CN118564103A - Large-size old building reconstruction and utilization method capable of keeping building appearance - Google Patents

Large-size old building reconstruction and utilization method capable of keeping building appearance Download PDF

Info

Publication number
CN118564103A
CN118564103A CN202411049990.8A CN202411049990A CN118564103A CN 118564103 A CN118564103 A CN 118564103A CN 202411049990 A CN202411049990 A CN 202411049990A CN 118564103 A CN118564103 A CN 118564103A
Authority
CN
China
Prior art keywords
building
wall
old building
window
old
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202411049990.8A
Other languages
Chinese (zh)
Other versions
CN118564103B (en
Inventor
赵来柱
张莉莉
王亮
张进红
罗洁
刘海涛
李东华
姚俊琴
孙汉霖
李汀滢
李萌
朱志华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Jinyu Xingfa Technology Co ltd
Beijing Fourth Construction & Engineering Co ltd
Original Assignee
Beijing Jinyu Xingfa Technology Co ltd
Beijing Fourth Construction & Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Jinyu Xingfa Technology Co ltd, Beijing Fourth Construction & Engineering Co ltd filed Critical Beijing Jinyu Xingfa Technology Co ltd
Priority to CN202411049990.8A priority Critical patent/CN118564103B/en
Publication of CN118564103A publication Critical patent/CN118564103A/en
Application granted granted Critical
Publication of CN118564103B publication Critical patent/CN118564103B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • E—FIXED CONSTRUCTIONS
    • E04—BUILDING
    • E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G23/00—Working measures on existing buildings
    • E04G23/02—Repairing, e.g. filling cracks; Restoring; Altering; Enlarging
    • E—FIXED CONSTRUCTIONS
    • E04—BUILDING
    • E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G23/00—Working measures on existing buildings

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Chemical & Material Sciences (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Electrochemistry (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Working Measures On Existing Buildindgs (AREA)

Abstract

本发明涉及对现有建筑物的施工措施技术领域,公开了一种保留建筑外形的大尺寸旧建筑改造利用方法,采用功能与外形分离的思路对大尺寸旧建筑进行改造,旧建筑仅保留外壳,建筑的功能由外壳内新建的建筑来实现,从而使得旧建筑不仅不需要承载新的荷载,其原先承载的荷载也仅剩屋盖和装饰材料,即使旧建筑的受力结构也能满足需求。利用特殊尺寸的幕墙窗和侧窗的窗洞,克服了新旧两层建筑嵌套对施工造成的干涉问题,使得嵌套建筑的施工可行且在施工后克服内部通风采光问题;采用仿照旧建筑外貌的新装饰材料对旧建筑进行包裹,从而使得旧建筑破旧的外表被彻底翻新的同时还得到了保护;以上3点结合,在保留建筑外形的前提下完成了大尺寸旧建筑改造。

The present invention relates to the technical field of construction measures for existing buildings, and discloses a method for renovating and utilizing large-scale old buildings while retaining the appearance of the buildings. The idea of separating function from appearance is adopted to renovate large-scale old buildings. Only the outer shell of the old building is retained, and the function of the building is realized by the newly built building inside the outer shell, so that the old building not only does not need to bear new loads, but also only the roof and decorative materials are left for the loads originally carried, and even the load-bearing structure of the old building can meet the demand. The window openings of curtain wall windows and side windows of special sizes are used to overcome the interference problem caused by the nesting of new and old two-story buildings on the construction, so that the construction of the nested buildings is feasible and the internal ventilation and lighting problems are overcome after the construction; the old buildings are wrapped with new decorative materials that imitate the appearance of the old buildings, so that the dilapidated appearance of the old buildings is completely refurbished and protected at the same time; the above three points are combined to complete the renovation of large-scale old buildings while retaining the appearance of the buildings.

Description

一种保留建筑外形的大尺寸旧建筑改造利用方法A method for renovating and utilizing a large-scale old building while retaining its appearance

技术领域Technical Field

本发明涉及对现有建筑物的施工措施技术领域,特别是涉及一种保留建筑外形的大尺寸旧建筑改造利用方法。The invention relates to the technical field of construction measures for existing buildings, and in particular to a method for renovating and utilizing a large-sized old building while retaining the building appearance.

背景技术Background Art

绝大部分旧建筑的归宿是被拆除后腾出空地用于修建新建筑,但存在一些有特殊意义的旧建筑,需要在保留其原貌的前提下改变建筑用途,为此需要对建筑进行深度改造。The fate of most old buildings is to be demolished to make way for the construction of new buildings, but there are some old buildings with special significance that need to be changed in use while retaining their original appearance, which requires in-depth renovation of the buildings.

考虑到旧建筑本身已发生严重的老化,其结构强度严重下降,且外观已非常破旧。这些问题难以在不对建筑本身进行深度改造的前提下解决,因此对旧建筑的改造往往需要采用拆为零件后重新组装的形式进行,拆为零件的过程中可对建筑零件分别进行检测并更换其中强度不达标或破损严重的零件,并在内部进行补强处理或改变建筑内部布局,从而适应建筑用途的变化。Considering that the old building itself has been seriously aged, its structural strength has seriously declined, and its appearance has become very dilapidated. These problems are difficult to solve without deep transformation of the building itself. Therefore, the transformation of old buildings often needs to be carried out in the form of dismantling into parts and reassembling. During the dismantling process, the building parts can be tested separately and the parts that do not meet the strength standards or are seriously damaged can be replaced. The internal reinforcement treatment can be carried out or the internal layout of the building can be changed to adapt to the changes in the use of the building.

