CN102000427B - Vibration isometric multi-angle hammer ball specific-strength training and monitoring device - Google Patents

Vibration isometric multi-angle hammer ball specific-strength training and monitoring device Download PDF

Info

Publication number
CN102000427B
CN102000427B CN201010607356A CN201010607356A CN102000427B CN 102000427 B CN102000427 B CN 102000427B CN 201010607356 A CN201010607356 A CN 201010607356A CN 201010607356 A CN201010607356 A CN 201010607356A CN 102000427 B CN102000427 B CN 102000427B
Authority
CN
China
Prior art keywords
shaft
sleeve
vibration
monitoring device
casing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201010607356A
Other languages
Chinese (zh)
Other versions
CN102000427A (en
Inventor
夏国滨
李真真
齐骥
侯政治
罗中宽
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Harbin Normal University
Original Assignee
Harbin Normal University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Harbin Normal University filed Critical Harbin Normal University
Priority to CN201010607356A priority Critical patent/CN102000427B/en
Publication of CN102000427A publication Critical patent/CN102000427A/en
Application granted granted Critical
Publication of CN102000427B publication Critical patent/CN102000427B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Measurement Of Mechanical Vibrations Or Ultrasonic Waves (AREA)

Abstract

振动等长多角度链球专项力量训练及监控装置,它涉及一种链球专项力量训练及监控装置。针对链球专项力量训练缺乏振动等长多角度练习手段及监控手段问题。振动装置与第一、二下套管固接,高、矮立柱设置在第一、二下套管内,高立柱上套装有第一限位套、第一弹簧和第一上套管,矮立柱上套装有第二限位套、第二弹簧和第二上套管,斜拉梁与第一、二上套管铰接,连接部件与斜拉梁固接,轴套固装在连接部件中心孔内,齿轮安装轴设置在轴套内,阻力计顶靠在齿轮安装轴上,第一调速电机通过齿轮传动副将动力传递给齿轮安装轴,液压缸的活塞杆与拉力传感器固接,拉力传感器与背带固接。本发明用于链球专项等力量训练。

Figure 201010607356

The utility model relates to a hammer throw special strength training and monitoring device with vibration isometric and multi-angle, which relates to a hammer throw special strength training and monitoring device. Aiming at the special strength training of hammer throw, there is a lack of long-distance and multi-angle training methods such as vibration and monitoring methods. The vibrating device is fixedly connected with the first and second lower casings, the high and low columns are set in the first and second lower casings, the high column is covered with the first limit sleeve, the first spring and the first upper casing, and the short column The upper sleeve is equipped with the second limit sleeve, the second spring and the second upper sleeve, the cable-stayed beam is hinged with the first and second upper sleeves, the connecting part is fixedly connected with the cable-stayed beam, and the shaft sleeve is fixed in the central hole of the connecting part Inside, the gear installation shaft is set in the shaft sleeve, the resistance gauge is against the gear installation shaft, the first speed regulating motor transmits power to the gear installation shaft through the gear transmission pair, the piston rod of the hydraulic cylinder is fixedly connected to the tension sensor, and the tension sensor Fastened with strap. The invention is used for strength training such as hammer throw special.

Figure 201010607356

Description

振动等长多角度链球专项力量训练及监控装置Vibration isometric multi-angle hammer special strength training and monitoring device

技术领域 technical field

本发明涉及一种链球专项力量训练及监控装置。The invention relates to a hammer throw special strength training and monitoring device.

背景技术 Background technique

目前,链球专项力量训练采用的是等张(又称动力性)练习手段,如:持重物抡摆、投掷重物等,而对于等长(又称静力性)练习重视不够,手段欠缺,更缺少对运动员动作技术过程进行监控。研究表明,等张练习结合等长练习对于发展力量非常有效。有一种振动等长训练力量的新理论,用5Hz~26Hz的正弦曲线波振动对某个动作进行短暂的等长训练对发展力量非常有效。等长训练只对关节某个角度及其周围一个小的区域(±15°)的最大力量有效,为了提高整个关节运动幅度的肌肉最大力量,应在关节各个不同的角度上进行等长训练。使用爆发式等长收缩来发展肌肉的力产生的速度的能力,甚至比等张(动力性)练习对发展爆发力更为有效。At present, the hammer throw special strength training uses isotonic (also known as dynamic) exercises, such as: swinging with heavy objects, throwing heavy objects, etc., but not enough attention is paid to isometric (also called static) exercises, and the means are lacking. What's more, there is a lack of monitoring the technical process of athletes' movements. Research has shown that isotonic exercises combined with isometric exercises are very effective for developing strength. There is a new theory of vibration isometric training strength, using 5 Hz to 26 Hz sinusoidal wave vibration to perform short isometric training on an action is very effective for developing strength. Isometric training is only effective for the maximum strength of a certain angle of the joint and a small area (±15°) around it. In order to improve the maximum muscle strength of the entire joint range of motion, isometric training should be performed at different angles of the joint. The ability to use explosive isometric contractions to develop a muscle's force-generating velocity is even more effective for developing explosive power than isotonic (dynamic) exercises.

然而,能够很好地利用最新研究成果,符合现代高水平链球专项力量训练发展方向(即更接近专项动作的力量练习手段),利用运动员运动信息对运动员动作技术过程进行监控的振动等长多角度链球专项力量训练及监控装置国内国外还没有出现。However, it can make good use of the latest research results, conform to the development direction of modern high-level hammer throw special strength training (that is, strength training methods that are closer to special movements), and use athlete movement information to monitor the athlete's movement technical process. The vibration isometric multi-angle Hammer throw special strength training and monitoring device have not yet occurred at home and abroad.

