouvre ensuite la vanne 51, on ferme  le robinet 37 et on ouvre à nouveau le ro  binet 60. La pression s'élève dans tout l'en  semble de l'installation, le liquide du récipient  2' se trouve expulsé dans le réservoir-magasin  1 et toute l'installation se trouve remplie de  gaz inerte à une pression légèrement supé  rieure à la pression     atmosphérique,    ce qui est  indiqué par le manomètre 57.

   On ferme le  robinet 60 et, par le robinet 58, on laisse  échapper du gaz inerte jusqu'à ce que l'ai  guille du manomètre indique la pression       atmosphérique.    L'installation se trouve ainsi  en ordre de marche et dans la position de  repos, telle qu'il n'y a aucun liquide au-dessus  du niveau dans le     réservoir-magasin,    sauf une  légère quantité dans le fond du récipient 21.      <I>Position d'attente.</I> Pour rendre l'installation       préte    pour le débit, on place les robinets 53,  54 dans la position de la     fig.    4, l'on ferme  la vanne 51 et l'on met le compresseur 4 en  marche. Celui-ci aspire dans le récipient 21  et refoule dans le récipient 22; le robinet 37  est fermé.

   Le liquide s'élève dans le tuyau 3,  traverse la soupape 11 et remplit le récipient  2' jusqu'au niveau du flotteur 26 qu'il soulève  en obturant la conduite 12. Pendant cette  montée du liquide dans le récipient 2' la  pression s'est élevée dans le récipient 2', par  exemple à 2 atmosphères.

   Dès que la con  duite 12 est obturée par une soupape à flot  teur, le compresseur 4 fait le vide dans les  conduites 12 et     14a    jusqu'à la limite de vide  qui le caractérise et, à partir du moment     oir.     cette     liMite    est atteinte, il tourne à vide, prati  quement sans consommer d'énergie, la pression       cesse    de s'élever dans le récipient 22 et  l'aiguille du manomètre 57 se fixe.

       Quand    ce  résultat est atteint     oit    place les robinets 53,  54 dans- la position de la     fig.    5, dans laquelle  le compresseur aspire dans le récipient 22 et  refoule dans le récipient 21, le liquide dans  celui-ci pouvant passer directement dans la  conduite 13. La soupape 11 se ferme et le  liquide s'élève par la conduite 13 dans le  récipient 2 , où on peut suivre sou ascension  par le tube de verre 52. Il remplit le réci  pient 22 jusqu'au flotteur 26 qu'il soulève en  obturant la conduite 14. Pendant cette montée  du liquide dans le récipient 22, la pression  s'élève dans le récipient 21 de façon à  atteindre par exemple 2 atmosphères.

   A partir  du moment     oit    la soupape à flotteur obture  la conduite 14, le compresseur fait le vide  dans la     conduite    14 et     14@    jusqu'à la limite  qui caractérise le compresseur et l'aiguille  de l'indicateur de vide se fixe à la graduation  qui indique ce vide. Si l'on ne prévoit pas  de débit avant quelque temps, l'on place alors  les robinets 53, 54 dans la position de la       fig.    6; dans laquelle le robinet 53 est fermé  sur     tout?s    les directions et oit le compresseur  est mis en court-circuit par les petits     canaux     de la clé du robinet 54; l'on art-ôte     égale-          tuent    le compresseur.

           .Position   <I>de débit.</I> Deux cas sont à envi  sager: il s'ait de débiter soit une quantité  déterminée<B>dé'</B>     liquide,    soit une quantité in  déterminée, par exemple, pour faire le plein  d'un réservoir.  



  <I>a) Premier cas:</I>     quantité   <I>déterminée à</I>     d'a-          vance,    par exemple, 17 litres. Le desservant  met le compresseur en route, place les robi  nets 53, 54 dans la position de la     fig.    4 et  la canne de distribution sur le récipient qui doit  recevoir le liquide et il tient en main la poignée  de     manaeuvre    des robinets 53, 54.     Orr    ouvre  alors le robinet 37, le liquide s'écoule et on  en suit le débit sur le tube de verre 52 qui  est gradué en litres et     1/.2    litres à partir du  haut. Lorsque le niveau est arrivé à 17, le  desservant met les robinets 53, 54 dans la  position de la     fig.    6.