但对于一些大尺寸旧建筑而言,这种拆改方式并不适用。最大的问题在于,大尺寸的旧建筑中,由于建筑尺寸较大,因此刚度较低,容易发生形变且强度难以达标,为维持形状,往往需要用到诸如钢筋混凝土梁柱/剪力墙这类高刚度但不适合拆成零件的构件。此外,由于旧建筑年深日久,建筑施工的规范可能发生变化,某些地方的建筑可能因为限高等因素,而在拆成零件后不允许再次组装为原有尺寸的建筑。However, this method of demolition and modification is not applicable to some large-scale old buildings. The biggest problem is that in large-scale old buildings, due to their large size, they have low rigidity, are prone to deformation, and have difficulty meeting strength standards. In order to maintain their shape, they often need to use components such as reinforced concrete beams and columns/shear walls that have high rigidity but are not suitable for disassembly into parts. In addition, as old buildings have been around for a long time, construction specifications may change. Buildings in some places may not be allowed to be reassembled into their original size after being disassembled into parts due to height restrictions and other factors.

以本发明涉及的北京怀柔科学城北区金隅兴发科技园项目为例,该项目所在地为兴发水泥厂,兴建于90年代初,为北京的城建贡献了大量的建材,是一处重要的工业遗址。因此,该处的建筑需要在保留外形的情况下改造为附近北京雁栖湖应用数学研究院的研究设施。其中的库房需要改建为多层超算机房,该库房为典型的单体单层大跨度建筑,本身承载力很弱且已十分破旧,完全无法承载其中增加的楼板以及复杂的电子设备,同时其内部也无法满足超算设备对环境的要求,其砖混复合结构也不允许拆碎后重新组装。类似的问题在全国三批工业遗址的改造过程中普遍存在。更为致命的是,哪怕不考虑工业遗址的保护,由于当地的限高政策,即使想要把该建筑拆除后仿照原有建筑的外形重新建造一栋建筑也不可行。Take the Jinyu Xingfa Science Park project in the northern area of Beijing Huairou Science City as an example. The project site is Xingfa Cement Factory, which was built in the early 1990s and contributed a large amount of building materials to Beijing's urban construction. It is an important industrial heritage site. Therefore, the building there needs to be transformed into a research facility of the nearby Beijing Yanqi Lake Institute of Applied Mathematics while retaining its appearance. The warehouse needs to be converted into a multi-story supercomputer room. The warehouse is a typical single-story large-span building with weak bearing capacity and is very dilapidated. It is completely unable to bear the added floor slabs and complex electronic equipment. At the same time, its interior cannot meet the environmental requirements of supercomputer equipment, and its brick-concrete composite structure is not allowed to be dismantled and reassembled. Similar problems are common in the transformation of three batches of industrial heritage sites across the country. What is more fatal is that even if the protection of industrial heritage sites is not considered, due to the local height restriction policy, it is not feasible to demolish the building and rebuild a building in the shape of the original building.

发明内容Summary of the invention

本发明提供一种保留建筑外形的大尺寸旧建筑改造利用方法。The invention provides a method for renovating and utilizing a large-sized old building while retaining the building appearance.

解决的技术问题是:大尺寸旧建筑的改造利用过程中,由于需要用到诸如钢筋混凝土梁柱或剪力墙这类高刚度但不能破拆的构件来维持建筑形状,导致无法采用拆为零件后重新组装的方式进行维修改造。The technical problem to be solved is: in the process of renovation and utilization of large-scale old buildings, it is impossible to repair and renovate by dismantling them into parts and then reassembling them, because high-rigidity but non-destructible components such as reinforced concrete beams and columns or shear walls are needed to maintain the shape of the building.

为解决上述技术问题,本发明采用如下技术方案:一种保留建筑外形的大尺寸旧建筑改造利用方法,包括以下步骤:In order to solve the above technical problems, the present invention adopts the following technical solution: a method for renovating and utilizing a large-sized old building while retaining the building appearance, comprising the following steps:

步骤一:对旧建筑进行加固,使其在后续的外墙开洞过程中及开洞后承载力合格;Step 1: Strengthen the old building to ensure that it has a qualified bearing capacity during and after the subsequent opening of the exterior wall;

步骤二:在旧建筑的外墙上开设幕墙窗的窗洞及侧窗的窗洞;Step 2: Open window openings for curtain wall windows and side windows on the exterior wall of the old building;

所述幕墙窗为在窗洞内安装透明的幕墙形成的窗户,所述幕墙窗的窗洞满足以下条件:The curtain wall window is a window formed by installing a transparent curtain wall in the window opening, and the window opening of the curtain wall window meets the following conditions:

条件2.1:能够通行旧建筑内部施工所需的所有车辆及机械;Condition 2.1: All vehicles and machinery required for construction inside the old building can pass through;

