CN106948366B - Barrel-shaped foundation and auxiliary assembly convenient for controlling verticality and construction method - Google Patents
Barrel-shaped foundation and auxiliary assembly convenient for controlling verticality and construction method Download PDFInfo
- Publication number
- CN106948366B CN106948366B CN201710257792.4A CN201710257792A CN106948366B CN 106948366 B CN106948366 B CN 106948366B CN 201710257792 A CN201710257792 A CN 201710257792A CN 106948366 B CN106948366 B CN 106948366B
- Authority
- CN
- China
- Prior art keywords
- barrel
- positioning
- positioning steel
- foundation
- shaped foundation
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000010276 construction Methods 0.000 title claims abstract description 46
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 148
- 239000010959 steel Substances 0.000 claims abstract description 148
- 230000035515 penetration Effects 0.000 claims abstract description 9
- 238000005086 pumping Methods 0.000 claims abstract description 8
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims abstract description 8
- 230000000149 penetrating effect Effects 0.000 claims description 3
- 230000003014 reinforcing effect Effects 0.000 claims description 3
- 230000000717 retained effect Effects 0.000 claims description 3
- 238000003466 welding Methods 0.000 claims description 3
- 238000000034 method Methods 0.000 abstract description 18
- 238000010586 diagram Methods 0.000 description 7
- 238000005516 engineering process Methods 0.000 description 4
- 230000009286 beneficial effect Effects 0.000 description 2
- 239000002689 soil Substances 0.000 description 2
- 238000004458 analytical method Methods 0.000 description 1
- 238000012938 design process Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 238000011031 large-scale manufacturing process Methods 0.000 description 1
- 239000000314 lubricant Substances 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 230000001737 promoting effect Effects 0.000 description 1
- 238000007789 sealing Methods 0.000 description 1
- 238000004904 shortening Methods 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D27/00—Foundations as substructures
- E02D27/32—Foundations for special purposes
- E02D27/42—Foundations for poles, masts or chimneys
- E02D27/425—Foundations for poles, masts or chimneys specially adapted for wind motors masts
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D27/00—Foundations as substructures
- E02D27/32—Foundations for special purposes
- E02D27/52—Submerged foundations, i.e. submerged in open water
- E02D27/525—Submerged foundations, i.e. submerged in open water using elements penetrating the underwater ground
Landscapes
- Engineering & Computer Science (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Piles And Underground Anchors (AREA)
- Revetment (AREA)
Abstract
Description
技术领域:Technical areas:
本发明涉及海洋平台和海上风机基础,具体涉及一种吸力式桶形基础,尤其涉及一种便于控制垂直度的桶形基础和辅助组件及施工方法。The present invention relates to offshore platforms and offshore wind turbine foundations, specifically to a suction barrel foundation, and in particular to a barrel foundation and auxiliary components and construction methods that facilitate vertical control.
背景技术:Background technique:
桶形基础产生于二十世纪九十年代的挪威,是一种带裙的圆板基础,由于其具有减小工程量、节约投资、缩短海上施工时间、可重复使用等特点,逐渐被运用至海洋平台与海上风机基础中。The barrel foundation was produced in Norway in the 1990s. It is a circular plate foundation with a skirt. Due to its characteristics of reducing the amount of work, saving investment, shortening offshore construction time, and being reusable, it has been gradually used in Offshore platforms and offshore wind turbine foundations.
桶形基础在沉贯过程中需保持竖直贯入,若产生一定程度的倾斜,需通过调平使其保持竖直状态,否则影响其使用功能。参考文献[1]对渤海海域某油田的桶形基础施工进行了介绍,施工过程中桶形基础发生倾斜、桶壁出现过大变形与裂纹、土塞现象严重,导致桶形基础的施工以失败告终。可见,如何有效控制与维持桶形基础沉贯过程中的垂直度,是桶形基础施工过程中的关键技术之一。The barrel-shaped foundation needs to be kept vertical during the sinking process. If it tilts to a certain extent, it needs to be leveled to keep it vertical, otherwise its function will be affected. Reference [1] introduces the construction of barrel foundation in an oil field in the Bohai Sea. During the construction process, the barrel foundation tilted, the barrel wall suffered excessive deformation and cracks, and soil plugging was serious, resulting in the failure of the barrel foundation construction. end. It can be seen that how to effectively control and maintain the verticality during the sinking process of barrel foundation is one of the key technologies in the construction process of barrel foundation.
特别地,桶形基础的构型越来越多样化。如中国专利公告号CN205742258U、CN205857222U、CN205444224U、CN204940320U、CN205188994U、CN204626445U等公开了多种新型桶形基础构型,这些设计丰富了桶形基础的功能,但同时在一定程度上也增加了桶形基础的沉贯施工难度。现行桶形基础的各类设计构型,对施工过程的方便性、可行性考虑较少。In particular, the configurations of barrel foundations are becoming increasingly diverse. For example, Chinese patent announcement numbers CN205742258U, CN205857222U, CN205444224U, CN204940320U, CN205188994U, CN204626445U, etc. disclose a variety of new barrel-shaped foundation configurations. These designs enrich the functions of the barrel-shaped foundation, but at the same time, to a certain extent, they also increase the number of barrel-shaped foundations. The difficulty of sinking construction. The current various design configurations of barrel foundations give less consideration to the convenience and feasibility of the construction process.
