CL2017002524A1 - Structural concrete tower and mounting method. - Google Patents

Structural concrete tower and mounting method.

Info

Publication number
CL2017002524A1
CL2017002524A1 CL2017002524A CL2017002524A CL2017002524A1 CL 2017002524 A1 CL2017002524 A1 CL 2017002524A1 CL 2017002524 A CL2017002524 A CL 2017002524A CL 2017002524 A CL2017002524 A CL 2017002524A CL 2017002524 A1 CL2017002524 A1 CL 2017002524A1
Authority
CL
Chile
Prior art keywords
tower
mounting method
concrete tower
structural concrete
segments
Prior art date
Application number
CL2017002524A
Other languages
Spanish (es)
Inventor
De Sá Cristiano Ferreira
Marcos Onishi
Kako Daniel Massashi
Original Assignee
Protende Sist E Metodos De Construcoes Ltda
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Protende Sist E Metodos De Construcoes Ltda filed Critical Protende Sist E Metodos De Construcoes Ltda
Publication of CL2017002524A1 publication Critical patent/CL2017002524A1/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H12/00Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H12/00Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
    • E04H12/18Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures movable or with movable sections, e.g. rotatable or telescopic
    • E04H12/182Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures movable or with movable sections, e.g. rotatable or telescopic telescopic
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H12/00Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
    • E04H12/02Structures made of specified materials
    • E04H12/12Structures made of specified materials of concrete or other stone-like material, with or without internal or external reinforcements, e.g. with metal coverings, with permanent form elements
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H12/00Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
    • E04H12/22Sockets or holders for poles or posts
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H12/00Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
    • E04H12/22Sockets or holders for poles or posts
    • E04H12/2253Mounting poles or posts to the holder
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H12/00Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
    • E04H12/34Arrangements for erecting or lowering towers, masts, poles, chimney stacks, or the like
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/70Wind energy
    • Y02E10/728Onshore wind turbines

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Chemical & Material Sciences (AREA)
  • Materials Engineering (AREA)
  • Wood Science & Technology (AREA)
  • Wind Motors (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

<p>DICHA TORRE ESTANDO COMPUESTA POR LA SUPERPOSICIÓN DE UN PRIMER Y UN SEGUNDO SEGMENTOS DE TORRE, CADA SEGMENTO DE TORRE ESTANDO FORMADO POR EL APILAMIENTO DE POR LO MENOS DOS TRAMOS CILÍNDRICOS DE DISTINTOS DIÁMETROS Y AL MENOS UN TRAMO TRONCOCÓNICO ENTRE DICHOS TRAMOS CILÍNDRICOS; EL MÉTODO DE MONTAJE DE LA TORRE COMPRENDE DOS ETAPAS, LA PRIMERA CONSISTE EN LA  CONSTRUCCIÓN CONCÉNTRICA DE LOS DOS DICHOS SEGMENTOS DE TORRE Y LA SEGUNDA EN LA ELEVACIÓN DEL SEGMENTO DE TORRE INTERNO, QUE QUEDA SOPORTADO POR EL SEGMENTO DE TORRE EXTERIOR, DONDE LA UNIÓN ENTRE DICHOS SEGMENTOS DE TORRE ES PROPORCIONADA POR UN NUDO DOBLE DE COMPORTAMIENTO INVERSO.</p><p> SUCH TOWER BEING COMPOSED BY THE SUPERPOSITION OF A FIRST AND A SECOND TOWER SEGMENTS, EACH TOWER SEGMENT BEING FORMED BY THE STACKING OF AT LEAST TWO CYLINDRICAL SECTIONS OF DIFFERENT DIAMETERS AND AT LEAST A THREE-DUTY THREE-DUTY BALANCE; THE METHOD OF ASSEMBLY OF THE TOWER INCLUDES TWO STAGES, THE FIRST CONSISTS IN THE CONCENTRIC CONSTRUCTION OF THE TWO SUCH TOWER SEGMENTS AND THE SECOND IN THE ELEVATION OF THE INTERNAL TOWER SEGMENT, WHICH IS SUPPORTED BY THE EXTERNAL TOWER SEGMENT, WHERE THE UN BETWEEN SUCH TOWER SEGMENTS IS PROVIDED BY A DOUBLE REVERSE BEARING KNOT. </p>

CL2017002524A 2016-10-11 2017-10-06 Structural concrete tower and mounting method. CL2017002524A1 (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
BR102016023743-2A BR102016023743B1 (en) 2016-10-11 2016-10-11 STRUCTURAL CONCRETE TOWER AND ASSEMBLY METHOD

Publications (1)

Publication Number Publication Date
CL2017002524A1 true CL2017002524A1 (en) 2018-02-16

Family

ID=61597930

Family Applications (1)

Application Number Title Priority Date Filing Date
CL2017002524A CL2017002524A1 (en) 2016-10-11 2017-10-06 Structural concrete tower and mounting method.

