CN115228564A - Pressurization ball adding device - Google Patents

Pressurization ball adding device Download PDF

Info

Publication number
CN115228564A
CN115228564A CN202210596384.2A CN202210596384A CN115228564A CN 115228564 A CN115228564 A CN 115228564A CN 202210596384 A CN202210596384 A CN 202210596384A CN 115228564 A CN115228564 A CN 115228564A
Authority
CN
China
Prior art keywords
throat
port
flange
pipe
nozzle
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202210596384.2A
Other languages
Chinese (zh)
Inventor
王乐
许新跃
童伟
童胜宝
将康帅
徐赛东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Alc Minerals Technology Co ltd
Original Assignee
Alc Minerals Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Alc Minerals Technology Co ltd filed Critical Alc Minerals Technology Co ltd
Priority to CN202210596384.2A priority Critical patent/CN115228564A/en
Publication of CN115228564A publication Critical patent/CN115228564A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B02CRUSHING, PULVERISING, OR DISINTEGRATING; PREPARATORY TREATMENT OF GRAIN FOR MILLING
    • B02CCRUSHING, PULVERISING, OR DISINTEGRATING IN GENERAL; MILLING GRAIN
    • B02C17/00Disintegrating by tumbling mills, i.e. mills having a container charged with the material to be disintegrated with or without special disintegrating members such as pebbles or balls
    • B02C17/18Details
    • B02C17/20Disintegrating members
    • B02C17/205Adding disintegrating members to the tumbling mill
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B02CRUSHING, PULVERISING, OR DISINTEGRATING; PREPARATORY TREATMENT OF GRAIN FOR MILLING
    • B02CCRUSHING, PULVERISING, OR DISINTEGRATING IN GENERAL; MILLING GRAIN
    • B02C17/00Disintegrating by tumbling mills, i.e. mills having a container charged with the material to be disintegrated with or without special disintegrating members such as pebbles or balls
    • B02C17/18Details
    • B02C17/183Feeding or discharging devices
    • B02C17/186Adding fluid, other than for crushing by fluid energy

Landscapes

  • Engineering & Computer Science (AREA)
  • Food Science & Technology (AREA)
  • Nozzles (AREA)

Abstract

本发明公开了一种加压加球装置,包括水管、四通送料器、喷管组件和喉管组件,四通送料器具有上下左右四个通口,上下左右四个通口贯通于四通送料器的中部空腔处,喷管组件包括喷管本体,喉管组件包括喉管本体,左右通口相对设置,喷管本体一端对接水管,另一端对接左通口并且伸入中部空腔处,水管上设置有水泵;喉管本体对接右通口并且伸入四通送料器中,喷管本体的管道出口呈尺寸缩小设置并且对应喉管本体的管道入口。本发明通过管道出入口的布置位置设计对应以及尺寸的设置,令喷管本体的管道出口形成更高水压输送介质球至运行中的磨矿机内,保证磨矿机正常运行不影响工作效率。

Figure 202210596384

The invention discloses a pressurized ball feeding device, which comprises a water pipe, a four-way feeder, a nozzle assembly and a throat assembly. The four-way feeder has four through ports, up and down, left and right, and the four through ports are connected to the four-way through the four-way feeder. At the central cavity of the feeder, the nozzle assembly includes a nozzle body, the throat assembly includes a throat body, and the left and right ports are arranged oppositely. , the water pipe is provided with a water pump; the throat body is connected to the right port and extends into the four-way feeder, and the pipe outlet of the nozzle body is reduced in size and corresponds to the pipe inlet of the throat body. Through the arrangement position design and size setting of the inlet and outlet of the pipe, the invention makes the pipe outlet of the nozzle body form a higher water pressure to transport the medium ball to the running mill, so as to ensure the normal operation of the mill without affecting the work efficiency.

Figure 202210596384

Description

加压加球装置Pressurized ball device

技术领域technical field

本发明涉及磨机领域,尤其是涉及一种加压加球装置。The invention relates to the field of mills, in particular to a pressurized ball-adding device.

背景技术Background technique

有色金属选矿细磨设备在执行开路磨矿时,为使工艺流程连续稳定和节约时间,主机通常是连续运转,而设备运行中需要定时给磨矿室补充磨损消耗的介质球。运行的磨矿室中具有一定的压力,其中的介质球在该压力下进行运行研磨,因此对磨矿室进行介质球的补充时,需要通过加压把介质球快速输送进入磨矿室,从而实现介质的顺畅补充过渡,避免速度及压力不足的介质球进入时影响磨矿室本身的研磨效率。本发明的目的就是设计一款通过加压来进行快速输送固体介质球的装置,令后序磨矿机在不停机的情况下完成介质球的添加,并且不影响磨矿机的工作效率。When the non-ferrous metal beneficiation and fine grinding equipment performs open-circuit grinding, in order to make the technological process continuous and stable and save time, the main engine usually runs continuously, and the grinding chamber needs to be regularly replenished to the grinding chamber during the operation of the medium ball. There is a certain pressure in the running grinding chamber, and the media balls in it are run and ground under this pressure. Therefore, when supplementing the media balls in the grinding chamber, the media balls need to be quickly transported into the grinding chamber by pressure, so as to Realize the smooth replenishment transition of the medium, and avoid the impact of the grinding efficiency of the grinding chamber itself when the medium ball with insufficient speed and pressure enters. The purpose of the present invention is to design a device for rapidly conveying solid medium balls by pressurizing, so that the subsequent grinding machine can complete the addition of medium balls without stopping the machine, and the working efficiency of the grinding machine is not affected.

