CN110106830B - A kind of perforated mould bag concrete ecological bank protection structure and construction method - Google Patents
A kind of perforated mould bag concrete ecological bank protection structure and construction method Download PDFInfo
- Publication number
- CN110106830B CN110106830B CN201910364805.7A CN201910364805A CN110106830B CN 110106830 B CN110106830 B CN 110106830B CN 201910364805 A CN201910364805 A CN 201910364805A CN 110106830 B CN110106830 B CN 110106830B
- Authority
- CN
- China
- Prior art keywords
- concrete
- bamboo
- anchor rod
- bag
- slope
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 239000004567 concrete Substances 0.000 title claims abstract description 103
- 238000010276 construction Methods 0.000 title claims abstract description 30
- 235000017166 Bambusa arundinacea Nutrition 0.000 claims abstract description 116
- 235000017491 Bambusa tulda Nutrition 0.000 claims abstract description 116
- 241001330002 Bambuseae Species 0.000 claims abstract description 116
- 235000015334 Phyllostachys viridis Nutrition 0.000 claims abstract description 116
- 239000011425 bamboo Substances 0.000 claims abstract description 116
- 241000196324 Embryophyta Species 0.000 claims abstract description 25
- 241001465754 Metazoa Species 0.000 claims abstract description 10
- 239000011376 self-consolidating concrete Substances 0.000 claims abstract description 8
- 239000002689 soil Substances 0.000 claims description 26
- 229910000831 Steel Inorganic materials 0.000 claims description 25
- 239000010959 steel Substances 0.000 claims description 25
- 239000004568 cement Substances 0.000 claims description 22
- 239000004576 sand Substances 0.000 claims description 13
- 239000000463 material Substances 0.000 claims description 11
- 239000000758 substrate Substances 0.000 claims description 8
- 239000002023 wood Substances 0.000 claims description 8
- 238000005520 cutting process Methods 0.000 claims description 7
- 238000005516 engineering process Methods 0.000 claims description 7
- 238000005086 pumping Methods 0.000 claims description 6
- 239000004575 stone Substances 0.000 claims description 6
- 244000104272 Bidens pilosa Species 0.000 claims description 5
- 235000010662 Bidens pilosa Nutrition 0.000 claims description 5
- 244000052363 Cynodon dactylon Species 0.000 claims description 5
- 239000000853 adhesive Substances 0.000 claims description 5
- 230000001070 adhesive effect Effects 0.000 claims description 5
- 238000005553 drilling Methods 0.000 claims description 5
- 238000007667 floating Methods 0.000 claims description 5
- 239000002985 plastic film Substances 0.000 claims description 5
- 229920006255 plastic film Polymers 0.000 claims description 5
- 238000005096 rolling process Methods 0.000 claims description 5
- 241001251949 Xanthium sibiricum Species 0.000 claims description 4
- 241000205407 Polygonum Species 0.000 claims description 3
- 238000003466 welding Methods 0.000 claims description 3
- 238000000034 method Methods 0.000 claims description 2
- 238000003825 pressing Methods 0.000 claims 5
- 230000000149 penetrating effect Effects 0.000 claims 3
- 230000003014 reinforcing effect Effects 0.000 claims 3
- 229910000975 Carbon steel Inorganic materials 0.000 claims 1
- 238000004080 punching Methods 0.000 claims 1
- 238000007789 sealing Methods 0.000 claims 1
- 238000009958 sewing Methods 0.000 claims 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 abstract description 7
- 239000011324 bead Substances 0.000 description 16
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 description 10
- 239000011435 rock Substances 0.000 description 6
- 239000011230 binding agent Substances 0.000 description 5
- 238000009434 installation Methods 0.000 description 5
- 229910052742 iron Inorganic materials 0.000 description 5
- 239000000203 mixture Substances 0.000 description 5
- 239000011159 matrix material Substances 0.000 description 4
- 239000004570 mortar (masonry) Substances 0.000 description 4
- 239000007787 solid Substances 0.000 description 4
- 229910001220 stainless steel Inorganic materials 0.000 description 4
- 239000010935 stainless steel Substances 0.000 description 4
- 238000004026 adhesive bonding Methods 0.000 description 3
- 239000004816 latex Substances 0.000 description 3
- 229920000126 latex Polymers 0.000 description 3
- 238000000465 moulding Methods 0.000 description 3
- 244000081171 Ludwigia prostrata Species 0.000 description 2
- 238000005188 flotation Methods 0.000 description 2
- 239000010881 fly ash Substances 0.000 description 2
- 229910052500 inorganic mineral Inorganic materials 0.000 description 2
- 244000005700 microbiome Species 0.000 description 2
- 239000011707 mineral Substances 0.000 description 2
- 239000004033 plastic Substances 0.000 description 2
- 239000000843 powder Substances 0.000 description 2
- 238000003971 tillage Methods 0.000 description 2
- 241000251468 Actinopterygii Species 0.000 description 1
- 241000269350 Anura Species 0.000 description 1
- 241000238557 Decapoda Species 0.000 description 1
- 229920001273 Polyhydroxy acid Polymers 0.000 description 1
- 239000004743 Polypropylene Substances 0.000 description 1
- 239000011398 Portland cement Substances 0.000 description 1
- 241000270295 Serpentes Species 0.000 description 1
- 241000270666 Testudines Species 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 239000003795 chemical substances by application Substances 0.000 description 1
- 230000024346 drought recovery Effects 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 229920001971 elastomer Polymers 0.000 description 1
- 230000007613 environmental effect Effects 0.000 description 1
- 230000003628 erosive effect Effects 0.000 description 1
- 239000004744 fabric Substances 0.000 description 1
- 230000008635 plant growth Effects 0.000 description 1
- -1 polypropylene Polymers 0.000 description 1
- 229920001155 polypropylene Polymers 0.000 description 1
- 125000006850 spacer group Chemical group 0.000 description 1
- 238000011105 stabilization Methods 0.000 description 1
- 239000008030 superplasticizer Substances 0.000 description 1
- 230000004083 survival effect Effects 0.000 description 1
- 230000008961 swelling Effects 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02B—HYDRAULIC ENGINEERING
- E02B3/00—Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
- E02B3/04—Structures or apparatus for, or methods of, protecting banks, coasts, or harbours
- E02B3/12—Revetment of banks, dams, watercourses, or the like, e.g. the sea-floor
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02A—TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
- Y02A10/00—TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE at coastal zones; at river basins
- Y02A10/11—Hard structures, e.g. dams, dykes or breakwaters
Landscapes
- Engineering & Computer Science (AREA)
- General Engineering & Computer Science (AREA)
- Environmental & Geological Engineering (AREA)
- Ocean & Marine Engineering (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)
- Revetment (AREA)
Abstract
Description
技术领域technical field
本发明涉及一种有孔模袋混凝土生态护岸结构及施工方法,属于生态环境保护领域。The invention relates to a concrete ecological bank protection structure and a construction method with perforated mould bags, and belongs to the field of ecological environmental protection.
