CN109082995A - municipal road construction method - Google Patents

municipal road construction method Download PDF

Info

Publication number
CN109082995A
CN109082995A CN201810924622.1A CN201810924622A CN109082995A CN 109082995 A CN109082995 A CN 109082995A CN 201810924622 A CN201810924622 A CN 201810924622A CN 109082995 A CN109082995 A CN 109082995A
Authority
CN
China
Prior art keywords
graticule
module
coating
hot
shape
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810924622.1A
Other languages
Chinese (zh)
Inventor
吴翠瑜
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Foshan Jimei Municipal Garden Engineering Co Ltd
Original Assignee
Foshan Jimei Municipal Garden Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Foshan Jimei Municipal Garden Engineering Co Ltd filed Critical Foshan Jimei Municipal Garden Engineering Co Ltd
Priority to CN201810924622.1A priority Critical patent/CN109082995A/en
Publication of CN109082995A publication Critical patent/CN109082995A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C23/00Auxiliary devices or arrangements for constructing, repairing, reconditioning, or taking-up road or like surfaces
    • E01C23/16Devices for marking-out, applying, or forming traffic or like markings on finished paving; Protecting fresh markings
    • E01C23/18Devices for marking-out, applying, or forming traffic or like markings on finished paving; Protecting fresh markings for applying prefabricated markings
    • E01C23/185Tape- or sheet-shape markers or carriers
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C23/00Auxiliary devices or arrangements for constructing, repairing, reconditioning, or taking-up road or like surfaces
    • E01C23/16Devices for marking-out, applying, or forming traffic or like markings on finished paving; Protecting fresh markings
    • E01C23/166Means for dispensing particulate material on to freshly applied markings or into the marking material after discharge thereof, e.g. reflective beads, grip-improving particles

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Road Signs Or Road Markings (AREA)

Abstract

The invention discloses a kind of municipal road construction methods, it comprises the following steps: (1) prefabricated graticule module identical with ground surface material, according to the shape of graticule, it is greater than the graticule module of graticule by Mold Making profile, the upper surface of graticule module is molded shape and the identical coating filler of corresponding graticule shape;(2) it is formed completely to graticule module and fills hot-melt coating used in graticule in hardening and then coating filler, be fully filled with hot-melt coating by coating filler;(3) modules house position is reserved, when being laid with road surface, modules house similar with graticule modular shape position is reserved in the corresponding position for needing to be arranged graticule, (4) graticule module is put into modules house position, make the upper surface of graticule module keep flushing with road surface, fills the gap between modules house position and graticule module;Coating filler can provide certain protective effect;It is thicker to be formed simultaneously the hot-melt coating of graticule its thickness, service life is longer.