   Pendant cette opération  de débit, le récipient 21 s'est rempli de liquide  jusqu'à un certain niveau, qui doit être tel  que la     quantité    de liquide passée dans ce  récipient 2' soit égale à celle qui a été puisée  dans le réservoir 2 . Cette égalité ne sera  obtenue que si le débit du compresseur est  égal au débit du robinet 37.

   Avec les plus  petits modèles de compresseurs du commerce,  ce résultat n'est pas absolument certain;  aussi, pour pallier à cet     inconvénient,        oit    a  disposé en 59 la soupape tarée dont le fonc  tionnement est le suivant: Si le débit du  compresseur est, par exemple, cinq fois plus  grand que le débit acceptable de la canne,  le récipient 2' se remplira cinq fois plus vite  que le récipient 22 ne se videra et par con  séquent, la pression au-dessus du liquide dans  le récipient 22 prendrait une valeur cinq Lis  plus grande que celle qui serait normale pour  le débit de la carme.

   Mais la soupape 59 est  réglée pour la pression normale qui doit  exister au-dessus du liquide en écoulement  et elle s'ouvre dès que cette pression est  atteinte: un     court-circuit    se produit alors  entre les conduites 12 et     14@,    de sorte que  le débit est régularisé, ainsi que le remplissage  du récipient 21.  



       b)        Deuxième   <I>cas:</I>     quardité        non        déterminée          d.        l'avance.    Les parties de l'installation étant  placées dans la position d'attente, le desser-           vant    met le compresseur en marche, place  les robinets 53, 54 dans la position de la       fig.    4 et la canne de distribution sur le ré  cipient à remplir. On ouvre le robinet 37 et  on     surveille    le niveau dans le récipient à  remplir. Quand le récipient est plein, on ferme  le robinet 37 et on lit sur le tube de verre  5 2 la quantité débitée.

   Si la quantité de  mandée est supérieure à la capacité totale  du récipient 21, on arrête par les robinets 53,  54, après écoulement d'une quantité déter  minée, 50 litres par exemple, et on fait la       mana        uvre    de remplissage du récipient 22, puis  la     manceuvre    de débit et on note la quantité  débitée comme dans le premier cas, soit 17  par     exemple;    la totalité du liquide livré est  donc de 50     ---    17     #-    67 litres.

   Dans le cas  où le desservant manquerait d'accomplir la       manceuvre    d'arrêt par les robinets 52, 54,  après écoulement de 50 litres, la soupape à  flotteur 61 obturerait la conduite 13 -et em  pêcherait une sortie intempestive du gaz  inerte,  <I>Position de repos.</I> Quand la journée est  terminée, les parties de l'installation sont en  général dans la position d'attente, c'est-à-dire  le récipient jaugeur supérieur plein, le récipient  jaugeur inférieur vide, le     compresseur    arrêté. Le  desservant place les robinets 53, 54 dans la  position de la     fig.    7 et ouvre la vanne 51.

    Dans cette position, il y a libre communica  tion entre les atmosphères supérieures des  récipients 2' et 2", ainsi qu'entre les liquides  des capacités 1, 2' et 2 ; le liquide s'écoule  alors par gravité dans le réservoir-magasin  et la pression dans     hensemble    de l'installa  tion s'établit à la pression atmosphérique ou  à une valeur très voisine, la     différence    entre  cette pression et la pression atmosphérique  étant due aux variations de température  extérieure depuis la mise en marche. L'ai  guille du manomètre devra se fixer au voisi  nage de zéro.

   Si l'indication de ce manomètre  est très     différente    de zéro, il faudra inter  préter ce renseignement pour conclure qu'il  existe des fuites dans l'installation par où de  l'air     extérieur    peut entrer dans celle-ci et il  y aura lieu de supprimer ces fuites.    Dans le cas où l'on voudrait prendre la  position de repos alors que le réservoir 2'  est plein et le réservoir 22 vide, la     manceuvre     est absolument la même.  



  Le remplissage du     réservoir-magasin    1 à  l'aide des récipients d'amenée pourra s'opérer  par exemple au moyen des deux conduites 8  et 49 comme .dans le cas de l'installation  des     fig.    1 et 2.