背景技术Background technique
现有护坡技术中通常会根据消落带水位涨落对植物进行分阶梯布置和设置自动漂浮装置的方法对消落带进行防护。植物分阶梯布置的方案根据不同植物的耐水、耐旱能力等生物学特性区分不同的梯级,可以在一定程度上解决消落带绿化的问题,但是大多数岩质边坡缺乏植物、动物以及微生物生活的条件,植物不易存活,且汛期时间的长短直接影响到植物的生长;自动漂浮装置通过设置伐垫能够对消落带边坡有效防护,能够消波防浪,减小侵蚀,但是无法适应复杂的地形,缺乏对动物生境的考虑,使生态平衡遭到破坏。In the existing slope protection technology, the plants are usually arranged in steps according to the fluctuation of the water level in the water level, and the automatic flotation device is installed to protect the level. The plan for arranging plants in steps can distinguish different steps according to the biological characteristics of different plants such as water tolerance and drought tolerance, which can solve the problem of greening in the ebb and flow zone to a certain extent, but most rock slopes lack plants, animals and microorganisms. Living conditions, plants are not easy to survive, and the length of the flood season directly affects the growth of plants; the automatic flotation device can effectively protect the slopes of the fluctuating belt by setting cutting mats, can eliminate waves and prevent waves, and reduce erosion, but it cannot adapt to The complex terrain and lack of consideration of animal habitats have destroyed the ecological balance.
发明内容SUMMARY OF THE INVENTION
本发明针对上述问题,能够对边坡进行有效防护,使种植的植物易存活,克服汛期时间的长短对植物的影响,提出了一种有孔模袋混凝土生态护岸结构及施工方法。Aiming at the above problems, the invention can effectively protect the slope, make the planted plants easy to survive, overcome the influence of the length of the flood season on the plants, and propose a concrete ecological bank protection structure and construction method with a hole mould bag.
本发明采取的技术方案如下:The technical scheme adopted by the present invention is as follows:
一种有孔模袋混凝土生态护岸结构,包括混凝土条,在混凝土条中预埋有巢穴竹管、植被竹管,所述混凝土条之间留有与其长度和宽度方向分别平行的间隙形成相互交叉的斜沟;巢穴竹管绑扎固定于圆环锚杆上,其管口开口于斜沟,至少有两根相互贯通;圆环锚杆的一端插在边坡中,另一端埋在混凝土条中;植被竹管插在圆环锚杆的圆环中,植被竹管的空腔中有基质及植物。A concrete ecological bank protection structure with perforated mould bags, comprising concrete strips, in which nest bamboo pipes and vegetation bamboo pipes are pre-buried, and gaps parallel to the length and width directions thereof are left between the concrete strips to form intersecting each other. the sloping ditch; the nest bamboo pipe is bound and fixed on the annular anchor rod, and its nozzle is open in the inclined ditch, and at least two of them are connected to each other; one end of the annular anchor rod is inserted into the slope, and the other end is buried in the concrete strip The vegetation bamboo tube is inserted in the ring of the annular anchor rod, and there are substrates and plants in the cavity of the vegetation bamboo tube.
斜沟长度方向与坡面等高线成β角,12°≤β≤30°。The length direction of the inclined groove forms an angle of β with the contour line of the slope, 12°≤β≤30°.
所述植被竹管与坡面成α角,60°≤α≤80°。The vegetation bamboo pipe forms an α angle with the slope, 60°≤α≤80°.
所述植被竹管空腔中的基质为:耕植土、腐熟木屑、河沙和土壤粘合剂充分拌合后的混合物,以体积比计:耕植土:腐熟木屑:河沙=70-90:5-12:5-15;土壤粘合剂的用量为0.016-0.019 g/L;植物为狗牙根(Cynodon dactylon (L.) Pers.)、鬼针草(Bidens pilosa L.)、苍耳(Xanthium sibiricum Patrin ex Widder)或蓼草(Ludwigia prostrata Roxb)中的一种或几种。The matrix in the cavity of the bamboo tube for vegetation is: a mixture of tillage soil, decomposed sawdust, river sand and soil binder fully mixed, in a volume ratio: tillage soil: decomposed sawdust: river sand=70- 90:5-12:5-15; the dosage of soil binder is 0.016-0.019 g/L; the plants are Cynodon dactylon (L.) Pers. , Bidens pilosa L. , One or more of Xanthium sibiricum Patrin ex Widder or Polygonum (Ludwigia prostrata Roxb) .
圆环锚杆插入坡面的深度不小于15 cm,伸出坡面的长度不小于20 cm。The depth of the annular anchor rod inserted into the slope surface is not less than 15 cm, and the length of the projecting slope surface is not less than 20 cm.
所述的圆环锚杆包括竖向钢筋以及与竖向钢筋连接的圆环,圆环穿过竖向钢筋并固定在竖向钢筋上。The annular anchor rod includes vertical steel bars and a ring connected with the vertical steel bars, and the annular rings pass through the vertical steel bars and are fixed on the vertical steel bars.
