CN106948366A - A kind of barrel base and accessory part and construction method for being easy to control perpendicularity - Google Patents

A kind of barrel base and accessory part and construction method for being easy to control perpendicularity Download PDF

Info

Publication number
CN106948366A
CN106948366A CN201710257792.4A CN201710257792A CN106948366A CN 106948366 A CN106948366 A CN 106948366A CN 201710257792 A CN201710257792 A CN 201710257792A CN 106948366 A CN106948366 A CN 106948366A
Authority
CN
China
Prior art keywords
barrel
positioning
positioning steel
foundation
piles
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710257792.4A
Other languages
Chinese (zh)
Other versions
CN106948366B (en
Inventor
刘洁群
刘金龙
肖新国
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hefei College
Original Assignee
Hefei College
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hefei College filed Critical Hefei College
Priority to CN201710257792.4A priority Critical patent/CN106948366B/en
Publication of CN106948366A publication Critical patent/CN106948366A/en
Application granted granted Critical
Publication of CN106948366B publication Critical patent/CN106948366B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/32Foundations for special purposes
    • E02D27/42Foundations for poles, masts or chimneys
    • E02D27/425Foundations for poles, masts or chimneys specially adapted for wind motors masts
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/32Foundations for special purposes
    • E02D27/52Submerged foundations, i.e. submerged in open water
    • E02D27/525Submerged foundations, i.e. submerged in open water using elements penetrating the underwater ground

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Piles And Underground Anchors (AREA)
  • Revetment (AREA)

Abstract

本发明公开了一种便于控制垂直度的桶形基础和辅助组件及施工方法,包括桶形基础,桶形基础主体为倒置的桶体,桶体内壁设有三个沿着环形均匀分布的、贯穿桶体顶板的定位套管,桶体上端面设有与抽水系统相连接的进出水阀;辅助组件包括三角形定位架及利用其竖直打入海床中的三根定位钢桩;桶形基础活动套装于三根定位钢桩上,桶体沉入海中接触海床并贯入至设计深度。本发明把桶形基础沉贯过程中垂直度问题转化为定位钢桩的垂直度问题,只要定位钢桩的垂直度满足要求,则桶形基础的垂直度自动满足要求,无需后续调平与校正,使得桶形基础施工过程大大简化,施工难度大大降低,缩短了海上作业时间,降低了施工成本。

The invention discloses a barrel-shaped foundation, an auxiliary component and a construction method which are convenient to control the verticality. The positioning sleeve of the top plate of the barrel body, the upper end of the barrel body is provided with an inlet and outlet valve connected with the pumping system; the auxiliary components include a triangular positioning frame and three positioning steel piles driven vertically into the seabed by using it; the barrel-shaped foundation is movable Set on three positioning steel piles, the barrel sinks into the sea to touch the seabed and penetrate to the design depth. The invention transforms the verticality problem in the sinking process of the barrel foundation into the verticality problem of the positioning steel piles. As long as the verticality of the positioning steel piles meets the requirements, the verticality of the barrel foundation automatically meets the requirements without subsequent leveling and correction , so that the construction process of the barrel foundation is greatly simplified, the construction difficulty is greatly reduced, the offshore operation time is shortened, and the construction cost is reduced.

Description

一种便于控制垂直度的桶形基础和辅助组件及施工方法Bucket foundation, auxiliary components and construction method for convenient verticality control

技术领域:Technical field:

本发明涉及海洋平台和海上风机基础,具体涉及一种吸力式桶形基础,尤其涉及一种便于控制垂直度的桶形基础和辅助组件及施工方法。The invention relates to foundations for offshore platforms and offshore wind turbines, in particular to a suction barrel foundation, and in particular to a barrel foundation, auxiliary components and a construction method that are convenient for verticality control.

背景技术:Background technique:

桶形基础产生于二十世纪九十年代的挪威,是一种带裙的圆板基础,由于其具有减小工程量、节约投资、缩短海上施工时间、可重复使用等特点,逐渐被运用至海洋平台与海上风机基础中。The barrel foundation was produced in Norway in the 1990s. It is a circular plate foundation with a skirt. Because of its characteristics of reducing engineering volume, saving investment, shortening offshore construction time, and being reusable, it has been gradually used to In the foundation of offshore platforms and offshore wind turbines.

桶形基础在沉贯过程中需保持竖直贯入,若产生一定程度的倾斜,需通过调平使其保持竖直状态,否则影响其使用功能。参考文献[1]对渤海海域某油田的桶形基础施工进行了介绍,施工过程中桶形基础发生倾斜、桶壁出现过大变形与裂纹、土塞现象严重,导致桶形基础的施工以失败告终。可见,如何有效控制与维持桶形基础沉贯过程中的垂直度,是桶形基础施工过程中的关键技术之一。The barrel-shaped foundation needs to be kept vertical during the sinking process. If a certain degree of inclination occurs, it needs to be leveled to keep it vertical, otherwise its function will be affected. Reference [1] introduced the barrel foundation construction of an oilfield in the Bohai Sea. During the construction process, the barrel foundation was tilted, the barrel wall had excessive deformation and cracks, and soil plugging was serious, which led to the failure of the barrel foundation construction. end. It can be seen that how to effectively control and maintain the verticality in the barrel foundation sinking process is one of the key technologies in the barrel foundation construction process.

特别地,桶形基础的构型越来越多样化。如中国专利公告号CN205742258U、CN205857222U、CN205444224U、CN204940320U、CN205188994U、CN204626445U等公开了多种新型桶形基础构型,这些设计丰富了桶形基础的功能,但同时在一定程度上也增加了桶形基础的沉贯施工难度。现行桶形基础的各类设计构型,对施工过程的方便性、可行性考虑较少。In particular, the configurations of barrel foundations are becoming more and more diverse. For example, Chinese Patent Announcement Nos. CN205742258U, CN205857222U, CN205444224U, CN204940320U, CN205188994U, CN204626445U, etc. disclose a variety of new barrel-shaped foundation configurations. These designs enrich the functions of the barrel-shaped foundation, but also increase the barrel-shaped foundation to a certain extent Shen through the construction difficulty. The various design configurations of the current barrel foundations have little consideration for the convenience and feasibility of the construction process.