  Low pressure pneumatic installation for the distribution of liquids by the use of conjugate measuring vessels. The present invention relates to a low-pressure pneumatic installation for the distribution of liquids by the use of conjugate measuring vessels.

   According to the invention, the measuring vessels are combined in a closed circuit with two gas reservoirs between which a compressor is placed, which can be operated mechanically or by hand, these parts being interconnected in such a way that the gas intended for distribution liquid can be caused to exit alternately from the measuring container during filling to relax in the reservoir placed on the suction side of the compressor, this gas then being compressed by the latter in the reservoir located on the discharge side of the compressor ,

   from which it leaves at the desired pressure to cause the liquid to be withdrawn into the other measuring container, during emptying.



  The accompanying drawings show three embodiments of the object of the invention. FIG. 1 is a diagrammatic overall view of the first embodiment, in which the measuring containers are arranged below a storage tank; Fig. 2 is a similar view of the second embodiment, in which the measuring vessels are located at a level higher than that of the store-tank; Fig. 3 is a similar view of the third embodiment, in which the operation of the measuring vessels is asymmetrical;

    Figs. 4 to 7 show the four different positions that can be occupied by the control valves of the installation of FIG. 3, respectively during the periods of flow, filling, waiting and rest.



  The embodiment of FIG. 1 comprises a store-reservoir 1, two combined measuring receptacles 2 'and 22, a compressor 4, an expansion reservoir 46 upstream of the compressor and a low-pressure reservoir 5 downstream of the compressor.



  The liquid to be handled is supplied to the tank-store 1 by the supply receptacle 9, from which it can flow through a pipe 8 provided with a shut-off valve 34. A pipe 49, controlled by a valve 50, allows the upper chambers of the store-tank 1 and of the led container 9 to communicate with each other.



  The filling of the measuring vessels 21 and 22 with the liquid from the storage tank is effected by means of a pipe 3 controlled by a three-way valve 11. The measuring vessels are connected, on the one hand, to the expansion tank 46 by a pipe 12 controlled by a three-way valve 15 and, on the other hand, to the low-pressure tank 5 by a pipe 14 provided with a three-way valve 17. A regulator 35 adjusted for the withdrawal pressure is arranged on line 14, at the outlet of tank 5.

   The liquid is discharged from one or the other of the measuring vessels by line 13, provided with a three-way valve 16 and extended by the discharge line 27 provided with flow valve 37.



  The compressor 4 is connected to the reservoir 46 by the pipe 31 and to the reservoir 5 by the pipe. 18.



  The operation of the installation is as follows: Storage. The simple opening of the taps 34 and 50 allows the direct filling of the store-tank 1 with the liquid from the receptacle 9 by means of the pipe 8. Thanks to the opening of the tap 50, there is displacement of the upper atmosphere. from the tank 1 by the liquid and the gas passes directly through line 49 into the container 9, so as to constantly maintain the atmospheric pressure in these two capacities and their communication lines, without admission of air or exhaust of gas.



       Racking. The opening of the tap 11 allows one or the other of the two measuring containers to be filled with the liquid coming from the reservoir 1 and flowing by gravity through the pipe 3. The taps 11, 16, 17 and 15 being in the positions shown, the measuring container 22 is being filled and the measuring container 21 is being emptied. The pressurized gas from the reservoir 5 flowing through the pipe 14 into the measuring vessel 21 discharges the liquid through the pipe 13 and the pipe 27. The gas contained in the measuring vessel 22 passes through the pipe 12 into the reservoir 46 from where it is sucked in by the com pressor 4 which delivers this gas into the tank, see 5 through line 18.



  When the measuring container 21 has been emptied and the measuring container 22 filled, the simple reversal of the valves 11, 16, 17 and 15 determines the automatic reversal of the operation of the measuring containers, the measuring container 21 being filled, while the measuring receptacle 22 empties.



  Under these conditions, the gas used to protect the liquid contained in the measuring vessels is used in the closed cycle and can therefore be used indefinitely.



  In the embodiment shown in FIG. 2, we find the same organs as in the previous arrangement and these are designated by the same reference numbers. The difference is that here the measuring containers 21 and 22 are arranged at a higher level than that of the store-tank 1 and that the. liquid passes into the measuring vessels by suction, the compressor creating in the reservoir 46 the desired depression to cause this suction.