有孔模袋混凝土生态护岸结构的施工方法,包括以下步骤:The construction method of the concrete ecological bank protection structure with hole mould bag includes the following steps:
(1)准备材料,准备竹管、圆环锚杆、螺纹锚杆、垫片、螺帽、土工模袋和压条等材料:将巢穴竹管和植被竹管的内腔打通,管口用加厚塑料薄膜封口,然后将巢穴竹管管壁开口;在光圆钢筋上焊上圆环形成圆环锚杆;土工模袋在加工时预留未缝合的边B及混凝土灌注口,在其与坡面接触平面的两个相邻的边上缝制定位环;(1) Prepare materials, prepare bamboo pipes, ring bolts, threaded bolts, gaskets, nuts, geomoulding bags and beading and other materials: open up the inner cavity of the nest bamboo pipe and the vegetation bamboo pipe, and use a The thick plastic film is sealed, and then the wall of the bamboo tube of the nest is opened; a ring is welded on the smooth round steel bar to form a ring anchor; the unstitched side B and the concrete pouring port are reserved for the geoform bag during processing. Positioning rings are sewn on two adjacent sides of the slope contact plane;
(2)清坡放样,清理坡面滚石、浮土及枯树枝,并测量放线;(2) Clear the slope and set out, clean up the rolling stones, floating soil and dead branches on the slope, and measure and set out the line;
(3)钻锚孔,在坡面上钻锚孔;(3) Drill anchor holes and drill anchor holes on the slope;
(4)安装螺纹锚杆,把螺纹锚杆插入锚孔中,用水泥注浆填充螺纹锚杆与孔隙之间的间隙;(4) Install the threaded bolt, insert the threaded bolt into the anchor hole, and fill the gap between the threaded bolt and the hole with cement grouting;
(5)安装土工模袋,待水泥硬化后,将螺纹锚杆穿过定位环,然后把压条压在土工模袋上,在压条上钻孔,接着将螺纹锚杆穿过垫片和压条插入坡体,最后拧紧螺帽;(5) Install the geoform bag. After the cement hardens, pass the threaded anchor rod through the positioning ring, then press the bead on the geoform bag, drill holes on the bead, and then insert the threaded bolt through the gasket and the bead. slope, and finally tighten the nut;
(6)安装竹管,把圆环锚杆刺穿土工模袋插入锚孔中,用水泥注浆填充锚杆与孔隙之间的间隙,待水泥硬化后,把植被竹管插入圆环锚杆的圆环中,将其顶端粘接在土工模袋内表面,接着把巢穴竹管绑扎固定在圆环锚杆上,两巢穴竹管之间在接口E处粘接,拼装完成后缝合土工模袋;(6) Install the bamboo pipe, pierce the annular anchor rod through the geo-mold bag and insert it into the anchor hole, fill the gap between the anchor rod and the hole with cement grouting, and insert the vegetation bamboo pipe into the annular anchor rod after the cement hardens. In the ring, the top end is glued to the inner surface of the geomodel bag, then the nest bamboo tube is tied and fixed on the ring anchor, the two nest bamboo tubes are bonded at the interface E, and the geomodel is sewed after the assembly is completed. bag;
(7)浇筑混凝土,采用泵送混凝土的技术施工混凝土条,混凝土条的施工顺序是从坡顶到坡脚依次进行;每一个混凝土条施工时,从土工模袋混凝土灌注口浇注自密实混凝土;(7) Concrete is poured, and the technology of pumping concrete is used to construct the concrete strip. The construction sequence of the concrete strip is carried out in sequence from the top of the slope to the foot of the slope; when each concrete strip is constructed, self-compacting concrete is poured from the concrete pouring port of the geoform bag;
(8)养护,砂浆终凝后开始洒水养护,养护期间要求护坡表面处于湿润状态,待混凝土强度达到75%以上时,剪开与巢穴竹管相连的模袋的侧边使管口露出,成为动物通行的入口;(8) Conservation. After the mortar is finally set, start watering and curing. During the curing period, the surface of the slope protection is required to be in a wet state. When the concrete strength reaches more than 75%, cut the side of the mold bag connected with the nest bamboo pipe to expose the pipe opening, which becomes the entrances for animal passage;
(9)植被竹管施工,剪开与植被竹管相连的模袋上表面,使管口露出并在管中放入基质及植物种子。(9) Construction of the vegetation bamboo pipe, cutting the upper surface of the mold bag connected with the vegetation bamboo pipe to expose the mouth of the pipe and put the substrate and plant seeds in the pipe.
本发明提供的有孔模袋混凝土生态护岸结构及施工方法具有以下有益效果:The perforated mould bag concrete ecological bank protection structure and construction method provided by the present invention have the following beneficial effects:
1) 通过模袋混凝土和预埋竹管形成的有孔混凝土结构,一体化解决了消落带或河岸的防护、绿化和生物巢穴构建,增加了消落带或河岸的稳定和生物多样性,美化了景观。1) The porous concrete structure formed by the moulded bag concrete and the pre-embedded bamboo pipes integratedly solves the protection, greening and biological nest construction of the ebb and flow zone or river bank, and increases the stability and biodiversity of the ebb and flow zone or river bank. Beautify the landscape.
2) 使用土工模袋和泵送自密实混凝土技术,降低了施工成本,方便施工。2) The use of geoform bags and pumping self-compacting concrete technology reduces construction costs and facilitates construction.
3) 模袋混凝土能适应边坡的凹凸不平的地形,可对边坡有效防护。3) Molded bag concrete can adapt to the uneven terrain of the slope, and can effectively protect the slope.
4) 通过预埋不同直径的竹管,可以供多种生物栖息,在水下时,可供鱼虾等栖息;在水上时,可供蛙、蛇、龟等栖息。4) Bamboo pipes with different diameters can be pre-buried to inhabit a variety of creatures. When underwater, fish and shrimp can inhabit; when underwater, frogs, snakes, turtles, etc. can inhabit.
5)混凝土条之间的斜沟,坡度较小,可以排水的同时,为动物活动提供通道。5) The inclined grooves between the concrete strips have a small slope, which can provide passage for animal activities while draining water.
6) 圆环锚杆和螺纹锚杆植入边坡中,加固岩体强度和自稳能力,增加了竹管的固定强度,使混凝土、土工模袋和岩体形成共同的体系。6) Ring bolts and threaded bolts are implanted in the slope to strengthen the strength and self-stabilization of the rock mass, increase the fixing strength of the bamboo pipe, and make the concrete, the geoform bag and the rock mass form a common system.
综上,本发明能够对边坡进行有效防护,在岩质边坡为植物、动物以及微生物提供了存活条件,使种植的植物易存活,解决了陡峭岩石边坡同时防护和绿化的难题。In conclusion, the present invention can effectively protect the slope, provide survival conditions for plants, animals and microorganisms on the rocky slope, make the planted plants easy to survive, and solve the problem of simultaneous protection and greening of the steep rock slope.
附图说明Description of drawings
图1是安装在坡面上已浇筑混凝土但未拆除土工模袋的平面示意图。Figure 1 is a schematic plan view of the installation on the slope and the concrete has been poured but the geoform bag has not been removed.
图2是安装在坡面上已安装竹管但未浇筑混凝土的单个土工模袋的立体示意图。Figure 2 is a schematic perspective view of a single geoform bag installed on a slope with bamboo pipes installed but no concrete poured.
图3是图1的A-A剖面图。FIG. 3 is a cross-sectional view taken along line A-A of FIG. 1 .
图4是图3中螺纹锚杆安装部位Z处详图。FIG. 4 is a detailed view of the installation position Z of the threaded anchor rod in FIG. 3 .
图5是图2中巢穴竹管拼接部位C处详图。FIG. 5 is a detailed view of the splicing part C of the bamboo tube in the nest in FIG. 2 .
图6是未缝合的单个土工模袋示意图。Figure 6 is a schematic illustration of a single unsewn geoform bag.