条件2.2:设置在旧建筑的向阳面;Condition 2.2: Set up on the sunny side of the old building;

条件2.3:窗洞一周的旧建筑构件不发生掉落;Condition 2.3: The old building components around the window opening do not fall off;

所述侧窗的窗洞满足以下条件:The window opening of the side window meets the following conditions:

条件2.4:绕旧建筑外墙一周间隔设置;Condition 2.4: Set at intervals around the outer wall of the old building;

条件2.5:顶部高于旧建筑内部待修建的新建筑的顶层地板,底部低于旧建筑内部待修建的新建筑的低层天花板;Condition 2.5: The top is higher than the top floor of the new building to be built inside the old building, and the bottom is lower than the lower ceiling of the new building to be built inside the old building;

步骤三:将旧建筑内部施工所需的车辆及机械沿幕墙窗的窗洞开入旧建筑,在旧建筑内施工新建筑;所述新建筑与旧建筑之间无连接,在新建筑的外墙与旧建筑的外墙之间存在能够供人员通行的间隙,且新建筑的顶层为无屋盖的敞篷结构;Step 3: Drive vehicles and machinery required for the internal construction of the old building into the old building along the window openings of the curtain wall windows, and construct the new building inside the old building; the new building is not connected to the old building, there is a gap between the outer wall of the new building and the outer wall of the old building for people to pass, and the top floor of the new building is an open-top structure without a roof;

新建筑施工过程中所需的物料以及混凝土泵管沿离当前施工位置最近的侧窗的窗洞吊入旧建筑内,渣土装车沿幕墙窗的窗洞运出,渣土之外的废料沿离废料最近的侧窗的窗洞吊出;The materials and concrete pump pipes required for the construction of the new building are hoisted into the old building through the window opening of the side window closest to the current construction location, the muck is loaded and transported out through the window opening of the curtain wall window, and the waste materials other than the muck are hoisted out through the window opening of the side window closest to the waste materials;

步骤四:在幕墙窗的窗洞内安装幕墙,在侧窗的窗洞内安装玻璃窗扇和/或百叶窗,对旧建筑的外墙进行清洗,然后在旧建筑的外墙上包裹一层用于模仿旧建筑外墙原貌并对旧建筑外墙进行保护的装饰材料。Step 4: Install curtain walls in the window openings of the curtain wall windows, install glass sashes and/or shutters in the window openings of the side windows, clean the exterior walls of the old building, and then wrap the exterior walls of the old building with a layer of decorative material that imitates the original appearance of the exterior walls of the old building and protects the exterior walls of the old building.

进一步,步骤一中,根据旧建筑外墙结构的不同,对建筑的加固过程分为以下三种工况:Furthermore, in step 1, according to the different exterior wall structures of the old buildings, the reinforcement process of the buildings is divided into the following three working conditions:

工况1:若旧建筑的外墙为非承重墙,则在侧窗的窗洞顶部位置的墙体开槽安装过梁,且幕墙窗的窗洞一直向上延伸到屋盖;Working condition 1: If the exterior wall of the old building is a non-load-bearing wall, a lintel is installed in the wall groove at the top of the window opening of the side window, and the window opening of the curtain wall window extends upward to the roof;

工况2:若旧建筑的外墙为承重墙且为钢筋混凝土结构,则在旧建筑的外墙中开槽安装暗柱并在幕墙窗的窗洞顶部安装过梁进行加固;Working condition 2: If the exterior wall of the old building is a load-bearing wall and is a reinforced concrete structure, grooves are cut in the exterior wall of the old building to install concealed columns and lintels are installed at the top of the window openings of the curtain wall windows for reinforcement;

工况3:若旧建筑的外墙为承重墙且为砌体结构,则在旧建筑的外墙中开槽安装暗柱并在侧窗的窗洞顶部位置的墙体开槽安装过梁进行加固,且幕墙窗的窗洞一直向上延伸到屋盖;Condition 3: If the exterior wall of the old building is a load-bearing wall and a masonry structure, grooves are cut in the exterior wall of the old building to install concealed columns, and grooves are cut in the wall at the top of the window openings of the side windows to install lintels for reinforcement, and the window openings of the curtain wall windows extend all the way up to the roof;

且在工况1-3中,若在旧建筑的外墙上开洞过程中有梁被打断,则在被打断的梁上方贴靠屋盖安装新的梁。Furthermore, in working condition 1-3, if a beam is broken during the process of drilling a hole in the outer wall of the old building, a new beam is installed above the broken beam close to the roof.

进一步,所述幕墙窗中的幕墙采用以下方式进行固定:Furthermore, the curtain wall in the curtain wall window is fixed in the following manner:

幕墙下方地面埋设钢筋混凝土地梁,幕墙顶部与屋盖相邻的位置设置天梁,幕墙中间隔设置内柱,所述内柱上下两端分别与地梁和天梁固定连接;A reinforced concrete ground beam is buried in the ground below the curtain wall, a sky beam is set at the top of the curtain wall adjacent to the roof, and inner columns are set at intervals in the curtain wall. The upper and lower ends of the inner columns are fixedly connected to the ground beam and the sky beam respectively;

所述地梁上开设有用于固定幕墙底部的镶嵌槽,或锚固有用于固定幕墙底部的支架;The ground beam is provided with an inlay groove for fixing the bottom of the curtain wall, or is anchored with a bracket for fixing the bottom of the curtain wall;

所述幕墙左右两侧与旧建筑的外墙固定连接。The left and right sides of the curtain wall are fixedly connected to the outer walls of the old building.

