CN103602000A - Novel pipeline suitable for non-excavation engineering - Google Patents

Novel pipeline suitable for non-excavation engineering Download PDF

Info

Publication number
CN103602000A
CN103602000A CN201310487315.9A CN201310487315A CN103602000A CN 103602000 A CN103602000 A CN 103602000A CN 201310487315 A CN201310487315 A CN 201310487315A CN 103602000 A CN103602000 A CN 103602000A
Authority
CN
China
Prior art keywords
parts
temperature
pipeline
alkali
barrel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201310487315.9A
Other languages
Chinese (zh)
Other versions
CN103602000B (en
Inventor
颜德岿
王龙飞
孙成
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Feilong Pipe Group Co ltd
Original Assignee
FEILONG TUBE INDUSTRY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by FEILONG TUBE INDUSTRY Co Ltd filed Critical FEILONG TUBE INDUSTRY Co Ltd
Priority to CN201310487315.9A priority Critical patent/CN103602000B/en
Publication of CN103602000A publication Critical patent/CN103602000A/en
Application granted granted Critical
Publication of CN103602000B publication Critical patent/CN103602000B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B29WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
    • B29CSHAPING OR JOINING OF PLASTICS; SHAPING OF MATERIAL IN A PLASTIC STATE, NOT OTHERWISE PROVIDED FOR; AFTER-TREATMENT OF THE SHAPED PRODUCTS, e.g. REPAIRING
    • B29C48/00Extrusion moulding, i.e. expressing the moulding material through a die or nozzle which imparts the desired form; Apparatus therefor
    • B29C48/25Component parts, details or accessories; Auxiliary operations
    • B29C48/92Measuring, controlling or regulating

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Extrusion Moulding Of Plastics Or The Like (AREA)
  • Compositions Of Macromolecular Compounds (AREA)

Abstract

The invention provides a novel pipeline which is suitable for non-excavation engineering, and the product is prepared from the following components by weight ratio: 100 parts of B-85 type PVC resins, 3-5 parts of compound lead stabilizing agents, 3-5 parts of acrylic acid resins, 5-7 parts of chlorinated polyethylene or MBS resins, 1-3 parts of plasticizers, 0.5-2 parts of lubricants, 1.5-3 parts of fire retardants, 0.5-2 parts of anti-oxidants, 7-15 parts of alkali-free short glass fibers, and 0-5 parts of color masterbatch. The pipeline has good toughness and the fracture percentage elongation reaches more than 350, and the fracture yield strength reaches more than 50 MPa; the pipeline has good rigidity, and the wall is twice or three times as thick as the wall of pipeline made from polypropylene material; the product has good recovery rate and small permanent compression deformation; the product has good acid and alkali resistance capabilities, and the components mainly do not have inorganic filling materials, so the underground acid and alkali environment has little corrosion to the pipeline; the joint employs rivet or special-purpose glue, thereby the joint has high intensity and can be used for non-excavation engineering; the product has aging resistance with long usage life, and the can be better applied to non-excavation engineering.

