CN100359103C - 在混凝土切割单元内充填注浆材料的方法 - Google Patents
在混凝土切割单元内充填注浆材料的方法 Download PDFInfo
- Publication number
- CN100359103C CN100359103C CNB200510029202XA CN200510029202A CN100359103C CN 100359103 C CN100359103 C CN 100359103C CN B200510029202X A CNB200510029202X A CN B200510029202XA CN 200510029202 A CN200510029202 A CN 200510029202A CN 100359103 C CN100359103 C CN 100359103C
- Authority
- CN
- China
- Prior art keywords
- plastic composite
- concrete
- composite material
- cutting unit
- filling
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Landscapes
- Working Measures On Existing Buildindgs (AREA)
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
Abstract
本发明涉及在高炉大修时高炉炉底的混凝土基础的切割单元完成后,对切割单元充填注浆材料的一种工艺方法。一种在混凝土切割单元内充填注浆材料的方法,其特征是:(1)将铝塑复合材料囊放入切割单元混凝土缝内,在切割单元外面,铝塑复合材料囊的两端装有橡胶垫,橡胶垫外侧一端为进灌嘴,另一端为出浆嘴;(2)进灌嘴连接进浆管,出浆嘴连接回浆管;(3)进浆管和回浆管接灌浆系统;(4)操作时对铝塑复合材料囊采用高压注浆法将充填材料注入铝塑复合材料囊中,使铝塑复合材料囊压附在混凝土缝内表面,将充填材料与混凝土隔离。本发明将充填材料注入铝塑复合材料囊充填切割单元内,硬化后与混凝土容易脱离,并能支撑高炉炉体正常运行。
Description
(一)技术领域
本发明涉及在高炉大修时高炉炉底的混凝土基础的切割单元完成后,对切割单元充填注浆材料的一种工艺方法。
(二)背景技术
在高炉大修时为缩短工程周期,提出了一种在高炉正常生产条件下,先将基础圆台部分横向切断,高炉停产后在短时间内将切断部分推出,然后在规定时间内完成剩余基础的改造。因此在高炉炉底的解体过程中,需对混凝土基础的各个单元进行切割,切割单元完成切割后需用充填材料进行回填,从而支撑高炉炉体进行正常生产。要完成切割单元,需要在混凝土基础上进行钻孔,并用金刚石绳索进行切割。对切割单元回填充填材料后的要求是充填材料硬化后应与混凝土基础容易分开,并能支撑高炉炉体正常运行。
(三)发明内容
本发明的目的在于提供一种在混凝土切割单元内充填注浆材料的方法,该方法将充填材料注入铝塑复合材料囊充填切割单元内,硬化后与混凝土容易脱离,并能支撑高炉炉体正常运行。
本发明是这样实现的:一种在混凝土切割单元内充填注浆材料的方法,其特征是:
(1)将铝塑复合材料囊放入切割单元混凝土缝内,在切割单元外面,铝塑复合材料囊的两端装有橡胶垫,橡胶垫外侧铝塑复合材料囊一端为进灌嘴,另一端为出浆嘴;
(2)进灌嘴连接进浆管,出浆嘴连接回浆管;
(3)进浆管和回浆管接灌浆系统;
(4)操作开始时对铝塑复合材料囊采用高压注浆法将充填材料注入铝塑复合材料囊中,使铝塑复合材料囊压附在混凝土缝内表面,将充填材料与混凝土隔离。
本发明是将充填材料注入铝塑复合材料囊充填切割单元内,铝塑复合材料囊将充填材料与混凝土基础隔开,形成剥离面,充填材料硬化后能支撑高炉炉体的正常运行,不影响高炉的正常生产。待高炉停产大修时,将切断单元上部分的高炉基础和高炉炉体推出,就可对剩余基础进行扩容改造,可大大缩短大修工期。
(四)附图说明
下面结合附图和具体实施方式对本发明作进一步说明。
图1为在混凝土切割单元内充填注浆材料的方法示意图;
图2为在混凝土切割单元内充填注浆材料的侧视图。
图中:1铝塑复合材料囊,2进灌嘴,3出浆嘴,4橡胶垫,5单元划分钻孔,6混凝土,7充填材料。
(五)具体实施方式
参见图1、图2,一种在混凝土切割单元内充填注浆材料的方法,其步骤是:
(1)将铝塑复合材料囊1放入切割单元混凝土6缝内,切割单元混凝土6缝内可并列放三个铝塑复合材料囊1;在切割单元外面,铝塑复合材料囊1的两端装有橡胶垫4,橡胶垫4外侧铝塑复合材料囊1一端为进灌嘴2,另一端为出浆嘴3;
(2)进灌嘴2连接进浆管,出浆嘴3连接回浆管;
(3)进浆管和回浆管接灌浆系统;
(4)操作开始时对铝塑复合材料囊1采用高压注浆法将充填材料7注入铝塑复合材料囊1中,使铝塑复合材料囊1压附在混凝土6缝内表面,将充填材料7与混凝土6隔离。同时也解决了流动界面粗糙的问题。