若在桶形基础的结构上增加一些方便施工的辅助构造,确保桶形基础沉贯的垂直度,并缩短海上施工时间,则可大大降低桶形基础的施工难度与施工成本,进而促进桶形基础在工程中的应用。可见,有必要探讨适应海上施工的桶形基础构型,促进现有桶形基础施工技术的革新与进步。If some auxiliary structures that are convenient for construction are added to the structure of the barrel foundation to ensure the verticality of the barrel foundation sinking and shorten the offshore construction time, the construction difficulty and construction cost of the barrel foundation can be greatly reduced, thereby promoting the construction of the barrel foundation. Application of fundamentals in engineering. It can be seen that it is necessary to explore the barrel foundation configuration suitable for offshore construction and promote the innovation and progress of the existing barrel foundation construction technology.

参考文献:[1] 张翊飞. 筒形基础安装失败案例分析[J]. 造船技术, 2014, 6:16-19。References: [1] Zhang Yifei. Case Analysis of Tube Foundation Installation Failure [J]. Shipbuilding Technology, 2014, 6:16-19.

发明内容:Invention content:

为了弥补现有技术问题的不足,本发明的目的是提供一种便于控制垂直度的桶形基础和辅助组件及施工方法,桶形基础上均匀设置三个定位套管,能引导桶形基础竖直的贯入海床,方便沉贯施工。In order to make up for the deficiencies of the existing technical problems, the purpose of the present invention is to provide a bucket foundation and auxiliary components and a construction method that are convenient to control the verticality. Three positioning sleeves are evenly arranged on the bucket foundation, which can guide the bucket foundation vertically It penetrates directly into the seabed, which is convenient for sinking construction.

本发明的技术方案如下:Technical scheme of the present invention is as follows:

便于控制垂直度的桶形基础和辅助组件,其特征在于,包括桶形基础,桶形基础主体为倒置的桶体,桶体内壁设有三个沿着环形均匀分布的、贯穿桶体顶板的定位套管,桶体上端面设有与抽水系统相连接的进出水阀;The barrel-shaped foundation and auxiliary components that are convenient to control the verticality are characterized in that it includes the barrel-shaped foundation, the main body of the barrel-shaped foundation is an inverted barrel, and the inner wall of the barrel is provided with three positioning holes that are evenly distributed along the ring and penetrate the top plate of the barrel Sleeve, the upper end of the barrel body is provided with an inlet and outlet valve connected to the pumping system;

所述辅助组件包括三角形定位架及利用其竖直打入海床中的三根定位钢桩;The auxiliary assembly includes a triangular positioning frame and three positioning steel piles vertically driven into the seabed by means of the triangular positioning frame;

所述的桶形基础活动套装于三根定位钢桩上,桶体沉入海中接触海床并贯入至设计深度。The barrel-shaped foundation is movable set on three positioning steel piles, and the barrel is sunk into the sea to contact the seabed and penetrate to the design depth.

所述的便于控制垂直度的桶形基础和辅助组件,其特征在于,所述的桶体内壁焊接三个两两互夹120°的定位套管,定位套管的上部高出桶体顶板,定位套管的下端口呈指向桶壁的刀刃状,桶体上端面还设有与抽水系统相连接的进出水阀。The barrel-shaped foundation and auxiliary components that are convenient to control the verticality are characterized in that three positioning sleeves that clamp each other at 120° in pairs are welded to the inner wall of the barrel, and the upper part of the positioning sleeves is higher than the top plate of the barrel body. The lower port of the positioning sleeve is in the shape of a knife pointing to the barrel wall, and the upper end surface of the barrel body is also provided with an inlet and outlet valve connected with the pumping system.

所述的便于控制垂直度的桶形基础和辅助组件,其特征在于,所述的三角形定位架由三个套筒之间用钢管相互焊接成构成,各焊接处上下设置两个加筋肋,各套筒之间的中心距离与桶体上三个定位套管之间的中心距离相等。The barrel-shaped foundation and auxiliary components that are convenient to control the verticality are characterized in that the triangular positioning frame is formed by welding steel pipes between three sleeves, and two reinforcing ribs are arranged up and down at each welding place, The center distance between the sleeves is equal to the center distance between the three positioning sleeves on the barrel body.

所述的便于控制垂直度的桶形基础和辅助组件,其特征在于,所述的定位钢桩由一根定位钢桩底部节与多根定位钢桩标准节自下至上依次连接组装构成,定位钢桩底部节下端设有锥状桩尖,定位钢桩底部节上端设有螺纹连接孔;The barrel-shaped foundation and auxiliary components that are convenient to control the verticality are characterized in that the positioning steel pile is composed of a bottom section of the positioning steel pile and a plurality of standard sections of the positioning steel pile connected and assembled sequentially from bottom to top, and the positioning The lower end of the bottom section of the steel pile is provided with a tapered pile tip, and the upper end of the bottom section of the positioning steel pile is provided with a threaded connection hole;

定位钢桩标准节一端设有螺纹凸榫,定位钢桩标准节另一端也设有螺纹连接孔,螺纹凸榫与螺纹连接孔相互匹配,通过把定位钢桩标准节的螺纹凸榫拧入底部节或其它标准节的螺纹连接孔实现相互固定与连接。One end of the positioning steel pile standard section is provided with a threaded tenon, and the other end of the positioning steel pile standard section is also provided with a threaded connection hole. The threaded tenon and the threaded connection hole match each other. By screwing the threaded tenon of the positioning steel pile standard section into the bottom The threaded connection holes of joints or other standard joints can be fixed and connected with each other.

所述的便于控制垂直度的桶形基础和辅助组件,其特征在于,所述的桶体上定位套管的内径与三角形定位架上套筒内径相等,二者内径大于定位钢桩外径1~2cm。The barrel-shaped foundation and auxiliary components that are convenient to control verticality are characterized in that the inner diameter of the positioning sleeve on the barrel body is equal to the inner diameter of the sleeve on the triangular positioning frame, and the inner diameter of the two is greater than the outer diameter of the positioning steel pile by 1 ~2cm.