Description

Municipal road construction method
Technical field
The present invention relates to a kind of engineering construction method, in particular to a kind of municipal road construction method.
Background technique
Urban road is generally broad compared with highway, and to adapt to the complicated vehicles, mostly division car lane, bus are excellent First lane, non-motorized lane etc..There are the pavement for being higher by road surface and building construction in both sides of the road, bury public pipe under pavement more Line.Greenbelt, sculptures art work are arranged for beautifying city.To protect urban environmental hygiene, to lack fugitive dust, few noise.Highway Then in driveway peripheral hardware road shoulder, two sides kind shade tree, gutter draining.
To make vehicle reasonably form in the road, roadmarking is provided on road surface, for guiding vehicle correct Form, but make in actual use, roadmarking can disappear because of the pounding wear of automobile, roadmarking meeting local damage, make Use restricted lifetime.
Summary of the invention
In view of the deficienciess of the prior art, the present invention provides a kind of road construction method, for increasing roadmarking Service life.
For achieving the above object, it the present invention provides a kind of municipal road construction method, comprises the following steps:
(1) prefabricated graticule module identical with ground surface material is greater than graticule by Mold Making profile according to the shape of graticule Graticule module, the upper surface of graticule module are molded shape and the identical coating filler of corresponding graticule shape;
(2) after forming hardening completely to graticule module, hot-melt coating used in graticule is filled in coating filler, makes to heat Coating filler is fully filled with by coating;
(3) modules house position is reserved, when being laid with road surface, is reserved and graticule modular shape in the corresponding position for needing to be arranged graticule Similar modules house position,
(4) it is put into graticule module in modules house position, the upper surface of graticule module is made to keep flushing with road surface, filling module peace Put the gap between position and graticule module.
By using above-mentioned technical proposal, wherein the graticule module with graticule is prefabricated in advance, graticule module passes through mold Molding, the material on road surface is unobstructed to use concrete or pitch, is poured in different ways according to different materials, such as Using concrete, concrete is poured into mold, jolt ramming is carried out by vibrator;According to pitch, then pressed by upper mold It is real;Graticule module after molding, upper surface have coating filler, and the coating filling of respective depth is arranged according to the actual situation Position;After graticule module is placed on modules house position, it is made to form one with road surface, graticule module is paid in advance in advance, therefore During practice of construction, graticule modules house is completed at the same time in company with the construction of road, without crossing subsequent in road pavement Deng operation;During use, since hot-melt coating is embedded in graticule module, damaged probability, which will occur, in it in this way to drop significantly It is low, and since it is with certain thickness, the wear-out period will greatly reinforce, and also increase the service life of graticule, subtract The frequency to graticule maintenance is lacked.
The present invention is further arranged to: the edge of graticule module upper surface is provided with inclined surface, when graticule module is placed into Behind modules house position, in the gap on graticule module and road surface and corresponding ground surface material is filled in the top of inclined surface, until Road surface keeps flushing with the upper surface of graticule module.
By using above-mentioned technical proposal, the inclined-plane of graticule module upper edge is for increasing graticule module in the knot on road surface Area is closed, combines graticule module adequately in road surface, convenient for the fixation of graticule module.
The present invention is further arranged to: the bottom surface of graticule module, inclined surface, coating filler inner wall are provided with decorative pattern.
By using above-mentioned technical proposal, the abundant combination for being arranged to add to graticule module Yu road surface, roadbed of decorative pattern, It is embedded in its stable in road;Decorative pattern in coating filler increases for realizing the abundant combination of itself and hot-melt coating The bond strength of the two.
The present invention is further arranged to: before filling hot-melt coating, now first in coating filler internal coat priming paint;Priming paint After the completion of coating, then hot-melt coating is filled into graticule installation position, hot-melt coating is filled each time according to modes such as layering fillings With a thickness of 5mm.
By using above-mentioned technical proposal, primer coating, for gluing hot-melt coating adequately with coating filler inner wall It connects, combines the two preferably;The coating of hot-melt coating multilayer makes after completing to fill, and hot-melt coating has better compactibility, The generation of bubble in filling process is reduced, the quality after the completion of hot-melt coating filling is increased.
The present invention is further arranged to: including several evenly distributed filling holes or shape and corresponding in coating filler The consistent graticule slot of graticule shape.
By using above-mentioned technical proposal, coating filler can be using the form in multiple filling holes, if by dry-packing hole Interior coating collectively constitutes a graticule, and hot-melt coating its probability being worn individually in filling hole greatly reduces in this way, main Abrasion is undertaken by the upper surface of graticule module, the service life of graticule is significantly increased;Another way is directly in graticule Module upper surface forms a graticule slot, and shape is consistent with the shape of graticule, its construction cost of this mode is relatively low, and And the high production efficiency in prefabrication process.
The present invention is further arranged to: hot-melt coating is higher than the upper surface of graticule module, in hot-melt coating after the completion of filling Upper surface dispenses glass microballoon.