灌浆系统应做到:浆液应能自下而上均匀地灌注到整个混凝土缝;注浆管路和出浆设施与缝面应畅通;注浆管路应顺直、畅通、少弯头。
注浆管路中的进灌嘴2及出浆嘴3与铝塑复合材料囊1应用压联结方式并密封;出浆嘴3和排气嘴的四周应与基墩紧贴,安装牢固。
对充填材料7的要求是:速凝、高强,在10至24小时抗压强度达30MPa;超自流态易充填,过流高差小于4厘米;无收缩,骨料粒度小于1毫米,易剥离,微膨胀,竖向自由膨胀率最大0.5‰,可操作时间大于40分钟。
Claims (1)
1.一种在混凝土切割单元内充填注浆材料的方法,其特征是:
(1)将铝塑复合材料囊放入切割单元混凝土缝内,在切割单元外面,铝塑复合材料囊的两端装有橡胶垫,橡胶垫外侧铝塑复合材料囊一端为进灌嘴,另一端为出浆嘴;
(2)进灌嘴连接进浆管,出浆嘴连接回浆管;
(3)进浆管和回浆管接灌浆系统;
(4)操作开始时对铝塑复合材料囊采用高压注浆法将充填材料注入铝塑复合材料囊中,使铝塑复合材料囊压附在混凝土缝内表面,将充填材料与混凝土隔离。
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CNB200510029202XA CN100359103C (zh) | 2005-08-30 | 2005-08-30 | 在混凝土切割单元内充填注浆材料的方法 |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CNB200510029202XA CN100359103C (zh) | 2005-08-30 | 2005-08-30 | 在混凝土切割单元内充填注浆材料的方法 |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CN1779084A CN1779084A (zh) | 2006-05-31 |
| CN100359103C true CN100359103C (zh) | 2008-01-02 |
Family
ID=36769535
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CNB200510029202XA Expired - Lifetime CN100359103C (zh) | 2005-08-30 | 2005-08-30 | 在混凝土切割单元内充填注浆材料的方法 |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN100359103C (zh) |
Citations (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPH1096005A (ja) * | 1996-09-20 | 1998-04-14 | Kawasaki Steel Corp | 高炉炉底部の解体方法 |
| JP2001081508A (ja) * | 1999-09-09 | 2001-03-27 | Sumitomo Metal Ind Ltd | 高炉の改修方法 |
| JP2001207204A (ja) * | 2000-01-25 | 2001-07-31 | Sumitomo Metal Ind Ltd | 高炉の改修方法 |
| JP2002339007A (ja) * | 2001-03-16 | 2002-11-27 | Nippon Steel Corp | 高炉炉底部の解体方法 |
| CN1399041A (zh) * | 2002-08-27 | 2003-02-26 | 上海隧道工程股份有限公司 | 沉管法隧道基础施工工艺 |
-
2005
- 2005-08-30 CN CNB200510029202XA patent/CN100359103C/zh not_active Expired - Lifetime
Patent Citations (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPH1096005A (ja) * | 1996-09-20 | 1998-04-14 | Kawasaki Steel Corp | 高炉炉底部の解体方法 |
| JP2001081508A (ja) * | 1999-09-09 | 2001-03-27 | Sumitomo Metal Ind Ltd | 高炉の改修方法 |
| JP2001207204A (ja) * | 2000-01-25 | 2001-07-31 | Sumitomo Metal Ind Ltd | 高炉の改修方法 |
| JP2002339007A (ja) * | 2001-03-16 | 2002-11-27 | Nippon Steel Corp | 高炉炉底部の解体方法 |
