CN109082995A - municipal road construction method - Google Patents
municipal road construction method Download PDFInfo
- Publication number
- CN109082995A CN109082995A CN201810924622.1A CN201810924622A CN109082995A CN 109082995 A CN109082995 A CN 109082995A CN 201810924622 A CN201810924622 A CN 201810924622A CN 109082995 A CN109082995 A CN 109082995A
- Authority
- CN
- China
- Prior art keywords
- graticule
- module
- coating
- hot
- shape
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000010276 construction Methods 0.000 title claims abstract description 19
- 239000011248 coating agent Substances 0.000 claims abstract description 43
- 238000000576 coating method Methods 0.000 claims abstract description 43
- 239000000945 filler Substances 0.000 claims abstract description 37
- 238000007757 hot melt coating Methods 0.000 claims abstract description 36
- 239000000463 material Substances 0.000 claims abstract description 14
- 238000011010 flushing procedure Methods 0.000 claims abstract description 5
- 239000011521 glass Substances 0.000 claims description 7
- 238000000465 moulding Methods 0.000 claims description 6
- 239000003973 paint Substances 0.000 claims description 5
- 230000037452 priming Effects 0.000 claims description 5
- 238000009434 installation Methods 0.000 claims description 2
- 230000001681 protective effect Effects 0.000 abstract description 3
- 238000004519 manufacturing process Methods 0.000 description 4
- 238000010586 diagram Methods 0.000 description 3
- 238000000034 method Methods 0.000 description 3
- 238000005299 abrasion Methods 0.000 description 2
- 239000000428 dust Substances 0.000 description 2
- 239000002987 primer (paints) Substances 0.000 description 2
- 238000004026 adhesive bonding Methods 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000009435 building construction Methods 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 230000007613 environmental effect Effects 0.000 description 1
- 238000005429 filling process Methods 0.000 description 1
- 238000012423 maintenance Methods 0.000 description 1
- 238000012856 packing Methods 0.000 description 1
- 238000010422 painting Methods 0.000 description 1
- 230000002093 peripheral effect Effects 0.000 description 1
- 238000009417 prefabrication Methods 0.000 description 1
- 239000002689 soil Substances 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01C—CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
- E01C23/00—Auxiliary devices or arrangements for constructing, repairing, reconditioning, or taking-up road or like surfaces
- E01C23/16—Devices for marking-out, applying, or forming traffic or like markings on finished paving; Protecting fresh markings
- E01C23/18—Devices for marking-out, applying, or forming traffic or like markings on finished paving; Protecting fresh markings for applying prefabricated markings
- E01C23/185—Tape- or sheet-shape markers or carriers
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01C—CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
- E01C23/00—Auxiliary devices or arrangements for constructing, repairing, reconditioning, or taking-up road or like surfaces
- E01C23/16—Devices for marking-out, applying, or forming traffic or like markings on finished paving; Protecting fresh markings
- E01C23/166—Means for dispensing particulate material on to freshly applied markings or into the marking material after discharge thereof, e.g. reflective beads, grip-improving particles
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Road Signs Or Road Markings (AREA)
Abstract
The invention discloses a kind of municipal road construction methods, it comprises the following steps: (1) prefabricated graticule module identical with ground surface material, according to the shape of graticule, it is greater than the graticule module of graticule by Mold Making profile, the upper surface of graticule module is molded shape and the identical coating filler of corresponding graticule shape;(2) it is formed completely to graticule module and fills hot-melt coating used in graticule in hardening and then coating filler, be fully filled with hot-melt coating by coating filler;(3) modules house position is reserved, when being laid with road surface, modules house similar with graticule modular shape position is reserved in the corresponding position for needing to be arranged graticule, (4) graticule module is put into modules house position, make the upper surface of graticule module keep flushing with road surface, fills the gap between modules house position and graticule module;Coating filler can provide certain protective effect;It is thicker to be formed simultaneously the hot-melt coating of graticule its thickness, service life is longer.
Description
Technical field
The present invention relates to a kind of engineering construction method, in particular to a kind of municipal road construction method.
Background technique
Urban road is generally broad compared with highway, and to adapt to the complicated vehicles, mostly division car lane, bus are excellent
First lane, non-motorized lane etc..There are the pavement for being higher by road surface and building construction in both sides of the road, bury public pipe under pavement more
Line.Greenbelt, sculptures art work are arranged for beautifying city.To protect urban environmental hygiene, to lack fugitive dust, few noise.Highway
Then in driveway peripheral hardware road shoulder, two sides kind shade tree, gutter draining.