若在桶形基础的结构上增加一些方便施工的辅助构造,确保桶形基础沉贯的垂直度,并缩短海上施工时间,则可大大降低桶形基础的施工难度与施工成本,进而促进桶形基础在工程中的应用。可见,有必要探讨适应海上施工的桶形基础构型,促进现有桶形基础施工技术的革新与进步。If some auxiliary structures are added to the structure of the barrel foundation to facilitate construction, ensure the verticality of the barrel foundation sinking, and shorten the offshore construction time, the construction difficulty and construction cost of the barrel foundation can be greatly reduced, thereby promoting the barrel foundation Application of fundamentals in engineering. It can be seen that it is necessary to explore the barrel foundation configuration suitable for offshore construction and promote the innovation and progress of the existing barrel foundation construction technology.
参考文献:[1] 张翊飞. 筒形基础安装失败案例分析[J]. 造船技术, 2014, 6:16-19。References: [1] Zhang Yifei. Case analysis of tubular foundation installation failure[J]. Shipbuilding Technology, 2014, 6:16-19.
发明内容:Contents of the invention:
为了弥补现有技术问题的不足,本发明的目的是提供一种便于控制垂直度的桶形基础和辅助组件及施工方法,桶形基础上均匀设置三个定位套管,能引导桶形基础竖直的贯入海床,方便沉贯施工。In order to make up for the shortcomings of the existing technical problems, the purpose of the present invention is to provide a barrel-shaped foundation, auxiliary components and a construction method that facilitate control of verticality. Three positioning casings are evenly arranged on the barrel-shaped foundation to guide the verticality of the barrel-shaped foundation. It penetrates straight into the seabed to facilitate sinking construction.
本发明的技术方案如下:The technical solution of the present invention is as follows:
便于控制垂直度的桶形基础和辅助组件,其特征在于,包括桶形基础,桶形基础主体为倒置的桶体,桶体内壁设有三个沿着环形均匀分布的、贯穿桶体顶板的定位套管,桶体上端面设有与抽水系统相连接的进出水阀;A barrel-shaped foundation and auxiliary components that facilitate control of verticality are characterized in that they include a barrel-shaped foundation, the main body of the barrel-shaped foundation is an inverted barrel, and the inner wall of the barrel is provided with three positioning points evenly distributed along the ring and penetrating the top plate of the barrel The upper end of the casing and barrel is equipped with an inlet and outlet valve connected to the water pumping system;
所述辅助组件包括三角形定位架及利用其竖直打入海床中的三根定位钢桩;The auxiliary components include a triangular positioning frame and three positioning steel piles driven vertically into the seabed;
所述的桶形基础活动套装于三根定位钢桩上,桶体沉入海中接触海床并贯入至设计深度。The barrel-shaped foundation is movablely mounted on three positioning steel piles, and the barrel is sunk into the sea to contact the seabed and penetrate to the designed depth.
所述的便于控制垂直度的桶形基础和辅助组件,其特征在于,所述的桶体内壁焊接三个两两互夹120°的定位套管,定位套管的上部高出桶体顶板,定位套管的下端口呈指向桶壁的刀刃状,桶体上端面还设有与抽水系统相连接的进出水阀。The barrel-shaped foundation and auxiliary components that facilitate control of verticality are characterized in that three positioning sleeves sandwiching each other at 120° are welded to the inner wall of the barrel, and the upper part of the positioning sleeves is higher than the top plate of the barrel. The lower port of the positioning sleeve is in the shape of a blade pointing toward the barrel wall, and the upper end surface of the barrel is also provided with an inlet and outlet valve connected to the water pumping system.
所述的便于控制垂直度的桶形基础和辅助组件,其特征在于,所述的三角形定位架由三个套筒之间用钢管相互焊接成构成,各焊接处上下设置两个加筋肋,各套筒之间的中心距离与桶体上三个定位套管之间的中心距离相等。The barrel-shaped foundation and auxiliary components that facilitate control of verticality are characterized in that the triangular positioning frame is composed of three sleeves welded to each other with steel pipes, and two reinforcing ribs are provided up and down at each welding point. The center distance between each sleeve is equal to the center distance between the three positioning sleeves on the barrel.
所述的便于控制垂直度的桶形基础和辅助组件,其特征在于,所述的定位钢桩由一根定位钢桩底部节与多根定位钢桩标准节自下至上依次连接组装构成,定位钢桩底部节下端设有锥状桩尖,定位钢桩底部节上端设有螺纹连接孔;The barrel-shaped foundation and auxiliary components that facilitate control of verticality are characterized in that the positioning steel pile is composed of a bottom section of a positioning steel pile and a plurality of standard sections of a positioning steel pile connected and assembled in sequence from bottom to top. The lower end of the bottom section of the steel pile is provided with a tapered pile tip, and the upper end of the positioning steel pile bottom section is provided with a threaded connection hole;
定位钢桩标准节一端设有螺纹凸榫,定位钢桩标准节另一端也设有螺纹连接孔,螺纹凸榫与螺纹连接孔相互匹配,通过把定位钢桩标准节的螺纹凸榫拧入底部节或其它标准节的螺纹连接孔实现相互固定与连接。One end of the standard section of the positioning steel pile is equipped with a threaded tenon, and the other end of the standard section of the positioning steel pile is also provided with a threaded connection hole. The threaded tenon and the threaded connection hole match each other. By screwing the threaded tenon of the standard section of the positioning steel pile into the bottom The threaded connection holes of joints or other standard joints realize mutual fixation and connection.