发明内容 Contents of the invention

本发明的目的是根据运动生物力学、电子学、机械学等原理,提供一种振动等长多角度链球专项力量训练及监控装置,以解决链球专项力量训练缺乏振动等长多角度练习手段及监控手段的问题。The purpose of the present invention is to provide a vibration equal-length multi-angle hammer special strength training and monitoring device based on the principles of sports biomechanics, electronics, mechanics, etc., to solve the lack of vibration equal-length multi-angle exercise means and monitoring for the hammer special strength training The question of means.

本发明为解决上述技术问题采取的技术方案是:本发明所述训练及监控装置包括斜拉梁、第一弹簧、第二弹簧、两个上套管、两个下套管、两个限位套、两根立柱和多个顶丝;所述训练及监控装置还包括振动装置、拉力传感器、阻力计、连接部件、轴套、齿轮安装轴、第一调速电机、齿轮传动副、拉力显示器、压力传感器、压力显示器、垫板、连杆、连接套、背带、液压缸和油泵;两个立柱分别是高立柱和矮立柱,两个限位套分别是第一限位套和第二限位套,两个上套管分别是第一上套管和第二上套管,两个下套管分别是第一下套管和第二下套管;振动装置的上面板的上端面的左端与第一下套管的一端固接,振动装置的上面板的上端面的右端与第二下套管的一端固接,高立柱的下端设置在第一下套管内,矮立柱的下端设置在第二下套管内,拉力显示器固装在第二下套管上,压力显示器固装在第一下套管上,高立柱上由下至上套装有第一限位套、第一弹簧和第一上套管,矮立柱上由下至上依次套装有第二限位套、第二弹簧和第二上套管,第一下套管、第一限位套和第一上套管与高立柱之间以及第二下套管、第二限位套和第二上套管与矮立柱之间各分别通过顶丝固接;斜拉梁的两端与第一上套管和第二上套管铰接,连接部件设置在振动装置的上方且位于斜拉梁的下方,连接部件的上端与斜拉梁固接,连接部件的中部设有中心孔,轴套固装在连接部件的中心孔内,齿轮安装轴为L形,齿轮安装轴的一端设置在轴套内,阻力计安装在轴套的侧壁上,且阻力计的顶杆顶靠在齿轮安装轴上,齿轮安装轴的另一端与连杆的一端均设置在连接套的两端内,齿轮安装轴与连杆通过顶丝与连接套固接,连杆的另一端与压力传感器固接,第一调速电机的输出轴通过齿轮传动副将动力传递给齿轮安装轴,第一调速电机与斜拉梁固接,液压缸和油泵均固装在垫板上,垫板设置在振动装置的上面板的上端面上,垫板与振动装置的上面板可拆卸连接,油泵驱动液压缸的活塞杆伸缩,液压缸的活塞杆的外端与拉力传感器固接,拉力传感器与背带固接,拉力传感器的信号输出端与拉力显示器的信号输入端连接,压力传感器的信号输出端与压力显示器的信号输入端连接。The technical solution adopted by the present invention to solve the above technical problems is: the training and monitoring device of the present invention includes a cable-stayed beam, a first spring, a second spring, two upper bushings, two lower bushings, and two limiters. cover, two uprights and a plurality of top wires; the training and monitoring device also includes a vibration device, a tension sensor, a resistance gauge, a connecting part, a shaft sleeve, a gear installation shaft, a first speed regulating motor, a gear transmission pair, and a tension display , pressure sensor, pressure display, backing plate, connecting rod, connecting sleeve, strap, hydraulic cylinder and oil pump; the two columns are high column and short column, and the two limit sleeves are the first limit sleeve and the second limit sleeve respectively The two upper sleeves are respectively the first upper sleeve and the second upper sleeve, and the two lower sleeves are respectively the first lower sleeve and the second lower sleeve; the upper end surface of the upper panel of the vibrating device The left end is fixedly connected to one end of the first lower casing, the right end of the upper surface of the upper panel of the vibration device is fixedly connected to one end of the second lower casing, the lower end of the high column is set in the first lower casing, and the lower end of the short column is set In the second lower casing, the tension indicator is fixed on the second lower casing, the pressure indicator is fixed on the first lower casing, and the high column is fitted with the first limit sleeve, the first spring and the second lower casing from bottom to top. One upper sleeve, the lower column is sequentially fitted with the second limit sleeve, the second spring and the second upper sleeve, the first lower sleeve, the first limit sleeve, the first upper sleeve and the high column between the second lower sleeve, the second limit sleeve and the second upper sleeve and the short column respectively through jacking screws; both ends of the cable-stayed beam and the first upper sleeve and the second upper sleeve The pipe is hinged, the connecting part is set above the vibrating device and below the cable-stayed beam, the upper end of the connecting part is fixed to the cable-stayed beam, the middle part of the connecting part is provided with a central hole, and the bushing is fixed in the central hole of the connecting part , the gear installation shaft is L-shaped, one end of the gear installation shaft is set in the shaft sleeve, the resistance meter is installed on the side wall of the shaft sleeve, and the push rod of the resistance meter is against the gear installation shaft, the other end of the gear installation shaft One end of the connecting rod is set in both ends of the connecting sleeve, the gear installation shaft and the connecting rod are fixedly connected to the connecting sleeve through the top screw, the other end of the connecting rod is fixedly connected to the pressure sensor, and the output shaft of the first speed regulating motor passes through The gear transmission pair transmits the power to the gear installation shaft. The first speed-regulating motor is fixedly connected to the cable-stayed beam. Both the hydraulic cylinder and the oil pump are fixed on the backing plate. It is detachably connected to the upper panel of the vibrating device, the oil pump drives the piston rod of the hydraulic cylinder to expand and contract, the outer end of the piston rod of the hydraulic cylinder is fixedly connected to the tension sensor, the tension sensor is fixed to the strap, and the signal output end of the tension sensor is connected to the tension display. The signal input end is connected, and the signal output end of the pressure sensor is connected with the signal input end of the pressure display.