| CN1399041A (zh) * | 2002-08-27 | 2003-02-26 | 上海隧道工程股份有限公司 | 沉管法隧道基础施工工艺 |
Also Published As
| Publication number | Publication date |
|---|---|
| CN1779084A (zh) | 2006-05-31 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN107762532B (zh) | 隧道拱顶带模注浆施工方法 | |
| CN101666234B (zh) | 破碎岩体无止浆墙复合式注浆施工方法 | |
| CN207647522U (zh) | 一种可重复使用的伸缩式临时钢架仰拱结构 | |
| CN108035439A (zh) | 一种快速混凝土装配式节点及其施工方法 | |
| CN103452332A (zh) | 一种建筑工程楼板裂缝修补方法 | |
| CN108252726A (zh) | 预防隧道二次衬砌拱顶脱空的装置及其施工方法 | |
| CN206888995U (zh) | 一种隧道台车辅助注浆装置 | |
| CN103498687A (zh) | 一种注浆锚杆的封孔装置及方法 | |
| CN101435192A (zh) | 一种新老混凝土结合施工方法 | |
| CN209115120U (zh) | 一种暗挖结构二衬混凝土拱顶防脱空装置 | |
| CN107587884A (zh) | 隧道二衬混凝土拱顶回填注浆装置 | |
| US20080110640A1 (en) | Process for Setting Anchors and Anchor Which Can Be Used in This Process | |
| CN100359103C (zh) | 在混凝土切割单元内充填注浆材料的方法 | |
| CN110499743A (zh) | 一种覆膜胶凝砂砾石坝及其建造方法 | |
| CN106498929B (zh) | 注浆管及混凝土缺陷修补方法 | |
| CN113294008A (zh) | 一种建筑裂缝修补方法 | |
| CN110359932B (zh) | 一种二衬拱顶注浆管组件及其注浆施工方法 | |
| CN212337227U (zh) | 一种瓦斯抽采钻孔高压循环注浆封孔装置 | |
| CN210767339U (zh) | 一种套筒出浆管定位模具及便于检查灌浆质量的墙体 | |
| CN108755776A (zh) | 一种地下结构底板漏水综合处理装置及其处理方法 | |
| CN112709195A (zh) | 一种用于堆石坝砼面板结构缝止水修复及空腔回填的方法 | |
| CN210317339U (zh) | 一种二衬拱顶注浆管组件 | |
| CN103224345A (zh) | 能自愈合的混凝土结构体 | |
| CN210660138U (zh) | 一种高铁隧道动态环境下的渗漏水处理装置 | |
| CN104929314B (zh) | 牛腿柱混凝土施工方法 |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C06 | Publication | ||
| PB01 | Publication | ||
| C10 | Entry into substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| C56 | Change in the name or address of the patentee |
Owner name: SHANGHAI BAOYE GROUP CORP., LTD. Free format text: FORMER NAME: BAOYE CONSTRUCTION CO., LTD., SHANGHAI |
|
| CP03 | Change of name, title or address |
Address after: 200941 Fuyuan Road, Shanghai, No. 2457, No. Patentee after: SHANGHAI BAOYE GROUP Corp.,Ltd. Address before: 200941 Shanghai City, Baoshan District Road, No. four yuan, 168 Patentee before: SHANGHAI BAOYE GROUP Corp.,Ltd. |
|
| CX01 | Expiry of patent term |
Granted publication date: 20080102 |
|
| CX01 | Expiry of patent term |