       In all other respects, the operation is the same as in the first case. The simplified installation shown in fig. 3 comprises, as in the arrangement of FIGS. 1 and 2, a reservoir-store 1, two measuring containers 21 and 22, a compressor 4 and a reservoir 46. One of the measuring containers 21 here constitutes an auxiliary gauge for the measuring container 22 which constitutes the main measuring container. The measuring container 21 is fixed in a dome part of the reservoir-store 1.

   A pipe 3, which immerses in the liquid of this reservoir 1, passes through the container 21 and ends in a valve 11 which closes from top to bottom; a pipe 31 leaves from the valve 11, passes through the top of the measuring container 21 and opens into the lower part of the latter. The pipe 3 and the pipe 3a can be made to communicate with each other, below the valve 11, by a connection pipe provided with a valve 51. A pipe 13 starts from the bottom of the auxiliary measuring vessel. 21 and leads to the lower part of the second measuring vessel, or main gauge 22, the capacity of which is slightly smaller than that of the measuring vessel 21 and which is provided with a glass tube 52 making it possible to check the level of the liquid in the measuring vessel 21.

         On this pipe 13 is mounted a three-way valve 53, the third pipe of which is connected to the discharge pipe 27 consisting of a flexible pipe terminated by a distribution pipe provided with a control valve <B> 37. </ B>



  At the lower part of the measuring container 22 is arranged a float valve 61 which closes the pipe 13 when said container is empty.



  At the upper part of the measuring vessels 21 and 22 are arranged two float valves 26, from the seats from which the two pipes 12 and 14 leave leading to two different pipes of a four-way valve 54. The other two pipes of the latter valve are joined by pipes 12 and 14a to the reservoirs 46 and 5 on either side of the compressor 4, which may be mechanically or manually operated. The keys of the two taps 53 and 54 are connected together, so that a single command produces their simultaneous operation and allows them to occupy the positions indicated in FIGS. 4 to 7.

   It will be noted in these last figures that the key of the valve 54 is pierced with two small diameter channels 55 and 56. On the pipe 14 is fixed a pressure and vacuum pressure gauge 57 and a pilot valve nozzle 58. The pipes 12 and 14a can be made to communicate with each other by means of a suitably calibrated valve 59, opening from 14a to 12. On the pipe 14a is placed a tubing with stopcock 60 , allowing the connection of a compressed gas cylinder 28.



  The operation of this -installation is as follows: <I> Preparation of </I> installation <I> before nightfall </I> <I> on the way. </I> The bottle 28 being connected and the tap 60 closed, the valve 51 being closed, the taps 53 and 54 are placed in the position of fig. 4 and cry starts the compressor 4, so that it sucks into the container 21 and that it - discharges into the receptacle 22. During this operation, the valve 37 is left open so that all the air drawn into the receptacle 21 is expelled to the outside by this valve 37.

   The liquid from the tank-store 1 rises through the pipe 3, passes through the valve 11 and fills the receptacle 21, in which it rises up to the float 26 which it lifts by closing off the pipe 12. When estimated that this result is obtained, we open the valve 60 through which the bottle 28 delivers the inert gas in the pipe 14a. The compressor 4 is filled with inert gas, as well as the container 22. It is possible to realize, at the outlet of the valve 37, the oxygen content of the expelled gas.

         When we judge that this content is sufficiently low, we stop the compressor, close the tap 60 and place the taps 53 and 54 in the position shown on the <B><I>fi</I> </B> g '7. The valve 51 is then opened, the valve 37 is closed and the valve 60 is reopened. The pressure rises throughout the entire installation, the liquid in the container 2' is present. expelled into the store-tank 1 and the entire installation is filled with inert gas at a pressure slightly above atmospheric pressure, which is indicated by the manometer 57.

   The valve 60 is closed and, through the valve 58, inert gas is allowed to escape until the needle of the manometer indicates atmospheric pressure. The installation is thus in working order and in the rest position, such that there is no liquid above the level in the storage tank, except a small quantity in the bottom of the receptacle 21. < I> Standby position. </I> To make the installation ready for the flow, the taps 53, 54 are placed in the position of fig. 4, valve 51 is closed and compressor 4 is started. The latter sucks into the container 21 and discharges into the container 22; valve 37 is closed.