To make vehicle reasonably form in the road, roadmarking is provided on road surface, for guiding vehicle correct
Form, but make in actual use, roadmarking can disappear because of the pounding wear of automobile, roadmarking meeting local damage, make
Use restricted lifetime.
Summary of the invention
In view of the deficienciess of the prior art, the present invention provides a kind of road construction method, for increasing roadmarking
Service life.
For achieving the above object, it the present invention provides a kind of municipal road construction method, comprises the following steps:
(1) prefabricated graticule module identical with ground surface material is greater than graticule by Mold Making profile according to the shape of graticule
Graticule module, the upper surface of graticule module are molded shape and the identical coating filler of corresponding graticule shape;
(2) after forming hardening completely to graticule module, hot-melt coating used in graticule is filled in coating filler, makes to heat
Coating filler is fully filled with by coating;
(3) modules house position is reserved, when being laid with road surface, is reserved and graticule modular shape in the corresponding position for needing to be arranged graticule
Similar modules house position,
(4) it is put into graticule module in modules house position, the upper surface of graticule module is made to keep flushing with road surface, filling module peace
Put the gap between position and graticule module.
By using above-mentioned technical proposal, wherein the graticule module with graticule is prefabricated in advance, graticule module passes through mold
Molding, the material on road surface is unobstructed to use concrete or pitch, is poured in different ways according to different materials, such as
Using concrete, concrete is poured into mold, jolt ramming is carried out by vibrator;According to pitch, then pressed by upper mold
It is real;Graticule module after molding, upper surface have coating filler, and the coating filling of respective depth is arranged according to the actual situation
Position;After graticule module is placed on modules house position, it is made to form one with road surface, graticule module is paid in advance in advance, therefore
During practice of construction, graticule modules house is completed at the same time in company with the construction of road, without crossing subsequent in road pavement
Deng operation;During use, since hot-melt coating is embedded in graticule module, damaged probability, which will occur, in it in this way to drop significantly
It is low, and since it is with certain thickness, the wear-out period will greatly reinforce, and also increase the service life of graticule, subtract
The frequency to graticule maintenance is lacked.
The present invention is further arranged to: the edge of graticule module upper surface is provided with inclined surface, when graticule module is placed into
Behind modules house position, in the gap on graticule module and road surface and corresponding ground surface material is filled in the top of inclined surface, until
Road surface keeps flushing with the upper surface of graticule module.
By using above-mentioned technical proposal, the inclined-plane of graticule module upper edge is for increasing graticule module in the knot on road surface
Area is closed, combines graticule module adequately in road surface, convenient for the fixation of graticule module.
The present invention is further arranged to: the bottom surface of graticule module, inclined surface, coating filler inner wall are provided with decorative pattern.
By using above-mentioned technical proposal, the abundant combination for being arranged to add to graticule module Yu road surface, roadbed of decorative pattern,
It is embedded in its stable in road;Decorative pattern in coating filler increases for realizing the abundant combination of itself and hot-melt coating
The bond strength of the two.
The present invention is further arranged to: before filling hot-melt coating, now first in coating filler internal coat priming paint;Priming paint
After the completion of coating, then hot-melt coating is filled into graticule installation position, hot-melt coating is filled each time according to modes such as layering fillings
With a thickness of 5mm.
By using above-mentioned technical proposal, primer coating, for gluing hot-melt coating adequately with coating filler inner wall
It connects, combines the two preferably;The coating of hot-melt coating multilayer makes after completing to fill, and hot-melt coating has better compactibility,
The generation of bubble in filling process is reduced, the quality after the completion of hot-melt coating filling is increased.
The present invention is further arranged to: including several evenly distributed filling holes or shape and corresponding in coating filler
The consistent graticule slot of graticule shape.
By using above-mentioned technical proposal, coating filler can be using the form in multiple filling holes, if by dry-packing hole
Interior coating collectively constitutes a graticule, and hot-melt coating its probability being worn individually in filling hole greatly reduces in this way, main
Abrasion is undertaken by the upper surface of graticule module, the service life of graticule is significantly increased;Another way is directly in graticule
Module upper surface forms a graticule slot, and shape is consistent with the shape of graticule, its construction cost of this mode is relatively low, and
And the high production efficiency in prefabrication process.
The present invention is further arranged to: hot-melt coating is higher than the upper surface of graticule module, in hot-melt coating after the completion of filling
Upper surface dispenses glass microballoon.