Description

A kind of novel pipeline that is applicable to trenchless engineering
Technical field
The invention belongs to pipeline manufacture technology field, specifically relate to a kind of novel pipeline that is applicable to trenchless engineering.
Background technology
Popularization along with urbanization, existing city network transformation and public works transformation etc., being difficult to directly ditching carries out pipe laying again, and some pipelines need pass through heavy construction, only way can only be by the underground pipe laying that carries out, and the generation of trenchless technology has solved this difficult problem well.Yet dilatory pipe used in trenchless technology will be faced underground more complicated situation, therefore require pipeline to there is the features such as stronger toughness, higher tensile strength, higher ring stiffness, lower temperature resistance, flame retardant resistance, erosion resistance, ageing resistance and cost of manufacture be low.Existing pipeline material adopts high density polyethylene(HDPE), modified polypropene, polyvinyl chloride or chlorinated polyvinyl chloride etc. more, exist separately certain limitation, as existing the low dilatory process of rigidity, easily flattens polyethylene, the defects such as equal result of use material cost is higher, and material is inflammable, ageing-resistant performance is poor also limit its large-area promoting the use of; The defects such as it is low that modified polypropene exists Joint Strength, and dilatory process easily ruptures, and equal result of use material cost is higher, and material is inflammable, ageing-resistant performance is poor also limit its large-area promoting the use of; Common polyvinyl chloride or chlorinated polyvinyl chloride poor toughness, dilatory process frangibility, the slightly high defect such as yielding of fragile under low temperatureization, temperature is all the common polyvinyl chloride of restriction or chlorinated polyvinyl chloride large-area promoting the use of on trenchless engineering.
Summary of the invention
The present invention solves the existing technical problem of prior art, and a kind of novel pipeline that is applicable to trenchless engineering is provided.
Above-mentioned technical problem of the present invention is mainly solved by following technical proposals: a kind of novel pipeline that is applicable to trenchless engineering, its component and weight part proportioning are: 100 parts of B-85 type polyvinyl chloride (PVC) RESINS, compound lead stabilizer 3-5 part, acrylic acid or the like resin 3-5 part, chlorinatedpolyethylene or MBS resin 5-7 part, softening agent 1-3 part, lubricant 0.5-2 part, fire retardant 1.5-3 part, oxidation inhibitor 0.5-2 part, alkali-free short glass fiber 7-15 part, look female 0-5 part.Wherein said B-85 type polyvinyl chloride (PVC) RESINS is selected 2500 high-polymerization degrees, weight part content plumbous in compound lead stabilizer is 28-32%, softening agent is selected epoxy soybean oil, lubricant is selected the oxidic polyethylene of honeybee board stearic acid He section, fire retardant is selected needle antimony, and oxidation inhibitor is selected Milan chemical industry antioxidant 1010.A kind of novel pipeline that is applicable to trenchless engineering of the present invention, its making method is: except alkali-free short glass fiber, all the other component heat are mixed to 135 ℃, now add alkali-free short glass fiber, then stir and be cooled to 40 ℃, again batch mixing is dropped into conical double screw extruder plasticizing and extrude, by mould and shaping equipment, obtain goods; While wherein utilizing conical double screw extruder plasticizing to extrude, the temperature in barrel I district is 200-220 ℃, the temperature in barrel II district is 205-225 ℃, the temperature in barrel III district is 205-225 ℃, and the temperature in barrel IV district is 190-210 ℃, and the temperature of merging core is 175-195 ℃, after mould, the temperature of die body is 190-210 ℃, the temperature of Support is 185-195 ℃, and before mould, the temperature of die body is 185-195 ℃, and the temperature of mouthful mould is 210-230 ℃.
The B-85 type polyvinyl chloride (PVC) RESINS of 2500 high-polymerization degrees has good physicals, can be processed into the macromolecular material with caoutchouc elasticity, have that Compression Set is little, rebound resilience greatly, the feature such as wider use temperature, lower embrittlement temperature, good high temperature resistant, resistance to bending and creep resistance.The present invention is usingd B-85 type polyvinyl chloride (PVC) RESINS as main material, utilize short glass fiber to fill and carry out rigidity modification, multiple impact-resistant modified material is worked in coordination with and is carried out toughness modification, needle antimonys etc. are flame-retardant modified and be aided with relevant processing aid, utilize the duct products that Mold Making goes out to there is following