所述的便于控制垂直度的桶形基础和辅助组件,其特征在于,所述的桶体上定位套管的内径与三角形定位架上套筒内径相等,二者内径大于定位钢桩外径1~2cm。The barrel-shaped foundation and auxiliary components that facilitate control of verticality are characterized in that the inner diameter of the positioning sleeve on the barrel is equal to the inner diameter of the sleeve on the triangular positioning frame, and the inner diameter of both is greater than the outer diameter of the positioning steel pile by 1 ~2cm.
一种便于控制垂直度的桶形基础和辅助组件的施工方法,其特征在于,包括如下步骤:A construction method for barrel-shaped foundations and auxiliary components that facilitates control of verticality, which is characterized by including the following steps:
1)、打入第一根定位钢桩:1). Driving the first positioning steel pile:
根据设计参数,通过螺纹凸榫拧入螺纹连接孔,把一根定位钢桩底部节与多根定位钢桩标准节相互组装而成定位钢桩,在设计指定的海域竖直的打入第一根定位钢桩;According to the design parameters, the threaded tenon is screwed into the threaded connection hole, and the bottom section of a positioning steel pile and the standard sections of multiple positioning steel piles are assembled with each other to form a positioning steel pile. The first positioning steel pile is driven vertically in the designated sea area. Root positioning steel pile;
2)、打入其它两根定位钢桩:2) Drive the other two positioning steel piles:
把三角形定位架的一个套筒套住已打好的第一根定位钢桩,再依次把其它两根定位钢桩基于其它两个套筒的限制与定位作用打入海床,最终使三根定位钢桩的中心距、铅垂度、入土深度等参数满足设计要求;Put a sleeve of the triangular positioning frame around the first positioning steel pile that has been driven, and then drive the other two positioning steel piles into the seabed based on the restrictions and positioning functions of the other two sleeves, and finally drive the three positioning steel piles into the seabed. Parameters such as center distance, plumb degree, and depth of penetration of positioning steel piles meet the design requirements;
3)、套入桶形基础:3) Insert the barrel-shaped foundation:
从三根定位钢桩上取出三角形定位架,起吊桶体使三个定位套管套住三根定位钢桩并逐渐下沉,定位钢桩露出桶体顶面后再把三角形定位架套在三根定位钢桩上,并使桶体沿着定位钢桩缓慢沉入海中直至接触海床;Take out the triangular positioning frame from the three positioning steel piles, lift the barrel so that the three positioning sleeves cover the three positioning steel piles and gradually sink. After the positioning steel piles are exposed on the top surface of the barrel, put the triangular positioning frame on the three positioning steel piles. piles, and the barrel slowly sinks into the sea along the positioning steel piles until it touches the seabed;
4)、桶形基础贯入海床:4) The barrel-shaped foundation penetrates into the seabed:
打开连接桶体进出水阀上的抽水系统抽取负压,使桶体在自重及负压作用下沿着定位钢桩贯入海床至设计深度;Open the pumping system connected to the inlet and outlet valve of the barrel to extract negative pressure, so that the barrel penetrates into the seabed along the positioning steel piles to the designed depth under the action of its own weight and negative pressure;
5)、移除部分定位钢桩:5) Remove some positioning steel piles:
从三根定位钢桩上取出三角形定位架,并逐个旋转、拧出、移除桶体顶面以上的定位钢桩标准节,并而使桶体顶面以下的定位钢桩继续保留,从而完成桶体基础沉贯施工。Take out the triangular positioning frame from the three positioning steel piles, and rotate, screw out, and remove the standard sections of the positioning steel piles above the top of the barrel one by one, while leaving the positioning steel piles below the top of the barrel to complete the barrel. Body foundation sinking and penetration construction.
本发明的有益效果是:The beneficial effects of the present invention are:
1、本发明在桶体内壁上设置三个竖直、中空的定位套孔,定位套孔的尺寸较小,该辅助构造不会明显增加桶形基础的制作难度与沉贯难度,具有经济性与实用性;1. The present invention provides three vertical, hollow positioning sleeve holes on the inner wall of the barrel. The size of the positioning sleeve holes is small. This auxiliary structure will not significantly increase the difficulty of making and sinking the barrel-shaped foundation, and is economical. and practicality;
2、本发明把桶形基础沉贯过程中的垂直度问题转化为定位钢桩的垂直度问题,只要三根定位钢桩的垂直度满足要求,则桶形基础的垂直度自动满足要求,且无需后续的调平与校正;定位钢桩的垂直度较容易实现,从而整体上降低了桶形基础的施工难度;2. The present invention transforms the verticality problem during the sinking process of the barrel-shaped foundation into the verticality problem of the positioning steel piles. As long as the verticality of the three positioning steel piles meets the requirements, the verticality of the barrel-shaped foundation automatically meets the requirements without the need for Subsequent leveling and correction; the verticality of the positioned steel piles is easier to achieve, thus reducing the construction difficulty of the barrel foundation as a whole;
3、本发明桶形基础施工结束后,桶形基础顶面以下的定位钢桩继续保留,其能持续的为桶形基础进行定位与限制,保证桶形基础在后续使用过程中的垂直度,显然对工程有利。3. After the construction of the barrel foundation of the present invention is completed, the positioning steel piles below the top surface of the barrel foundation continue to be retained, which can continuously position and restrict the barrel foundation to ensure the verticality of the barrel foundation during subsequent use. Obviously good for the project.