进一步,所述幕墙窗的龙骨网格中带有门框,并在门框内安装玻璃门扇作为旧建筑的新门;旧建筑原有的门拆除并更换为玻璃门。Furthermore, the curtain wall window has a door frame in the keel grid, and a glass door leaf is installed in the door frame as a new door for the old building; the original door of the old building is removed and replaced with a glass door.

进一步,步骤三中,新建筑的楼板水平向外延伸到旧建筑的外墙位置,形成悬空的室内走廊,所述室内走廊为挑廊,挑廊的悬挑端与旧建筑的外墙之间的接缝采用柔性的装饰板进行遮挡,所述装饰板与挑廊的悬挑端固定连接,与旧建筑的外墙无连接;Further, in step 3, the floor of the new building is horizontally extended outward to the position of the outer wall of the old building to form a suspended indoor corridor, wherein the indoor corridor is a cantilevered corridor, and the joint between the cantilevered end of the cantilevered corridor and the outer wall of the old building is covered by a flexible decorative panel, and the decorative panel is fixedly connected to the cantilevered end of the cantilevered corridor and has no connection with the outer wall of the old building;

幕墙窗与新建筑之间的间隙布置为门厅。The gap between the curtain wall windows and the new building is arranged as a foyer.

进一步,若旧建筑为多层建筑,则步骤二中拆除二楼的楼板,步骤三施工过程中,自下而上逐层向上施工新建筑,每施工一层新建筑,就拆除一层旧建筑的楼板。Furthermore, if the old building is a multi-story building, the floor slab of the second floor is demolished in step 2, and during the construction process of step 3, the new building is constructed layer by layer from bottom to top, and each time a new floor is constructed, a floor slab of the old building is demolished.

进一步,所述侧窗的窗洞采用水锯切割的方式开洞并使洞壁光滑平整,侧窗的玻璃窗扇直接顶撑在洞壁上。Furthermore, the window holes of the side windows are opened by cutting with a water saw and the hole walls are made smooth and flat, and the glass window sashes of the side windows are directly supported on the hole walls.

进一步,所述旧建筑的外墙为清水砖墙,步骤四中的装饰材料为贴在旧建筑的外墙上的PK砖。Furthermore, the outer wall of the old building is a plain brick wall, and the decorative material in step 4 is a PK brick affixed to the outer wall of the old building.

进一步,新建筑的非顶层为用于集中安装计算机和/或数据中心的机柜的机房,机柜的散热器的进风口及出风口均为侧窗顶部的百叶窗,安装有百叶窗的侧窗中,底部为玻璃窗。Furthermore, the non-top floor of the new building is a computer room for centrally installing computer and/or data center cabinets. The air inlet and outlet of the cabinet radiator are both shutters on the top of the side windows, and the bottom of the side windows with shutters is a glass window.

本发明一种保留建筑外形的大尺寸旧建筑改造利用方法与现有技术相比,具有如下有益效果:Compared with the prior art, the method for renovating and utilizing a large-sized old building with the building appearance preserved in the present invention has the following beneficial effects:

本发明中,采用功能与外形分离的思路对大尺寸旧建筑进行改造,旧建筑仅保留其外壳来维持建筑外形,建筑的功能由外壳内新建的建筑来实现,从而使得旧建筑不仅不需要承载新的荷载,其原先承载的荷载也仅剩屋盖和装饰材料,即使旧建筑的受力结构也能满足需求In the present invention, the idea of separating function from appearance is adopted to renovate large-scale old buildings. The old building only retains its shell to maintain the building appearance, and the function of the building is realized by the newly built building inside the shell. As a result, the old building does not need to bear new loads, and the load it originally carried is only the roof and decorative materials. Even the load-bearing structure of the old building can meet the demand.

同时利用特殊尺寸的幕墙窗和侧窗的窗洞,克服了新旧两层建筑嵌套对施工造成的干涉问题(施工车辆及设备开不进去,建材和废料无法吊运,混凝土浇筑泵管被挡),使得这种嵌套建筑的施工可行,且在施工后克服嵌套建筑内部的通风及采光问题;At the same time, by using the special-sized curtain wall windows and side window openings, the interference problem caused by the nesting of the old and new buildings was overcome (construction vehicles and equipment could not enter, building materials and waste materials could not be hoisted, and the concrete pouring pump pipe was blocked), making the construction of this nested building feasible, and overcoming the ventilation and lighting problems inside the nested building after construction;

采用仿照旧建筑外貌的新装饰材料对旧建筑进行包裹,从而使得旧建筑破旧的外表被彻底翻新的同时还得到了保护;The old building is wrapped with new decorative materials that imitate the appearance of the old building, so that the dilapidated appearance of the old building is completely renovated and protected at the same time;

以上3点结合,在保留建筑外形的前提下完成了大尺寸旧建筑改造,同时双层嵌套结构使得新建筑内部环境更为稳定(新建筑无需直面太阳直射、风、雨、雪、尘),能更好满足包括计算机机房在内的各种对环境稳定性要求较高的场合。The above three points are combined to complete the renovation of large-scale old buildings while retaining the building's appearance. At the same time, the double-layer nested structure makes the internal environment of the new building more stable (the new building does not need to face direct sunlight, wind, rain, snow, and dust), which can better meet various occasions with high requirements for environmental stability, including computer rooms.