图中:圆环锚杆1,混凝土条2,巢穴竹管3,定位环4,边坡5,植被竹管6,斜沟7,混凝土灌注口8,压条9,螺纹锚杆10,垫片11,螺帽12,巢穴竹管接口E,土工模袋未缝合的边B,土工模袋已加工的边D。In the figure:
具体实施方式Detailed ways
下面结合附图和实施例对本发明作进一步说明。下述实施例的说明只是用于帮助理解本发明,但并不因此限制本发明的保护范围。应当指出,以上技术方案的某些技术特征的简单替换和组合,如用塑料或铁管代替竹管,用塑料杆或木杆代替锚杆所形成的技术方案,都包含在本发明的技术方案之内。The present invention will be further described below with reference to the accompanying drawings and embodiments. The description of the following examples is only used to help the understanding of the present invention, but does not limit the protection scope of the present invention. It should be pointed out that the simple replacement and combination of some technical features of the above technical solutions, such as replacing the bamboo tube with a plastic or iron tube, and replacing the anchor rod with a plastic rod or a wooden rod, are all included in the technical solution of the present invention. within.
本发明的的圆环锚杆1包括竖向钢筋以及与竖向钢筋连接的圆环,圆环穿过竖向钢筋并固定在竖向钢筋上。The
土工模袋袋体为两层全丙纶高强机织布制成的产品。The body of the geomold bag is made of two layers of high-strength woven polypropylene fabric.
自密实混凝土的重量配比为水泥:矿粉:粉煤灰:水:砂:碎石:外加剂为17:4.5:2.5:6.5:30:39:0.5。其中,水泥为普通硅酸盐水泥P.042.5;矿粉型号为S95级;粉煤灰为Ⅱ级;砂为Ⅱ区中砂;碎石为石灰岩碎石,石子粒径为5-20 mm;外加剂为聚羟酸高性能减水剂和膨胀剂的混合物。The weight ratio of self-compacting concrete is cement: mineral powder: fly ash: water: sand: crushed stone: admixture 17:4.5:2.5:6.5:30:39:0.5. Among them, the cement is ordinary Portland cement P.042.5; the mineral powder type is S95; the fly ash is grade II; the sand is medium sand in zone II; The admixture is a mixture of polyhydroxy acid superplasticizer and swelling agent.
钻机型号为手持ZQSJ-140/4.1钻机。The drilling rig model is handheld ZQSJ-140/4.1 drilling rig.
焊机型号为NB-315Y气体焊机。The welding machine model is NB-315Y gas welding machine.
实施例1Example 1
某地为岩质边坡,坡度30°,坡高为3 m,拟采用本发明进行防护。A certain place is a rocky slope with a slope of 30° and a slope height of 3 m. The present invention is proposed to be used for protection.
土工模袋形状如图6所示,长度为2 m,宽度为1 m,最高点与土工模袋底面的垂直高度H为40 cm;定位环材料为不锈钢材质,其安装位置距土工模袋侧边的距离为15 cm,直径为15 mm,厚度为8 mm,两定位环之间的间距为30 cm。The shape of the geomold bag is shown in Figure 6, the length is 2 m, the width is 1 m, and the vertical height H between the highest point and the bottom surface of the geomold bag is 40 cm; the positioning ring is made of stainless steel, and its installation position is far from the side of the geomold bag. The distance between the sides is 15 cm, the diameter is 15 mm, the thickness is 8 mm, and the distance between the two positioning rings is 30 cm.
圆环锚杆中的竖向钢筋为HPB300级光圆钢筋,直径为10 mm,间距为50 cm,其上的圆环为为实心圆钢,外直径为10 cm;螺纹锚杆为HRB400E级螺纹钢筋,直径为12 mm,间距为30 cm。The vertical steel bars in the ring anchor rod are HPB300 grade smooth round steel rods, with a diameter of 10 mm and a spacing of 50 cm. The rings on it are solid round steel with an outer diameter of 10 cm; the threaded anchor rods are HRB400E grade threads. Rebars, 12 mm in diameter and 30 cm apart.
有孔模袋混凝土生态护岸结构,包括混凝土条2,在混凝土条2中预埋有巢穴竹管3、植被竹管6,所述混凝土条2之间留有与其长度和宽度方向分别平行的间隙形成相互交叉的斜沟7,其长度方向与坡面等高线成12°角;巢穴竹管3绑扎固定于圆环锚杆1上,其管口开口于斜沟7,至少有两根相互贯通;圆环锚杆1的一端插在边坡中,另一端埋在混凝土条2中;植被竹管6插在圆环锚杆1的圆环中,植被竹管6的空腔中有基质及植物并与坡面成60°角。Concrete ecological bank protection structure with hole mould bag, comprises
所述单个混凝土条2内的巢穴竹管3设有3根,直径分别为5 cm,10 cm,15 cm;植被竹管6长度为40 cm,直径为5 cm。The
所述植被竹管6空腔中的基质为:耕植土、腐熟木屑、河沙和土壤粘合剂的混合物,以体积比计:耕植土:腐熟木屑:河沙=70:5:5;土壤粘合剂的用量为0.016 g/L;植物为狗牙根(Cynodon dactylon (L.) Pers.)和鬼针草(Bidens pilosa L.)。The matrix in the cavity of the
所述斜沟7的宽度为30 cm。The width of the
所述圆环锚杆1插入坡面的长度为15 cm,伸出坡面的长度为20 cm。The length of the
所述混凝土条2采用泵送C25自密实混凝土浇筑而成。The
上述一种有孔模袋混凝土生态护岸结构的施工方法,包括以下步骤:The above-mentioned construction method of a perforated mould bag concrete ecological bank protection structure comprises the following steps:
(1)准备材料,准备竹管、圆环锚杆、螺纹锚杆、垫片、螺帽、土工模袋和压条等材料:将巢穴竹管和植被竹管的内腔打通,管口用加厚塑料薄膜封口,然后将巢穴竹管管壁开口;在光圆钢筋上焊上圆环形成圆环锚杆;土工模袋在加工时预留未缝合的边B及混凝土灌注口,在其与坡面接触平面的两个相邻的边上缝制定位环。(1) Prepare materials, prepare bamboo pipes, ring bolts, threaded bolts, gaskets, nuts, geomoulding bags and beading and other materials: open up the inner cavity of the nest bamboo pipe and the vegetation bamboo pipe, and use a The thick plastic film is sealed, and then the wall of the bamboo tube of the nest is opened; a ring is welded on the smooth round steel bar to form a ring anchor; the unstitched side B and the concrete pouring port are reserved for the geoform bag during processing. Positioning rings are sewn on two adjacent edges of the sloped contact plane.
(2)清坡放样,清理坡面滚石、浮土及枯树枝,并测量放线。(2) Clear the slope and set out, clean up the rolling stones, floating soil and dead branches on the slope, and measure and set out the line.
(3)钻锚孔,在坡面上钻锚孔。(3) Drill anchor holes and drill anchor holes on the slope.