附图说明:Picture description:
图1 为本发明的桶形基础俯视图。Figure 1 is a top view of the barrel-shaped foundation of the present invention.
图2 为本发明的桶形基础仰视图。Figure 2 is a bottom view of the barrel-shaped foundation of the present invention.
图3 为本发明的桶形基础横截面剖面图。Figure 3 is a cross-sectional view of the barrel foundation of the present invention.
图4 为本发明的定位钢桩配件及组装示意图。Figure 4 is a schematic diagram of positioning steel pile accessories and assembly of the present invention.
图5 为本发明的三角形定位架结构示意图。Figure 5 is a schematic structural diagram of the triangular positioning frame of the present invention.
图6 为本发明施工第一根定位钢桩示意图。Figure 6 is a schematic diagram of the first positioning steel pile constructed according to the present invention.
图7 为本发明三根定位钢桩施工完毕示意图。Figure 7 is a schematic diagram of the completion of construction of three positioning steel piles according to the present invention.
图8 为本发明桶形基础套入三根定位钢桩示意图。Figure 8 is a schematic diagram of three positioning steel piles inserted into the barrel-shaped foundation of the present invention.
图9 为本发明桶形基础贯入海床示意图。Figure 9 is a schematic diagram of the barrel-shaped foundation penetrating into the seabed according to the present invention.
图10 为本发明桶形基础施工完毕示意图。Figure 10 is a schematic diagram of the barrel-shaped foundation construction completed according to the present invention.
附图标记说明:1、桶体;2、进出水阀;3、定位套管;4、定位钢桩底部节;5、锥状桩尖;6、螺纹连接孔;7、定位钢桩标准节;8、螺纹凸榫;9、三角形定位架;10、套筒;11、加筋肋;A、海平面;B、海床面。Explanation of reference signs: 1. Barrel; 2. Water inlet and outlet valve; 3. Positioning sleeve; 4. Positioning steel pile bottom section; 5. Conical pile tip; 6. Threaded connection hole; 7. Positioning steel pile standard section ; 8. Threaded tenon; 9. Triangular positioning frame; 10. Sleeve; 11. Reinforced rib; A. Sea level; B. Sea bed surface.
具体实施方式:Detailed ways:
参见附图:See attached picture:
一种便于控制垂直度的桶形基础和辅助组件,包括桶体1与定位套管3,在桶形基础桶体1的内壁对称、均匀的焊接三个定位套管3,施工时基于三角形定位架9预先打设三根竖直的定位钢桩,再把桶形基础的三个定位套管3套住三根定位钢桩沉入海中接触海床,在自重及桶内外压力差作用下把桶形基础贯入海床至设计深度,整个过程桶形基础的垂直度能自动满足,由此构成便于施工的新型桶形基础。A barrel-shaped foundation and auxiliary components for easy control of verticality, including a barrel 1 and a positioning sleeve 3. Three positioning sleeves 3 are symmetrically and evenly welded on the inner wall of the barrel 1 of the barrel-shaped foundation. The construction is based on triangular positioning. Three vertical positioning steel piles are pre-installed on the frame 9, and then the three positioning casings 3 of the barrel-shaped foundation are placed around the three positioning steel piles and sunk into the sea to contact the seabed. Under the action of the dead weight and the pressure difference between the inside and outside of the barrel, the barrel-shaped foundation is The foundation penetrates into the seabed to the design depth, and the verticality of the barrel foundation can be automatically satisfied during the entire process, thus forming a new barrel foundation that is easy to construct.
桶形基础桶体1的内壁对称、均匀的焊接三个定位套管3,定位套管3的上部透过、高出桶形基础顶板,定位套管3的下部呈指向桶壁的刀刃状,方便桶形基础的下沉,如图1与图2所示。Three positioning sleeves 3 are welded symmetrically and evenly on the inner wall of the barrel-shaped foundation barrel 1. The upper part of the positioning sleeve 3 passes through and is higher than the top plate of the barrel-shaped foundation. The lower part of the positioning sleeve 3 is in the shape of a knife edge pointing toward the barrel wall. It facilitates the sinking of the barrel-shaped foundation, as shown in Figures 1 and 2.
桶体1上三个定位套管3与中心轴的连线互成120º,如图3所示:定位套管3与桶体内壁焊接相连,其下部呈刀刃状,可减少沉贯的阻力,便于施工。定位套管3的顶部高出桶形基础的顶板,其对桶体内部的封闭性无影响。设计三个定位套管3,是为了利用三角形的稳定性,使后续三根定位钢桩的整体稳定性满足施工要求。The connection lines between the three positioning sleeves 3 on the barrel 1 and the central axis are 120° to each other, as shown in Figure 3: the positioning sleeves 3 are welded and connected to the inner wall of the barrel, and the lower part is blade-shaped, which can reduce the resistance of sinking. Easy to construct. The top of the positioning sleeve 3 is higher than the top plate of the barrel foundation, which has no effect on the sealing property inside the barrel. The three positioning casings 3 are designed to utilize the stability of the triangle to ensure that the overall stability of the subsequent three positioning steel piles meets the construction requirements.