By using above-mentioned technical proposal, since the wearability of hot-melt coating is poor compared to the wearability of ground surface material,
It is higher by the graticule with graticule module after hot-melt coating filling, graticule can be allow to possess longer service life in this way, in heat
Molten coating upper surface spreads glass microballoon for realizing the reflective of graticule, increases the identity of graticule.
Compared with prior art, the present invention the beneficial effect is that, since hot-melt coating is embedded in coating filler, this
Sample graticule, which is not easy to generate with vehicle, directly restarts, and coating filler can provide certain protective effect;It is formed simultaneously mark
Its thickness of the hot-melt coating of line is thicker, and service life is longer.
Detailed description of the invention
Fig. 1 is the schematic diagram of the first graticule module;
Fig. 2 is the structural schematic diagram of second of graticule module;
Fig. 3 is the structural schematic diagram after graticule modules house.;
Appended drawing reference: 1, graticule module;2, decorative pattern;3, inclined surface;4, coating filler;5, hot-melt coating;6, road surface.
Specific embodiment
A kind of municipal road construction method, the specific steps are as follows:
(1) prefabricated graticule module 1 identical with 6 material of road surface, as shown in Figure 1, passing through Mold Making wheel according to the shape of graticule
Exterior feature is greater than the graticule module 1 of graticule, the preferred graticule module 1 for using rectangle, in this way convenient for mould reserved during road construction
Block places position;The upper surface of graticule module 1 is molded shape and the identical coating filler 4 of corresponding graticule shape, applies
The depth of material filler 4 can control in 5cm or so;In order to enable graticule module 1 preferably to be combined with roadbed, graticule module 1
Bottom surface be provided with decorative pattern 2, the edge of 1 upper surface of graticule module is provided with inclined surface 3, and the surface of inclined surface 3 is again provided with
Decorative pattern 2 is equally provided with decorative pattern 2, the flower of coating filler 4 for having better combination with road surface 6 in coating filler 4
2 attached drawing of line is not shown.
Typically 6 material of road surface uses pitch or concrete, according to the difference for using material, the production of graticule module 1
It also can some differences;If needing to pour into concrete in a mold using concrete as road surface 6, and fixed use above
In the identical upper mold of molding 4 shape of coating filler, jolt ramming is carried out by vibrator and forms graticule module 1, waited after molding mixed
Solidifying soil hardening, then demoulded;If need to pour into pitch in a mold using pitch as road surface 6, then by upper mold into
Row compacting forms coating filler 4 in the upper surface of graticule module 1 by above touching.Attached drawing is by taking graticule of keeping straight on as an example, Shen of the present invention
Two kinds of coating fillers 4 please be provide, one is identical with graticule shape in graticule module 1 upper surface straight forming, one shape
Filling slot, for the ease of showing, is not opened up decorative pattern 2 in attached drawing as shown in Figure 1, being provided with decorative pattern 2 in filling slot inner wall
Show, using this form, the comparision of production of graticule module 1 is simple, and producing efficiency is higher;Another kind is in the upper of graticule module 1
Several filling holes of surface forming form a graticule as shown in Fig. 2, being combined by several filling holes, are shown in attached drawing
Using the form of strip hole, production graticule module 1 may be incorporated for using the hole of round hole or other geometries certainly, adopt
It is produced with such form, it is smaller due to individually filling hole area, in this way when actual use, due to table in graticule module 1
Face can play a protective role, and the abrasion for filling hole inside courtyard is smaller, more durable.
(2) after to graticule module 1 completely molding hardening, hot-melt coating used in graticule is filled in coating filler 4
5, it is fully filled with hot-melt coating 5 by coating filler 4;It is strong in order to increase the connection between hot-melt coating 5 and coating filler 4
Degree, before filling hot-melt coating 5 can first in the inner wall primer coating of coating filler 4, when priming paint no longer adhering dust,
Hot-melt coating 5 is filled into coating filler 4;Form of the process of filling using layering filling, the thickness control filled every time
In 0.5cm, until coating filler 4 is filled up, continue to be covered with one layer in the module painting of graticule according to the profile of graticule after filling up,
So that hot-melt coating 5 is higher than 1 upper surface of graticule module about 0.2-0.3cm, after the completion of filling, dispenses glass in 5 upper surface of hot-melt coating
Glass microballon.As preferred hot-melt coating 5 during fusing, a certain proportion of glass microballoon can be mixed, is stirred
Afterwards, filling is into coating filler 4.The effect of glass microballoon is that graticule is made to have preferable reflection action.