发明内容SUMMARY OF THE INVENTION

本发明的目的是克服现有技术的不足,提供一种加压加球装置,其通过组合式的管道设计,对管道中的液体进行加压,从而达到对介质球进行加压输送,提高介质球输送的速度和压力,进而可以将介质球良好的加入运行中的磨矿机内,保证磨矿机正常运行不影响工作效率。The purpose of the present invention is to overcome the deficiencies of the prior art and provide a pressurized ball-adding device, which can pressurize the liquid in the pipeline through the combined pipeline design, so as to achieve pressurized transportation of the medium ball and improve the medium The speed and pressure of the ball conveying, and then the media ball can be well added to the running mill, so as to ensure the normal operation of the mill without affecting the work efficiency.

本发明采用以下技术方案:加压加球装置,包括水管、四通送料器、喷管组件和喉管组件,四通送料器具有四个通口,其包括左通口、右通口、上通口和下通口,左通口、右通口、上通口和下通口贯通于四通送料器的中部空腔处,喷管组件包括喷管本体,喉管组件包括喉管本体,左通口和右通口相对设置,喷管本体一端对接水管,另一端对接左通口并且伸入中部空腔处,水管上设置有水泵;喉管本体对接右通口并且伸入四通送料器中,喷管本体的管道出口呈尺寸缩小设置并且对应喉管本体的管道入口。The present invention adopts the following technical scheme: a pressurized ball feeding device includes a water pipe, a four-way feeder, a nozzle assembly and a throat assembly, and the four-way feeder has four ports, which include a left port, a right port, an upper port, and a left port. The opening and the lower opening, the left opening, the right opening, the upper opening and the lower opening pass through the central cavity of the four-way feeder, the nozzle assembly includes a nozzle body, and the throat assembly includes a throat body, The left port and the right port are arranged oppositely. One end of the nozzle body is connected to the water pipe, and the other end is connected to the left port and extends into the middle cavity. The water pipe is provided with a water pump; the throat body is connected to the right port and extends into the spool for feeding. In the device, the pipe outlet of the nozzle body is reduced in size and corresponds to the pipe inlet of the throat body.

作为一种改进,上通口和下通口在中部空腔的上下位置对应设置。As an improvement, the upper through opening and the lower through opening are correspondingly arranged at the upper and lower positions of the central cavity.

作为一种改进,上通口对外对接用于储存介质球的储球仓,下通口对外对接液体回收仓。As an improvement, the upper port is externally connected to the ball storage bin for storing the medium balls, and the lower port is externally connected to the liquid recovery bin.

作为一种改进,下通口由管道弯折形成下部的水平段,水平段向四通送料器的侧边延伸。As an improvement, the lower port is formed by bending the pipe to form a lower horizontal section, and the horizontal section extends to the side of the four-way feeder.

作为一种改进,喉管本体的管道出口呈尺寸扩大设置。As an improvement, the pipe outlet of the throat body is provided with enlarged size.

作为一种改进,喉管本体的管道包括入口段、中间段和出口段,入口段的尺寸由大逐渐变小连接至中间段,中间段的尺寸一致,出口段的尺寸从中间段处向外由小逐渐变大呈扩大设置。As an improvement, the pipe of the throat body includes an inlet section, a middle section and an outlet section, the size of the inlet section is gradually reduced from large to small and connected to the middle section, the size of the middle section is the same, and the size of the outlet section is from the middle section to the outside. Gradually increase from small to large to expand.

作为一种改进,喷管组件还包括第一喷管法兰,喉管组件还包括第一喉管法兰,左通口、右通口处均设置有送料器法兰,第一喷管法兰设置于喷管本体中部并与送料器法兰进行安装固定,第一喉管法兰设置于喉管本体中部并与送料器法兰进行安装固定。As an improvement, the nozzle assembly further includes a first nozzle flange, the throat assembly further includes a first throat flange, and the left port and the right port are provided with feeder flanges. The first nozzle method The flange is arranged in the middle of the nozzle body and is installed and fixed with the feeder flange, and the first throat flange is arranged in the middle of the throat body and is installed and fixed with the feeder flange.

作为一种改进,喷管组件还包括第二喷管法兰,喉管组件还包括第二喉管法兰,水管的两端均设置有水管法兰,第二喷管法兰设置于喷管本体的入口端并与水管法兰进行安装,第二喉管法兰设置于喉管本体的出口端用于与外部法兰进行安装。As an improvement, the nozzle assembly further includes a second nozzle flange, the throat assembly further includes a second throat flange, both ends of the water pipe are provided with water pipe flanges, and the second nozzle flange is disposed on the nozzle The inlet end of the body is installed with the water pipe flange, and the second throat flange is arranged at the outlet end of the throat body for installation with the external flange.