定位钢桩由一根定位钢桩底部节4与多根定位钢桩标准节7组装而成,定位钢桩底部节4的一端为锥状桩尖5,定位钢桩底部节4的另一端为内部带内置螺纹6的中空段,定位钢桩标准节7的一端为螺纹凸榫8,定位钢桩标准节7的另一端为内部带内置螺纹6的中空段,螺纹凸榫8与内置螺纹6相互匹配,通过把定位钢桩标准节7的螺纹凸榫8拧入底部节4或其它标准节7的内置螺纹6实现相互固定与连接,如图4所示。The positioning steel pile is assembled from a positioning steel pile bottom section 4 and a plurality of positioning steel pile standard sections 7. One end of the positioning steel pile bottom section 4 is a cone-shaped pile tip 5, and the other end of the positioning steel pile bottom section 4 is There is a hollow section with a built-in thread 6 inside. One end of the positioning steel pile standard section 7 is a threaded tenon 8. The other end of the positioning steel pile standard section 7 is a hollow section with a built-in thread 6. The threaded tenon 8 and the built-in thread 6 To match each other, mutual fixation and connection can be achieved by screwing the threaded tenons 8 of the standard section 7 of the positioning steel pile into the built-in threads 6 of the bottom section 4 or other standard sections 7, as shown in Figure 4.
一般定位钢桩底部节4与定位钢桩标准节7的长度相同。定位钢桩标准节7可进行标准化、规格化、规模化制作,满足不同情况下不同深度的需求。通过螺纹凸榫8与内置螺纹6相互拧入连接,实现定位钢桩的延长与续接。Generally, the length of the bottom section 4 of the positioning steel pile is the same as the length of the standard section 7 of the positioning steel pile. The positioning steel pile standard section 7 can be standardized, standardized and large-scale production to meet the needs of different depths under different circumstances. By screwing the threaded tenon 8 and the built-in thread 6 into each other, the positioning steel pile can be extended and continued.
定位钢桩的作用主要是引导桶形基础垂直贯入海床,施工过程中其受到的水平荷载与竖向荷载均较小,故其截面尺寸不需要太大,只要其能维持桶形基础的垂直度即可。虽称其为“定位钢桩”,实际上属于“定位钢棒”。优选地,定位钢桩的外径取10~25cm。The main function of the positioning steel pile is to guide the barrel-shaped foundation to penetrate vertically into the seabed. During the construction process, the horizontal and vertical loads it receives are small, so its cross-sectional size does not need to be too large, as long as it can maintain the verticality of the barrel-shaped foundation. Just the degree. Although it is called "positioning steel pile", it is actually a "positioning steel rod". Preferably, the outer diameter of the positioning steel pile is 10~25cm.
三角形定位架9为三个套筒10之间用钢管相互焊接而成,各焊接处上下设置两个加筋肋11,各套筒10之间的中心距离与桶体1上三个定位套管3之间的中心距离相等,如图5所示。桶体1上定位套管3的中空内径与三角形定位架9上套筒10的内径相等,桶体1上定位套管3的中空内径大于定位钢桩外径1~2cm。The triangular positioning frame 9 is made of steel pipes welded to each other between three sleeves 10. Two reinforcing ribs 11 are provided up and down at each welding point. The center distance between each sleeve 10 is equal to the three positioning sleeves on the barrel 1. The center distances between 3 are equal, as shown in Figure 5. The hollow inner diameter of the positioning sleeve 3 on the barrel 1 is equal to the inner diameter of the sleeve 10 on the triangular positioning frame 9. The hollow inner diameter of the positioning sleeve 3 on the barrel 1 is 1~2 cm larger than the outer diameter of the positioning steel pile.
三角形定位架9的作用是准确定位与限制三根定位钢桩的位置,使三根定位钢桩铅垂状态的插入海床,三根定位钢桩中心轴之间的距离即为桶体1上三个定位套管3中心轴之间的距离。The function of the triangular positioning frame 9 is to accurately locate and limit the positions of the three positioning steel piles, so that the three positioning steel piles can be inserted into the seabed in a vertical state. The distance between the central axes of the three positioning steel piles is the three positioning positions on the barrel 1 The distance between the central axes of casing 3.
事实上,施工过程中可根据需要使用多个三角形定位架9,对三根定位钢桩在不同位置进行定位约束,确保定位钢桩的垂直度与位置准确。只有三根定位钢桩的垂直度与间距满足要求,才能确保后续桶形基础的垂直度满足要求。定位钢桩应有足够的强度与刚度,在施工过程中能维持桶形基础的铅垂特性。In fact, during the construction process, multiple triangular positioning frames 9 can be used as needed to constrain the three positioning steel piles at different positions to ensure the accuracy of the verticality and position of the positioning steel piles. Only if the verticality and spacing of the three positioning steel piles meet the requirements can the verticality of the subsequent barrel-shaped foundation meet the requirements. Positioning steel piles should have sufficient strength and rigidity to maintain the plumb characteristics of the barrel foundation during the construction process.
可见,本技术把确保桶形基础的垂直度要求转化为定位钢桩的垂直度要求,而各类钢桩施工经验丰富,定位钢桩的垂直度较容易实现,从而达到降低桶形基础施工难度的目的。It can be seen that this technology transforms the verticality requirements of ensuring the barrel-shaped foundation into the verticality requirements of positioning steel piles. With rich experience in the construction of various types of steel piles, the verticality of positioning steel piles is easier to achieve, thereby reducing the difficulty of construction of barrel-shaped foundations. the goal of.