一种便于控制垂直度的桶形基础和辅助组件的施工方法,其特征在于,包括如下步骤:A method for constructing barrel-shaped foundations and auxiliary components convenient for verticality control, characterized in that it includes the following steps:

1)、打入第一根定位钢桩:1) Drive in the first positioning steel pile:

根据设计参数,通过螺纹凸榫拧入螺纹连接孔,把一根定位钢桩底部节与多根定位钢桩标准节相互组装而成定位钢桩,在设计指定的海域竖直的打入第一根定位钢桩;According to the design parameters, the threaded tenon is screwed into the threaded connection hole, and the bottom section of a positioning steel pile is assembled with multiple standard sections of the positioning steel pile to form a positioning steel pile, which is vertically driven into the first sea area in the designated sea area. Root positioning steel pile;

2)、打入其它两根定位钢桩:2) Drive in the other two positioning steel piles:

把三角形定位架的一个套筒套住已打好的第一根定位钢桩,再依次把其它两根定位钢桩基于其它两个套筒的限制与定位作用打入海床,最终使三根定位钢桩的中心距、铅垂度、入土深度等参数满足设计要求;Put a sleeve of the triangular positioning frame around the first positioning steel pile that has been laid, and then drive the other two positioning steel piles into the seabed based on the restriction and positioning of the other two sleeves, and finally make the three positioning steel piles Parameters such as the center distance, plumbness, and soil penetration depth of the positioning steel piles meet the design requirements;

3)、套入桶形基础:3) Set into the barrel foundation:

从三根定位钢桩上取出三角形定位架,起吊桶体使三个定位套管套住三根定位钢桩并逐渐下沉,定位钢桩露出桶体顶面后再把三角形定位架套在三根定位钢桩上,并使桶体沿着定位钢桩缓慢沉入海中直至接触海床;Take out the triangular positioning frame from the three positioning steel piles, lift the barrel so that the three positioning sleeves cover the three positioning steel piles and sink gradually. piles, and slowly sink the barrel into the sea along the positioning steel piles until it touches the seabed;

4)、桶形基础贯入海床:4) The barrel foundation penetrates into the seabed:

打开连接桶体进出水阀上的抽水系统抽取负压,使桶体在自重及负压作用下沿着定位钢桩贯入海床至设计深度;Open the pumping system connected to the water inlet and outlet valves of the barrel to draw negative pressure, so that the barrel penetrates into the seabed along the positioning steel piles to the design depth under the action of its own weight and negative pressure;

5)、移除部分定位钢桩:5) Remove part of the positioning steel piles:

从三根定位钢桩上取出三角形定位架,并逐个旋转、拧出、移除桶体顶面以上的定位钢桩标准节,并而使桶体顶面以下的定位钢桩继续保留,从而完成桶体基础沉贯施工。Take out the triangular positioning frame from the three positioning steel piles, and rotate, unscrew and remove the standard sections of the positioning steel piles above the top surface of the barrel body one by one, and keep the positioning steel piles below the top surface of the barrel body to complete the barrel. Body foundation sinking construction.

本发明的有益效果是:The beneficial effects of the present invention are:

1、本发明在桶体内壁上设置三个竖直、中空的定位套孔,定位套孔的尺寸较小,该辅助构造不会明显增加桶形基础的制作难度与沉贯难度,具有经济性与实用性;1. In the present invention, three vertical and hollow positioning bushings are arranged on the inner wall of the barrel. The size of the positioning bushings is small. This auxiliary structure will not significantly increase the difficulty of making and sinking the barrel-shaped foundation, and is economical and practicality;

2、本发明把桶形基础沉贯过程中的垂直度问题转化为定位钢桩的垂直度问题,只要三根定位钢桩的垂直度满足要求,则桶形基础的垂直度自动满足要求,且无需后续的调平与校正;定位钢桩的垂直度较容易实现,从而整体上降低了桶形基础的施工难度;2. The present invention transforms the verticality problem in the barrel foundation sinking process into the verticality problem of the positioning steel piles. As long as the verticality of the three positioning steel piles meets the requirements, the verticality of the barrel foundation automatically meets the requirements, and there is no need to Subsequent leveling and correction; the verticality of the positioning steel piles is easier to achieve, thus reducing the construction difficulty of the barrel foundation as a whole;

3、本发明桶形基础施工结束后,桶形基础顶面以下的定位钢桩继续保留,其能持续的为桶形基础进行定位与限制,保证桶形基础在后续使用过程中的垂直度,显然对工程有利。3. After the construction of the barrel-shaped foundation of the present invention is completed, the positioning steel piles below the top surface of the barrel-shaped foundation continue to be retained, which can continuously position and restrict the barrel-shaped foundation, ensuring the verticality of the barrel-shaped foundation in the subsequent use process, Obviously good for engineering.

附图说明:Description of drawings:

图1为本发明的桶形基础俯视图。Fig. 1 is a top view of the bucket foundation of the present invention.

图2为本发明的桶形基础仰视图。Fig. 2 is a bottom view of the bucket foundation of the present invention.

图3为本发明的桶形基础横截面剖面图。Fig. 3 is a cross-sectional view of the bucket foundation of the present invention.

图4为本发明的定位钢桩配件及组装示意图。Fig. 4 is a schematic diagram of positioning steel pile accessories and assembly of the present invention.

图5为本发明的三角形定位架结构示意图。Fig. 5 is a schematic structural diagram of the triangular positioning frame of the present invention.

图6为本发明施工第一根定位钢桩示意图。Fig. 6 is a schematic diagram of the first positioning steel pile constructed in the present invention.

图7为本发明三根定位钢桩施工完毕示意图。Fig. 7 is a schematic diagram of the completion of construction of three positioning steel piles of the present invention.

图8为本发明桶形基础套入三根定位钢桩示意图。Fig. 8 is a schematic diagram of inserting three positioning steel piles into the barrel foundation of the present invention.

图9为本发明桶形基础贯入海床示意图。Fig. 9 is a schematic diagram of the barrel foundation of the present invention penetrating into the seabed.

图10为本发明桶形基础施工完毕示意图。Fig. 10 is a schematic diagram of the completion of construction of the barrel foundation of the present invention.

附图标记说明:1、桶体;2、进出水阀;3、定位套管;4、定位钢桩底部节;5、锥状桩尖;6、螺纹连接孔;7、定位钢桩标准节;8、螺纹凸榫;9、三角形定位架;10、套筒;11、加筋肋;A、海平面;B、海床面。Explanation of reference signs: 1. Bucket body; 2. Inlet and outlet water valve; 3. Positioning sleeve; 4. Bottom section of positioning steel pile; 5. Tapered pile tip; 6. Threaded connection hole; 7. Standard section of positioning steel pile ; 8. Thread tenon; 9. Triangular positioning frame; 10. Sleeve; 11. Reinforced rib; A, sea level; B, seabed surface.