本发明的有益效果是:利用本发明的振动等长多角度链球专项力量训练及监控装置可以实现在一个能产生低频(5Hz~26Hz)正弦曲线波振动的机械平台上做等长的链球专项力量训练,由于振动的作用,使肌肉在一定长度范围内做小的拉长和缩短,随意收缩所能产生的最大张力与最大维持的张力都能增加,对提高链球专项肌肉力量是有效的。The beneficial effects of the present invention are: using the vibration equal-length multi-angle hammer special strength training and monitoring device of the present invention can realize equal-length hammer special strength on a mechanical platform that can generate low-frequency (5Hz-26Hz) sinusoidal wave vibration In training, due to the effect of vibration, the muscles are slightly elongated and shortened within a certain length range, and the maximum tension that can be generated by voluntary contraction and the maximum maintained tension can be increased, which is effective for improving the strength of hammer-throw special muscles.

使用爆发式等长收缩发展肌肉的力产生的速度的能力,甚至比等张练习发展链球专项肌肉力量更为有效。在链球最后用力各个不同角度上进行等长训练,可以提高链球整个最后用力关节运动幅度的肌肉最大力量。The ability to use explosive isometric contractions to develop a muscle's force-generating velocity is even more effective than isotonic exercises for developing hammer-specific muscle strength. Performing isometric training at different angles of the hammer final force can improve the maximum muscle strength of the entire final force joint movement range of the hammer throw.

采用经过专门设计的更接近专项动作等长力量练习手段训练效果更为显著。The effect of using specially designed isometric strength exercises that are closer to special movements is more significant.

使用压力传感器和拉力传感器,通过压力显示器和拉力显示器可以监测链球最后用力的大小及运动时,可以对练习者动作技术过程进行实时有效地监控。Using the pressure sensor and the tension sensor, the pressure display and the tension display can monitor the final force and movement of the hammer, and can effectively monitor the practitioner's technical process in real time.

附图说明 Description of drawings

图1是本发明的主视结构图,图2是垫板与振动装置的上面板装配在一起的俯视图,图3是振动装置的俯视图(上面板及第三弹簧未画出)。Fig. 1 is the front structural view of the present invention, and Fig. 2 is the plan view that backing plate and the upper panel of vibrating device are assembled together, and Fig. 3 is the plan view of vibrating device (upper panel and the 3rd spring are not drawn).