定位套管3的中空内径大于定位钢桩外径1~2cm,是为了使桶形基础能够套在定位钢桩上顺利的滑入海床。为了减少相互摩擦,甚至可以在定位套管3的内壁及定位钢桩的外壁上涂抹润滑剂。The hollow inner diameter of the positioning casing 3 is 1 to 2 cm larger than the outer diameter of the positioning steel pile, so that the barrel-shaped foundation can be placed on the positioning steel pile and slide into the seabed smoothly. In order to reduce mutual friction, lubricant can even be applied on the inner wall of the positioning sleeve 3 and the outer wall of the positioning steel pile.
一种便于控制垂直度的桶形基础和辅助组件的施工方法,详细描述如下:A construction method for barrel-shaped foundations and auxiliary components that facilitates control of verticality is described in detail as follows:
1)、打入第一根定位钢桩:1). Driving the first positioning steel pile:
根据设计参数,通过螺纹凸榫8拧入内置螺纹6,把一根定位钢桩底部节4与多根定位钢桩标准节7相互组装而成定位钢桩。在设计指定的海域竖直的打入第一根定位钢桩,如图6所示。According to the design parameters, the threaded tenon 8 is screwed into the built-in thread 6, and the bottom section 4 of one positioning steel pile and the standard sections 7 of multiple positioning steel piles are assembled with each other to form a positioning steel pile. Drive the first positioning steel pile vertically in the sea area designated by the design, as shown in Figure 6.
定位钢桩的铅垂度、入土深度等参数满足设计要求。一般地,定位钢桩的入土深度应大于桶形基础的沉贯深度。Parameters such as the plumbness and depth of the positioning steel piles meet the design requirements. Generally, the penetration depth of positioning steel piles should be greater than the penetration depth of barrel foundation.
2)、打入其它两根定位钢桩:2) Drive the other two positioning steel piles:
把三角形定位架9的一个套筒10套住已打好的第一根定位钢桩,再依次把其它两根定位钢桩基于其它两个套筒10的限制与定位作用打入海床,最终使三根定位钢桩的中心距、铅垂度、入土深度等参数满足设计要求,如图7所示。Put a sleeve 10 of the triangular positioning frame 9 around the first positioning steel pile that has been driven, and then drive the other two positioning steel piles into the seabed based on the restriction and positioning functions of the other two sleeves 10. Finally, the center distance, plumb degree, soil penetration depth and other parameters of the three positioning steel piles met the design requirements, as shown in Figure 7.
桶形基础的沉贯姿态依靠定位钢桩的引导与约束,故定位钢桩应能抵抗施工过程中的各类荷载而不发生侧移与倾斜,各构件的强度应能承受复杂工况下组合荷载的作用而不发生屈曲与变形,仍能保持铅垂状态。The sinking posture of the barrel-shaped foundation relies on the guidance and restraint of the positioning steel piles. Therefore, the positioning steel piles should be able to resist various loads during the construction process without lateral movement and tilt. The strength of each component should be able to withstand the combination under complex working conditions. No buckling or deformation occurs under the action of load, and the plumb state can still be maintained.
3)、套入桶形基础:3) Insert the barrel-shaped foundation:
从三根定位钢桩上取出三角形定位架9,起吊桶形基础使三个定位套管3套住三根定位钢桩并逐渐下沉,定位钢桩露出桶形基础顶面后再把三角形定位架9套在三根定位钢桩上,并使桶形基础沿着定位钢桩缓慢沉入海中直至接触海床,如图8所示。Take out the triangular positioning frame 9 from the three positioning steel piles, lift the barrel-shaped foundation so that the three positioning sleeves 3 cover the three positioning steel piles and gradually sink. After the positioning steel piles expose the top surface of the barrel-shaped foundation, lift the triangular positioning frame 9 It is placed on three positioning steel piles, and the barrel-shaped foundation is slowly sunk into the sea along the positioning steel piles until it touches the seabed, as shown in Figure 8.
及时把三角形定位架9套住三根定位钢桩,是为了维护定位钢桩的垂直度,三根定位钢桩组装在一起整体刚度更大,避免过程中个别定位钢桩受到局部荷载而发生倾斜。The purpose of promptly covering the three positioning steel piles with the triangular positioning frame 9 is to maintain the verticality of the positioning steel piles. When the three positioning steel piles are assembled together, the overall rigidity is greater and to prevent individual positioning steel piles from being tilted due to local loads during the process.
4)、桶形基础贯入海床:4) The barrel-shaped foundation penetrates into the seabed:
打开连接桶形基础进出水阀2上的抽水系统抽取负压,使桶形基础在自重及负压作用下沿着定位钢桩贯入海床至设计深度,如图9所示。Open the pumping system connected to the inlet and outlet valve 2 of the barrel foundation to extract negative pressure, so that the barrel foundation penetrates into the seabed along the positioning steel piles to the design depth under the action of its own weight and negative pressure, as shown in Figure 9.
在三根定位钢桩垂直度满足要求的情况下,桶形基础沿着三根定位钢桩贯入海床,其垂直度自动满足要求,施工过程无需调平与反复校核。施工过程大大简化,施工难度大大降低,缩短了海上作业时间,从而降低了施工成本。When the verticality of the three positioning steel piles meets the requirements, the barrel-shaped foundation penetrates into the seabed along the three positioning steel piles, and its verticality automatically meets the requirements. There is no need for leveling and repeated checks during the construction process. The construction process is greatly simplified, the construction difficulty is greatly reduced, the offshore operation time is shortened, and the construction cost is reduced.