By using above-mentioned technical proposal, since the wearability of hot-melt coating is poor compared to the wearability of ground surface material, It is higher by the graticule with graticule module after hot-melt coating filling, graticule can be allow to possess longer service life in this way, in heat Molten coating upper surface spreads glass microballoon for realizing the reflective of graticule, increases the identity of graticule.
Compared with prior art, the present invention the beneficial effect is that, since hot-melt coating is embedded in coating filler, this Sample graticule, which is not easy to generate with vehicle, directly restarts, and coating filler can provide certain protective effect;It is formed simultaneously mark Its thickness of the hot-melt coating of line is thicker, and service life is longer.
Detailed description of the invention
Fig. 1 is the schematic diagram of the first graticule module;
Fig. 2 is the structural schematic diagram of second of graticule module;
Fig. 3 is the structural schematic diagram after graticule modules house.;
Appended drawing reference: 1, graticule module;2, decorative pattern;3, inclined surface;4, coating filler;5, hot-melt coating;6, road surface.
Specific embodiment
A kind of municipal road construction method, the specific steps are as follows:
(1) prefabricated graticule module 1 identical with 6 material of road surface, as shown in Figure 1, passing through Mold Making wheel according to the shape of graticule Exterior feature is greater than the graticule module 1 of graticule, the preferred graticule module 1 for using rectangle, in this way convenient for mould reserved during road construction Block places position;The upper surface of graticule module 1 is molded shape and the identical coating filler 4 of corresponding graticule shape, applies The depth of material filler 4 can control in 5cm or so;In order to enable graticule module 1 preferably to be combined with roadbed, graticule module 1 Bottom surface be provided with decorative pattern 2, the edge of 1 upper surface of graticule module is provided with inclined surface 3, and the surface of inclined surface 3 is again provided with Decorative pattern 2 is equally provided with decorative pattern 2, the flower of coating filler 4 for having better combination with road surface 6 in coating filler 4 2 attached drawing of line is not shown.
Typically 6 material of road surface uses pitch or concrete, according to the difference for using material, the production of graticule module 1 It also can some differences;If needing to pour into concrete in a mold using concrete as road surface 6, and fixed use above In the identical upper mold of molding 4 shape of coating filler, jolt ramming is carried out by vibrator and forms graticule module 1, waited after molding mixed Solidifying soil hardening, then demoulded;If need to pour into pitch in a mold using pitch as road surface 6, then by upper mold into Row compacting forms coating filler 4 in the upper surface of graticule module 1 by above touching.Attached drawing is by taking graticule of keeping straight on as an example, Shen of the present invention Two kinds of coating fillers 4 please be provide, one is identical with graticule shape in graticule module 1 upper surface straight forming, one shape Filling slot, for the ease of showing, is not opened up decorative pattern 2 in attached drawing as shown in Figure 1, being provided with decorative pattern 2 in filling slot inner wall Show, using this form, the comparision of production of graticule module 1 is simple, and producing efficiency is higher;Another kind is in the upper of graticule module 1 Several filling holes of surface forming form a graticule as shown in Fig. 2, being combined by several filling holes, are shown in attached drawing Using the form of strip hole, production graticule module 1 may be incorporated for using the hole of round hole or other geometries certainly, adopt It is produced with such form, it is smaller due to individually filling hole area, in this way when actual use, due to table in graticule module 1 Face can play a protective role, and the abrasion for filling hole inside courtyard is smaller, more durable.
(2) after to graticule module 1 completely molding hardening, hot-melt coating used in graticule is filled in coating filler 4 5, it is fully filled with hot-melt coating 5 by coating filler 4;It is strong in order to increase the connection between hot-melt coating 5 and coating filler 4 Degree, before filling hot-melt coating 5 can first in the inner wall primer coating of coating filler 4, when priming paint no longer adhering dust, Hot-melt coating 5 is filled into coating filler 4;Form of the process of filling using layering filling, the thickness control filled every time In 0.5cm, until coating filler 4 is filled up, continue to be covered with one layer in the module painting of graticule according to the profile of graticule after filling up, So that hot-melt coating 5 is higher than 1 upper surface of graticule module about 0.2-0.3cm, after the completion of filling, dispenses glass in 5 upper surface of hot-melt coating Glass microballon.As preferred hot-melt coating 5 during fusing, a certain proportion of glass microballoon can be mixed, is stirred Afterwards, filling is into coating filler 4.The effect of glass microballoon is that graticule is made to have preferable reflection action.
(3) modules house position is reserved, as shown in figure 3, when being laid with road surface 6, it is pre- in the corresponding position for needing to be arranged graticule Modules house similar with 1 shape of graticule module position is stayed, modules house position is slightly larger than graticule module 1, due to the shape of graticule module 1 Shape is in rectangle, therefore will not influence the construction of road rest part.
(4) it can be laid with one layer of pitch or concrete in the bottom of modules house position, in modules house after laying It is put into graticule module 1 in position, the upper surface of graticule module 1 is made to keep flushing with road surface 6;Fill modules house position and graticule module Gap between 1, the material of filling and the material on road surface 6 are consistent, since the edge of graticule module 1 is provided with inclined surface 3, Therefore have between road surface 6 and graticule module 1 and preferably contact.