具体实施方式 Detailed ways

具体实施方式一:结合图1~图3说明本实施方式,本实施方式所述训练及监控装置包括斜拉梁1、第一弹簧2、第二弹簧3、两个上套管、两个下套管、两个限位套、两根立柱和多个顶丝23;所述训练及监控装置还包括振动装置15、拉力传感器4、阻力计5、连接部件6、轴套7、齿轮安装轴8、第一调速电机10、齿轮传动副11、拉力显示器9、压力传感器27、压力显示器28、垫板29、连杆12、连接套30、背带22、液压缸24和油泵25;两个立柱分别是高立柱13和矮立柱14,两个限位套分别是第一限位套21和第二限位套16,两个上套管分别是第一上套管17和第二上套管18,两个下套管分别是第一下套管19和第二下套管20;振动装置15的上面板15-1的上端面的左端与第一下套管19的一端固接,振动装置15的上面板15-1的上端面的右端与第二下套管20的一端固接,高立柱13的下端设置在第一下套管19内,矮立柱14的下端设置在第二下套管20内,拉力显示器9固装在第二下套管20上,压力显示器28固装在第一下套管19上,高立柱13上由下至上套装有第一限位套21、第一弹簧2和第一上套管17,矮立柱14上由下至上依次套装有第二限位套16、第二弹簧3和第二上套管18,第一下套管19、第一限位套21和第一上套管17与高立柱13之间以及第二下套管20、第二限位套16和第二上套管18与矮立柱14之间各分别通过顶丝23固接;斜拉梁1的两端与第一上套管17和第二上套管18铰接,连接部件6设置在振动装置15的上方且位于斜拉梁1的下方,连接部件6的上端与斜拉梁1固接,连接部件6的中部设有中心孔,轴套7固装在连接部件6的中心孔内,齿轮安装轴8为L形,齿轮安装轴8的一端设置在轴套7内,阻力计5安装在轴套7的侧壁上,且阻力计5的顶杆顶靠在齿轮安装轴8上,齿轮安装轴8的另一端与连杆12的一端均设置在连接套30的两端内,齿轮安装轴8与连杆12通过顶丝23与连接套30固接,连杆12的另一端与压力传感器27固接,第一调速电机10的输出轴通过齿轮传动副11(即两个相互啮合的齿轮)将动力传递给齿轮安装轴8,第一调速电机10与斜拉梁1固接,液压缸24和油泵25均固装在垫板29上,垫板29设置在振动装置15的上面板15-1的上端面上,垫板29与振动装置15的上面板15-1可拆卸连接(本实施方式中,振动装置15的上面板15-1上设有多个螺纹孔,垫板29上设有多个连接孔,如此设置,便于调整垫板29在振动装置15的上面板15-1上的位置。本实施方式中的垫板29与振动装置15的上面板15-1通过螺栓可拆卸连接),油泵25驱动液压缸24的活塞杆24-1伸缩,液压缸24的活塞杆24-1的外端与拉力传感器4固接,拉力传感器4与背带22固接,拉力传感器4的信号输出端与拉力显示器9的信号输入端连接,压力传感器27的信号输出端与压力显示器28的信号输入端连接。Specific Embodiment 1: This embodiment will be described with reference to FIGS. 1 to 3. The training and monitoring device described in this embodiment includes a cable-stayed beam 1, a first spring 2, a second spring 3, two upper sleeves, and two lower Sleeve, two limit sleeves, two uprights and a plurality of top screws 23; the training and monitoring device also includes a vibration device 15, a tension sensor 4, a resistance meter 5, a connecting part 6, a shaft sleeve 7, and a gear installation shaft 8. The first speed regulating motor 10, gear transmission pair 11, tension indicator 9, pressure sensor 27, pressure indicator 28, backing plate 29, connecting rod 12, connecting sleeve 30, strap 22, hydraulic cylinder 24 and oil pump 25; two The columns are high columns 13 and short columns 14 respectively, the two spacer sleeves are the first spacer sleeve 21 and the second spacer sleeve 16 respectively, and the two upper sleeves are the first upper sleeve 17 and the second upper sleeve respectively Pipe 18, the two lower casings are respectively the first lower casing 19 and the second lower casing 20; The right end of the upper end surface of the upper panel 15-1 of the vibration device 15 is affixed to an end of the second lower casing 20, the lower end of the high column 13 is arranged in the first lower casing 19, and the lower end of the short column 14 is arranged in the second lower casing. In the lower casing 20, the tension indicator 9 is fixed on the second lower casing 20, the pressure indicator 28 is fixed on the first lower casing 19, and the high column 13 is fitted with a first stopper 21, The first spring 2 and the first upper sleeve 17, the short column 14 is sequentially set with the second limit sleeve 16, the second spring 3 and the second upper sleeve 18, the first lower sleeve 19, the first Between the limit sleeve 21 and the first upper sleeve 17 and the high column 13, and between the second lower sleeve 20, the second limit sleeve 16, the second upper sleeve 18 and the short column 14, respectively pass the top wire 23 fixed connection; the two ends of the cable-stayed beam 1 are hinged with the first upper casing 17 and the second upper casing 18, the connecting part 6 is arranged above the vibrating device 15 and below the cable-stayed beam 1, and the upper end of the connecting part 6 It is fixedly connected with the cable-stayed beam 1, the middle part of the connecting part 6 is provided with a central hole, the bushing 7 is fixed in the central hole of the connecting part 6, the gear installation shaft 8 is L-shaped, and one end of the gear installation shaft 8 is set on the bushing 7, the resistance meter 5 is installed on the side wall of the shaft sleeve 7, and the push rod of the resistance meter 5 is against the gear installation shaft 8, and the other end of the gear installation shaft 8 and one end of the connecting rod 12 are all arranged on the connecting sleeve 30, the gear installation shaft 8 and the connecting rod 12 are fixedly connected to the connecting sleeve 30 through the top screw 23, the other end of the connecting rod 12 is fixedly connected to the pressure sensor 27, and the output shaft of the first speed regulating motor 10 is driven by the gear The pair 11 (i.e. two gears meshing with each other) transmits the power to the gear installation shaft 8, the first speed regulating motor 10 is fixedly connected to the cable-stayed beam 1, the hydraulic cylinder 24 and the oil pump 25 are all fixedly mounted on the backing plate 29, and the backing plate 29 The plate 29 is arranged on the upper end face of the upper panel 15-1 of the vibrating device 15, and the backing plate 29 is detachably connected with the upper panel 15-1 of the vibrating device 15 (in this embodiment, the upper panel 15-1 of the vibrating device 15 Provided with multiple threaded holes, on the backing plate 29 A plurality of connection holes are provided, so that the position of the backing plate 29 on the upper panel 15 - 1 of the vibrating device 15 can be adjusted conveniently. The backing plate 29 in this embodiment is detachably connected to the upper panel 15-1 of the vibrating device 15 by bolts), the oil pump 25 drives the piston rod 24-1 of the hydraulic cylinder 24 to expand and contract, and the outer surface of the piston rod 24-1 of the hydraulic cylinder 24 end is affixed to the tension sensor 4, the tension sensor 4 is affixed to the strap 22, the signal output end of the tension sensor 4 is connected to the signal input end of the tension display 9, and the signal output end of the pressure sensor 27 is connected to the signal input end of the pressure display 28 .