(3) modules house position is reserved, as shown in figure 3, when being laid with road surface 6, it is pre- in the corresponding position for needing to be arranged graticule
Modules house similar with 1 shape of graticule module position is stayed, modules house position is slightly larger than graticule module 1, due to the shape of graticule module 1
Shape is in rectangle, therefore will not influence the construction of road rest part.
(4) it can be laid with one layer of pitch or concrete in the bottom of modules house position, in modules house after laying
It is put into graticule module 1 in position, the upper surface of graticule module 1 is made to keep flushing with road surface 6;Fill modules house position and graticule module
Gap between 1, the material of filling and the material on road surface 6 are consistent, since the edge of graticule module 1 is provided with inclined surface 3,
Therefore have between road surface 6 and graticule module 1 and preferably contact.
Claims (6)
1. a kind of municipal road construction method, it is characterized in that: comprising the following steps:
(1) prefabricated graticule module (1) identical with road surface (6) material is greater than according to the shape of graticule by Mold Making profile
The graticule module (1) of graticule, the upper surface of graticule module (1) are molded shape and the identical coating of corresponding graticule shape
Filler (4);
(2) to hot-melt coating used in filling graticule in graticule module (1) completely molding hardening and then coating filler (4)
(5), it is fully filled with hot-melt coating (5) by coating filler (4);
(3) modules house position is reserved, when being laid with road surface (6), is reserved and graticule module in the corresponding position for needing to be arranged graticule
(1) the similar modules house position of shape,
(4) it is put into graticule module (1) in modules house position, the upper surface of graticule module (1) is made to keep flushing with road surface (6),
Fill the gap between modules house position and graticule module (1).
2. municipal road construction method according to claim 1, it is characterized in that: the edge of graticule module (1) upper surface is set
Inclined surface (3) are equipped with, after graticule module (1) is placed into modules house position, in the gap of graticule module (1) and road surface (6)
And corresponding road surface (6) material is filled in the top of inclined surface (3), until the upper surface of road surface (6) and graticule module (1) is kept
It flushes.
3. municipal road construction method as claimed in claim 2, it is characterized in that: the bottom surface of graticule module (1), inclined surface (3),
Coating filler (4) inner wall is provided with decorative pattern (2).
4. municipal road construction method according to claim 3, it is characterized in that: now first existing before filling hot-melt coating (5)
Coating filler (4) internal coat priming paint;After the completion of priming paint coating, then filling hot-melt coating (5) into graticule installation position, hot melt
Coating (5) is according to modes such as layering fillings, and filling thickness is 5mm each time.
5. municipal road construction method according to claim 4, it is characterized in that: including several equal in coating filler (4)
The filling hole of even arrangement or the shape graticule slot consistent with corresponding graticule shape.
6. municipal road construction method according to claim 5, it is characterized in that: hot-melt coating (5) is higher than graticule module (1)
Upper surface, after the completion of filling hot-melt coating (5) upper surface dispense glass microballoon.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201810924622.1A CN109082995A (en) | 2018-08-14 | 2018-08-14 | municipal road construction method |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201810924622.1A CN109082995A (en) | 2018-08-14 | 2018-08-14 | municipal road construction method |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN109082995A true CN109082995A (en) | 2018-12-25 |
Family
ID=64834688
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201810924622.1A Pending CN109082995A (en) | 2018-08-14 | 2018-08-14 | municipal road construction method |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN109082995A (en) |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN110761135A (en) * | 2019-10-08 | 2020-02-07 | 杭州宝力体育设施工程有限公司 | Municipal road construction method |
| CN118563692A (en) * | 2024-05-13 | 2024-08-30 | 东南大学 | Rivet-shaped marking structure formed by microwave heating and secondary forming and construction method thereof |
Citations (7)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPS5568909A (en) * | 1978-11-14 | 1980-05-24 | Kikusui Teepu Kk | Method of sticking road mark |
| CN1062571A (en) * | 1991-12-28 | 1992-07-08 | 陈鸿春 | Road warning device and manufacturing method thereof |
| CN1316059A (en) * | 1998-05-29 | 2001-10-03 | 美国3M公司 | Prefabricated retroreflective sign |