作为一种改进,水泵对接于设置于水管的管道中部,对水管输入口输送过来的液体进行加压并输送向出口端。As an improvement, the water pump is connected to the middle of the pipe arranged in the water pipe to pressurize the liquid transported from the input port of the water pipe and transport it to the outlet end.

作为一种改进,还包括有底座,底座向上延伸依次形成一个安装架和两个支撑架,安装架用于水管和水泵的放置支撑并安装,两个支撑架分别用于喷管本体和喉管本体放置支撑并安装。As an improvement, it also includes a base. The base extends upward to form a mounting frame and two supporting frames in turn. The mounting frame is used for placing, supporting and installing the water pipe and the water pump, and the two supporting frames are respectively used for the nozzle body and the throat pipe. The body is placed on the support and installed.

本发明的有益效果:通过四通送料器多通口的设置,实现对液体、介质球的输送,液体的排出;通过管道出入口的布置位置设计对应以及尺寸的设置,令喷管本体的管道出口形成更高水压,可激发介质球高速进入喉管本体并输送向出口,进而可以将介质球良好的加入运行中的磨矿机内,保证磨矿机正常运行不影响工作效率。The beneficial effects of the invention are as follows: through the setting of the multi-ports of the four-way feeder, the transportation of liquid and medium balls and the discharge of the liquid are realized; the arrangement position of the inlet and outlet of the pipe is designed to correspond to the size and the setting of the size, so that the outlet of the pipe of the nozzle body can be set. The formation of higher water pressure can stimulate the media ball to enter the throat body at a high speed and transport it to the outlet, and then the media ball can be well added to the running mill to ensure the normal operation of the mill without affecting the work efficiency.

附图说明Description of drawings

图1是本发明的纵向局部剖视结构示意图。FIG. 1 is a schematic view of the longitudinal partial cross-sectional structure of the present invention.

图2是图1中M处的放大图。FIG. 2 is an enlarged view of M in FIG. 1 .

具体实施方式Detailed ways

以下结合附图对本发明的具体实施例做详细说明。The specific embodiments of the present invention will be described in detail below with reference to the accompanying drawings.

如图1、2所示,为本发明加压加球装置的具体实施例。该实施例包括水管0、四通送料器1、喷管组件2和喉管组件3,四通送料器1具有四个通口,其包括左通口11、右通口12、上通口13和下通口14,左通口11、右通口12、上通口13和下通口14贯通于四通送料器1的中部空腔15处,喷管组件2包括喷管本体21,喉管组件3包括喉管本体31,左通口11和右通口12相对设置,喷管本体21一端对接水管0,另一端对接左通口11并且伸入中部空腔15处,水管0上设置有水泵01;喉管本体31对接右通口12并且伸入四通送料器1中,喷管本体21的管道出口呈尺寸缩小设置并且对应喉管本体31的管道入口。As shown in Figures 1 and 2, it is a specific embodiment of the pressurized ball feeding device of the present invention. This embodiment includes a water pipe 0, a four-way feeder 1, a nozzle assembly 2 and a throat assembly 3. The four-way feeder 1 has four ports, including a left port 11, a right port 12, and an upper port 13. and the lower port 14, the left port 11, the right port 12, the upper port 13 and the lower port 14 pass through the central cavity 15 of the four-way feeder 1, the nozzle assembly 2 includes a nozzle body 21, a throat The pipe assembly 3 includes a throat body 31, the left port 11 and the right port 12 are arranged oppositely, one end of the nozzle body 21 is connected to the water pipe 0, and the other end is connected to the left port 11 and extends into the central cavity 15. The water pipe 0 is provided on There is a water pump 01 ; the throat body 31 is connected to the right port 12 and extends into the four-way feeder 1 .