具体实施方式:detailed description:

参见附图:See attached picture:

一种便于控制垂直度的桶形基础和辅助组件,包括桶体1与定位套管3,在桶形基础桶体1的内壁对称、均匀的焊接三个定位套管3,施工时基于三角形定位架9预先打设三根竖直的定位钢桩,再把桶形基础的三个定位套管3套住三根定位钢桩沉入海中接触海床,在自重及桶内外压力差作用下把桶形基础贯入海床至设计深度,整个过程桶形基础的垂直度能自动满足,由此构成便于施工的新型桶形基础。A barrel-shaped foundation and auxiliary components that are easy to control verticality, including a barrel body 1 and positioning sleeves 3, three positioning sleeves 3 are welded symmetrically and uniformly on the inner wall of the barrel-shaped foundation barrel 1, and the construction is based on triangular positioning Three vertical positioning steel piles are drilled in advance on the frame 9, and then the three positioning sleeves 3 of the barrel-shaped foundation are covered with the three positioning steel piles and sunk into the sea to contact the seabed. The foundation penetrates into the seabed to the design depth, and the verticality of the barrel-shaped foundation can be automatically satisfied throughout the process, thus forming a new type of barrel-shaped foundation that is convenient for construction.

桶形基础桶体1的内壁对称、均匀的焊接三个定位套管3,定位套管3的上部透过、高出桶形基础顶板,定位套管3的下部呈指向桶壁的刀刃状,方便桶形基础的下沉,如图1与图2所示。The inner wall of the barrel-shaped foundation barrel 1 is symmetrically and evenly welded with three positioning sleeves 3, the upper part of the positioning sleeve 3 penetrates and is higher than the top plate of the barrel-shaped foundation, and the lower part of the positioning sleeve 3 is in the shape of a blade pointing to the barrel wall. It facilitates the sinking of the barrel foundation, as shown in Figure 1 and Figure 2.

桶体1上三个定位套管3与中心轴的连线互成120º,如图3所示:定位套管3与桶体内壁焊接相连,其下部呈刀刃状,可减少沉贯的阻力,便于施工。定位套管3的顶部高出桶形基础的顶板,其对桶体内部的封闭性无影响。设计三个定位套管3,是为了利用三角形的稳定性,使后续三根定位钢桩的整体稳定性满足施工要求。The connection between the three positioning sleeves 3 on the barrel body 1 and the central axis is 120°, as shown in Figure 3: the positioning sleeve 3 is connected to the inner wall of the barrel by welding, and its lower part is in the shape of a knife edge, which can reduce the resistance of penetration. It is convenient for construction. The top of the positioning sleeve 3 is higher than the top plate of the barrel-shaped foundation, which has no influence on the sealing of the inside of the barrel. Three positioning sleeves 3 are designed to make use of the stability of the triangle to make the overall stability of the subsequent three positioning steel piles meet the construction requirements.

定位钢桩由一根定位钢桩底部节4与多根定位钢桩标准节7组装而成,定位钢桩底部节4的一端为锥状桩尖5,定位钢桩底部节4的另一端为内部带内置螺纹6的中空段,定位钢桩标准节7的一端为螺纹凸榫8,定位钢桩标准节7的另一端为内部带内置螺纹6的中空段,螺纹凸榫8与内置螺纹6相互匹配,通过把定位钢桩标准节7的螺纹凸榫8拧入底部节4或其它标准节7的内置螺纹6实现相互固定与连接,如图4所示。The positioning steel pile is assembled by a positioning steel pile bottom section 4 and a plurality of positioning steel pile standard sections 7, one end of the positioning steel pile bottom section 4 is a conical pile tip 5, and the other end of the positioning steel pile bottom section 4 is A hollow section with a built-in thread 6 inside, one end of the standard section 7 of the positioning steel pile is a threaded tenon 8, and the other end of the standard section 7 of the positioning steel pile is a hollow section with a built-in thread 6 inside, the threaded tenon 8 and the built-in thread 6 Mutual matching, by screwing the threaded tenon 8 of the positioning steel pile standard section 7 into the built-in thread 6 of the bottom section 4 or other standard sections 7 to achieve mutual fixation and connection, as shown in Figure 4.

一般定位钢桩底部节4与定位钢桩标准节7的长度相同。定位钢桩标准节7可进行标准化、规格化、规模化制作,满足不同情况下不同深度的需求。通过螺纹凸榫8与内置螺纹6相互拧入连接,实现定位钢桩的延长与续接。Generally, the bottom section 4 of the positioning steel pile has the same length as the standard section 7 of the positioning steel pile. The positioning steel pile standard section 7 can be standardized, normalized, and scaled to meet the needs of different depths in different situations. The extension and continuation of the positioning steel pile are realized by screwing the threaded tenon 8 and the built-in thread 6 into each other.

定位钢桩的作用主要是引导桶形基础垂直贯入海床,施工过程中其受到的水平荷载与竖向荷载均较小,故其截面尺寸不需要太大,只要其能维持桶形基础的垂直度即可。虽称其为“定位钢桩”,实际上属于“定位钢棒”。优选地,定位钢桩的外径取10~25cm。The role of positioning steel piles is mainly to guide the barrel foundation to penetrate into the seabed vertically. During the construction process, the horizontal load and vertical load it receives are small, so its cross-sectional size does not need to be too large, as long as it can maintain the vertical position of the barrel foundation. degree can be. Although it is called "positioning steel pile", it actually belongs to "positioning steel rod". Preferably, the outer diameter of the positioning steel pile is 10-25cm.

三角形定位架9为三个套筒10之间用钢管相互焊接而成,各焊接处上下设置两个加筋肋11,各套筒10之间的中心距离与桶体1上三个定位套管3之间的中心距离相等,如图5所示。桶体1上定位套管3的中空内径与三角形定位架9上套筒10的内径相等,桶体1上定位套管3的中空内径大于定位钢桩外径1~2cm。The triangular positioning frame 9 is welded with steel pipes between three sleeves 10, and two reinforcing ribs 11 are arranged up and down at each welding place. The center distances between the 3 are equal, as shown in Figure 5. The hollow inner diameter of the positioning sleeve 3 on the barrel body 1 is equal to the inner diameter of the sleeve 10 on the triangular positioning frame 9, and the hollow inner diameter of the positioning sleeve 3 on the barrel 1 is 1-2 cm larger than the outer diameter of the positioning steel pile.