附图说明BRIEF DESCRIPTION OF THE DRAWINGS

图1为本发明一种保留建筑外形的大尺寸旧建筑改造利用方法中的建筑的平面图;FIG1 is a plan view of a building in a method for renovating and utilizing a large-sized old building while retaining the building appearance according to the present invention;

图2为一段包含了侧窗的旧建筑外墙的结构示意图;FIG2 is a schematic diagram of the structure of a section of an exterior wall of an old building including side windows;

图3为幕墙窗的结构示意图;FIG3 is a schematic diagram of the structure of a curtain wall window;

图中,1-旧建筑,11-幕墙窗,12-侧窗,2-新建筑,3-门厅,4-室内走廊。In the figure, 1-old building, 11-curtain wall window, 12-side window, 2-new building, 3-foyer, 4-interior corridor.

具体实施方式DETAILED DESCRIPTION

以北京怀柔科学城北区金隅兴发科技园项目为例,如图1所示,一种保留建筑外形的大尺寸旧建筑改造利用方法,包括以下步骤:Taking the Jinyuxingfa Science Park project in the northern area of Huairou Science City in Beijing as an example, as shown in Figure 1, a method for renovating and utilizing a large-scale old building while retaining the building's appearance includes the following steps:

步骤一:对旧建筑1进行加固,使其在后续的外墙开洞过程中及开洞后承载力合格;Step 1: Strengthen the old building 1 so that its bearing capacity is qualified during and after the subsequent opening of the external wall;

由于后续需要在旧建筑1的外墙上打洞来避免内外两层建筑嵌套而造成干涉,旧建筑1的外墙的承载力会下降,因此在打洞之前需要提前进行补强。同时如果旧建筑1本身已是危房,在这个过程中还可进行额外的补强。补强的方案是根据事先的勘探以及模拟计算过程来制定的。Since it is necessary to drill holes in the outer wall of the old building 1 to avoid interference caused by the nesting of the inner and outer buildings, the bearing capacity of the outer wall of the old building 1 will decrease, so it is necessary to reinforce it in advance before drilling the holes. At the same time, if the old building 1 itself is already a dangerous building, additional reinforcement can be carried out during this process. The reinforcement plan is formulated based on the previous exploration and simulation calculation process.

步骤二:在旧建筑1的外墙上开设幕墙窗11的窗洞及侧窗12的窗洞;Step 2: Opening window openings for curtain wall windows 11 and side windows 12 on the exterior wall of the old building 1;

如图2所示,幕墙窗11为在窗洞内安装透明的幕墙(通常选玻璃幕墙,也可选阳光板幕墙)形成的窗户,幕墙窗11的窗洞满足以下条件:As shown in FIG. 2 , the curtain wall window 11 is a window formed by installing a transparent curtain wall (usually a glass curtain wall, or a polycarbonate curtain wall) in the window opening. The window opening of the curtain wall window 11 meets the following conditions:

条件2.1:能够通行旧建筑1内部施工所需的所有车辆及机械;Condition 2.1: All vehicles and machinery required for construction inside the old building 1 can pass through;

这里通常选择旧建筑1一面较窄的墙,把整面墙都拆掉改为玻璃幕墙。Here, we usually choose a narrow wall of an old building, demolish the entire wall and replace it with a glass curtain wall.

条件2.2:设置在旧建筑1的向阳面;Condition 2.2: Set on the sunny side of old building 1;

这里的玻璃幕墙是主要的采光通道,在北半球位于建筑南侧,在南半球位于建筑北侧。The glass curtain wall here is the main lighting channel, located on the south side of the building in the northern hemisphere and on the north side of the building in the southern hemisphere.

条件2.3:窗洞一周的旧建筑1构件不发生掉落;Condition 2.3: The components of the old building 1 around the window opening do not fall off;

幕墙窗11是一个很特殊的结构,它并没有像常规的幕墙那样贴在墙面上,而是像窗户那样安装。因此它的玻璃需要依靠龙骨来网格来固定,且周边也需要固定。而窗洞一周的旧建筑1构件需要就是对幕墙窗11的边沿进行固定的,必须确保能够在开洞后能够稳定存在。The curtain wall window 11 is a very special structure. It is not attached to the wall like a conventional curtain wall, but installed like a window. Therefore, its glass needs to be fixed by the keel grid, and the periphery also needs to be fixed. The old building 1 component around the window hole needs to fix the edge of the curtain wall window 11, and it must be ensured that it can be stable after the hole is opened.