具体实施方式二:结合图1和图3说明,本实施方式所述振动装置15包括上面板15-1、底座15-2、第二调速电机15-3、第一带传动机构15-4、第二带传动机构15-5、过渡轴15-6、偏心轴15-7、两个第一轴座15-8、两个第二轴座15-9、两个偏心轴套15-10和两个支柄15-11;上面板15-1位于底座15-2的正上方,第二调速电机15-3固装在底座15-2的上端面上,第二调速电机15-3的输出轴通过第一带传动机构15-4将动力传递给过渡轴15-6,过渡轴15-6的两端各套装有一个与其转动连接的第一轴座15-8,过渡轴15-6通过第二带传动机构15-5将动力传递给偏心轴15-7,偏心轴15-7上套装有两个与其转动连接的偏心轴套15-10,两个支柄15-11与两个偏心轴套15-10一一对应设置,每个支柄15-11的一端与偏心轴套15-10的外侧壁固接,每个支柄15-11的另一端与上面板15-1的下端面固接,两个支柄15-11相对于振动装置15的竖直方向的中心线对称设置,两个第一轴座15-8和两个第二轴座15-9均分别与底座15-2的上端面固接。如此设置,结构简单、工作安全可靠。其它与具体实施方式一相同。Specific Embodiment 2: In conjunction with Fig. 1 and Fig. 3, the vibrating device 15 in this embodiment includes an upper panel 15-1, a base 15-2, a second speed regulating motor 15-3, and a first belt transmission mechanism 15-4 , the second belt transmission mechanism 15-5, transition shaft 15-6, eccentric shaft 15-7, two first shaft seats 15-8, two second shaft seats 15-9, two eccentric shaft sleeves 15-10 and two support handles 15-11; the upper panel 15-1 is located directly above the base 15-2, the second speed regulating motor 15-3 is fixed on the upper end surface of the base 15-2, and the second speed regulating motor 15-2 The output shaft of 3 transmits power to the transition shaft 15-6 through the first belt transmission mechanism 15-4, and the two ends of the transition shaft 15-6 are respectively sleeved with a first shaft seat 15-8 connected to it in rotation, and the transition shaft 15 -6 transmits power to the eccentric shaft 15-7 through the second belt transmission mechanism 15-5, and the eccentric shaft 15-7 is sleeved with two eccentric shaft sleeves 15-10 that are rotationally connected with it, and the two support handles 15-11 and Two eccentric shaft sleeves 15-10 are provided in one-to-one correspondence, one end of each support handle 15-11 is fixedly connected to the outer side wall of the eccentric shaft sleeve 15-10, and the other end of each support handle 15-11 is connected to the upper panel 15-10. The lower end surface of 1 is fixedly connected, and the two support handles 15-11 are arranged symmetrically with respect to the vertical center line of the vibration device 15, and the two first shaft seats 15-8 and the two second shaft seats 15-9 are respectively It is affixed to the upper end surface of the base 15-2. With such arrangement, the structure is simple, and the work is safe and reliable. Others are the same as in the first embodiment.

具体实施方式三:结合图1说明,本实施方式所述振动装置15还包括两个第三弹簧15-12;上面板15-1下端面的左端和右端各固定装有一个第三弹簧15-12,两个第三弹簧15-12的下端设置在地面上。如此设置,可提高振动装置15工作的可靠性。其它与具体实施方式二相同。Specific embodiment three: In conjunction with Fig. 1, the vibrating device 15 in this embodiment also includes two third springs 15-12; the left end and the right end of the lower end surface of the upper panel 15-1 are respectively fixed with a third spring 15-12. 12. The lower ends of the two third springs 15-12 are set on the ground. Such arrangement can improve the working reliability of the vibrating device 15 . Others are the same as in the second embodiment.

具体实施方式四:结合图1说明,本实施方式所述训练及监控装置还包括量角器26;量角器26与第二上套管18的左侧壁固接,斜拉梁1与量角器26相贴靠。如此设置,便于测量斜拉梁1的倾斜角度。其它与具体实施方式一相同。Specific embodiment four: In conjunction with Fig. 1 description, the training and monitoring device described in this embodiment also includes a protractor 26; . Such setting facilitates the measurement of the inclination angle of the cable-stayed beam 1 . Others are the same as in the first embodiment.

本发明中的拉力传感器、阻力计、拉力显示器、调速电机、液压缸、油泵、压力传感器和压力显示器均外购。In the present invention, tension sensor, resistance meter, tension indicator, speed regulating motor, hydraulic cylinder, oil pump, pressure sensor and pressure indicator are all outsourced.

训练过程:将阻力计调整至练习者本人的力量极限,将斜拉梁调整至42°(适宜链球的出手角度为42°),压力传感器调整至练习者链球投掷最后用力预备姿势投掷双臂手的位置,之后,练习者用双手握住压力传感器,液压缸的活塞杆的高度调整至适当的位置(根据练习者的身高确定),背带套在练习者的肩部,练习者成链球投掷最后用力的预备姿势,此时,启动振动装置振动。Training process: adjust the resistance meter to the strength limit of the practitioner himself, adjust the cable-stayed beam to 42° (42° is suitable for the shot angle of the hammer throw), adjust the pressure sensor to the point where the practitioner throws the hammer throw, and finally throws both arms in the preparation position. After that, the practitioner holds the pressure sensor with both hands, adjusts the height of the piston rod of the hydraulic cylinder to an appropriate position (determined according to the height of the practitioner), puts the strap on the shoulder of the practitioner, and finally throws the hammer into the Preparing posture vigorously, at this time, start the vibrating device to vibrate.

练习者爆发式等长链球最后用力,在进行短暂的最后用力后(时间为3s~4s),启动第一调速电机工作,齿轮传动副使齿轮安装轴、连杆及压力传感器逆时针转动约30°(以用手投掷为例),同时液压缸工作,液压缸的活塞杆伸出适当距离(根据练习者身高确定),在此位置上进行第二次爆发式等长最后用力,如此进行直至完成链球的最后用力动作。The practitioner exerts the final force in the explosive isometric chain ball. After a brief final force (3s to 4s), the first speed-regulating motor is started to work, and the gear transmission pair makes the gear installation shaft, connecting rod and pressure sensor rotate counterclockwise for about 30° (take throwing by hand as an example), while the hydraulic cylinder is working, the piston rod of the hydraulic cylinder extends an appropriate distance (determined according to the height of the practitioner), and at this position, perform the second explosive isometric and finally exert force, and so on Until the final hard action of the hammer is completed.

在练习中,通过压力显示器及拉力显示器实时显示练习者在练习过程中的用力大小及运动时,对训练过程进行实时监控。During the exercise, the pressure monitor and tension monitor are used to display the practitioner's strength and movement during the exercise in real time, and to monitor the training process in real time.