本发明在使用时,四通送料器1的上通口13对外连接用于储存介质球的储球仓,下通口14对外连接液体回收仓;左通口11连接喷管组件2,而喷管组件2连接水管0;右通口12连接喉管组件3,而喉管组件3对外连接磨矿机的磨矿室。水流从水管0入口端输送进行管道,通过水泵01的设置,为水流加压并输送向喷管本体21,在喷管本体21的管道出口形成内径的尺寸缩小,进而形成输出口处的高压水流,喷管本体21的管道出口通过布置直接伸入至中部空腔15处。在进行介质球的输送时,下通口14保持关闭,而开启的上通口13会由储球仓处输送介质球到达中部空腔15,中部空腔15内充满了水,介质球能够因为水流的流动直接到达喷管本体21的管道出口处,然后由高压水流将介质球快速带入喉管本体31的管道并依靠较高的压力流速从喉管本体31的管道出口喷出送向磨矿机的磨矿室。在本领域中介质球一般采用陶瓷球,其在整体的加压输送中可顺畅的输送,在顺着液体的流动过程中尽量避免了磕碰磨损的可能。在一次输送完成之后,可关闭其他通口,开启下通口14来排出和收集液体。本发明通过管道出入口的布置位置设计对应以及尺寸的设置,令喷管本体21的管道出口形成更高水压,进而依靠机械化的结构良好的实现介质球的高速输送,保证磨矿机正常运行不影响工作效率,整体上制造成本得到良好的控制,并能较好的实现自身功能。When the present invention is in use, the upper port 13 of the four-way feeder 1 is externally connected to a ball storage bin for storing medium balls, and the lower port 14 is externally connected to the liquid recovery bin; the left port 11 is connected to the nozzle assembly 2, and the nozzle The pipe assembly 2 is connected to the water pipe 0; the right port 12 is connected to the throat assembly 3, and the throat assembly 3 is externally connected to the grinding chamber of the grinding machine. The water flow is transported from the inlet end of the water pipe 0 to the pipeline. By the setting of the water pump 01, the water flow is pressurized and transported to the nozzle body 21, and the size of the inner diameter is reduced at the pipe outlet of the nozzle body 21, thereby forming a high-pressure water flow at the output port. , the pipe outlet of the nozzle body 21 directly extends into the central cavity 15 through the arrangement. When the medium ball is transported, the lower port 14 is kept closed, and the open upper port 13 will transport the medium ball from the ball storage bin to the middle cavity 15. The middle cavity 15 is filled with water, and the medium ball can be The flow of the water flow directly reaches the pipe outlet of the nozzle body 21, and then the medium ball is quickly brought into the pipe of the throat pipe body 31 by the high-pressure water flow, and is ejected from the pipe outlet of the throat pipe body 31 by the high pressure flow rate and sent to the mill. The grinding chamber of the miner. In the field, ceramic balls are generally used for medium balls, which can be transported smoothly in the overall pressurized transport, and the possibility of bumping and abrasion is avoided as much as possible in the process of flowing along the liquid. After one delivery is complete, the other ports can be closed and the lower port 14 opened to drain and collect liquid. In the present invention, through the arrangement position of the inlet and outlet of the pipeline and the setting of the size, the pipeline outlet of the nozzle main body 21 can form a higher water pressure, and then rely on the good mechanized structure to realize the high-speed transportation of the medium ball, so as to ensure the normal operation of the grinding machine. Affecting work efficiency, the overall manufacturing cost is well controlled, and its own functions can be better realized.

作为一种改进的具体实施方式,上通口13和下通口14在中部空腔15的上下位置对应设置。As an improved specific embodiment, the upper through opening 13 and the lower through opening 14 are correspondingly arranged at the upper and lower positions of the central cavity 15 .

如图1、2所示,可通过上通口13上方的开阔空间来直接布置储球仓,上通口13下方直接对应中部空腔15,可使输入的介质球通过中部空腔15内的水流流动直接流向喷管本体21的管道出口位置进行加压输送,可顺畅准确的输送向对应的喉管本体31管道入口。中部空腔15下方对应的下通口14可便于停止工作后中部空腔15中的液体以及喷管本体21和喉管本体31中的液体集中流动并排走,整体排水顺畅。在工作过程中下通口14关闭,在下方居中的结构位置也避免了液体可能出现的对流出现,保证中部空腔15中液体稳定,主要流动轨迹位于喷管本体21管道出口和喉管本体31管道入口之间的位置。As shown in Figures 1 and 2, the ball storage bin can be directly arranged through the open space above the upper opening 13, and the lower part of the upper opening 13 directly corresponds to the middle cavity 15, so that the input medium balls can pass through the space in the middle cavity 15. The water flow directly flows to the pipe outlet of the nozzle body 21 for pressurized transportation, which can be smoothly and accurately transported to the corresponding pipe inlet of the throat body 31 . The corresponding lower port 14 below the central cavity 15 can facilitate the centralized flow and drainage of the liquid in the central cavity 15 and the liquid in the nozzle body 21 and the throat body 31 after the operation is stopped, and the overall drainage is smooth. During the working process, the lower port 14 is closed, and the central structural position at the bottom also avoids possible convection of the liquid, and ensures the stability of the liquid in the central cavity 15. The main flow path is located at the pipe outlet of the nozzle body 21 and the throat body 31. Location between pipe inlets.

作为一种改进的具体实施方式,下通口14由管道弯折形成下部的水平段141,水平段141向四通送料器1的侧边延伸。As an improved specific embodiment, the lower port 14 is formed by bending a pipe to form a lower horizontal section 141 , and the horizontal section 141 extends to the side of the four-way feeder 1 .

如图1、2所示、本身整体机构会保持在一个较低的位置设置,从而便于工作人员的操作和维护,也不必设置过高的底座4;在此基础上下通口14的管道结构设计下部弯折的水平段141,可良好的将管道向四通送料器1的侧边延伸,进而对外连接液体回收仓,不占用四通送料器1的下方空间。As shown in Figures 1 and 2, the overall mechanism itself will be kept at a lower position, so as to facilitate the operation and maintenance of the staff, and there is no need to set a high base 4; on this basis, the pipeline structure design of the upper and lower ports 14 The lower bent horizontal section 141 can well extend the pipeline to the side of the four-way feeder 1 , and then connect the liquid recovery bin to the outside without occupying the space below the four-way feeder 1 .

作为一种改进的具体实施方式,喉管本体31的管道出口呈尺寸扩大设置。As an improved specific embodiment, the pipe outlet of the throat body 31 is provided with enlarged size.

如图1所示,在喉管本体31的管道出口形成内径的尺寸扩大,形成一个喷管效应,将介质球与水流一起快速喷出,从而达到快速输送介质球的作用。As shown in FIG. 1 , the size of the inner diameter is enlarged at the pipe outlet of the throat body 31 , forming a nozzle effect, rapidly ejecting the medium balls together with the water flow, thereby achieving the effect of rapidly conveying the medium balls.