如图3所示,侧窗12的窗洞满足以下条件:As shown in FIG3 , the window opening of the side window 12 satisfies the following conditions:

条件2.4:绕旧建筑1外墙一周间隔设置;Condition 2.4: Set at intervals around the outer wall of the old building 1;

这一条要求一则为了通风及采光,二则为了确保所有的施工位置都能找到一个较近的侧窗12窗洞。This requirement is for ventilation and lighting, and secondly to ensure that all construction locations can find a nearby side window 12 window opening.

条件2.5:顶部高于旧建筑1内部待修建的新建筑2的顶层地板,底部低于旧建筑1内部待修建的新建筑2的低层天花板;Condition 2.5: The top is higher than the top floor of the new building 2 to be built inside the old building 1, and the bottom is lower than the lower ceiling of the new building 2 to be built inside the old building 1;

由于侧窗12的窗洞需要运输各种物料,因此其需要足够高且足够低,能够满足所有楼层施工的需要。Since the window openings of the side windows 12 need to transport various materials, they need to be high enough and low enough to meet the needs of construction on all floors.

步骤三:将旧建筑1内部施工所需的车辆及机械沿幕墙窗11的窗洞开入旧建筑1,在旧建筑1内施工新建筑2;新建筑2与旧建筑1之间无连接,以确保新建筑2上的荷载不会传递到旧建筑1上。Step 3: Drive the vehicles and machinery required for the internal construction of the old building 1 into the old building 1 along the window opening of the curtain wall window 11, and construct the new building 2 inside the old building 1; there is no connection between the new building 2 and the old building 1 to ensure that the load on the new building 2 will not be transferred to the old building 1.

在新建筑2的外墙与旧建筑1的外墙之间存在能够供人员通行的间隙,这里由于新建筑2与旧建筑1之间无连接,因此二者之间存在间隙,这里确保间隙能够通行人,从而使这些间隙能够作为走廊而被利用,以弥补新建筑2由于在旧建筑1内而尺寸减小造成的问题。There is a gap between the outer wall of the new building 2 and the outer wall of the old building 1 for people to pass through. Since there is no connection between the new building 2 and the old building 1, there is a gap between the two. Here, it is ensured that the gap can be passed by pedestrians so that these gaps can be used as corridors to make up for the problem caused by the reduced size of the new building 2 due to being inside the old building 1.

新建筑2的顶层为无屋盖的敞篷结构;The top floor of New Building 2 is an open structure without a roof;

这里新建筑2的顶层的屋盖的施工会受到旧建筑1的无盖的严重干涉,无法正常完成施工,因此这里干脆抛弃新建筑2的屋盖,直接利用旧建筑1的屋盖。如果旧建筑1的屋盖存在破损,这里应进行翻新,也即更换屋盖板。不同于外墙,屋盖本身不需要承受自重以外的荷载,因此屋盖板可方便地进行更换。The construction of the roof of the top floor of the new building 2 will be seriously interfered by the lack of roof of the old building 1, and the construction cannot be completed normally. Therefore, the roof of the new building 2 is simply abandoned and the roof of the old building 1 is directly used. If the roof of the old building 1 is damaged, it should be renovated, that is, the roof board should be replaced. Unlike the exterior wall, the roof itself does not need to bear loads other than its own weight, so the roof board can be easily replaced.

新建筑2施工过程中所需的物料以及混凝土泵管沿离当前施工位置最近的侧窗12的窗洞吊入旧建筑1内,渣土装车沿幕墙窗11的窗洞运出,渣土之外的废料沿离废料最近的侧窗12的窗洞吊出;The materials and concrete pump pipes required during the construction of the new building 2 are hoisted into the old building 1 along the window opening of the side window 12 closest to the current construction position, the muck is loaded and transported out along the window opening of the curtain wall window 11, and the waste materials other than the muck are hoisted out along the window opening of the side window 12 closest to the waste materials;

这里密集且尺寸及位置经过专门调整的窗洞,可使内部的新建筑2的施工过程不受外部的旧建筑1干涉。The dense window openings with specially adjusted sizes and positions here can ensure that the construction process of the new building 2 inside is not interfered by the old building 1 outside.

步骤四:在幕墙窗11的窗洞内安装幕墙,在侧窗12的窗洞内安装玻璃窗扇和/或百叶窗,对旧建筑1的外墙进行清洗,然后在旧建筑1的外墙上包裹一层用于模仿旧建筑1外墙原貌并对旧建筑1外墙进行保护的装饰材料。Step 4: Install a curtain wall in the window opening of the curtain wall window 11, install glass window sashes and/or shutters in the window opening of the side window 12, clean the exterior wall of the old building 1, and then wrap the exterior wall of the old building 1 with a layer of decorative material that imitates the original appearance of the exterior wall of the old building 1 and protects the exterior wall of the old building 1.

旧建筑1的外表不仅破旧,而且正在持续风化中,因此这里选择直接包裹一层装饰材料,不仅可以用较低的成本及较短的时间彻底完成对建筑外表的翻新,而且能够中断建筑的风化过程。The exterior of the old building 1 is not only dilapidated, but also undergoing continuous weathering. Therefore, we choose to directly wrap it with a layer of decorative materials, which can not only completely complete the renovation of the building's exterior at a lower cost and in a shorter time, but also interrupt the weathering process of the building.