三角形定位架9的作用是准确定位与限制三根定位钢桩的位置,使三根定位钢桩铅垂状态的插入海床,三根定位钢桩中心轴之间的距离即为桶体1上三个定位套管3中心轴之间的距离。The function of the triangular positioning frame 9 is to accurately locate and limit the position of the three positioning steel piles, so that the three positioning steel piles are inserted into the seabed in a vertical state, and the distance between the central axes of the three positioning steel piles is the three positioning steel piles on the barrel body 1. The distance between the central axes of casing 3.

事实上,施工过程中可根据需要使用多个三角形定位架9,对三根定位钢桩在不同位置进行定位约束,确保定位钢桩的垂直度与位置准确。只有三根定位钢桩的垂直度与间距满足要求,才能确保后续桶形基础的垂直度满足要求。定位钢桩应有足够的强度与刚度,在施工过程中能维持桶形基础的铅垂特性。In fact, during the construction process, a plurality of triangular positioning frames 9 can be used as needed to perform positioning constraints on the three positioning steel piles at different positions, so as to ensure the verticality and accurate position of the positioning steel piles. Only when the verticality and spacing of the three positioning steel piles meet the requirements can the verticality of the subsequent barrel foundation be guaranteed. The positioning steel piles should have sufficient strength and rigidity to maintain the plumb characteristics of the barrel foundation during the construction process.

可见,本技术把确保桶形基础的垂直度要求转化为定位钢桩的垂直度要求,而各类钢桩施工经验丰富,定位钢桩的垂直度较容易实现,从而达到降低桶形基础施工难度的目的。It can be seen that this technology transforms the verticality requirements of ensuring the barrel foundation into the verticality requirements of positioning steel piles, and various types of steel piles have rich construction experience, and the verticality of positioning steel piles is relatively easy to achieve, so as to reduce the difficulty of barrel foundation construction the goal of.

定位套管3的中空内径大于定位钢桩外径1~2cm,是为了使桶形基础能够套在定位钢桩上顺利的滑入海床。为了减少相互摩擦,甚至可以在定位套管3的内壁及定位钢桩的外壁上涂抹润滑剂。The hollow inner diameter of the positioning sleeve 3 is 1 to 2 cm larger than the outer diameter of the positioning steel pile, so that the barrel-shaped foundation can be placed on the positioning steel pile and slide into the seabed smoothly. In order to reduce mutual friction, lubricant can even be applied on the inner wall of the positioning sleeve 3 and the outer wall of the positioning steel pile.

一种便于控制垂直度的桶形基础和辅助组件的施工方法,详细描述如下:A construction method for barrel foundations and auxiliary components that facilitates verticality control, described in detail as follows:

1)、打入第一根定位钢桩:1) Drive in the first positioning steel pile:

根据设计参数,通过螺纹凸榫8拧入内置螺纹6,把一根定位钢桩底部节4与多根定位钢桩标准节7相互组装而成定位钢桩。在设计指定的海域竖直的打入第一根定位钢桩,如图6所示。According to the design parameters, the threaded tenon 8 is screwed into the built-in thread 6, and a positioning steel pile bottom section 4 is assembled with a plurality of positioning steel pile standard sections 7 to form a positioning steel pile. Drive the first positioning steel pile vertically in the designated sea area, as shown in Figure 6.

定位钢桩的铅垂度、入土深度等参数满足设计要求。一般地,定位钢桩的入土深度应大于桶形基础的沉贯深度。Parameters such as plumbness and soil penetration depth of positioning steel piles meet the design requirements. Generally, the penetration depth of positioning steel piles should be greater than the sinking depth of the barrel foundation.

2)、打入其它两根定位钢桩:2) Drive in the other two positioning steel piles:

把三角形定位架9的一个套筒10套住已打好的第一根定位钢桩,再依次把其它两根定位钢桩基于其它两个套筒10的限制与定位作用打入海床,最终使三根定位钢桩的中心距、铅垂度、入土深度等参数满足设计要求,如图7所示。Put a sleeve 10 of the triangular positioning frame 9 around the first positioning steel pile that has been laid, and then drive the other two positioning steel piles into the seabed based on the restriction and positioning of the other two sleeves 10, Finally, the parameters such as the center distance, plumbness, and soil depth of the three positioning steel piles meet the design requirements, as shown in Figure 7.

桶形基础的沉贯姿态依靠定位钢桩的引导与约束,故定位钢桩应能抵抗施工过程中的各类荷载而不发生侧移与倾斜,各构件的强度应能承受复杂工况下组合荷载的作用而不发生屈曲与变形,仍能保持铅垂状态。The sinking posture of the barrel foundation depends on the guidance and restraint of the positioning steel piles, so the positioning steel piles should be able to resist various loads during the construction process without side shifting and inclination, and the strength of each component should be able to withstand the combination under complex working conditions. Under the action of load, buckling and deformation do not occur, and the vertical state can still be maintained.

3)、套入桶形基础:3) Set into the barrel foundation:

从三根定位钢桩上取出三角形定位架9,起吊桶形基础使三个定位套管3套住三根定位钢桩并逐渐下沉,定位钢桩露出桶形基础顶面后再把三角形定位架9套在三根定位钢桩上,并使桶形基础沿着定位钢桩缓慢沉入海中直至接触海床,如图8所示。Take out the triangular positioning frame 9 from the three positioning steel piles, lift the barrel-shaped foundation so that the three positioning sleeves 3 cover the three positioning steel piles and gradually sink, and then place the triangular positioning frame 9 after the positioning steel piles expose the top surface of the barrel-shaped foundation. Set it on three positioning steel piles, and make the barrel-shaped foundation slowly sink into the sea along the positioning steel piles until it touches the seabed, as shown in Figure 8.

及时把三角形定位架9套住三根定位钢桩,是为了维护定位钢桩的垂直度,三根定位钢桩组装在一起整体刚度更大,避免过程中个别定位钢桩受到局部荷载而发生倾斜。Timely covering the three positioning steel piles with the triangular positioning frame 9 is to maintain the verticality of the positioning steel piles. When the three positioning steel piles are assembled together, the overall rigidity is greater, so as to avoid inclination of individual positioning steel piles due to local loads during the process.