作为一种改进的具体实施方式,喉管本体31的管道包括入口段301、中间段302和出口段303,入口段301的尺寸由大逐渐变小连接至中间段302,中间段302的尺寸一致,出口段303的尺寸从中间段302处向外由小逐渐变大呈扩大设置。As an improved specific embodiment, the pipe of the throat body 31 includes an inlet section 301, a middle section 302 and an outlet section 303. The size of the inlet section 301 gradually decreases from large to be connected to the middle section 302, and the size of the middle section 302 is the same. , the size of the outlet section 303 gradually increases from small to large from the middle section 302 to the outside and expands.

如图1、2所示,在出口段303形成尺寸扩大带来喷管效应的基础上,进一步限定了入口段301的尺寸结构,其形成一个扩口,便于由喷管本体21的高压水流带动过来的介质球顺利的进入喉管本体31,避免因介质球从相对喷管本体21的管道出口上侧随水流流向入口段301时,非完全水平的流动状态受到喉管本体31入口端面的磕碰干扰,入口段301的扩口避免了磕碰的可能,保证介质球被高压水流顺利加速输送。另一方面,中间段302的尺寸保持一致,令介质球在中间段302稳定输送保持速度,并在到达出口段303时可产生良好的喷管效应,再一次加速送出介质球,提高加压输送的效果。As shown in FIGS. 1 and 2 , on the basis of the nozzle effect brought about by the expansion of the size of the outlet section 303 , the size structure of the inlet section 301 is further defined, which forms a flare, which is easily driven by the high-pressure water flow of the nozzle body 21 . The incoming medium ball smoothly enters the throat body 31 to avoid the non-complete horizontal flow state being hit by the inlet end face of the throat body 31 when the medium ball flows from the upper side of the pipe outlet relative to the nozzle body 21 to the inlet section 301 with the water flow. Interference, the flaring of the inlet section 301 avoids the possibility of bumping, and ensures that the medium ball is smoothly accelerated and transported by the high-pressure water flow. On the other hand, the size of the middle section 302 is kept the same, so that the medium ball can be transported stably in the middle section 302 to maintain the speed, and when it reaches the outlet section 303, a good nozzle effect can be produced, and the medium ball is again accelerated to send out, improving the pressurized transportation. Effect.

作为一种改进的具体实施方式,喷管组件2还包括第一喷管法兰22,喉管组件3还包括第一喉管法兰32,左通口11、右通口12处均设置有送料器法兰10,第一喷管法兰22设置于喷管本体21中部并与送料器法兰10进行安装固定,第一喉管法兰32设置于喉管本体31中部并与送料器法兰10进行安装固定。As an improved specific embodiment, the nozzle assembly 2 further includes a first nozzle flange 22, the throat assembly 3 further includes a first throat flange 32, and the left port 11 and the right port 12 are provided with The feeder flange 10, the first nozzle flange 22 is arranged in the middle of the nozzle body 21 and is installed and fixed with the feeder flange 10, the first throat flange 32 is arranged in the middle of the throat body 31 and is connected with the feeder flange 10. Lan 10 is installed and fixed.

如图1所示,设置于喷管本体21中部的第一喷管法兰22与左通口11处的送料器法兰10完成对接安装,保证密封效果,保持喷管本体21的结构稳定,令喷管本体21稳定的伸入左通口11至中部空腔15处;设置于喉管本体31中部的第一喉管法兰32与右通口12处的送料器法兰10完成对接安装,保证密封效果,保持喉管本体31的结构稳定,令喉管本体31稳定的伸入右通口12至与喷管本体21的管道出口对应的位置。As shown in FIG. 1 , the first nozzle flange 22 disposed in the middle of the nozzle body 21 and the feeder flange 10 at the left port 11 are connected and installed to ensure the sealing effect and maintain the structural stability of the nozzle body 21. Make the nozzle body 21 stably extend into the left port 11 to the central cavity 15; the first throat flange 32 arranged in the middle of the throat body 31 and the feeder flange 10 at the right port 12 complete the docking installation , to ensure the sealing effect, keep the structure of the throat body 31 stable, and make the throat body 31 stably extend into the right port 12 to the position corresponding to the pipe outlet of the nozzle body 21 .

作为一种改进的具体实施方式,喷管组件2还包括第二喷管法兰23,喉管组件3还包括第二喉管法兰33,水管0的两端均设置有水管法兰02,第二喷管法兰23设置于喷管本体21的入口端并与水管法兰02进行安装,第二喉管法兰33设置于喉管本体31的出口端用于与外部法兰进行安装。As an improved specific embodiment, the nozzle assembly 2 further includes a second nozzle flange 23, the throat assembly 3 further includes a second throat flange 33, and both ends of the water pipe 0 are provided with water pipe flanges 02, The second nozzle flange 23 is disposed at the inlet end of the nozzle body 21 and is installed with the water pipe flange 02 , and the second throat flange 33 is disposed at the outlet end of the throat body 31 for installation with the external flange.