5)、移除部分定位钢桩:5) Remove some positioning steel piles:
从三根定位钢桩上取出三角形定位架9,并逐个旋转、拧出、移除桶形基础顶面以上的定位钢桩标准节7,并而使桶形基础顶面以下的定位钢桩继续保留,从而完成桶形基础的沉贯施工,如图10所示。Take out the triangular positioning frame 9 from the three positioning steel piles, and rotate, screw out and remove the positioning steel pile standard sections 7 above the top surface of the barrel foundation one by one, while leaving the positioning steel piles below the top surface of the barrel foundation still retained. , thereby completing the sinking construction of the barrel-shaped foundation, as shown in Figure 10.
桶形基础沉贯就位后,高出桶形基础顶面的定位钢桩影响后续施工,也影响该区域的航道,故需移除;定位钢桩的设计过程中,需考虑后续的解除、移除需要,通过螺纹凸榫8反向拧出内置螺纹6实现定位钢桩标准节7的移除。但桶形基础顶面以下的定位钢桩无需移除,其不影响后续施工,且保留该段对维持桶形基础在后续工作过程中的垂直度有利。After the barrel foundation is sunk and in place, the positioning steel piles that are higher than the top surface of the barrel foundation will affect subsequent construction and also affect the waterway in the area, so they need to be removed. During the design process of the positioning steel piles, subsequent lifting, If necessary, remove the standard section 7 of the positioning steel pile by screwing out the built-in thread 6 in the opposite direction through the threaded tenon 8. However, the positioning steel piles below the top surface of the barrel foundation do not need to be removed. It will not affect subsequent construction, and retaining this section is beneficial to maintaining the verticality of the barrel foundation during subsequent work.
本发明在桶体内壁上设置三个竖直、定位套管,定位套管的尺寸较小,该辅助构造不会明显增加桶形基础的制作难度与沉贯难度,具有经济性与实用性;把桶形基础沉贯过程中的垂直度问题转化为定位钢桩的垂直度问题,只要三根定位钢桩的垂直度满足要求,则桶形基础的垂直度自动满足要求,且无需后续的调平与校正;定位钢桩的垂直度较容易实现,从而整体上降低了桶形基础的施工难度。The present invention sets three vertical positioning sleeves on the inner wall of the barrel. The size of the positioning sleeves is small. This auxiliary structure does not significantly increase the difficulty of making and sinking the barrel foundation, and is economical and practical; The verticality problem during the penetration process of the barrel foundation is transformed into the verticality problem of the positioning steel piles. As long as the verticality of the three positioning steel piles meets the requirements, the verticality of the barrel foundation automatically meets the requirements without subsequent leveling. And correction; the verticality of positioning steel piles is easier to achieve, thus reducing the construction difficulty of barrel foundation as a whole.
本发明不局限于上述具体实施方式,根据上述内容,按照本领域的普通技术知识和惯用手段,在不脱离本发明上述基本技术思想前提下,本发明还可以做出其它多种形式的等效修改、替换或变更,均落在本发明的保护范围之内。The present invention is not limited to the above-mentioned specific embodiments. According to the above content, according to the common technical knowledge and common means in the field, without departing from the above-mentioned basic technical ideas of the present invention, the present invention can also make other equivalent forms. Modifications, replacements or changes all fall within the protection scope of the present invention.
Claims (2)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201710257792.4A CN106948366B (en) | 2017-04-19 | 2017-04-19 | Barrel-shaped foundation and auxiliary assembly convenient for controlling verticality and construction method |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201710257792.4A CN106948366B (en) | 2017-04-19 | 2017-04-19 | Barrel-shaped foundation and auxiliary assembly convenient for controlling verticality and construction method |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CN106948366A CN106948366A (en) | 2017-07-14 |
| CN106948366B true CN106948366B (en) | 2023-10-13 |
Family
ID=59477275
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201710257792.4A Expired - Fee Related CN106948366B (en) | 2017-04-19 | 2017-04-19 | Barrel-shaped foundation and auxiliary assembly convenient for controlling verticality and construction method |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN106948366B (en) |
Families Citing this family (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN111335354B (en) * | 2019-11-11 | 2021-06-04 | 合肥学院 | Ocean anchor foundation construction device with adjustable height |
Citations (12)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN102268880A (en) * | 2010-06-04 | 2011-12-07 | 中国海洋石油总公司 | Through-middle type cylindrical foundation and mounting process |
| CN102296623A (en) * | 2011-06-27 | 2011-12-28 | 天津大学 | Tripod type leveling offshore foundation structure and construction method thereof |
| CN202730789U (en) * | 2012-03-29 | 2013-02-13 | 北京天工创道建筑科技有限公司 | Foundation pile and integrated structure thereof |
| CN103741705A (en) * | 2013-12-23 | 2014-04-23 | 中交第二航务工程局有限公司 | Double-layer bucket cover suction type bucket pile composite foundation and constructing method thereof |
| CN204626445U (en) * | 2015-05-21 | 2015-09-09 | 山东科技大学 | A kind of barrel base with steel wing plate |
| CN204940320U (en) * | 2015-09-08 | 2016-01-06 | 山东科技大学 | A kind of taper Blade fence |
| CN205188994U (en) * | 2015-12-08 | 2016-04-27 | 山东科技大学 | Take branch storehouse skirt -type suction bucket shape basis of pterygoid lamina |
| CN205444224U (en) * | 2015-12-24 | 2016-08-10 | 山东科技大学 | Convex bucket foundation with ribbing in surface |