   The liquid rises in the pipe 3, passes through the valve 11 and fills the container 2 'to the level of the float 26 which it lifts by closing off the line 12. During this rise of the liquid in the container 2', the pressure s 'is raised in vessel 2', for example to 2 atmospheres.

   As soon as the duct 12 is closed by a float valve, the compressor 4 creates a vacuum in the ducts 12 and 14a up to the vacuum limit which characterizes it and, from the moment oir. this limit is reached, it runs empty, practically without consuming energy, the pressure ceases to rise in the receptacle 22 and the needle of the manometer 57 is fixed.

       When this result is achieved, place the taps 53, 54 in the position of FIG. 5, in which the compressor sucks into the container 22 and discharges into the container 21, the liquid therein being able to pass directly into the line 13. The valve 11 closes and the liquid rises through the line 13 into the container. 2, where you can follow its ascent through the glass tube 52. It fills the container 22 up to the float 26 which it lifts by closing off the pipe 14. During this rise of the liquid in the container 22, the pressure s' raises in the container 21 so as to reach for example 2 atmospheres.

   From the moment when the float valve closes the line 14, the compressor creates a vacuum in the line 14 and 14 @ up to the limit which characterizes the compressor and the needle of the vacuum indicator is fixed to the graduation which indicates this void. If no flow is expected for some time, then the taps 53, 54 are placed in the position of FIG. 6; in which the valve 53 is closed in all directions and where the compressor is shorted by the small channels of the valve key 54; the compressor is also removed.

           .Position <I> of flow. </I> Two cases are to be considered: it is necessary to discharge either a determined quantity <B> de '</B> liquid, or a quantity in determined, for example, for fill up a tank.



  <I> a) First case: </I> quantity <I> determined </I> in advance, for example, 17 liters. The servant starts the compressor, places the valves 53, 54 in the position of fig. 4 and the dispensing rod on the container which is to receive the liquid and he holds in hand the operating handle of the taps 53, 54. Orr then opens the tap 37, the liquid flows and the flow is followed on the tube of glass 52 which is graduated in liters and 1 / .2 liters from the top. When the level has reached 17, the attendant puts the taps 53, 54 in the position of FIG. 6.

   During this flow operation, the container 21 is filled with liquid up to a certain level, which must be such that the quantity of liquid passed into this container 2 'is equal to that which has been drawn from the tank 2. This equality will only be obtained if the flow rate of the compressor is equal to the flow rate of tap 37.

   With the smaller models of compressors on the market, this result is not absolutely certain; also, to alleviate this drawback, the calibrated valve has been placed at 59, the operation of which is as follows: If the flow rate of the compressor is, for example, five times greater than the acceptable flow rate of the rod, the container 2 ' will fill five times faster than the container 22 will empty and therefore the pressure above the liquid in the container 22 would take a value five Lis greater than that which would be normal for the flow of the carm.

   But the valve 59 is set for the normal pressure which must exist above the flowing liquid and it opens as soon as this pressure is reached: a short-circuit then occurs between the pipes 12 and 14 @, so that the flow is regulated, as is the filling of the container 21.



       b) Second <I> case: </I> quardity not determined d. advance. The parts of the installation being placed in the standby position, the release starts the compressor, places the taps 53, 54 in the position of fig. 4 and the dispensing rod on the receptacle to be filled. The tap 37 is opened and the level in the container to be filled is monitored. When the container is full, the tap 37 is closed and the quantity dispensed is read on the glass tube 52.

   If the quantity of demand is greater than the total capacity of the container 21, it is stopped by the taps 53, 54, after the flow of a determined quantity, 50 liters for example, and the maneuver of filling the container 22 is carried out, then the debit operation and the quantity discharged as in the first case is noted, ie 17 for example; the total liquid delivered is therefore 50 --- 17 # - 67 liters.

   In the event that the service provider fails to complete the shut-off maneuver by taps 52, 54, after 50 liters have flowed, the float valve 61 would close the line 13 - and would catch an untimely exit of the inert gas, <I > Rest position. </I> When the day is over, the parts of the installation are generally in the waiting position, i.e. the upper measuring container full, the lower measuring container empty, the compressor stopped. The servant places the taps 53, 54 in the position of FIG. 7 and open valve 51.