如图1所示,第二喷管法兰23与水管0出口端的水管法兰02进行对接安装,保证密封效果,水管0入口端的水管法兰02可与外部机构连接,进行密封性良好的水输送。第二喉管法兰33与磨矿机处的管道法兰进行对接安装,保证密封效果,整体上保证水流以及介质球被稳定的加压输送。As shown in FIG. 1 , the second nozzle flange 23 is butt-installed with the water pipe flange 02 at the outlet end of the water pipe 0 to ensure the sealing effect. delivery. The second throat flange 33 is butt-installed with the pipe flange at the grinding machine to ensure the sealing effect, and as a whole, ensure that the water flow and the medium ball are stably conveyed under pressure.

作为一种改进的具体实施方式,水泵01对接于设置于水管0的管道中部,对水管0输入口输送过来的液体进行加压并输送向出口端。As an improved specific embodiment, the water pump 01 is connected to the middle of the pipe arranged in the water pipe 0 to pressurize the liquid transported from the input port of the water pipe 0 and transport it to the outlet end.

如图1所示,通过水管0上部的空旷结构,进行水泵01的布置安装,可较好的减少装置所占用的空间,便于水管0的管道入口端对外进行水源的对接;水泵01具体可采用管道离心泵,令管道中的水产生水压加速输送。As shown in Figure 1, the arrangement and installation of the water pump 01 is carried out through the open structure on the upper part of the water pipe 0, which can better reduce the space occupied by the device and facilitate the connection of the water source at the inlet end of the water pipe 0 to the outside; The pipeline centrifugal pump makes the water in the pipeline generate water pressure to accelerate the transportation.

作为一种改进的具体实施方式,还包括有底座4,底座4向上延伸依次形成一个安装架41和两个支撑架42,安装架41用于水管0和水泵01的放置支撑并安装,两个支撑架42分别用于喷管本体21和喉管本体31放置支撑并安装。As an improved specific embodiment, it also includes a base 4. The base 4 extends upward to form a mounting frame 41 and two supporting frames 42 in turn. The mounting frame 41 is used for placing, supporting and installing the water pipe 0 and the water pump 01. The support brackets 42 are respectively used for placing, supporting and installing the nozzle body 21 and the throat body 31 .

如图1所示,具体的采用一个安装架41和两个支撑架42,形成三个位置的结构安装固定,可保证整体管道结构的安装稳定;整条管道的法兰位置不与安装架41和支撑架42重叠,便于工作人员进行法兰位置的相应维护。As shown in FIG. 1 , one mounting frame 41 and two supporting frames 42 are specifically used to form a three-position structure for installation and fixation, which can ensure the stable installation of the overall pipeline structure; It overlaps with the support frame 42 to facilitate the corresponding maintenance of the flange position by the staff.

以上仅是本发明的优选实施方式,本发明的保护范围并不仅局限于上述实施例,凡属于本发明思路下的技术方案均属于本发明的保护范围。应当指出,对于本技术领域的普通技术人员来说,在不脱离本发明原理前提下的若干改进和润饰,这些改进和润饰也应视为本发明的保护范围。The above are only preferred embodiments of the present invention, and the protection scope of the present invention is not limited to the above-mentioned embodiments, and all technical solutions that belong to the idea of the present invention belong to the protection scope of the present invention. It should be pointed out that for those skilled in the art, some improvements and modifications without departing from the principle of the present invention should also be regarded as the protection scope of the present invention.

Claims (10)