4)、桶形基础贯入海床:4) The barrel foundation penetrates into the seabed:

打开连接桶形基础进出水阀2上的抽水系统抽取负压,使桶形基础在自重及负压作用下沿着定位钢桩贯入海床至设计深度,如图9所示。Open the pumping system connected to the inlet and outlet valve 2 of the barrel foundation to extract negative pressure, so that the barrel foundation penetrates into the seabed along the positioning steel piles to the design depth under the action of its own weight and negative pressure, as shown in Figure 9.

在三根定位钢桩垂直度满足要求的情况下,桶形基础沿着三根定位钢桩贯入海床,其垂直度自动满足要求,施工过程无需调平与反复校核。施工过程大大简化,施工难度大大降低,缩短了海上作业时间,从而降低了施工成本。When the verticality of the three positioning steel piles meets the requirements, the barrel-shaped foundation penetrates into the seabed along the three positioning steel piles, and its verticality automatically meets the requirements, and there is no need for leveling and repeated checks during the construction process. The construction process is greatly simplified, the construction difficulty is greatly reduced, and the offshore operation time is shortened, thereby reducing the construction cost.

5)、移除部分定位钢桩:5) Remove part of the positioning steel piles:

从三根定位钢桩上取出三角形定位架9,并逐个旋转、拧出、移除桶形基础顶面以上的定位钢桩标准节7,并而使桶形基础顶面以下的定位钢桩继续保留,从而完成桶形基础的沉贯施工,如图10所示。Take out the triangular positioning frame 9 from the three positioning steel piles, and rotate, unscrew and remove the positioning steel pile standard section 7 above the top surface of the barrel foundation one by one, and keep the positioning steel piles below the top surface of the barrel foundation , so as to complete the sinking construction of the barrel foundation, as shown in Figure 10.

桶形基础沉贯就位后,高出桶形基础顶面的定位钢桩影响后续施工,也影响该区域的航道,故需移除;定位钢桩的设计过程中,需考虑后续的解除、移除需要,通过螺纹凸榫8反向拧出内置螺纹6实现定位钢桩标准节7的移除。但桶形基础顶面以下的定位钢桩无需移除,其不影响后续施工,且保留该段对维持桶形基础在后续工作过程中的垂直度有利。After the barrel foundation is sunk in place, the positioning steel piles that are higher than the top surface of the barrel foundation will affect the subsequent construction and also affect the waterway in this area, so they need to be removed; during the design process of the positioning steel piles, it is necessary to consider the subsequent lifting, Removal needs, reversely unscrew the built-in thread 6 through the threaded tenon 8 to realize the removal of the standard section 7 of the positioning steel pile. However, the positioning steel piles below the top surface of the barrel foundation do not need to be removed, which will not affect the subsequent construction, and retaining this section is beneficial to maintaining the verticality of the barrel foundation in the subsequent work process.

本发明在桶体内壁上设置三个竖直、定位套管,定位套管的尺寸较小,该辅助构造不会明显增加桶形基础的制作难度与沉贯难度,具有经济性与实用性;把桶形基础沉贯过程中的垂直度问题转化为定位钢桩的垂直度问题,只要三根定位钢桩的垂直度满足要求,则桶形基础的垂直度自动满足要求,且无需后续的调平与校正;定位钢桩的垂直度较容易实现,从而整体上降低了桶形基础的施工难度。In the present invention, three vertical and positioning sleeves are arranged on the inner wall of the barrel, and the size of the positioning sleeves is small. This auxiliary structure will not significantly increase the difficulty of making and sinking the barrel-shaped foundation, and is economical and practical; The verticality problem in the barrel foundation sinking process is transformed into the verticality problem of the positioning steel piles. As long as the verticality of the three positioning steel piles meets the requirements, the verticality of the barrel foundation automatically meets the requirements without subsequent leveling and correction; the verticality of the positioning steel piles is easier to achieve, thus reducing the construction difficulty of the barrel foundation as a whole.

本发明不局限于上述具体实施方式,根据上述内容,按照本领域的普通技术知识和惯用手段,在不脱离本发明上述基本技术思想前提下,本发明还可以做出其它多种形式的等效修改、替换或变更,均落在本发明的保护范围之内。The present invention is not limited to the above-mentioned specific implementation methods. According to the above-mentioned content, according to the common technical knowledge and conventional means in this field, without departing from the above-mentioned basic technical idea of the present invention, the present invention can also make other equivalent forms. Amendments, substitutions or alterations all fall within the protection scope of the present invention.

Claims (6)