步骤一中,根据旧建筑1外墙结构的不同,对建筑的加固过程分为以下三种工况:In step 1, according to the different exterior wall structures of the old building 1, the reinforcement process of the building is divided into the following three working conditions:

工况1:若旧建筑1的外墙为非承重墙,则在侧窗12的窗洞顶部位置的墙体开槽安装过梁,且幕墙窗11的窗洞一直向上延伸到屋盖;Working condition 1: If the outer wall of the old building 1 is a non-load-bearing wall, a lintel is installed in a groove in the wall at the top of the window opening of the side window 12, and the window opening of the curtain wall window 11 extends upward to the roof;

本实施例中即属于这种工况,旧建筑1的外墙是砖混结构,包含砖墙以及埋设在砖墙中的钢筋混凝土暗柱,砖墙本身不承重,而是由钢筋混凝土暗柱承载屋盖。屋盖中带有一排平面桁架,每个平面桁架两端分别落在一根钢筋混凝土暗柱上。This embodiment belongs to this working condition. The outer wall of the old building 1 is a brick-concrete structure, including brick walls and reinforced concrete hidden columns embedded in the brick walls. The brick walls themselves do not bear weight, but the reinforced concrete hidden columns bear the roof. The roof has a row of plane trusses, and the two ends of each plane truss fall on a reinforced concrete hidden column.

这里之所以要安装过梁,是因为非承重墙无论是何种形式均较脆弱,在开完窗洞后窗洞顶部位置是不能自持的。而幕墙窗11的窗洞位置安装过梁来托住上方的脆弱墙体成本过高,因此这里选择直接把幕墙的窗的窗洞所在的外墙拆到顶部。这里的过梁基本不承重,因此端部可以不连接到旧建筑1的钢筋混凝土暗柱上。The reason why the lintel is installed here is that the non-load-bearing wall is relatively fragile regardless of its form, and the top of the window hole cannot support itself after the window hole is opened. However, it is too expensive to install a lintel at the window hole position of the curtain wall window 11 to support the fragile wall above, so here it is chosen to directly dismantle the outer wall where the window hole of the curtain wall window is located to the top. The lintel here is basically not load-bearing, so the end does not need to be connected to the reinforced concrete hidden column of the old building 1.

工况2:若旧建筑1的外墙为承重墙且为钢筋混凝土结构,则在旧建筑1的外墙中开槽安装暗柱并在幕墙窗11的窗洞顶部安装过梁进行加固;Working condition 2: If the outer wall of the old building 1 is a load-bearing wall and is a reinforced concrete structure, grooves are cut in the outer wall of the old building 1 to install concealed columns and lintels are installed at the tops of the window openings of the curtain wall windows 11 for reinforcement;

这里由于承重墙上被开了洞,而导致承载能力下降,需要在其中安装暗柱来补强。但由于钢筋混凝土墙在开洞后不会落下砌块,因此在开完窗洞后窗洞顶部不需要安装过梁。Here, because a hole is opened in the load-bearing wall, the bearing capacity is reduced, and hidden columns need to be installed in it to reinforce it. However, since the reinforced concrete wall will not drop blocks after the hole is opened, there is no need to install a lintel on the top of the window hole after the window hole is opened.

工况3:若旧建筑1的外墙为承重墙且为砌体结构,则在旧建筑1的外墙中开槽安装暗柱并在侧窗12的窗洞顶部位置的墙体开槽安装过梁进行加固,避免砌块落下,且幕墙窗11的窗洞一直向上延伸到屋盖,避免大跨度过梁来托住上方的脆弱墙体成本过高。Working condition 3: If the outer wall of the old building 1 is a load-bearing wall and a masonry structure, grooves are cut in the outer wall of the old building 1 to install concealed columns, and grooves are cut in the wall at the top of the window opening of the side window 12 to install lintels for reinforcement to prevent the blocks from falling, and the window opening of the curtain wall window 11 extends upward to the roof to avoid the high cost of large-span lintels to support the fragile wall above.

除了钢筋混凝土墙以及砌体墙外,还有板墙以及夯土墙等,但这些是应用于临时建筑的,而旧建筑1之所以能成为旧建筑1,有一个隐藏的前提,也即它是永久性建筑。因此在旧建筑1的外墙通常也就只有砌体结构和钢筋混凝土结构两种,但如果遇到这二者以外的结构的话,统一按工况3进行处理。In addition to reinforced concrete walls and masonry walls, there are also board walls and rammed earth walls, but these are used for temporary buildings. The reason why Old Building 1 can be called Old Building 1 is that there is a hidden premise, that is, it is a permanent building. Therefore, the exterior walls of Old Building 1 usually only have masonry structures and reinforced concrete structures. However, if you encounter structures other than these two, you should uniformly handle them according to Working Condition 3.

且在工况1-3中,若在旧建筑1的外墙上开洞过程中有梁被打断,则在被打断的梁上方贴靠屋盖安装新的梁,以弥补梁被打断而造成的承载能力下降问题。Furthermore, in working condition 1-3, if a beam is broken during the process of drilling a hole on the outer wall of the old building 1, a new beam is installed above the broken beam close to the roof to compensate for the reduced bearing capacity caused by the broken beam.