1.加压加球装置,其特征在于:包括水管(0)、四通送料器(1)、喷管组件(2)和喉管组件(3),所述四通送料器(1)具有四个通口,其包括左通口(11)、右通口(12)、上通口(13)和下通口(14),所述左通口(11)、右通口(12)、上通口(13)和下通口(14)贯通于四通送料器(1)的中部空腔(15)处,所述喷管组件(2)包括喷管本体(21),所述喉管组件(3)包括喉管本体(31),所述左通口(11)和右通口(12)相对设置,所述喷管本体(21)一端对接水管(0),另一端对接左通口(11)并且伸入中部空腔(15)处,所述水管(0)上设置有水泵(01);所述喉管本体(31)对接右通口(12)并且伸入四通送料器(1)中,所述喷管本体(21)的管道出口呈尺寸缩小设置并且对应喉管本体(31)的管道入口。1. A pressurized ball feeding device, characterized in that it comprises a water pipe (0), a four-way feeder (1), a nozzle assembly (2) and a throat assembly (3), and the four-way feeder (1) has Four ports, including a left port (11), a right port (12), an upper port (13) and a lower port (14), the left port (11), right port (12) , the upper through port (13) and the lower through port (14) pass through the central cavity (15) of the four-way feeder (1), the nozzle assembly (2) comprises a nozzle body (21), the The throat pipe assembly (3) includes a throat pipe body (31), the left port (11) and the right port (12) are arranged oppositely, and one end of the nozzle body (21) is connected to the water pipe (0), and the other end is connected to the water pipe (0). The left port (11) extends into the central cavity (15), the water pipe (0) is provided with a water pump (01); the throat body (31) is connected to the right port (12) and extends into the four In the feeder (1), the pipe outlet of the nozzle body (21) is provided in a reduced size and corresponds to the pipe inlet of the throat pipe body (31). 2.根据权利要求1所述的加压加球装置,其特征在于:所述上通口(13)和下通口(14)在中部空腔(15)的上下位置对应设置。2 . The pressurized ball feeding device according to claim 1 , wherein the upper through opening ( 13 ) and the lower through opening ( 14 ) are correspondingly arranged at the upper and lower positions of the central cavity ( 15 ). 3 . 3.根据权利要求2所述的加压加球装置,其特征在于:所述上通口(13)对外对接用于储存介质球的储球仓,所述下通口(14)对外对接液体回收仓。3 . The pressurized ball feeding device according to claim 2 , wherein the upper port (13) is externally connected to a ball storage bin for storing medium balls, and the lower port (14) is externally connected to a liquid ball. 4 . recycling bin. 4.根据权利要求3所述的加压加球装置,其特征在于:所述下通口(14)由管道弯折形成下部的水平段(141),所述水平段(141)向四通送料器(1)的侧边延伸。4. The pressurized ball feeding device according to claim 3, characterized in that: the lower port (14) is formed by bending a pipe to form a lower horizontal section (141), and the horizontal section (141) is directed toward the four-way The sides of the feeder (1) extend. 5.根据权利要求1-4中任一项所述的加压加球装置,其特征在于:所述喉管本体(31)的管道出口呈尺寸扩大设置。5. The pressurized ball adding device according to any one of claims 1-4, characterized in that: the outlet of the pipe of the throat body (31) is provided with an enlarged size. 6.根据权利要求5所述的加压加球装置,其特征在于:所述喉管本体(31)的管道包括入口段(301)、中间段(302)和出口段(303),所述入口段(301)的尺寸由大逐渐变小连接至中间段(302),所述中间段(302)的尺寸一致,所述出口段(303)的尺寸从中间段(302)处向外由小逐渐变大呈扩大设置。6 . The pressurized ball feeding device according to claim 5 , wherein the pipeline of the throat body ( 31 ) comprises an inlet section ( 301 ), a middle section ( 302 ) and an outlet section ( 303 ). The size of the inlet section (301) is gradually reduced from large to the middle section (302), the size of the middle section (302) is consistent, and the size of the outlet section (303) is from the middle section (302) outwards by Small gradually becomes larger in an expanding setting. 7.根据权利要求1-4中任一项所述的加压加球装置,其特征在于:所述喷管组件(2)还包括第一喷管法兰(22),所述喉管组件(3)还包括第一喉管法兰(32),所述左通口(11)、右通口(12)处均设置有送料器法兰(10),所述第一喷管法兰(22)设置于喷管本体(21)中部并与送料器法兰(10)进行安装固定,所述第一喉管法兰(32)设置于喉管本体(31)中部并与送料器法兰(10)进行安装固定。7. The pressurized ball feeding device according to any one of claims 1-4, wherein the nozzle assembly (2) further comprises a first nozzle flange (22), and the throat assembly (3) It also includes a first throat flange (32), the left port (11) and the right port (12) are both provided with a feeder flange (10), and the first nozzle flange (22) is arranged in the middle of the nozzle body (21) and is installed and fixed with the feeder flange (10), the first throat flange (32) is arranged in the middle of the throat body (31) and is connected to the feeder The flange (10) is installed and fixed. 8.根据权利要求1-4中任一项所述的加压加球装置,其特征在于:所述喷管组件(2)还包括第二喷管法兰(23),所述喉管组件(3)还包括第二喉管法兰(33),所述水管(0)的两端均设置有水管法兰(02),所述第二喷管法兰(23)设置于喷管本体(21)的入口端并与水管法兰(02)进行安装,所述第二喉管法兰(33)设置于喉管本体(31)的出口端用于与外部法兰进行安装。8. The pressurized ball feeding device according to any one of claims 1-4, wherein the nozzle assembly (2) further comprises a second nozzle flange (23), and the throat assembly (3) It also includes a second throat flange (33), both ends of the water pipe (0) are provided with water pipe flanges (02), and the second nozzle flange (23) is provided on the nozzle body The inlet end of (21) is installed with the water pipe flange (02), and the second throat flange (33) is arranged at the outlet end of the throat body (31) for installation with the external flange. 9.根据权利要求1-4中任一项所述的加压加球装置,其特征在于:所述水泵(01)对接于设置于水管(0)的管道中部,对水管(0)输入口输送过来的液体进行加压并输送向出口端。9. The pressurized ball adding device according to any one of claims 1-4, characterized in that: the water pump (01) is connected to the middle of the pipeline arranged on the water pipe (0), and the input port of the water pipe (0) is connected. The delivered liquid is pressurized and delivered to the outlet end. 10.根据权利要求1-4中任一项所述的加压加球装置,其特征在于:还包括有底座(4),所述底座(4)向上延伸依次形成一个安装架(41)和两个支撑架(42),所述安装架(41)用于水管(0)和水泵(01)的放置支撑并安装,所述两个支撑架(42)分别用于喷管本体(21)和喉管本体(31)放置支撑并安装。10. The pressurizing ball adding device according to any one of claims 1-4, characterized in that: it further comprises a base (4), and the base (4) extends upward to form a mounting bracket (41) and Two supporting brackets (42), the mounting brackets (41) are used for placing, supporting and installing the water pipe (0) and the water pump (01), and the two supporting brackets (42) are respectively used for the nozzle body (21) And the throat body (31) is placed for support and installed.
CN202210596384.2A 2022-05-26 2022-05-26 Pressurization ball adding device Pending CN115228564A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202210596384.2A CN115228564A (en) 2022-05-26 2022-05-26 Pressurization ball adding device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202210596384.2A CN115228564A (en) 2022-05-26 2022-05-26 Pressurization ball adding device