    In this position, there is free communication between the upper atmospheres of the receptacles 2 'and 2 ", as well as between the liquids of capacities 1, 2' and 2; the liquid then flows by gravity into the storage tank. and the pressure in the whole installation is established at atmospheric pressure or at a very close value, the difference between this pressure and atmospheric pressure being due to the variations in outside temperature since the start-up. of the pressure gauge should be set near zero.

   If the indication of this manometer is very different from zero, it will be necessary to interpret this information to conclude that there are leaks in the installation through which outside air can enter it and it will be necessary to remove these leaks. In the event that one wishes to take the rest position while the reservoir 2 ′ is full and the reservoir 22 empty, the operation is absolutely the same.



  The filling of the store-reservoir 1 using the supply containers can be effected for example by means of the two pipes 8 and 49, as in the case of the installation of FIGS. 1 and 2.

 

Claims (1)

REVENDICATION Installation pneumatique à basse pression pour la distribution de liquides par l'emploi de récipients jaugeurs conjugués, caractérisée en ce que les récipients jaugeurs sont com binés en circuit fermé avec deux réservoirs de gaz entre lesquels est interposé un com presseur, ces parties étant interconnectées de telle manière que le gaz destiné à la distri bution du liquide puisse être amené à sortir alternativement du récipient jaugeur en cours de remplissage pour venir se détendre dans le réservoir placé du côté d'aspiration du compresseur, -ce gaz étant ensuite comprimé dans le réservoir situé du côté de refoulement du compresseur, d'où il sort à la pression voulue pour provoquer le soutirage du liquide dans l'autre récipient jaugeur en cours de vidage. . CLAIM Pneumatic installation at low pressure for the distribution of liquids by the use of combined measuring vessels, characterized in that the measuring vessels are combined in a closed circuit with two gas reservoirs between which a compressor is interposed, these parts being interconnected in such a way that the gas intended for the distribution of the liquid can be made to exit alternately from the measuring container during filling to come and relax in the reservoir placed on the suction side of the compressor, this gas then being compressed in the tank located on the discharge side of the compressor, from which it exits at the desired pressure to cause the liquid to be withdrawn into the other measuring container being emptied. . SOUS-REVENDICATIONS: 1 Installation suivant la revendication, ca ractérisée en ce que les récipients jaugeurs sont disposés à un niveau supérieur à celui d'un réservoir-magasin, leurs -connexions étant telles que leur remplissage soit pro duit par aspiration sous l'effet du compres seur créant dans le réservoir d'aspiration la dépression nécessaire à cet effet. 2 Installation suivant la revendication, ca ractérisé en ce que les récipients jaugeurs sont alimentés à partir d'un réservoir-ma- gasin, dans lequel règne toujours la pression atmosphérique et qui est disposé de façon à pouvoir être relié au récipient d'amenée à vider par deux conduites servant, SUB-CLAIMS: 1 Installation according to claim, ca ractérisée in that the measuring vessels are arranged at a level higher than that of a store-tank, their -connections being such that their filling is produced by suction under the effect the compressor creating the vacuum required for this purpose in the suction tank. 2 Installation according to claim, ca acterized in that the measuring vessels are fed from a storage tank, in which atmospheric pressure always prevails and which is arranged so as to be able to be connected to the supply vessel to empty through two serving pipes, l'une pour le remplissage au moyen du liquide du récipient d'amenée et l'autre pour l'échange des atmosphères de ce récipient et du réservoir-magasin. 3 Installation suivant la revendicaiton et la sous-revendication 2, caractérisée en ce que les deux récipients jaugeurs sont disposés de telle manière par rapport au réservoir- magasin et l'un par rapport à l'autre que l'un deux aspire directement le liquide dans le réservoir-magasin et le refoule dans l'autre récipient jaugeur, ou jaugeur prin cipal, tandis que ce dernier sert à distribuer directement le liquide à la consommation. one for filling the supply container with liquid and the other for exchanging the atmospheres of this container and of the storage tank. 3 Installation according to revendicaiton and the sub-claim 2, characterized in that the two measuring containers are arranged in such a way with respect to the reservoir-store and one with respect to the other that one of them directly sucks the liquid in the storage tank and discharges it into the other measuring receptacle, or main gauge, while the latter serves to distribute the liquid directly for consumption. 4 Installation suivant la revendication et les sous-revendications 2 et 3, caractérisée cri ce que le récipient jaugeur principal, ou distributeur, comporte un indicateur de ni veau permettant de suivre la distribution du liquide. â Installation suivant la revendication et les sous-revendications 2 et 3, caractérisée en ce que le premier récipient jaugeur servant au remplissage du récipient jaugeur prin cipal est disposé dans nue partie formant dôme du réservoir-magasin, sa communi cation avec ce dernier étant établie par une conduite pourvue d'une soupape de retenue. 4 Installation according to claim and sub-claims 2 and 3, characterized cri that the main measuring receptacle, or distributor, comprises a level indicator for monitoring the distribution of the liquid. â Installation according to claim and sub-claims 2 and 3, characterized in that the first measuring container for filling the main measuring container is arranged in a dome part of the storage tank, its communication with the latter being established by a pipe provided with a check valve. G Installation suivant la revendication et les sorrs-revendications 2 et 3, caractérisée par une paire de robinets combinés permettant la commande simultanée du gaz et du Ji- quide de l'installation -pour le fonctionne ment de celle-ci en même temps que la mise à la pression atmosphérique générale de ses éléments pendant les périodes de repos. G Installation according to claim and sorrs-claims 2 and 3, characterized by a pair of combined valves allowing the simultaneous control of gas and liquid of the installation -for the operation of the latter at the same time as the bringing its elements to general atmospheric pressure during periods of rest.
CH98679D 1920-07-16 1921-07-09 Low pressure pneumatic installation for the distribution of liquids by the use of conjugate measuring vessels. CH98679A (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
FR98679X 1920-07-16