(4)安装螺纹锚杆,把螺纹锚杆插入锚孔中并用水泥注浆填充螺纹锚杆与孔隙之间的间隙,螺纹锚杆插入坡面的深度为15 cm。(4) Install the threaded bolt, insert the threaded bolt into the anchor hole and fill the gap between the threaded bolt and the hole with cement grouting. The depth of the threaded bolt inserted into the slope is 15 cm.
(5)安装模袋,待水泥硬化后,将螺纹锚杆穿过定位环,然后把压条压在土工模袋上,然后在压条上钻孔,压条为橡胶实心,其宽度为10 cm,厚度为8 mm,接着将螺纹锚杆穿过垫片和压条插入坡体,最后拧紧螺帽。(5) Install the mold bag, after the cement hardens, pass the threaded anchor rod through the positioning ring, then press the bead on the geo-form bag, and then drill holes on the bead, the bead is solid rubber, its width is 10 cm, and its thickness is 10 cm. 8 mm, then insert the threaded anchor through the spacer and bead into the ramp, and finally tighten the nut.
(6)安装竹管,把圆环锚杆刺穿土工模袋插入锚孔中,用水泥注浆填充钢筋与孔隙之间的间隙,待水泥硬化后,把植被竹管插入圆环锚杆的圆环中,采用胶粘的方式将其顶端固定在土工模袋内表面,接着把巢穴竹管绑扎固定在圆环锚杆上,两巢穴竹管之间通过巢穴竹管接口E固定,为加强接口处的强度,可辅以乳胶固定,防止巢穴竹管松动,接着把巢穴竹管和植被竹管用铁丝固定在锚杆上,拼装完成后缝合土工模袋。(6) Install the bamboo pipe, pierce the circular anchor rod through the geo-model bag and insert it into the anchor hole, and fill the gap between the steel bar and the hole with cement grouting. After the cement hardens, insert the vegetation bamboo pipe into the ring anchor rod. In the ring, the top end is fixed on the inner surface of the geo-moulding bag by means of gluing, and then the nest bamboo pipe is tied and fixed on the ring anchor rod, and the two nest bamboo pipes are fixed through the nest bamboo pipe interface E. The strength of the interface can be supplemented with latex to prevent the nest bamboo tube from loosening. Then, the nest bamboo tube and the vegetation bamboo tube are fixed on the anchor rod with iron wire, and the geotechnical bag is sewed after the assembly is completed.
(7)浇筑混凝土,采用泵送混凝土的技术施工混凝土条,混凝土条的施工顺序是从坡顶到坡脚依次进行;每一个混凝土条施工时,从土工模袋混凝土灌注口浇注自密实的C25泵送混凝土。(7) Concrete is poured, and the concrete strip is constructed by the technology of pumping concrete. The construction sequence of the concrete strip is from the top of the slope to the toe of the slope. When each concrete strip is constructed, self-compacting C25 Pump concrete.
(8)养护,砂浆终凝后开始洒水养护,养护期间要求护坡表面处于湿润状态,养护时间为7天,待混凝土强度达到75%时,剪开与巢穴竹管相连的模袋的侧边使管口露出,成为动物通行的入口。(8) Conservation. After the mortar is finally set, start watering curing. During the curing period, the slope protection surface is required to be in a wet state. The curing time is 7 days. When the concrete strength reaches 75%, cut the side of the mold bag connected to the nest bamboo pipe to make The mouth of the pipe is exposed and becomes the entrance for animals to pass through.
(9)植被竹管施工,剪开与植被竹管相连的模袋上表面,使管口露出并在竹管的空腔中放入基质及植物种子。(9) Construction of the vegetation bamboo pipe, cutting the upper surface of the mold bag connected with the vegetation bamboo pipe to expose the mouth of the pipe and put the substrate and plant seeds in the cavity of the bamboo pipe.
实施案例2
某地为消落带土夹石边坡,坡度45°,坡高为4 m,拟采用本发明进行防护。A certain place is a soil and rock slope in the ebb and flow zone, with a slope of 45° and a slope height of 4 m. The present invention is planned to be used for protection.
土工模袋形状如图6所示,长度为2.5 m,宽度为1.5 m,最高点与土工模袋底面的垂直高度H为50 cm;定位环材料为不锈钢材质,其安装位置距土工模袋侧边的距离为25cm,直径为15 mm,厚度为10 mm,两定位环之间的间距为35 cm。The shape of the geo-mold bag is shown in Figure 6, with a length of 2.5 m and a width of 1.5 m. The vertical height H between the highest point and the bottom of the geo-mold bag is 50 cm; the positioning ring is made of stainless steel, and its installation position is far from the side of the geo-mold bag. The distance between the sides is 25cm, the diameter is 15mm, the thickness is 10mm, and the distance between the two positioning rings is 35cm.
圆环锚杆中的竖向钢筋为HPB300级光圆钢筋,直径为10 mm,间距为55 cm,其上的圆环为为实心圆钢,外直径为12 cm;螺纹锚杆为HRB400E级螺纹钢筋,直径为12 mm,间距为35 cm。The vertical steel bars in the ring anchor rod are HPB300 grade smooth round steel rods, with a diameter of 10 mm and a spacing of 55 cm, and the ring above it is a solid round steel with an outer diameter of 12 cm; the threaded anchor rods are HRB400E grade threads Rebars, 12 mm in diameter and 35 cm apart.
有孔模袋混凝土生态护岸结构,包括混凝土条2,在混凝土条2中预埋有巢穴竹管3、植被竹管6,所述混凝土条2之间留有与其长度和宽度方向分别平行的间隙形成相互交叉的斜沟7,其长度方向与坡面等高线成20°角;巢穴竹管3绑扎固定于圆环锚杆1上,其管口开口于斜沟7,至少有两根相互贯通;圆环锚杆1的一端插在边坡中,另一端埋在混凝土条2中;植被竹管6插在圆环锚杆1的圆环中,植被竹管6的空腔中有基质及植物并与坡面成70°角。Concrete ecological bank protection structure with hole mould bag, comprises
所述单个混凝土条2内的巢穴竹管3设有4根,直径分别为5 cm,10 cm,15 cm,20cm。There are four
所述植被竹管6长度为50 cm,直径为10 cm。The
所述植被竹管6空腔中的基质为:耕植土、腐熟木屑、河沙和土壤粘合剂的混合物,以体积比计:耕植土:腐熟木屑:河沙=80:10:10;土壤粘合剂的用量为0.018 g/L;植物为狗牙根(Cynodon dactylon (L.) Pers.)、鬼针草(Bidens pilosa L.)和苍耳(Xanthium sibiricum Patrin ex Widder)。The matrix in the cavity of the
所述斜沟7的宽度为40 cm。The width of the
所述圆环锚杆1插入坡面的长度为18 cm,伸出坡面的长度为25 cm。The length of the
所述混凝土条2为泵送C25自密实混凝土。The
所述的一种有孔模袋混凝土生态护岸结构的施工方法,包括以下步骤:The described construction method of the concrete ecological bank protection structure with hole mould bag comprises the following steps:
(1)准备材料,准备竹管、圆环锚杆、螺纹锚杆、垫片、螺帽、土工模袋和压条等材料:将巢穴竹管和植被竹管的内腔打通,管口用加厚塑料薄膜封口,然后将巢穴竹管管壁开口;在光圆钢筋上焊上圆环形成圆环锚杆;土工模袋在加工时预留未缝合的边B及混凝土灌注口,在其与坡面接触平面的两个相邻的边上缝制定位环。(1) Prepare materials, prepare bamboo pipes, ring bolts, threaded bolts, gaskets, nuts, geomoulding bags and beading and other materials: open up the inner cavity of the nest bamboo pipe and the vegetation bamboo pipe, and use a The thick plastic film is sealed, and then the wall of the bamboo tube of the nest is opened; a ring is welded on the smooth round steel bar to form a ring anchor; the unstitched side B and the concrete pouring port are reserved for the geoform bag during processing. Positioning rings are sewn on two adjacent edges of the sloped contact plane.