characteristics: 1, good toughness, elongation at break reaches more than 350, substantially reaches the value of HDPE; 2, more than breaking yield intensity reaches 50 MPas, apparently higher than common polyvinyl chloride (40 MPa) and polyolefins (25-30 MPa), the intensity of a little higher than pure chlorinated polyvinyl chloride (45 MPa); 3, good rigidity, apparently higher than common polyolefin pipe, equal wall thickness is 2 to 3 times of polypropylene material; 4, return rate is high, and Compression Set is little; 5, acid and alkali-resistance ability is strong, and in component, substantially not containing mineral filler, underground acid or alkali environment is less to corrosive pipeline; 6, joint adopts rivet or glue special, and strength of joint is high, at trenchless engineering, can relievedly use; 7, ageing-resistant, long service life, can be advantageously applied to trenchless engineering.
Embodiment
Below by embodiment, technical scheme of the present invention is described in further detail.
Embodiment 1: a kind of novel pipeline that is applicable to trenchless engineering, its component and weight part proportioning are: 100 parts of B-85 type polyvinyl chloride (PVC) RESINS, 3 parts of compound lead stabilizers, 3 parts of acrylic acid or the like resins, 5 parts of chlorinatedpolyethylene or MBS resins, 1 part, softening agent, lubricant 0.5,1.5 parts of fire retardants, 0.5 part, oxidation inhibitor, 15 parts of alkali-free short glass fibers, 5 parts of looks female.Wherein said B-85 type polyvinyl chloride (PVC) RESINS is selected 2500 high-polymerization degrees, weight part content plumbous in compound lead stabilizer is 28%, softening agent is selected epoxy soybean oil, lubricant is selected the oxidic polyethylene of honeybee board stearic acid He section, fire retardant is selected needle antimony, and oxidation inhibitor is selected Milan chemical industry antioxidant 1010.The making method of this pipeline is: except alkali-free short glass fiber, all the other component heat are mixed to 135 ℃, now add alkali-free short glass fiber, then stir and be cooled to 40 ℃, then batch mixing is dropped into conical double screw extruder plasticizing and extrude; While wherein utilizing conical double screw extruder plasticizing to extrude, the temperature in barrel I district is 200-220 ℃, the temperature in barrel II district is 205-225 ℃, the temperature in barrel III district is 205-225 ℃, and the temperature in barrel IV district is 190-210 ℃, and the temperature of merging core is 175-195 ℃, after mould, the temperature of die body is 190-210 ℃, the temperature of Support is 185-195 ℃, and before mould, the temperature of die body is 185-195 ℃, and the temperature of mouthful mould is 210-230 ℃.
Embodiment 2: a kind of novel pipeline that is applicable to trenchless engineering, its component and weight part proportioning are: 100 parts of B-85 type polyvinyl chloride (PVC) RESINS, 5 parts of compound lead stabilizers, 5 parts of acrylic acid or the like resins, 7 parts of chlorinatedpolyethylene or MBS resins, 3 parts, softening agent, lubricant 2,3 parts of fire retardants, 2 parts, oxidation inhibitor, 7 parts of alkali-free short glass fibers, 2 parts of looks female.Wherein said B-85 type polyvinyl chloride (PVC) RESINS is selected 2500 high-polymerization degrees, weight part content plumbous in compound lead stabilizer is 28-32%, softening agent is selected epoxy soybean oil, lubricant is selected the oxidic polyethylene of honeybee board stearic acid He section, fire retardant is selected needle antimony, and oxidation inhibitor is selected Milan chemical industry antioxidant 1010.The making method of this pipeline is: except alkali-free short glass fiber, all the other component heat are mixed to 135 ℃, now add alkali-free short glass fiber, then stir and be cooled to 40 ℃, then batch mixing is dropped into conical double screw extruder plasticizing and extrude; While wherein utilizing conical double screw extruder plasticizing to extrude, the temperature in barrel I district is 200-220 ℃, the temperature in barrel II district is 205-225 ℃, the temperature in barrel III district is 205-225 ℃, and the temperature in barrel IV district is 190-210 ℃, and the temperature of merging core is 175-195 ℃, after mould, the temperature of die body is 190-210 ℃, the temperature of Support is 185-195 ℃, and before mould, the temperature of die body is 185-195 ℃, and the temperature of mouthful mould is 210-230 ℃.