1.一种便于控制垂直度的桶形基础和辅助组件,其特征在于,包括桶形基础,桶形基础主体为倒置的桶体,桶体内壁设有三个沿着环形均匀分布的、贯穿桶体顶板的定位套管,桶体上端面设有与抽水系统相连接的进出水阀;1. A barrel-shaped foundation and auxiliary components that are convenient to control verticality, characterized in that it includes a barrel-shaped foundation, the main body of the barrel-shaped foundation is an inverted barrel, and the inner wall of the barrel is provided with three evenly distributed along the ring, penetrating the barrel The positioning sleeve of the top plate of the barrel body, the upper end of the barrel body is provided with an inlet and outlet valve connected with the pumping system; 所述辅助组件包括三角形定位架及利用其竖直打入海床中的三根定位钢桩;The auxiliary assembly includes a triangular positioning frame and three positioning steel piles vertically driven into the seabed by means of the triangular positioning frame; 所述的桶形基础活动套装于三根定位钢桩上,桶体沉入海中接触海床并贯入至设计深度。The barrel-shaped foundation is movable set on three positioning steel piles, and the barrel is sunk into the sea to contact the seabed and penetrate to the design depth. 2.根据权利要求1所述的便于控制垂直度的桶形基础和辅助组件,其特征在于,所述的桶体内壁焊接三个两两互夹120°的定位套管,定位套管的上部高出桶体顶板,定位套管的下端口呈指向桶壁的刀刃状,桶体上端面还设有与抽水系统相连接的进出水阀。2. The barrel-shaped foundation and auxiliary components that are convenient to control the verticality according to claim 1, characterized in that, the inner wall of the barrel is welded with three positioning sleeves that clamp each other at 120° in pairs, and the upper part of the positioning sleeves Higher than the top plate of the barrel body, the lower port of the positioning sleeve is in the shape of a knife pointing to the barrel wall, and the upper end surface of the barrel body is also provided with an inlet and outlet valve connected with the pumping system. 3.根据权利要求1所述的便于控制垂直度的桶形基础和辅助组件,其特征在于,所述的三角形定位架由三个套筒之间用钢管相互焊接成构成,各焊接处上下设置两个加筋肋,各套筒之间的中心距离与桶体上三个定位套管之间的中心距离相等。3. The barrel-shaped foundation and auxiliary components that are convenient to control verticality according to claim 1, wherein the triangular positioning frame is formed by welding steel pipes between three sleeves, and each welding point is arranged up and down Two reinforcing ribs, the center distance between the sleeves is equal to the center distance between the three positioning sleeves on the barrel body. 4.根据权利要求1所述的便于控制垂直度的桶形基础和辅助组件,其特征在于,所述的定位钢桩由一根定位钢桩底部节与多根定位钢桩标准节自下至上依次连接组装构成,定位钢桩底部节下端设有锥状桩尖,定位钢桩底部节上端设有螺纹连接孔;4. The barrel-shaped foundation and auxiliary components that are convenient to control the verticality according to claim 1, wherein the positioning steel pile is composed of a bottom section of the positioning steel pile and a plurality of standard sections of the positioning steel pile from bottom to top Connected and assembled sequentially, the lower end of the bottom section of the positioning steel pile is provided with a tapered pile tip, and the upper end of the bottom section of the positioning steel pile is provided with a threaded connection hole; 定位钢桩标准节一端设有螺纹凸榫,定位钢桩标准节另一端也设有螺纹连接孔,螺纹凸榫与螺纹连接孔相互匹配,通过把定位钢桩标准节的螺纹凸榫拧入底部节或其它标准节的螺纹连接孔实现相互固定与连接。One end of the positioning steel pile standard section is provided with a threaded tenon, and the other end of the positioning steel pile standard section is also provided with a threaded connection hole. The threaded tenon and the threaded connection hole match each other. By screwing the threaded tenon of the positioning steel pile standard section into the bottom The threaded connection holes of joints or other standard joints can be fixed and connected with each other. 5.根据权利要求1所述的便于控制垂直度的桶形基础和辅助组件,其特征在于,所述的桶体上定位套管的内径与三角形定位架上套筒内径相等,二者内径大于定位钢桩外径1~2cm。5. The barrel-shaped foundation and auxiliary assembly convenient to control verticality according to claim 1, characterized in that, the inner diameter of the positioning sleeve on the barrel body is equal to the inner diameter of the sleeve on the triangular positioning frame, and the inner diameters of the two are greater than The outer diameter of the positioning steel pile is 1~2cm. 6.一种便于控制垂直度的桶形基础和辅助组件的施工方法,其特征在于,包括如下步骤:6. A construction method for a bucket foundation and auxiliary components that is convenient to control verticality, is characterized in that, comprises the steps: 1)、打入第一根定位钢桩:1) Drive in the first positioning steel pile: 根据设计参数,通过螺纹凸榫拧入螺纹连接孔,把一根定位钢桩底部节与多根定位钢桩标准节相互组装而成定位钢桩,在设计指定的海域竖直的打入第一根定位钢桩;According to the design parameters, the threaded tenon is screwed into the threaded connection hole, and the bottom section of a positioning steel pile is assembled with multiple standard sections of the positioning steel pile to form a positioning steel pile, which is vertically driven into the first sea area in the designated sea area. Root positioning steel pile; 2)、打入其它两根定位钢桩:2) Drive in the other two positioning steel piles: 把三角形定位架的一个套筒套住已打好的第一根定位钢桩,再依次把其它两根定位钢桩基于其它两个套筒的限制与定位作用打入海床,最终使三根定位钢桩的中心距、铅垂度、入土深度等参数满足设计要求;Put a sleeve of the triangular positioning frame around the first positioning steel pile that has been laid, and then drive the other two positioning steel piles into the seabed based on the restriction and positioning of the other two sleeves, and finally make the three positioning steel piles Parameters such as the center distance, plumbness, and soil penetration depth of the positioning steel piles meet the design requirements; 3)、套入桶形基础:3) Set into the barrel foundation: 从三根定位钢桩上取出三角形定位架,起吊桶体使三个定位套管套住三根定位钢桩并逐渐下沉,定位钢桩露出桶体顶面后再把三角形定位架套在三根定位钢桩上,并使桶体沿着定位钢桩缓慢沉入海中直至接触海床;Take out the triangular positioning frame from the three positioning steel piles, lift the barrel so that the three positioning sleeves cover the three positioning steel piles and sink gradually. piles, and slowly sink the barrel into the sea along the positioning steel piles until it touches the seabed; 4)、桶形基础贯入海床:4) The barrel foundation penetrates into the seabed: 打开连接桶体进出水阀上的抽水系统抽取负压,使桶体在自重及负压作用下沿着定位钢桩贯入海床至设计深度;Open the pumping system connected to the water inlet and outlet valves of the barrel to draw negative pressure, so that the barrel penetrates into the seabed along the positioning steel piles to the design depth under the action of its own weight and negative pressure; 5)、移除部分定位钢桩:5) Remove part of the positioning steel piles: 从三根定位钢桩上取出三角形定位架,并逐个旋转、拧出、移除桶体顶面以上的定位钢桩标准节,并而使桶体顶面以下的定位钢桩继续保留,从而完成桶体基础沉贯施工。Take out the triangular positioning frame from the three positioning steel piles, and rotate, unscrew and remove the standard sections of the positioning steel piles above the top surface of the barrel body one by one, and keep the positioning steel piles below the top surface of the barrel body to complete the barrel. Body foundation sinking construction.
CN201710257792.4A 2017-04-19 2017-04-19 Barrel-shaped foundation and auxiliary assembly convenient for controlling verticality and construction method Expired - Fee Related CN106948366B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710257792.4A CN106948366B (en) 2017-04-19 2017-04-19 Barrel-shaped foundation and auxiliary assembly convenient for controlling verticality and construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710257792.4A CN106948366B (en) 2017-04-19 2017-04-19 Barrel-shaped foundation and auxiliary assembly convenient for controlling verticality and construction method

Publications (2)

Publication Number Publication Date
CN106948366A true CN106948366A (en) 2017-07-14
CN106948366B CN106948366B (en) 2023-10-13

Family

ID=59477275

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710257792.4A Expired - Fee Related CN106948366B (en) 2017-04-19 2017-04-19 Barrel-shaped foundation and auxiliary assembly convenient for controlling verticality and construction method