(2)清坡放样,清理坡面滚石、浮土及枯树枝,并测量放线。(2) Clear the slope and set out, clean up the rolling stones, floating soil and dead branches on the slope, and measure and set out the line.
(3)钻锚孔,在坡面上钻锚孔。(3) Drill anchor holes and drill anchor holes on the slope.
(4)安装螺纹锚杆,把螺纹锚杆插入锚孔中并用水泥注浆填充螺纹锚杆与孔隙之间的间隙,螺纹锚杆插入坡面的深度为18 cm。(4) Install the threaded bolt, insert the threaded bolt into the anchor hole and fill the gap between the threaded bolt and the hole with cement grouting. The depth of the threaded bolt inserted into the slope is 18 cm.
(5)安装模袋,待水泥硬化后,将螺纹锚杆穿过定位环,然后把压条压在土工模袋上,然后在压条上钻孔,压条的材料为不锈钢片,其宽度为15 cm,厚度为10 mm,接着将螺纹锚杆穿过垫片和压条插入坡体,最后拧紧螺帽。(5) Install the mold bag. After the cement hardens, pass the threaded anchor rod through the positioning ring, then press the bead on the geotechnical bag, and then drill holes on the bead. The material of the bead is stainless steel, and its width is 15 cm. , the thickness is 10 mm, then insert the threaded anchor rod through the gasket and the bead into the slope body, and finally tighten the nut.
(6)安装竹管,把圆环锚杆刺穿土工模袋插入锚孔中,用水泥注浆填充钢筋与孔隙之间的间距,待水泥硬化后,把植被竹管插入圆环锚杆的圆环中,采用胶粘的方式将其顶端固定在土工模袋内表面,接着把巢穴竹管绑扎固定在圆环锚杆上,两巢穴竹管之间通过巢穴竹管接口E固定,为加强接口处的强度,可辅以乳胶固定,防止巢穴竹管松动,接着把巢穴竹管和植被竹管用铁丝固定在锚杆上,拼装完成后缝合模袋。(6) Install the bamboo pipe, pierce the circular anchor rod through the geo-model bag and insert it into the anchor hole, fill the gap between the steel bar and the hole with cement grouting, and after the cement hardens, insert the vegetation bamboo pipe into the hole of the circular anchor rod In the ring, the top end is fixed on the inner surface of the geo-moulding bag by means of gluing, and then the nest bamboo pipe is tied and fixed on the ring anchor rod, and the two nest bamboo pipes are fixed through the nest bamboo pipe interface E. The strength of the interface can be supplemented with latex to prevent the nest bamboo pipe from loosening. Then, the nest bamboo pipe and the vegetation bamboo pipe are fixed on the anchor rod with iron wires, and the mold bag is sewed after the assembly is completed.
(7)浇筑混凝土,采用泵送混凝土的技术施工混凝土条,混凝土条的施工顺序是从坡顶到坡脚依次进行;每一个混凝土条施工时,从土工模袋混凝土灌注口浇注自密实的C25泵送混凝土。(7) Concrete is poured, and the concrete strip is constructed by the technology of pumping concrete. The construction sequence of the concrete strip is from the top of the slope to the toe of the slope. When each concrete strip is constructed, self-compacting C25 Pump concrete.
(8)养护,砂浆终凝后开始洒水养护,养护期间要求护坡表面处于湿润状态,养护时间为7天,待混凝土强度达到80%时,剪开与巢穴竹管相连的模袋的侧边使管口露出,成为动物通行的入口。(8) Conservation. After the mortar is finally set, start watering curing. During the curing period, the slope protection surface is required to be in a wet state. The curing time is 7 days. When the concrete strength reaches 80%, cut the side of the mold bag connected to the nest bamboo pipe to The mouth of the pipe is exposed and becomes the entrance for animals to pass through.
(9)植被竹管施工,剪开与植被竹管相连的模袋上表面,使管口露出并在竹管的空腔中放入基质及植物种子。(9) Construction of the vegetation bamboo pipe, cutting the upper surface of the mold bag connected with the vegetation bamboo pipe to expose the mouth of the pipe and put the substrate and plant seeds in the cavity of the bamboo pipe.
实施案例3
某地为破碎岩质边坡,坡度60°,坡高为5 m,拟采用本发明进行防护。A certain place is a broken rock slope with a slope of 60° and a slope height of 5 m, and the present invention is proposed to be used for protection.
土工模袋形状如图6所示,长度为3 m,宽度为2 m,最高点与土工模袋底面的垂直高度H为60 cm;定位环材料为不锈钢材质,其安装位置距土工模袋侧边的距离为35 cm,直径为15 mm,厚度为12 mm,两定位环之间的间距为40 cm。The shape of the geomold bag is shown in Figure 6, the length is 3 m, the width is 2 m, and the vertical height H between the highest point and the bottom surface of the geomold bag is 60 cm; the positioning ring is made of stainless steel, and its installation position is far from the side of the geomold bag. The distance between the sides is 35 cm, the diameter is 15 mm, the thickness is 12 mm, and the distance between the two positioning rings is 40 cm.
圆环锚杆中的竖向钢筋为HPB300级光圆钢筋,直径为10 mm,间距为60 cm,其上的圆环为为实心圆钢,外直径为16 cm;螺纹锚杆为HRB400E级螺纹钢筋,直径为12 mm,间距为40 cm。The vertical steel bars in the ring anchor rod are HPB300 grade smooth round steel rods, with a diameter of 10 mm and a spacing of 60 cm, and the ring above it is a solid round steel with an outer diameter of 16 cm; the threaded anchor rods are HRB400E grade threads Rebars, 12 mm in diameter and 40 cm apart.