Embodiment 3: a kind of novel pipeline that is applicable to trenchless engineering, its component and weight part proportioning are: 100 parts of B-85 type polyvinyl chloride (PVC) RESINS, 4 parts of compound lead stabilizers, 4 parts of acrylic acid or the like resins, 6 parts of chlorinatedpolyethylene or MBS resins, 2 parts, softening agent, lubricant 1,2 parts of fire retardants, 1 part, oxidation inhibitor, 10 parts of alkali-free short glass fibers, 3 parts of looks female.Wherein said B-85 type polyvinyl chloride (PVC) RESINS is selected 2500 high-polymerization degrees, weight part content plumbous in compound lead stabilizer is 28-32%, softening agent is selected epoxy soybean oil, lubricant is selected the oxidic polyethylene of honeybee board stearic acid He section, fire retardant is selected needle antimony, and oxidation inhibitor is selected Milan chemical industry antioxidant 1010.The making method of this pipeline is: except alkali-free short glass fiber, all the other component heat are mixed to 135 ℃, now add alkali-free short glass fiber, then stir and be cooled to 40 ℃, then batch mixing is dropped into conical double screw extruder plasticizing and extrude; While wherein utilizing conical double screw extruder plasticizing to extrude, the temperature in barrel I district is 200-220 ℃, the temperature in barrel II district is 205-225 ℃, the temperature in barrel III district is 205-225 ℃, and the temperature in barrel IV district is 190-210 ℃, and the temperature of merging core is 175-195 ℃, after mould, the temperature of die body is 190-210 ℃, the temperature of Support is 185-195 ℃, and before mould, the temperature of die body is 185-195 ℃, and the temperature of mouthful mould is 210-230 ℃.
Embodiment 4: a kind of novel pipeline that is applicable to trenchless engineering, its component and weight part proportioning are: 100 parts of B-85 type polyvinyl chloride (PVC) RESINS, 3 parts of compound lead stabilizers, 5 parts of acrylic acid or the like resins, 5 parts of chlorinatedpolyethylene or MBS resins, 3 parts, softening agent, lubricant 0.5,3 parts of fire retardants, 0.5 part, oxidation inhibitor, 15 parts of alkali-free short glass fibers, 3 parts of looks female.Wherein said B-85 type polyvinyl chloride (PVC) RESINS is selected 2500 high-polymerization degrees, weight part content plumbous in compound lead stabilizer is 28-32%, softening agent is selected epoxy soybean oil, lubricant is selected the oxidic polyethylene of honeybee board stearic acid He section, fire retardant is selected needle antimony, and oxidation inhibitor is selected Milan chemical industry antioxidant 1010.The making method of this pipeline is: except alkali-free short glass fiber, all the other component heat are mixed to 135 ℃, now add alkali-free short glass fiber, then stir and be cooled to 40 ℃, then batch mixing is dropped into conical double screw extruder plasticizing and extrude; While wherein utilizing conical double screw extruder plasticizing to extrude, the temperature in barrel I district is 200-220 ℃, the temperature in barrel II district is 205-225 ℃, the temperature in barrel III district is 205-225 ℃, and the temperature in barrel IV district is 190-210 ℃, and the temperature of merging core is 175-195 ℃, after mould, the temperature of die body is 190-210 ℃, the temperature of Support is 185-195 ℃, and before mould, the temperature of die body is 185-195 ℃, and the temperature of mouthful mould is 210-230 ℃.
Embodiment 5: a kind of novel pipeline that is applicable to trenchless engineering, its component and weight part proportioning are: 100 parts of B-85 type polyvinyl chloride (PVC) RESINS, 5 parts of compound lead stabilizers, 3 parts of acrylic acid or the like resins, 7 parts of chlorinatedpolyethylene or MBS resins, 1 part, softening agent, lubricant 2,1.5 parts of fire retardants, 2 parts, oxidation inhibitor, 7 parts of alkali-free short glass fibers, 4 parts of looks female.Wherein said B-85 type polyvinyl chloride (PVC) RESINS is selected 2500 high-polymerization degrees, weight part content plumbous in compound lead stabilizer is 28-32%, softening agent is selected epoxy soybean oil, lubricant is selected the oxidic polyethylene of honeybee board stearic acid He section, fire retardant is selected needle antimony, and oxidation inhibitor is selected Milan chemical industry antioxidant 1010.The making method of this pipeline is: except alkali-free short glass fiber, all the other component heat are mixed to 135 ℃, now add alkali-free short glass fiber, then stir and be cooled to 40 ℃, then batch mixing is dropped into conical double screw extruder plasticizing and extrude; While wherein utilizing conical double screw extruder plasticizing to extrude, the temperature in barrel I district is 200-220 ℃, the temperature in barrel II district is 205-225 ℃, the temperature in barrel III district is 205-225 ℃, and the temperature in barrel IV district is 190-210 ℃, and the temperature of merging core is 175-195 ℃, after mould, the temperature of die body is 190-210 ℃, the temperature of Support is 185-195 ℃, and before mould, the temperature of die body is 185-195 ℃, and the temperature of mouthful mould is 210-230 ℃.
Finally, it should be pointed out that above embodiment is only the more representational example of the present invention.Obviously, technical scheme of the present invention is not limited to above-described embodiment, can also have many distortion.All distortion that those of ordinary skill in the art can directly derive or associate from content disclosed by the invention, all should think protection scope of the present invention.