Claims (6)

1. a kind of municipal road construction method, it is characterized in that: comprising the following steps:
(1) prefabricated graticule module (1) identical with road surface (6) material is greater than according to the shape of graticule by Mold Making profile The graticule module (1) of graticule, the upper surface of graticule module (1) are molded shape and the identical coating of corresponding graticule shape Filler (4);
(2) to hot-melt coating used in filling graticule in graticule module (1) completely molding hardening and then coating filler (4) (5), it is fully filled with hot-melt coating (5) by coating filler (4);
(3) modules house position is reserved, when being laid with road surface (6), is reserved and graticule module in the corresponding position for needing to be arranged graticule (1) the similar modules house position of shape,
(4) it is put into graticule module (1) in modules house position, the upper surface of graticule module (1) is made to keep flushing with road surface (6), Fill the gap between modules house position and graticule module (1).
2. municipal road construction method according to claim 1, it is characterized in that: the edge of graticule module (1) upper surface is set Inclined surface (3) are equipped with, after graticule module (1) is placed into modules house position, in the gap of graticule module (1) and road surface (6) And corresponding road surface (6) material is filled in the top of inclined surface (3), until the upper surface of road surface (6) and graticule module (1) is kept It flushes.
3. municipal road construction method as claimed in claim 2, it is characterized in that: the bottom surface of graticule module (1), inclined surface (3), Coating filler (4) inner wall is provided with decorative pattern (2).
4. municipal road construction method according to claim 3, it is characterized in that: now first existing before filling hot-melt coating (5) Coating filler (4) internal coat priming paint;After the completion of priming paint coating, then filling hot-melt coating (5) into graticule installation position, hot melt Coating (5) is according to modes such as layering fillings, and filling thickness is 5mm each time.
5. municipal road construction method according to claim 4, it is characterized in that: including several equal in coating filler (4) The filling hole of even arrangement or the shape graticule slot consistent with corresponding graticule shape.
6. municipal road construction method according to claim 5, it is characterized in that: hot-melt coating (5) is higher than graticule module (1) Upper surface, after the completion of filling hot-melt coating (5) upper surface dispense glass microballoon.
CN201810924622.1A 2018-08-14 2018-08-14 municipal road construction method Pending CN109082995A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810924622.1A CN109082995A (en) 2018-08-14 2018-08-14 municipal road construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810924622.1A CN109082995A (en) 2018-08-14 2018-08-14 municipal road construction method

Publications (1)

Publication Number Publication Date
CN109082995A true CN109082995A (en) 2018-12-25

Family

ID=64834688

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810924622.1A Pending CN109082995A (en) 2018-08-14 2018-08-14 municipal road construction method

Country Status (1)

Country Link
CN (1) CN109082995A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110761135A (en) * 2019-10-08 2020-02-07 杭州宝力体育设施工程有限公司 Municipal road construction method
CN118563692A (en) * 2024-05-13 2024-08-30 东南大学 Rivet-shaped marking structure formed by microwave heating and secondary forming and construction method thereof