Publications (1)

Publication Number Publication Date
CH98679A true CH98679A (en) 1923-04-16

Family

ID=8837572

Family Applications (1)

Application Number Title Priority Date Filing Date
CH98679D CH98679A (en) 1920-07-16 1921-07-09 Low pressure pneumatic installation for the distribution of liquids by the use of conjugate measuring vessels.

Country Status (1)

Country Link
CH (1) CH98679A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
USB508940I5 (en) * 1974-09-24 1976-02-17

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
USB508940I5 (en) * 1974-09-24 1976-02-17
US3981321A (en) * 1974-09-24 1976-09-21 The United States Of America As Represented By The United States Energy Research And Development Administration Vehicle fuel system

Similar Documents

Publication Publication Date Title
CH622960A5 (en)
US1460389A (en) Liquid-dispensing station
WO2021122433A1 (en) Filling spout having a return line
CH98679A (en) Low pressure pneumatic installation for the distribution of liquids by the use of conjugate measuring vessels.
WO2005075882A1 (en) Station for filling liquid carbon dioxide to a mobile tank
EP2362193B1 (en) Gauging device for liquid fuel dispenser and method implemented by using this device
US1673696A (en) Dispensing tank
FR2478776A1 (en) VALVE-CONTROLLED SQUEEGEE CONNECTOR
EP0439397B1 (en) Water level control in a household appliance and machine provided with such a device
FR2501962A1 (en) MILK DELIVERY DEVICE FOR VACUUM PROCESSING PLANTS
EP1789722A2 (en) Station for filling liquid carbon dioxide to a mobile tank
CH434781A (en) Volumetric liquid measuring device
FR2532747A1 (en) DEVICE FOR CALIBRATING VOLUMETRIC METERS OF LIQUIDS
FR2502482A1 (en) Distributor for liquid soap - has central reservoir with liquid delivered through pipes by pressure
FR2473774A1 (en) AUTOMATIC SPRAYING DEVICE FOR THE CONFINEMENT ENCLOSURE OF A PRESSURIZED WATER REACTOR
CH361544A (en) Flush
BE670475A (en)
FR2595585A1 (en) Fluid-mixing metering plant for the production of a gas mixture
BE668521A (en)
CH116609A (en) Liquid meter.
FR2496075A1 (en) Tanker vehicle unloading feed - has main control valve attached to membrane forming partition between flow and degasification chambers
CH101359A (en) Pneumatic installation for the flow of liquids sheltered from the ambient air.
BE661573A (en)
CH104828A (en) Apparatus for raising, measuring and distributing liquids.
CH232085A (en) Installation for supplying an engine and comprising at least one acetylene generator.