Publications (1)

Publication Number Publication Date
CN115228564A true CN115228564A (en) 2022-10-25

Family

ID=83667674

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202210596384.2A Pending CN115228564A (en) 2022-05-26 2022-05-26 Pressurization ball adding device

Country Status (1)

Country Link
CN (1) CN115228564A (en)

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20040026545A1 (en) * 2002-05-03 2004-02-12 Metso Paper Inc. Method and arrangement for feeding wood batches into a pressure grinder
WO2004101123A1 (en) * 2003-05-08 2004-11-25 Andreas Schmid Device and method for introducing gaseous and/or liquid media into a liquid medium
CN201659007U (en) * 2010-03-19 2010-12-01 肖磊 Ball feeding device of coal mill
WO2011072324A1 (en) * 2009-12-14 2011-06-23 Xstrata Technology Pty Ltd Method and apparatus for delivering a grinding media to a grinding mill
CN108579917A (en) * 2018-05-07 2018-09-28 浙江艾领创矿业科技有限公司 A kind of energy-efficient grinding technics
CN108704721A (en) * 2018-05-07 2018-10-26 浙江艾领创矿业科技有限公司 A kind of ball adding device for fine grinding equipment
CN211586873U (en) * 2019-12-27 2020-09-29 东莞市康搏智能装备有限公司 Be applied to bead device that adds of sand mill
CN112337591A (en) * 2020-11-07 2021-02-09 常州市龙鑫智能装备有限公司 Grinding ball online adding device for sand mill and grinding ball online adding method
CN217910744U (en) * 2022-05-26 2022-11-29 浙江艾领创矿业科技有限公司 Pressurization ball adding device

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20040026545A1 (en) * 2002-05-03 2004-02-12 Metso Paper Inc. Method and arrangement for feeding wood batches into a pressure grinder
WO2004101123A1 (en) * 2003-05-08 2004-11-25 Andreas Schmid Device and method for introducing gaseous and/or liquid media into a liquid medium
WO2011072324A1 (en) * 2009-12-14 2011-06-23 Xstrata Technology Pty Ltd Method and apparatus for delivering a grinding media to a grinding mill
CN201659007U (en) * 2010-03-19 2010-12-01 肖磊 Ball feeding device of coal mill
CN108579917A (en) * 2018-05-07 2018-09-28 浙江艾领创矿业科技有限公司 A kind of energy-efficient grinding technics
CN108704721A (en) * 2018-05-07 2018-10-26 浙江艾领创矿业科技有限公司 A kind of ball adding device for fine grinding equipment
CN211586873U (en) * 2019-12-27 2020-09-29 东莞市康搏智能装备有限公司 Be applied to bead device that adds of sand mill
CN112337591A (en) * 2020-11-07 2021-02-09 常州市龙鑫智能装备有限公司 Grinding ball online adding device for sand mill and grinding ball online adding method
CN217910744U (en) * 2022-05-26 2022-11-29 浙江艾领创矿业科技有限公司 Pressurization ball adding device

Similar Documents

Publication Publication Date Title
CN107265126A (en) Bulk solid material pipe hydraulic conveyor
CN203696786U (en) Tank for sand-blasting machine and sand-blasting machine
CN115228564A (en) Pressurization ball adding device
CN217910744U (en) Pressurization ball adding device
CN208265174U (en) A kind of dregs conveying equipment
CN208648155U (en) A kind of continuous Pneumatic ash conveying jet pump of low positive pressure
CN211470056U (en) Novel serial AV pump system
CN111520706B (en) Fluidized bed boiler coal drop pipe anti-blocking device
CN219599972U (en) Sand silo slurrying device
CN104197197B (en) A kind of pulp-water online changing method in long-distance slurry pipe-line transportation system
CN107671747A (en) A kind of front mixing abrasive gas jet continuous feeding system and method
CN108188937A (en) A kind of forced deburring sand-blasting machine of wet type
CN210633911U (en) A suction device for a batching system
CN211470047U (en) Intelligent regulation substep ash conveying system
CN212657702U (en) Anti-blocking device for coal dropping pipe of fluidized bed boiler
CN107187890B (en) Ore pulp part flow arrangement
CN221951344U (en) A grinding machine for conveying materials through pipeline
CN218624300U (en) Coal mining dust suppression device
CN220115687U (en) High-filling CaCO3 particle positive pressure conveying device
CN222410152U (en) Air tight chamber assembly for material conveying and dust conveying system
CN109051820A (en) A kind of defeated ash jet pump of high speed
CN216130894U (en) Pile hole deslagging system
CN217327708U (en) Raw material delivery pump buffer
CN223464908U (en) High-efficient reducing mechanism of high-purity silicon production
CN118373208B (en) Pneumatic conveying equipment for particulate matters and conveying method thereof

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20221025