Claims (4)

1.一种振动等长多角度链球专项力量训练及监控装置,所述训练及监控装置包括斜拉梁(1)、第一弹簧(2)、第二弹簧(3)、两个上套管、两个下套管、两个限位套、两根立柱和多个顶丝(23);其特征在于:所述训练及监控装置还包括振动装置(15)、拉力传感器(4)、阻力计(5)、连接部件(6)、轴套(7)、齿轮安装轴(8)、第一调速电机(10)、齿轮传动副(11)、拉力显示器(9)、压力传感器(27)、压力显示器(28)、垫板(29)、连杆(12)、连接套(30)、背带(22)、液压缸(24)和油泵(25);两个立柱分别是高立柱(13)和矮立柱(14),两个限位套分别是第一限位套(21)和第二限位套(16),两个上套管分别是第一上套管(17)和第二上套管(18),两个下套管分别是第一下套管(19)和第二下套管(20);振动装置(15)的上面板(15-1)的上端面的左端与第一下套管(19)的一端固接,振动装置(15)的上面板(15-1)的上端面的右端与第二下套管(20)的一端固接,高立柱(13)的下端设置在第一下套管(19)内,矮立柱(14)的下端设置在第二下套管(20)内,拉力显示器(9)固装在第二下套管(20)上,压力显示器(28)固装在第一下套管(19)上,高立柱(13)上由下至上套装有第一限位套(21)、第一弹簧(2)和第一上套管(17),矮立柱(14)上由下至上依次套装有第二限位套(16)、第二弹簧(3)和第二上套管(18),第一下套管(19)、第一限位套(21)和第一上套管(17)与高立柱(13)之间以及第二下套管(20)、第二限位套(16)和第二上套管(18)与矮立柱(14)之间各分别通过顶丝(23)固接;斜拉梁(1)的两端与第一上套管(17)和第二上套管(18)铰接,连接部件(6)设置在振动装置(15)的上方且位于斜拉梁(1)的下方,连接部件(6)的上端与斜拉梁(1)固接,连接部件(6)的中部设有中心孔,轴套(7)固装在连接部件(6)的中心孔内,齿轮安装轴(8)为L形,齿轮安装轴(8)的一端设置在轴套(7)内,阻力计(5)安装在轴套(7)的侧壁上,且阻力计(5)的顶杆顶靠在齿轮安装轴(8)上,齿轮安装轴(8)的另一端与连杆(12)的一端均设置在连接套(30)的两端内,齿轮安装轴(8)与连杆(12)通过顶丝(23)与连接套(30)固接,连杆(12)的另一端与压力传感器(27)固接,第一调速电机(10)的输出轴通过齿轮传动副(11)将动力传递给齿轮安装轴(8),第一调速电机(10)与斜拉梁(1)固接,液压缸(24)和油泵(25)均固装在垫板(29)上,垫板(29)设置在振动装置(15)的上面板(15-1)的上端面上,垫板(29)与振动装置(15)的上面板(15-1)可拆卸连接,油泵(25)驱动液压缸(24)的活塞杆(24-1)伸缩,液压缸(24)的活塞杆(24-1)的外端与拉力传感器(4)固接,拉力传感器(4)与背带(22)固接,拉力传感器(4)的信号输出端与拉力显示器(9)的信号输入端连接,压力传感器(27)的信号输出端与压力显示器(28)的信号输入端连接。1. A kind of vibration equal-length multi-angle hammer special strength training and monitoring device, described training and monitoring device comprise cable-stayed beam (1), first spring (2), second spring (3), two upper casings , two lower casings, two limit sleeves, two uprights and a plurality of jacking screws (23); it is characterized in that: the training and monitoring device also includes a vibration device (15), a tension sensor (4), a resistance Meter (5), connecting part (6), shaft sleeve (7), gear installation shaft (8), first speed regulating motor (10), gear transmission pair (11), tension indicator (9), pressure sensor (27 ), pressure indicator (28), backing plate (29), connecting rod (12), connecting sleeve (30), strap (22), hydraulic cylinder (24) and oil pump (25); two columns are high column ( 13) and the short column (14), two spacer sleeves are respectively the first spacer sleeve (21) and the second spacer sleeve (16), and the two upper sleeves are respectively the first upper sleeve pipe (17) and The second upper casing (18), the two lower casings are respectively the first lower casing (19) and the second lower casing (20); the upper end surface of the upper panel (15-1) of the vibration device (15) The left end of the left end is affixed to one end of the first lower casing (19), the right end of the upper surface of the upper panel (15-1) of the vibration device (15) is affixed to one end of the second lower casing (20), and the high column The lower end of (13) is arranged in the first lower casing (19), the lower end of the short column (14) is arranged in the second lower casing (20), and the tension indicator (9) is fixed in the second lower casing ( 20), the pressure indicator (28) is fixed on the first lower sleeve (19), and the high column (13) is set with the first limit sleeve (21), the first spring (2) and the second One upper casing (17), the second stopper (16), the second spring (3) and the second upper casing (18) are sequentially set on the short column (14) from bottom to top, and the first lower casing (19), between the first spacer sleeve (21) and the first upper casing (17) and the high column (13) and the second lower casing (20), the second spacer sleeve (16) and the second The upper casing (18) and the short column (14) are fixedly connected respectively by top screws (23); the two ends of the cable-stayed beam (1) are connected to the first upper casing (17) and the second upper casing ( 18) Hinged, the connecting part (6) is arranged above the vibration device (15) and below the cable-stayed beam (1), the upper end of the connecting part (6) is fixedly connected to the cable-stayed beam (1), and the connecting part (6 ) is provided with a center hole, the shaft sleeve (7) is fixed in the center hole of the connecting part (6), the gear installation shaft (8) is L-shaped, and one end of the gear installation shaft (8) is arranged on the shaft sleeve (7 ), the resistance meter (5) is installed on the side wall of the shaft sleeve (7), and the push rod of the resistance meter (5) is against the gear installation shaft (8), and the other end of the gear installation shaft (8) is connected to the One end of the connecting rod (12) is all arranged in the two ends of the connecting sleeve (30), the gear mounting shaft (8) and the connecting rod (12) are affixed to the connecting sleeve (30) through the top screw (23), and the connecting rod ( 12) The other end is connected to the pressure sensor The device (27) is fixedly connected, and the output shaft of the first speed-regulating motor (10) transmits power to the gear installation shaft (8) through the gear