| CN106087928A (en) * | 2016-07-27 | 2016-11-09 | 合肥学院 | An axisymmetric barrel-shaped foundation single-leg column oil production platform and its construction method |
| CN205742258U (en) * | 2016-06-15 | 2016-11-30 | 江苏建筑职业技术学院 | Good stability is prone to the heavy barrel base passed through |
| CN205857222U (en) * | 2016-06-15 | 2017-01-04 | 江苏建筑职业技术学院 | Triangle knife-edge barrel base |
| CN207331731U (en) * | 2017-04-19 | 2018-05-08 | 合肥学院 | A kind of barrel base easy to control verticality |
Family Cites Families (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| ES2490393B1 (en) * | 2013-01-29 | 2015-06-12 | Jose Emilio Jimeno Chueca | Installation procedure for offshore wind turbine tower, battery-based foundation, and equipment to carry out such procedure |
-
2017
- 2017-04-19 CN CN201710257792.4A patent/CN106948366B/en not_active Expired - Fee Related
Patent Citations (12)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN102268880A (en) * | 2010-06-04 | 2011-12-07 | 中国海洋石油总公司 | Through-middle type cylindrical foundation and mounting process |
| CN102296623A (en) * | 2011-06-27 | 2011-12-28 | 天津大学 | Tripod type leveling offshore foundation structure and construction method thereof |
| CN202730789U (en) * | 2012-03-29 | 2013-02-13 | 北京天工创道建筑科技有限公司 | Foundation pile and integrated structure thereof |
| CN103741705A (en) * | 2013-12-23 | 2014-04-23 | 中交第二航务工程局有限公司 | Double-layer bucket cover suction type bucket pile composite foundation and constructing method thereof |
| CN204626445U (en) * | 2015-05-21 | 2015-09-09 | 山东科技大学 | A kind of barrel base with steel wing plate |
| CN204940320U (en) * | 2015-09-08 | 2016-01-06 | 山东科技大学 | A kind of taper Blade fence |
| CN205188994U (en) * | 2015-12-08 | 2016-04-27 | 山东科技大学 | Take branch storehouse skirt -type suction bucket shape basis of pterygoid lamina |
| CN205444224U (en) * | 2015-12-24 | 2016-08-10 | 山东科技大学 | Convex bucket foundation with ribbing in surface |
| CN205742258U (en) * | 2016-06-15 | 2016-11-30 | 江苏建筑职业技术学院 | Good stability is prone to the heavy barrel base passed through |
| CN205857222U (en) * | 2016-06-15 | 2017-01-04 | 江苏建筑职业技术学院 | Triangle knife-edge barrel base |
| CN106087928A (en) * | 2016-07-27 | 2016-11-09 | 合肥学院 | An axisymmetric barrel-shaped foundation single-leg column oil production platform and its construction method |
| CN207331731U (en) * | 2017-04-19 | 2018-05-08 | 合肥学院 | A kind of barrel base easy to control verticality |
Also Published As
| Publication number | Publication date |
|---|---|
| CN106948366A (en) | 2017-07-14 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN103205980B (en) | Offshore wind turbine large diameter single pile foundation and construction method thereof | |
| CN106930313B (en) | Offshore wind power engineering pile barrel combined foundation and construction method thereof | |
| CN101845820B (en) | Sinking-assistant construction method for sinking sunk well | |
| CN103233481B (en) | Jacket supporting structure capable of being connected in grouting mode | |
| CN108532626B (en) | Suction injection type flat plate anchor with limiting pile | |
| CN105780802A (en) | Jacket offshore wind turbine foundation with brackets and construction method thereof | |
| CN106930261A (en) | A kind of simple ocean platform in intertidal zone and its construction method | |
| CN205712137U (en) | Foundation pit supporting construction | |
| CN111648396A (en) | A jacket with construction suction cylinder and construction method thereof | |
| CN206971251U (en) | A kind of coastal waters wind energy project stake bucket combination foundation | |
| CN105780806A (en) | Offshore wind turbine foundation for long-leg jacket of drilling piles and construction method of offshore wind turbine foundation | |
| CN206971250U (en) | A kind of offshore wind farm engineering jacket basis | |
| CN207331731U (en) | A kind of barrel base easy to control verticality | |
| CN103741711B (en) | Height bung double-walled suction bucket | |
| CN106948366B (en) | Barrel-shaped foundation and auxiliary assembly convenient for controlling verticality and construction method | |
| CN106948368A (en) | A kind of barrel base and three barrels of joint accessory parts and construction method | |
| CN103741705A (en) | Double-layer bucket cover suction type bucket pile composite foundation and constructing method thereof | |
| CN205276309U (en) | Anti ice tension leg wind turbine foundation of floating | |
| CN209538210U (en) | A kind of interpolation type offshore wind farm jacket basis carrying steady pipe casing | |
| CN207160044U (en) | A kind of three barrel base conjoined assembly | |
| CN208472750U (en) | Jacket foundation construction device | |
| CN207525758U (en) | A kind of reinforced Structure About Soldier Pile | |
| CN109179222A (en) | A kind of pre-buried section gradient of derrick crane and levelness control construction method | |
| CN204418167U (en) | A kind of novel slurry filling pile body structure | |
| CN204000815U (en) | A kind of multilayer spider structure |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PB01 | Publication | ||
| PB01 | Publication | ||
| SE01 | Entry into force of request for substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20231013 |
|
| CF01 | Termination of patent right due to non-payment of annual fee |