Country Status (7)

Country Link
CN (1) CN107916816A (en)
AR (1) AR109928A1 (en)
BR (1) BR102016023743B1 (en)
CL (1) CL2017002524A1 (en)
CO (1) CO2017005837A1 (en)
PE (1) PE20180768A1 (en)
WO (1) WO2018068117A1 (en)

Families Citing this family (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
ES2728789B2 (en) * 2018-04-25 2020-03-03 Esteyco S A MOBILE MODULE FOR LIFTING TELESCOPIC TOWERS AND LIFTING PROCEDURE FOR TELESCOPIC TOWERS
ES2761748A1 (en) * 2018-11-19 2020-05-20 Nabrawind Tech Sl Foundation for a wind turbine tower (Machine-translation by Google Translate, not legally binding)
CN111287905B (en) * 2018-12-06 2024-04-19 上海风领新能源有限公司 Tower drum
CN109930892A (en) * 2019-03-19 2019-06-25 中国电建集团华东勘测设计研究院有限公司 A kind of pre-tensioning system fragment prefabricated prestressing concrete tower structure
CN110877190B (en) * 2019-09-22 2024-10-29 中铁宝桥集团有限公司 Machining process for large-section low-profile single-box multi-chamber steel tower end face
CN111576978B (en) * 2020-04-03 2021-11-09 国网浙江省电力有限公司湖州供电公司 Transmission line drilling tower
CN112240128B (en) * 2020-08-28 2022-02-22 浙江德宝通讯科技股份有限公司 Tower support base and communication tower
WO2024189253A2 (en) * 2023-03-14 2024-09-19 Tenllado Infraestructuras, S.L. Tubular tower with decreasing cross-section
CN119392748A (en) * 2025-01-02 2025-02-07 浙江华东新能科技有限公司 A wind power tower beach foundation and construction method thereof

Family Cites Families (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0645977B2 (en) * 1988-01-27 1994-06-15 株式会社大林組 Lift up or down construction method
DE10126912A1 (en) * 2001-06-01 2002-12-19 Oevermann Gmbh & Co Kg Hoch Un Prestressed concrete tower structure
CN101855416B (en) * 2007-10-09 2013-07-31 杰弗里·O·威利斯 Tower structure and its assembly method
BR112012000808A2 (en) * 2009-07-13 2016-02-23 Vsl Int Ag telescopic tower assembly and method
ES2407756B1 (en) * 2011-12-09 2014-06-10 Esteyco Energía S.L. ASSEMBLY PROCEDURE OF A TELESCOPIC TOWER
ES2407779B1 (en) * 2011-12-09 2014-09-02 Esteyco Energía S.L. ASSEMBLY PROCEDURE OF A TELESCOPIC TOWER AND MEANS TO IMPLEMENT SUCH PROCEDURE
ES2407780B1 (en) * 2011-12-09 2014-09-05 Esteyco Energía S.L. ASSEMBLY OF HORIZONTAL BOARD BETWEEN TWO TELESCOPIC PORTIONS OF AEROGENERATOR TOWER AND ITS INSTALLATION PROCEDURE
WO2016119035A1 (en) * 2015-01-30 2016-08-04 Proacqua Construções E Comércio Ltda. Structural material tower and assembly method

Also Published As

Publication number Publication date
BR102016023743A2 (en) 2018-05-02
AR109928A1 (en) 2019-02-06
CO2017005837A1 (en) 2017-12-15
PE20180768A1 (en) 2018-05-07
WO2018068117A1 (en) 2018-04-19
BR102016023743B1 (en) 2022-11-29
CN107916816A (en) 2018-04-17

Similar Documents

Publication Publication Date Title
PE20180768A1 (en) STRUCTURAL CONCRETE TOWER AND MOUNTING METHOD
CL2021000828A1 (en) Sensor positioning system
CL2021000432A1 (en) Insulating and insulating frame apparatus and methods of manufacture and use thereof
BR112016018088A8 (en) METHOD OF ASSEMBLY OF PLATFORMS OF A FLOATING WIND TURBINE
AR111135A1 (en) RESUME OF SECURE NETWORK CONNECTION
AR096454A1 (en) CHANGING THE MOBILE COMMUNICATION SYSTEM
TR201905729T4 (en) The scaffolding containing the scaffold retainer holder and the use of an opening in a pier mast.
CL2016000604A1 (en) A method and system to determine maintenance needs in an alarm system.
CL2015001487U1 (en) One-axis solar tracker comprising an elongated structure on which a plurality of solar panels are coplanarly installed.
MX2019009637A (en) CRUCIFORM TOWER.
MX2017003811A (en) Open hole drilling magnet.
ES1206561Y (en) WIND TURBINE BEARING SYSTEM
ECSP21011903A (en) A SYSTEM AND A PROCEDURE FOR CONSTRUCTION OF A ROAD
CO2018007353A2 (en) Enhanced labeling of polymeric containers
MX2018010959A (en) Rotor assembly and method of manufacturing.
DK3312416T3 (en) WINDMILL TOWER ON FOUNDATION
MX2016000410A (en) METHOD FOR MANUFACTURING OF PREFABRICATED CONCRETE TOWER OF WIND TURBINE, AND FORMWORK OF PREFABRICATED TOWER SEGMENT.
ES1211939Y (en) ONE LOAD LIFTING TOWER WITH SAFETY SYSTEM
MX2017004355A (en) Bearing arrangement for a deep drilling device.
AR099889A1 (en) WIRE RING NETWORK AND METHOD FOR CARRYING OUT
ES1189058Y (en) Rotor, transmission and pickup system that optimizes the vertical axis wind turbine
CL2017000509A1 (en) Bearing assembly with safety bushing and axial clamping of the outer ring.
MX2020003745A (en) Photovoltaic plant with panel support structure.
CL2012001524A1 (en) Lifting system of a telescopic structure made up of a plurality of bodies, of those used in wind turbine supports over the sea, which need to raise their height, which comprises hydraulic means that are screwed alternately on the external part of each body of the structure as it is hoisted.
BR112018068650A2 (en) pressure detection system