transmission pair (11), and the first speed-regulating motor (10) and the cable-stayed beam (1 ) is fixedly connected, the hydraulic cylinder (24) and the oil pump (25) are all fixedly mounted on the backing plate (29), and the backing plate (29) is arranged on the upper end surface of the upper panel (15-1) of the vibrating device (15), The backing plate (29) is detachably connected to the upper panel (15-1) of the vibration device (15), the oil pump (25) drives the piston rod (24-1) of the hydraulic cylinder (24) to expand and contract, and the piston of the hydraulic cylinder (24) The outer end of the bar (24-1) is affixed to the tension sensor (4), the tension sensor (4) is affixed to the strap (22), and the signal output end of the tension sensor (4) is connected to the signal input end of the tension display (9). Connect, the signal output end of the pressure sensor (27) is connected with the signal input end of the pressure display (28). 2.根据权利要求1所述的振动等长多角度链球专项力量训练及监控装置,其特征在于:所述振动装置(15)包括上面板(15-1)、底座(15-2)、第二调速电机(15-3)、第一带传动机构(15-4)、第二带传动机构(15-5)、过渡轴(15-6)、偏心轴(15-7)、两个第一轴座(15-8)、两个第二轴座(15-9)、两个偏心轴套(15-10)和两个支柄(15-11);上面板(15-1)位于底座(15-2)的正上方,第二调速电机(15-3)固装在底座(15-2)的上端面上,第二调速电机(15-3)的输出轴通过第一带传动机构(15-4)将动力传递给过渡轴(15-6),过渡轴(15-6)的两端各套装有一个与其转动连接的第一轴座(15-8),过渡轴(15-6)通过第二带传动机构(15-5)将动力传递给偏心轴(15-7),偏心轴(15-7)上套装有两个与其转动连接的偏心轴套(15-10),两个支柄(15-11)与两个偏心轴套(15-10)一一对应设置,每个支柄(15-11)的一端与偏心轴套(15-10)的外侧壁固接,每个支柄(15-11)的另一端与上面板(15-1)的下端面固接,两个支柄(15-11)相对于振动装置(15)的竖直方向的中心线对称设置,两个第一轴座(15-8)和两个第二轴座(15-9)均分别与底座(15-2)的上端面固接。2. The vibration isometric multi-angle hammer throw special strength training and monitoring device according to claim 1, characterized in that: the vibration device (15) comprises an upper panel (15-1), a base (15-2), a second Two speed-regulating motors (15-3), the first belt transmission mechanism (15-4), the second belt transmission mechanism (15-5), transition shaft (15-6), eccentric shaft (15-7), two The first axle seat (15-8), two second axle seats (15-9), two eccentric bushings (15-10) and two support handles (15-11); upper panel (15-1) Located directly above the base (15-2), the second speed-regulating motor (15-3) is fixed on the upper end surface of the base (15-2), and the output shaft of the second speed-regulating motor (15-3) passes through the first A belt transmission mechanism (15-4) transmits power to the transition shaft (15-6), and the two ends of the transition shaft (15-6) are each fitted with a first shaft seat (15-8) connected to it in rotation, and the transition The shaft (15-6) transmits power to the eccentric shaft (15-7) through the second belt transmission mechanism (15-5), and the eccentric shaft (15-7) is sleeved with two eccentric shaft sleeves (15) connected to it in rotation. -10), two support handles (15-11) and two eccentric shaft sleeves (15-10) are provided in one-to-one correspondence, and one end of each support handle (15-11) is connected with the eccentric shaft sleeve (15-10) The outer wall is affixed, and the other end of each support handle (15-11) is affixed to the lower end surface of the upper panel (15-1), and the two support handles (15-11) are vertically connected to the vibration device (15). The central line of the direction is arranged symmetrically, and the two first shaft seats (15-8) and the two second shaft seats (15-9) are respectively affixed to the upper end surface of the base (15-2). 3.根据权利要求2所述的振动等长多角度链球专项力量训练及监控装置,其特征在于:所述振动装置(15)还包括两个第三弹簧(15-12);上面板(15-1)下端面的左端和右端各固定装有一个第三弹簧(15-12),两个第三弹簧(15-12)的下端设置在地面上。3. vibration isometric multi-angle hammer special strength training and monitoring device according to claim 2, is characterized in that: described vibrating device (15) also comprises two the 3rd spring (15-12); Upper panel (15 -1) A third spring (15-12) is fixedly installed on the left end and the right end of the lower end face respectively, and the lower ends of the two third springs (15-12) are arranged on the ground. 4.根据权利要求1所述的振动等长多角度链球专项力量训练及监控装置,其特征在于:所述训练及监控装置还包括量角器(26);量角器(26)与第二上套管(18)的左侧壁固接,斜拉梁(1)与量角器(26)相贴靠。4. vibration isometric multi-angle hammer special strength training and monitoring device according to claim 1, is characterized in that: described training and monitoring device also comprise protractor (26); Protractor (26) and the second upper casing ( The left side wall of 18) is affixed, and the cable-stayed beam (1) is attached to the protractor (26).
CN201010607356A 2010-12-27 2010-12-27 Vibration isometric multi-angle hammer ball specific-strength training and monitoring device Expired - Fee Related CN102000427B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201010607356A CN102000427B (en) 2010-12-27 2010-12-27 Vibration isometric multi-angle hammer ball specific-strength training and monitoring device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201010607356A CN102000427B (en) 2010-12-27 2010-12-27 Vibration isometric multi-angle hammer ball specific-strength training and monitoring device