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5568909A (en) * 1978-11-14 1980-05-24 Kikusui Teepu Kk Method of sticking road mark
CN1062571A (en) * 1991-12-28 1992-07-08 陈鸿春 Road warning device and manufacturing method thereof
CN1316059A (en) * 1998-05-29 2001-10-03 美国3M公司 Prefabricated retroreflective sign
DE10101154A1 (en) * 2001-01-12 2002-07-18 Kombilith Gmbh Entwicklung & Verwertung Component of floor surfaces, walls, etc., has base section of concrete and mortar plate joined to concrete base section that forms information bearer or part of one
US6576074B1 (en) * 2001-01-09 2003-06-10 Avery Dennison Corporation Pavement marking system
DE202005020151U1 (en) * 2005-12-22 2006-03-16 Everglow Gmbh Safety-management component e.g. for outdoor and building throughways, has basic element fabricated from cold plastics material
EP3121334A1 (en) * 2015-07-22 2017-01-25 Marcin Hamerski Prefabricated element containing a permanently embedded sign and the production method of prefabricated element

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5568909A (en) * 1978-11-14 1980-05-24 Kikusui Teepu Kk Method of sticking road mark
CN1062571A (en) * 1991-12-28 1992-07-08 陈鸿春 Road warning device and manufacturing method thereof
CN1316059A (en) * 1998-05-29 2001-10-03 美国3M公司 Prefabricated retroreflective sign
US6576074B1 (en) * 2001-01-09 2003-06-10 Avery Dennison Corporation Pavement marking system
DE10101154A1 (en) * 2001-01-12 2002-07-18 Kombilith Gmbh Entwicklung & Verwertung Component of floor surfaces, walls, etc., has base section of concrete and mortar plate joined to concrete base section that forms information bearer or part of one
DE202005020151U1 (en) * 2005-12-22 2006-03-16 Everglow Gmbh Safety-management component e.g. for outdoor and building throughways, has basic element fabricated from cold plastics material
EP3121334A1 (en) * 2015-07-22 2017-01-25 Marcin Hamerski Prefabricated element containing a permanently embedded sign and the production method of prefabricated element

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110761135A (en) * 2019-10-08 2020-02-07 杭州宝力体育设施工程有限公司 Municipal road construction method
CN118563692A (en) * 2024-05-13 2024-08-30 东南大学 Rivet-shaped marking structure formed by microwave heating and secondary forming and construction method thereof
CN118563692B (en) * 2024-05-13 2025-09-26 东南大学 A microwave-heated secondary-molded rivet-shaped marking structure and its construction method

Similar Documents

Publication Publication Date Title
CN107419638A (en) Track traffic level crossing paving reinforcement structure and method for paving
CN110820466A (en) Quick repairing method for cement concrete pavement
CN108086113A (en) A kind of road surface precast assembly fast repairing method for being suitable for southern damp-heat area
CN102352589A (en) Construction method for road base concrete side mold
CN109082995A (en) municipal road construction method
CN104911974A (en) Inclined prestress cement concrete-asphalt concrete composite pavement and construction method thereof
CN101892631A (en) Bridge expansion joint structure and construction technology thereof
CN102644224A (en) Novel roadbed side slope building protecting method and precast concrete blocks therefor
CN109457564A (en) Anti-settling roadbed and its construction method
CN102953310B (en) The paving method of porous pavement
CN109338840A (en) A kind of high-strength pavement and its construction technology
KR100687211B1 (en) Road Pavement Using Precast Concrete Panels
CN111747695A (en) Durable luminous pavement brick or kerbstone and preparation method thereof
CN207699970U (en) It is a kind of can quick assembling modularization road
CN115030224A (en) Municipal road inspection well and construction method thereof
CN104612016B (en) One is town road emergency repair method efficiently
CN213804695U (en) Anti-rutting semi-flexible pavement structure
CN112501973A (en) Concrete precast block for repairing cement road
CN209039963U (en) A kind of platform back preventing car jump between high road bed and bridge
CN105803886B (en) A kind of method using the cast-in-place annular proving road of foam lightweight material
CN110195402B (en) Road repairing module and construction method thereof
CN102071612B (en) Method for constructing arched uneven pavement slab
CN109826234A (en) A kind of maintaining process of national highway inspection well cover
CN110273340B (en) Construction method of municipal road
CN108774936A (en) A kind of anticorrosion kerbstone and its construction method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20181225