Country Status (1)

Country Link
CN (1) CN106948366B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111335354A (en) * 2019-11-11 2020-06-26 合肥学院 Ocean anchor foundation construction device with adjustable height

Citations (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102268880A (en) * 2010-06-04 2011-12-07 中国海洋石油总公司 Through-middle type cylindrical foundation and mounting process
CN102296623A (en) * 2011-06-27 2011-12-28 天津大学 Tripod type leveling offshore foundation structure and construction method thereof
CN202730789U (en) * 2012-03-29 2013-02-13 北京天工创道建筑科技有限公司 Foundation pile and integrated structure thereof
CN103741705A (en) * 2013-12-23 2014-04-23 中交第二航务工程局有限公司 Double-layer bucket cover suction type bucket pile composite foundation and constructing method thereof
CN204626445U (en) * 2015-05-21 2015-09-09 山东科技大学 A kind of barrel base with steel wing plate
US20150361965A1 (en) * 2013-01-29 2015-12-17 José Luis LLEYDA DIONIS Method of installation of an offshore wind turbine tower, with cement based on piles, and equipment for implementing said method
CN204940320U (en) * 2015-09-08 2016-01-06 山东科技大学 A kind of taper Blade fence
CN205188994U (en) * 2015-12-08 2016-04-27 山东科技大学 Take branch storehouse skirt -type suction bucket shape basis of pterygoid lamina
CN205444224U (en) * 2015-12-24 2016-08-10 山东科技大学 Convex bucket foundation with ribbing in surface
CN106087928A (en) * 2016-07-27 2016-11-09 合肥学院 An axisymmetric barrel-shaped foundation single-leg column oil production platform and its construction method
CN205742258U (en) * 2016-06-15 2016-11-30 江苏建筑职业技术学院 Good stability is prone to the heavy barrel base passed through
CN205857222U (en) * 2016-06-15 2017-01-04 江苏建筑职业技术学院 Triangle knife-edge barrel base
CN207331731U (en) * 2017-04-19 2018-05-08 合肥学院 A kind of barrel base easy to control verticality

Patent Citations (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102268880A (en) * 2010-06-04 2011-12-07 中国海洋石油总公司 Through-middle type cylindrical foundation and mounting process
CN102296623A (en) * 2011-06-27 2011-12-28 天津大学 Tripod type leveling offshore foundation structure and construction method thereof
CN202730789U (en) * 2012-03-29 2013-02-13 北京天工创道建筑科技有限公司 Foundation pile and integrated structure thereof
US20150361965A1 (en) * 2013-01-29 2015-12-17 José Luis LLEYDA DIONIS Method of installation of an offshore wind turbine tower, with cement based on piles, and equipment for implementing said method
CN103741705A (en) * 2013-12-23 2014-04-23 中交第二航务工程局有限公司 Double-layer bucket cover suction type bucket pile composite foundation and constructing method thereof
CN204626445U (en) * 2015-05-21 2015-09-09 山东科技大学 A kind of barrel base with steel wing plate
CN204940320U (en) * 2015-09-08 2016-01-06 山东科技大学 A kind of taper Blade fence
CN205188994U (en) * 2015-12-08 2016-04-27 山东科技大学 Take branch storehouse skirt -type suction bucket shape basis of pterygoid lamina
CN205444224U (en) * 2015-12-24 2016-08-10 山东科技大学 Convex bucket foundation with ribbing in surface
CN205742258U (en) * 2016-06-15 2016-11-30 江苏建筑职业技术学院 Good stability is prone to the heavy barrel base passed through
CN205857222U (en) * 2016-06-15 2017-01-04 江苏建筑职业技术学院 Triangle knife-edge barrel base
CN106087928A (en) * 2016-07-27 2016-11-09 合肥学院 An axisymmetric barrel-shaped foundation single-leg column oil production platform and its construction method
CN207331731U (en) * 2017-04-19 2018-05-08 合肥学院 A kind of barrel base easy to control verticality

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111335354A (en) * 2019-11-11 2020-06-26 合肥学院 Ocean anchor foundation construction device with adjustable height
CN111335354B (en) * 2019-11-11 2021-06-04 合肥学院 Ocean anchor foundation construction device with adjustable height

Also Published As

Publication number Publication date
CN106948366B (en) 2023-10-13

Similar Documents

Publication Publication Date Title
CN204370469U (en) A kind of drilled pile long leg jacket offshore wind turbine foundation
CN103233481B (en) Jacket supporting structure capable of being connected in grouting mode
CN106930313A (en) A kind of coastal waters wind energy project stake bucket combination foundation and its construction method
CN102605772A (en) Construction method for revolving digging cast-in-place pile
CN109024719B (en) A method of rectifying the inclination of buildings with pile side disturbance and resistance reduction
CN109306706B (en) A main and auxiliary barrel seabed penetration device and construction method thereof
CN205712137U (en) Foundation pit supporting construction
CN108316338A (en) A kind of suction penetration type arc steel anchor
WO2017096643A1 (en) Tubular pile having unfolding blades and construction method thereof
CN207331731U (en) A kind of barrel base easy to control verticality
CN203796175U (en) Embedment reamer for steel casings of rotary drilling bored piles
CN106948368A (en) A kind of barrel base and three barrels of joint accessory parts and construction method
CN206971251U (en) A kind of coastal waters wind energy project stake bucket combination foundation
CN106948366A (en) A kind of barrel base and accessory part and construction method for being easy to control perpendicularity
CN108625388B (en) Sleeve combined type large-diameter single pile foundation suitable for shallow bedrock geological conditions and construction method thereof
CN207160044U (en) A kind of three barrel base conjoined assembly
CN205154025U (en) Drill bit that construction drilling bored concrete pile was used
CN204418167U (en) A kind of novel slurry filling pile body structure
CN114960715B (en) Underground engineering surge treatment device and control method
CN206971210U (en) A kind of long casing in pile foundation construction
CN106759558B (en) A kind of control is buried in the earth the construction method of stand column pile direction and verticality
CN104818738A (en) Small steel storage tank annular wall foundation tank bottom plate taper repairing method
CN106555390A (en) The jacket-type location structure of catheterostat piling under water
CN212153370U (en) A self-elevating platform pile shoe with reduced pull-up resistance
CN103835240A (en) Buoyancy tank type deepwater pile group bridge abutment construction platform and construction method thereof

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20231013