| DE10101154A1 (en) * | 2001-01-12 | 2002-07-18 | Kombilith Gmbh Entwicklung & Verwertung | Component of floor surfaces, walls, etc., has base section of concrete and mortar plate joined to concrete base section that forms information bearer or part of one |
| US6576074B1 (en) * | 2001-01-09 | 2003-06-10 | Avery Dennison Corporation | Pavement marking system |
| DE202005020151U1 (en) * | 2005-12-22 | 2006-03-16 | Everglow Gmbh | Safety-management component e.g. for outdoor and building throughways, has basic element fabricated from cold plastics material |
| EP3121334A1 (en) * | 2015-07-22 | 2017-01-25 | Marcin Hamerski | Prefabricated element containing a permanently embedded sign and the production method of prefabricated element |
-
2018
- 2018-08-14 CN CN201810924622.1A patent/CN109082995A/en active Pending
Patent Citations (7)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPS5568909A (en) * | 1978-11-14 | 1980-05-24 | Kikusui Teepu Kk | Method of sticking road mark |
| CN1062571A (en) * | 1991-12-28 | 1992-07-08 | 陈鸿春 | Road warning device and manufacturing method thereof |
| CN1316059A (en) * | 1998-05-29 | 2001-10-03 | 美国3M公司 | Prefabricated retroreflective sign |
| US6576074B1 (en) * | 2001-01-09 | 2003-06-10 | Avery Dennison Corporation | Pavement marking system |
| DE10101154A1 (en) * | 2001-01-12 | 2002-07-18 | Kombilith Gmbh Entwicklung & Verwertung | Component of floor surfaces, walls, etc., has base section of concrete and mortar plate joined to concrete base section that forms information bearer or part of one |
| DE202005020151U1 (en) * | 2005-12-22 | 2006-03-16 | Everglow Gmbh | Safety-management component e.g. for outdoor and building throughways, has basic element fabricated from cold plastics material |
| EP3121334A1 (en) * | 2015-07-22 | 2017-01-25 | Marcin Hamerski | Prefabricated element containing a permanently embedded sign and the production method of prefabricated element |
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN110761135A (en) * | 2019-10-08 | 2020-02-07 | 杭州宝力体育设施工程有限公司 | Municipal road construction method |
| CN118563692A (en) * | 2024-05-13 | 2024-08-30 | 东南大学 | Rivet-shaped marking structure formed by microwave heating and secondary forming and construction method thereof |
| CN118563692B (en) * | 2024-05-13 | 2025-09-26 | 东南大学 | A microwave-heated secondary-molded rivet-shaped marking structure and its construction method |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN107419638A (en) | Track traffic level crossing paving reinforcement structure and method for paving | |
| CN110820466A (en) | Quick repairing method for cement concrete pavement | |
| CN108086113A (en) | A kind of road surface precast assembly fast repairing method for being suitable for southern damp-heat area | |
| CN102352589A (en) | Construction method for road base concrete side mold | |
| CN109082995A (en) | municipal road construction method | |
| CN104911974A (en) | Inclined prestress cement concrete-asphalt concrete composite pavement and construction method thereof | |
| CN101892631A (en) | Bridge expansion joint structure and construction technology thereof | |
| CN102644224A (en) | Novel roadbed side slope building protecting method and precast concrete blocks therefor | |
| CN109457564A (en) | Anti-settling roadbed and its construction method | |
| CN102953310B (en) | The paving method of porous pavement | |
| CN109338840A (en) | A kind of high-strength pavement and its construction technology | |
| KR100687211B1 (en) | Road Pavement Using Precast Concrete Panels | |
| CN111747695A (en) | Durable luminous pavement brick or kerbstone and preparation method thereof | |
| CN207699970U (en) | It is a kind of can quick assembling modularization road | |
| CN115030224A (en) | Municipal road inspection well and construction method thereof | |
| CN104612016B (en) | One is town road emergency repair method efficiently | |
| CN213804695U (en) | Anti-rutting semi-flexible pavement structure | |
| CN112501973A (en) | Concrete precast block for repairing cement road | |
| CN209039963U (en) | A kind of platform back preventing car jump between high road bed and bridge | |
| CN105803886B (en) | A kind of method using the cast-in-place annular proving road of foam lightweight material | |
| CN110195402B (en) | Road repairing module and construction method thereof | |
| CN102071612B (en) | Method for constructing arched uneven pavement slab | |
| CN109826234A (en) | A kind of maintaining process of national highway inspection well cover | |
| CN110273340B (en) | Construction method of municipal road | |
| CN108774936A (en) | A kind of anticorrosion kerbstone and its construction method |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PB01 | Publication | ||
| PB01 | Publication | ||
| SE01 | Entry into force of request for substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| RJ01 | Rejection of invention patent application after publication | ||
| RJ01 | Rejection of invention patent application after publication |
Application publication date: 20181225 |