Claims (4)

1. a novel pipeline that is applicable to trenchless engineering, the component and the weight part proportioning that it is characterized in that described pipeline are: 100 parts of B-85 type polyvinyl chloride (PVC) RESINS, compound lead stabilizer 3-5 part, acrylic acid or the like resin 3-5 part, chlorinatedpolyethylene or MBS resin 5-7 part, softening agent 1-3 part, lubricant 0.5-2, fire retardant 1.5-3 part, oxidation inhibitor 0.5-2 part, alkali-free short glass fiber 7-15 part, look female 0-5 part.
2. a kind of novel pipeline that is applicable to trenchless engineering according to claim 1, is characterized in that weight part content plumbous in described compound lead stabilizer is 28-32%.
3. according to a kind of novel pipeline that is applicable to trenchless engineering described in claim 1 or 2, the making method that it is characterized in that described pipeline is: except alkali-free short glass fiber, all the other component heat are mixed to 135 ℃, now add alkali-free short glass fiber, then stir and be cooled to 40 ℃, again batch mixing is dropped into conical double screw extruder plasticizing and extrude, by mould and shaping equipment, obtain goods.
4. a kind of novel pipeline that is applicable to trenchless engineering according to claim 3, it is characterized in that in described making method, while utilizing conical double screw extruder plasticizing to extrude, the temperature in barrel I district is 200-220 ℃, the temperature in barrel II district is 205-225 ℃, the temperature in barrel III district is 205-225 ℃, the temperature in barrel IV district is 190-210 ℃, the temperature of merging core is 175-195 ℃, after mould, the temperature of die body is 190-210 ℃, the temperature of Support is 185-195 ℃, and before mould, the temperature of die body is 185-195 ℃, and the temperature of mouthful mould is 210-230 ℃.
CN201310487315.9A 2013-10-17 2013-10-17 A kind of pipeline being applicable to trenchless engineering Active CN103602000B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310487315.9A CN103602000B (en) 2013-10-17 2013-10-17 A kind of pipeline being applicable to trenchless engineering

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310487315.9A CN103602000B (en) 2013-10-17 2013-10-17 A kind of pipeline being applicable to trenchless engineering

Publications (2)

Publication Number Publication Date
CN103602000A true CN103602000A (en) 2014-02-26
CN103602000B CN103602000B (en) 2016-04-27

Family

ID=50120271

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310487315.9A Active CN103602000B (en) 2013-10-17 2013-10-17 A kind of pipeline being applicable to trenchless engineering

Country Status (1)

Country Link
CN (1) CN103602000B (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104961991A (en) * 2015-01-14 2015-10-07 无锡龙舜实业有限公司 Directly-buried PVC pipe
CN105061950A (en) * 2015-09-23 2015-11-18 界首市申发雨鞋有限责任公司 Modified heat-resistant plastic
CN105111632A (en) * 2015-09-24 2015-12-02 界首市芮齐塑胶有限公司 Novel modified polyvinyl chloride plastics
CN115232412A (en) * 2022-07-12 2022-10-25 刘现海 Composite top pull pipe for municipal building and preparation method

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003301972A (en) * 2002-04-12 2003-10-24 Sekisui Chem Co Ltd Hard vinyl chloride resin tube
CN101348594A (en) * 2008-08-28 2009-01-21 广东联塑科技实业有限公司 Glass fiber reinforced unplasticised polyvinyl chloride material and preparation thereof
CN101487549A (en) * 2008-07-15 2009-07-22 河北科力空调工程有限公司 Plastic section bar spiral winding pipe and method for producing the same
CN103090123A (en) * 2013-01-23 2013-05-08 浙江飞龙管业有限公司 High impact polyvinyl chloride (PVC) pipe capable of noise reduction and static elimination