Publications (2)

Publication Number Publication Date
CN102000427A CN102000427A (en) 2011-04-06
CN102000427B true CN102000427B (en) 2011-11-30

Family

ID=43808285

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201010607356A Expired - Fee Related CN102000427B (en) 2010-12-27 2010-12-27 Vibration isometric multi-angle hammer ball specific-strength training and monitoring device

Country Status (1)

Country Link
CN (1) CN102000427B (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103638657B (en) * 2013-12-30 2016-01-20 河南科技学院 Laser-type super-equal-length weight throw core stable force training and information feedback device
CN104548545B (en) * 2014-12-30 2017-01-18 哈尔滨师范大学 Hammer throw apparatus vibration training and information feedback trainer
CN104548543B (en) * 2014-12-30 2017-11-14 哈尔滨师范大学 A kind of superfine long hammer apparatus vibration training and feedback of the information exercising machine
CN104492049B (en) * 2014-12-30 2017-02-01 哈尔滨商业大学 Laser type super-equal-length hammer throw equipment vibration core stabilizing strength training and information feedback trainer
CN106405833A (en) * 2016-06-01 2017-02-15 乐视控股(北京)有限公司 Head-wearing virtual reality device

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE202004021151U1 (en) * 2004-11-18 2007-02-15 Sport-Thieme Gmbh Exercise machine for stimulating a person's feet, hands and stomach using mechanical oscillations comprises a component group for supporting a person and having a plate-like base body with recesses having contours for a component
CN201042598Y (en) * 2007-06-12 2008-04-02 中国海洋大学 Centripetal and centrifugal strength training device for hammer throw
CN201091780Y (en) * 2007-06-12 2008-07-30 中国海洋大学 Hammer throw specific technique and strength trainer
DE102008016344A1 (en) * 2008-03-30 2009-10-01 Peter Kotlarov Muscle i.e. biceps, stimulating device for arm in upper body area of user, has drive device for driving handles to perform vibration movement relative to frame, where vibration movement is repeated with frequency in preset range
CN201551809U (en) * 2009-11-19 2010-08-18 哈尔滨师范大学 Shot put training bench

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201880328U (en) * 2010-12-27 2011-06-29 哈尔滨师范大学 Vibration isometric multi-angle hammer ball special strength training and monitoring device

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE202004021151U1 (en) * 2004-11-18 2007-02-15 Sport-Thieme Gmbh Exercise machine for stimulating a person's feet, hands and stomach using mechanical oscillations comprises a component group for supporting a person and having a plate-like base body with recesses having contours for a component
CN201042598Y (en) * 2007-06-12 2008-04-02 中国海洋大学 Centripetal and centrifugal strength training device for hammer throw
CN201091780Y (en) * 2007-06-12 2008-07-30 中国海洋大学 Hammer throw specific technique and strength trainer
DE102008016344A1 (en) * 2008-03-30 2009-10-01 Peter Kotlarov Muscle i.e. biceps, stimulating device for arm in upper body area of user, has drive device for driving handles to perform vibration movement relative to frame, where vibration movement is repeated with frequency in preset range
CN201551809U (en) * 2009-11-19 2010-08-18 哈尔滨师范大学 Shot put training bench

Also Published As

Publication number Publication date
CN102000427A (en) 2011-04-06

Similar Documents

Publication Publication Date Title
CN201880328U (en) Vibration isometric multi-angle hammer ball special strength training and monitoring device
CN201906443U (en) Vibratory equilong multi-angle shot put specialized strength training and monitoring device
CN102107080B (en) Specialized power training and monitoring device for vibrating equal-length multi-angle javelins
CN109312600A (en) Improved passive vibration damping device
CN102000424B (en) Vibrating equal-length multi-angle training and monitoring device for discus special strength
CN102000427A (en) Vibration isometric multi-angle hammer ball specific-strength training and monitoring device
CN102019078B (en) Vibratory equilong multi-angle shot special strength training and monitoring device
CN202961787U (en) Vibration super equal-length weight throw special strength training device
CN201880324U (en) Vibration isometric multi-angle leg, hip and waist combination strength training and monitoring device
CN102000423B (en) Vibrating training and monitoring device of isometric and multi-angle hip and leg combination force
CN203303610U (en) Vibrating super-equal-length shot put special-strength trainer
CN201880326U (en) Vibration equilong multi-angle sprint special strength training and monitoring device
CN206660079U (en) Wrist joint device for rehabilitation
CN102000421B (en) Vibration equilong multi-angle basket-shooting specific strength training and monitoring device
CN201880325U (en) Vibration isometric multi-angle discus special strength training and monitoring device
CN107042201A (en) Adjustable amplitude vibratory sieve
CN106823248B (en) Resistance generator for body-building apparatus
CN102100624B (en) Vibration isometric multi-angle leg, hip and waist combined strength training and monitoring device
CN201880323U (en) Vibration isometric multi-angle hip and leg combination strength training and monitoring device
CN201880263U (en) Vibrating equal-length multi-angle physical strength-training and monitoring device
CN209362932U (en) A kind of exciting bank for damage check
CN201880321U (en) Vibration isometric multi-angle waist and leg combination strength training and monitoring device
CN201880327U (en) Vibrating isometric multi-angle javelin dedicated strength training and monitoring device
CN102107059B (en) Vibration isometric multi-angle strength training and monitoring device
CN102000422B (en) Vibration equilong multi-angle chest-leg combined strength training and monitoring device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20111130

Termination date: 20121227