有孔模袋混凝土生态护岸结构,包括混凝土条2,在混凝土条2中预埋有巢穴竹管3、植被竹管6,所述混凝土条2之间留有与其长度和宽度方向分别平行的间隙形成相互交叉的斜沟7,其长度方向与坡面等高线成30°角;巢穴竹管3绑扎固定于圆环锚杆1上,其管口开口于斜沟7,至少有两根相互贯通;圆环锚杆1的一端插在边坡中,另一端埋在混凝土条2中;植被竹管6插在圆环锚杆1的圆环中,植被竹管6的空腔中有基质及植物并与坡面成80°角。Concrete ecological bank protection structure with hole mould bag, comprises
所述单个土工模袋2内的巢穴竹管3设有5根,直径分别为5 cm,10 cm,15 cm,20cm,25 cm。There are 5
所述植被竹管6长度为60 cm,直径为15 cm。The
所述植被竹管6空腔中的基质为:耕植土、腐熟木屑、河沙和土壤粘合剂的混合物,以体积比计:耕植土:腐熟木屑:河沙=90:12:15;土壤粘合剂的用量为0.019 g/L;植物为狗牙根(Cynodon dactylon (L.) Pers.)、鬼针草(Bidens pilosa L.)、苍耳(Xanthium sibiricum Patrin ex Widder)和蓼草(Ludwigia prostrata Roxb)。The matrix in the cavity of the
所述斜沟7的宽度为45 cm。The width of the
所述圆环锚杆1插入坡面的长度为20 cm,伸出坡面的长度为30 cm。The length of the
所述混凝土条2为泵送C25自密实混凝土。The
所述的一种有孔模袋混凝土生态护岸结构的施工方法,包括以下步骤:The described construction method of the concrete ecological bank protection structure with hole mould bag comprises the following steps:
(1)准备材料,准备竹管、圆环锚杆、螺纹锚杆、垫片、螺帽、土工模袋和压条等材料:将巢穴竹管和植被竹管的内腔打通,管口用加厚塑料薄膜封口,然后将巢穴竹管管壁开口;在光圆钢筋上焊上圆环形成圆环锚杆;土工模袋在加工时预留未缝合的边B及混凝土灌注口,在其与坡面接触平面的两个相邻的边上缝制定位环。(1) Prepare materials, prepare bamboo pipes, ring bolts, threaded bolts, gaskets, nuts, geomoulding bags and beading and other materials: open up the inner cavity of the nest bamboo pipe and the vegetation bamboo pipe, and use a The thick plastic film is sealed, and then the wall of the bamboo tube of the nest is opened; a ring is welded on the smooth round steel bar to form a ring anchor; the unstitched side B and the concrete pouring port are reserved for the geoform bag during processing. Positioning rings are sewn on two adjacent edges of the sloped contact plane.
(2)清坡放样,清理坡面滚石、浮土及枯树枝,并测量放线。(2) Clear the slope and set out, clean up the rolling stones, floating soil and dead branches on the slope, and measure and set out the line.
(3)钻锚孔,在坡面上钻锚孔。(3) Drill anchor holes and drill anchor holes on the slope.
(4)安装螺纹锚杆,把螺纹锚杆插入锚孔中并用水泥注浆填充螺纹锚杆与孔隙之间的间隙,螺纹锚杆插入坡面的深度为20 cm。(4) Install the threaded bolt, insert the threaded bolt into the anchor hole and fill the gap between the threaded bolt and the hole with cement grouting. The depth of the threaded bolt inserted into the slope is 20 cm.
(5)安装模袋,待水泥硬化后,将螺纹锚杆穿过定位环,然后把压条压在土工模袋上,然后在压条上钻孔,压条的材料为铁片,其宽度为20 cm,厚度为12 mm,接着将螺纹锚杆穿过垫片和压条插入坡体,最后拧紧螺帽。(5) Install the mold bag. After the cement is hardened, pass the threaded anchor rod through the positioning ring, then press the bead on the geotechnical mold bag, and then drill holes on the bead. The material of the bead is iron, and its width is 20 cm. , the thickness is 12 mm, then insert the threaded anchor rod through the gasket and the bead into the slope body, and finally tighten the nut.
(6)安装竹管,把圆环锚杆刺穿土工模袋插入锚孔中,用水泥注浆填充钢筋与孔隙之间的间隙,待水泥硬化后,把植被竹管插入圆环锚杆的圆环中,采用胶粘的方式将其顶端固定在土工模袋内表面,接着把巢穴竹管绑扎固定在圆环锚杆上,两巢穴竹管之间通过巢穴竹管接口E固定,为加强接口处的强度,可辅以乳胶固定,防止巢穴竹管松动,接着把巢穴竹管和植被竹管用铁丝固定在锚杆上,拼装完成后缝合模袋。(6) Install the bamboo pipe, pierce the circular anchor rod through the geo-model bag and insert it into the anchor hole, and fill the gap between the steel bar and the hole with cement grouting. After the cement hardens, insert the vegetation bamboo pipe into the ring anchor rod. In the ring, the top end is fixed on the inner surface of the geo-moulding bag by means of gluing, and then the nest bamboo pipe is tied and fixed on the ring anchor rod, and the two nest bamboo pipes are fixed through the nest bamboo pipe interface E. The strength of the interface can be supplemented with latex to prevent the nest bamboo pipe from loosening. Then, the nest bamboo pipe and the vegetation bamboo pipe are fixed on the anchor rod with iron wires, and the mold bag is sewed after the assembly is completed.
(7)浇筑混凝土,采用泵送混凝土的技术施工混凝土条,混凝土条的施工顺序是从坡顶到坡脚依次进行;每一个混凝土条施工时,从土工模袋混凝土灌注口浇注自密实的C25泵送混凝土。(7) Concrete is poured, and the concrete strip is constructed by the technology of pumping concrete. The construction sequence of the concrete strip is from the top of the slope to the toe of the slope. When each concrete strip is constructed, self-compacting C25 Pump concrete.
(8)养护,砂浆终凝后开始洒水养护,养护期间要求护坡表面处于湿润状态,养护时间为7天,待混凝土强度达到85%时,剪开与巢穴竹管相连的模袋的侧边使管口露出,成为动物通行的入口。(8) Conservation. After the mortar is finally set, start watering curing. During the curing period, the surface of the slope protection is required to be in a wet state. The curing time is 7 days. When the concrete strength reaches 85%, cut the side of the mold bag connected with the nest bamboo pipe to make The mouth of the pipe is exposed and becomes the entrance for animals to pass through.