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003301972A (en) * 2002-04-12 2003-10-24 Sekisui Chem Co Ltd Hard vinyl chloride resin tube
CN101487549A (en) * 2008-07-15 2009-07-22 河北科力空调工程有限公司 Plastic section bar spiral winding pipe and method for producing the same
CN101348594A (en) * 2008-08-28 2009-01-21 广东联塑科技实业有限公司 Glass fiber reinforced unplasticised polyvinyl chloride material and preparation thereof
CN103090123A (en) * 2013-01-23 2013-05-08 浙江飞龙管业有限公司 High impact polyvinyl chloride (PVC) pipe capable of noise reduction and static elimination

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104961991A (en) * 2015-01-14 2015-10-07 无锡龙舜实业有限公司 Directly-buried PVC pipe
CN105061950A (en) * 2015-09-23 2015-11-18 界首市申发雨鞋有限责任公司 Modified heat-resistant plastic
CN105111632A (en) * 2015-09-24 2015-12-02 界首市芮齐塑胶有限公司 Novel modified polyvinyl chloride plastics
CN115232412A (en) * 2022-07-12 2022-10-25 刘现海 Composite top pull pipe for municipal building and preparation method

Also Published As

Publication number Publication date
CN103602000B (en) 2016-04-27

Similar Documents

Publication Publication Date Title
CN102850629B (en) Mine polyethylene tube
CN103087388B (en) Reinforced and modified corrugated power protection sleeve
CN105670109A (en) Polypropylene composition, preparation method thereof, and polypropylene material prepared therethrough
CN103602000B (en) A kind of pipeline being applicable to trenchless engineering
CN104292699A (en) Antistatic flame-retardant composite material for coal mines and preparation method of antistatic flame-retardant composite material
CN101942130A (en) Thermoplastic composite material and preparation method thereof as well as cable channel and preparation method thereof
CN102140197B (en) Antistatic agent, antistatic flame-retarding plastics and production methods thereof
CN103992600A (en) High-filling highly-pressure-resistant U-PVC water supply pipe fitting
CN104565584A (en) Steel wire frame reinforced polyethylene composite pipe and preparation method thereof
CN105062062A (en) Halogen-free flame-retardant nylon composite material and preparation method thereof
CN101250307A (en) Low temperature resistant soft and environmentally friendly plastic sheath material and preparation method thereof
CN104385715B (en) A kind of chemical industry oil storage tank bottom plate
CN105968642A (en) High-impact-resisting and high-strength electric tubular product
CN111674130A (en) PVC anti-static toughening modified material for underground coal mine and preparation method thereof
CN104448627A (en) Prescription of modified cold-resistant flame-retardant PVC plastic profiles
CN104356485A (en) Modified polyethylene environment-friendly plastic inspection well and preparation method thereof
CN107163360A (en) A kind of High-strength power cable protection pipe and preparation method thereof
CN101824180A (en) High elasticity polyolefin hose with radiation crosslinking and preparation method thereof
CN106243465B (en) A kind of high-intensitive, fire-retardant, anti-static polyolefin pipeline and preparation method thereof
CN104390006B (en) A kind of gasket seal of refrigeration plant
CN103044768B (en) Polypropylene pipe for underground coal mine
CN108570226A (en) A kind of low temperature resistant dehiscence-resistant halogen-free fire-retardant nylon bellows and preparation method thereof
CN116769261A (en) PVC/CPVC/ABS alloy composite material, preparation method and application
CN103059407A (en) Polypropylene composite material and preparation method thereof and application
CN103509313A (en) Recycled-ABS toughened foam material and preparation method thereof

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CP03 Change of name, title or address

Address after: 311411 No.77, East Changkou street, Changkou Town, Fuyang District, Hangzhou City, Zhejiang Province

Patentee after: Zhejiang Feilong Pipe Group Co.,Ltd.

Address before: 311407 Zhejiang City, Hangzhou province Fuyang deer Street industrial function zone, Zhejiang Feilong Pipe Industry Co., Ltd.

Patentee before: ZHEJIANG FEILONG PIPE Co.,Ltd.

CP03 Change of name, title or address
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: A pipeline suitable for non excavation engineering

Granted publication date: 20160427

Pledgee: Zhejiang Fuyang rural commercial bank Limited by Share Ltd. deer Hill sub branch

Pledgor: Zhejiang Feilong Pipe Group Co.,Ltd.

Registration number: Y2024980028528

PE01 Entry into force of the registration of the contract for pledge of patent right