(9)植被竹管施工,剪开与植被竹管相连的模袋上表面,使管口露出并在竹管的空腔中放入基质及植物种子。(9) Construction of the vegetation bamboo pipe, cutting the upper surface of the mold bag connected with the vegetation bamboo pipe to expose the mouth of the pipe and put the substrate and plant seeds in the cavity of the bamboo pipe.
Claims (7)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201910364805.7A CN110106830B (en) | 2019-04-30 | 2019-04-30 | A kind of perforated mould bag concrete ecological bank protection structure and construction method |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201910364805.7A CN110106830B (en) | 2019-04-30 | 2019-04-30 | A kind of perforated mould bag concrete ecological bank protection structure and construction method |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CN110106830A CN110106830A (en) | 2019-08-09 |
| CN110106830B true CN110106830B (en) | 2020-11-27 |
Family
ID=67488022
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201910364805.7A Active CN110106830B (en) | 2019-04-30 | 2019-04-30 | A kind of perforated mould bag concrete ecological bank protection structure and construction method |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN110106830B (en) |
Families Citing this family (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN112554133B (en) * | 2020-11-27 | 2022-02-08 | 宁夏京大建筑工程有限公司 | Water conservancy construction is with supplementary type pay-off |
| CN114016466B (en) * | 2021-12-09 | 2023-05-05 | 山东科技大学 | Slope protection system for anchoring geomembrane bag and construction method thereof |
| CN114622518B (en) * | 2022-02-21 | 2023-05-09 | 中国长江三峡集团有限公司 | An ecological nest and its construction method of picking slabs and rockfills on rocky slopes in the hydrofluctuation zone |
Citations (8)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPH08296232A (en) * | 1995-04-25 | 1996-11-12 | Nouken:Kk | Greening block and construction method for greening |
| JPH1037157A (en) * | 1996-07-27 | 1998-02-10 | Nisshoku Corp | Protection and greening construction method of river immersion region |
| JPH1121897A (en) * | 1997-07-05 | 1999-01-26 | Takenaka Komuten Co Ltd | Greening vegetation mat structure |
| KR20110009351A (en) * | 2009-07-22 | 2011-01-28 | 장성근 | Shore block for masonry retaining wall construction |
| CN103225309A (en) * | 2013-04-03 | 2013-07-31 | 葛加君 | Construction method for concrete matrix planting protective slope |
| CN105178248A (en) * | 2015-07-30 | 2015-12-23 | 葛加君 | Concrete plant planting and slope protecting method for soft soil river slope |
| KR101582443B1 (en) * | 2015-06-17 | 2016-01-12 | (주) 일신네이쳐 | Ecological gabion having place for fishes |
| CN108708350A (en) * | 2018-05-18 | 2018-10-26 | 长沙理工大学 | An ecological slope protection structure and its construction method |
-
2019
- 2019-04-30 CN CN201910364805.7A patent/CN110106830B/en active Active
Patent Citations (8)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPH08296232A (en) * | 1995-04-25 | 1996-11-12 | Nouken:Kk | Greening block and construction method for greening |
| JPH1037157A (en) * | 1996-07-27 | 1998-02-10 | Nisshoku Corp | Protection and greening construction method of river immersion region |
| JPH1121897A (en) * | 1997-07-05 | 1999-01-26 | Takenaka Komuten Co Ltd | Greening vegetation mat structure |
| KR20110009351A (en) * | 2009-07-22 | 2011-01-28 | 장성근 | Shore block for masonry retaining wall construction |
| CN103225309A (en) * | 2013-04-03 | 2013-07-31 | 葛加君 | Construction method for concrete matrix planting protective slope |
| KR101582443B1 (en) * | 2015-06-17 | 2016-01-12 | (주) 일신네이쳐 | Ecological gabion having place for fishes |
| CN105178248A (en) * | 2015-07-30 | 2015-12-23 | 葛加君 | Concrete plant planting and slope protecting method for soft soil river slope |
| CN108708350A (en) * | 2018-05-18 | 2018-10-26 | 长沙理工大学 | An ecological slope protection structure and its construction method |
Also Published As
| Publication number | Publication date |
|---|---|
| CN110106830A (en) | 2019-08-09 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| Loudon | An Encyclopædia of Agriculture: Comprising the Theory and Practice of the Valuation, Transfer, Laying Out, Improvement, and Management of Landed Property: and the Cultivation and Economy of the Animal and Vegetable Productions of Agriculture, Including All the Latest Improvements: a General History of Agriculture in All Countries: and a Statistical View of Its Present State, with Suggestions for Its Future Progress in the British Isles | |
| CN105544460B (en) | Cast-in-place plant growing type eco-concrete slope protection construction method | |
| CN108951667B (en) | Integrated reinforcing method for green ecological side slope | |
| CN102071697A (en) | Hard reinforced concrete revetment slope biological repairing method | |
| CN105113518B (en) | Construction method for ecological slope protecting base material by arranging slot pits in slope surface | |
| CN101649608B (en) | Ecological slope protection structure | |
| CN107524116B (en) | Ecological method for hard revetment of river channel | |
| CN110106830B (en) | A kind of perforated mould bag concrete ecological bank protection structure and construction method | |
| CN109763504B (en) | Slope ecological reinforcement and greening method | |
| CN108677871A (en) | A kind of construction method of assembled grass planting concrete precast block and its ecological revetment | |
| CN207392127U (en) | A kind of bank protection barricade applied to hydraulic engineering | |
| CN103774627B (en) | The construction process of the ecological channel of irrigated area antiseepage type | |
| CN204875669U (en) | Ecological pipe bag bank protection cob wall | |
| CN109505301A (en) | The structure and construction method of steel fibre eco-cement reinforcing falling zone side slope | |
| CN108755593A (en) | A kind of concrete for plant growth prefabricated components and construction method for side slope protection | |
| CN210459113U (en) | A coastal ecological revetment structure | |
| CN209277095U (en) | A kind of cast-in-place counterfort virescence concrete structure | |
| CN108729409A (en) | A kind of river antiseepage stores ecological restoring apparatus again | |
| CN219491028U (en) | Ecological restoration plant growth groove structure of high steep rock slope | |
| CN214993495U (en) | Slope type ecological sea wall structure assembled with grid net | |
| CN109629510A (en) | An ecological revetment system and its construction method | |
| CN204780773U (en) | Ecological bank protection system | |
| CN115680018A (en) | Ecological concrete protection system and its construction method on cast-in-place concrete base | |
| CN113404005A (en) | Coarse aggregate interconnected nail type block ecological revetment structure and construction method thereof | |
| KR200303587Y1 (en) | Embankment block |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PB01 | Publication | ||
| PB01 | Publication | ||
| SE01 | Entry into force of request for substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| GR01 | Patent grant | ||
| GR01 | Patent grant |