幕墙窗11中的幕墙采用以下方式进行固定:The curtain wall in the curtain wall window 11 is fixed in the following manner:

如图2所示,幕墙下方地面埋设钢筋混凝土地梁,幕墙顶部与屋盖相邻的位置设置天梁,幕墙中间隔设置内柱,内柱上下两端分别与地梁和天梁固定连接;As shown in FIG2 , a reinforced concrete ground beam is buried under the curtain wall, a sky beam is set at the top of the curtain wall adjacent to the roof, and inner columns are set at intervals in the curtain wall. The upper and lower ends of the inner columns are fixedly connected to the ground beam and the sky beam respectively;

地梁上开设有用于固定幕墙底部的镶嵌槽,或锚固有用于固定幕墙底部的支架;The ground beam is provided with an inlay groove for fixing the bottom of the curtain wall, or a bracket for fixing the bottom of the curtain wall is anchored;

幕墙左右两侧与旧建筑1的外墙固定连接。The left and right sides of the curtain wall are fixedly connected to the outer wall of the old building 1.

这里幕墙被以这种形式固定在了一个类似窗框一样的稳定方框内,同时这个稳定方框中安装有龙骨网格,幕墙中的玻璃,以软镶嵌包边的方式镶嵌在龙骨网格中。这里的龙骨网格对玻璃进行固定,而软镶嵌包边是为了确保在发生热胀冷缩的时候,幕墙中的玻璃不因此发生损坏。当然如果采用阳光板幕墙,可不采用软镶嵌包边的方式进行镶嵌。Here, the curtain wall is fixed in a stable square frame similar to a window frame. At the same time, a keel grid is installed in this stable square frame. The glass in the curtain wall is inlaid in the keel grid in a soft inlay edging way. The keel grid here fixes the glass, and the soft inlay edging is to ensure that the glass in the curtain wall is not damaged when thermal expansion and contraction occur. Of course, if a polycarbonate curtain wall is used, the soft inlay edging method can be omitted.

幕墙窗11的龙骨网格中带有门框,并在门框内安装玻璃门扇作为旧建筑1的新门;旧建筑1原有的门拆除并更换为玻璃门。The keel grid of the curtain wall window 11 is provided with a door frame, and a glass door leaf is installed in the door frame as a new door of the old building 1; the original door of the old building 1 is removed and replaced with a glass door.

这里的门也作为建筑的采光窗口。The doors here also serve as lighting windows for the building.

步骤三中,新建筑2的楼板水平向外延伸到旧建筑1的外墙位置,形成悬空的室内走廊4,室内走廊4为挑廊,挑廊的悬挑端与旧建筑1的外墙之间的接缝采用柔性的装饰板进行遮挡,装饰板与挑廊的悬挑端固定连接,与旧建筑1的外墙无连接。In step three, the floor of the new building 2 extends horizontally outward to the outer wall of the old building 1, forming a suspended indoor corridor 4. The indoor corridor 4 is a cantilevered corridor. The joint between the cantilevered end of the cantilevered corridor and the outer wall of the old building 1 is covered with a flexible decorative panel. The decorative panel is fixedly connected to the cantilevered end of the cantilevered corridor and has no connection with the outer wall of the old building 1.

幕墙窗11与新建筑2之间的间隙布置为门厅3。The gap between the curtain wall window 11 and the new building 2 is arranged as a lobby 3.

若旧建筑1为多层建筑,则步骤二中拆除二楼的楼板,从而让车辆能够开入旧建筑1;If the old building 1 is a multi-story building, the floor slab of the second floor is removed in step 2 so that the vehicle can drive into the old building 1;

步骤三施工过程中,自下而上逐层向上施工新建筑2,每施工一层新建筑2,就拆除一层旧建筑1的楼板。During the construction process of step 3, the new building 2 is constructed layer by layer from bottom to top. Each time a new building 2 is constructed, a floor slab of the old building 1 is demolished.

这个过程不仅为了确保能够正常施工,而且去除了旧建筑1中除了屋盖和外壳上的装饰材料之外的荷载。如果是单层的建筑,其外墙上有除了装饰材料之外的荷载,这里一并进行去除。This process is not only to ensure normal construction, but also to remove the loads other than the decorative materials on the roof and shell of the old building 1. If it is a single-story building, there are loads other than decorative materials on its exterior wall, which are removed here.

本实施例中,侧窗12的窗洞采用水锯切割的方式开洞并使洞壁光滑平整,侧窗12的玻璃窗扇直接顶撑在洞壁上。In this embodiment, the window hole of the side window 12 is opened by cutting with a water saw and the hole wall is made smooth and flat, and the glass window sash of the side window 12 is directly supported on the hole wall.

旧建筑1的外墙为清水砖墙,步骤四中的装饰材料为贴在旧建筑1的外墙上的PK砖。这里用PK砖这种板材来模拟清水砖墙的外形。The exterior wall of the old building 1 is a plain brick wall, and the decorative material in step 4 is a PK brick attached to the exterior wall of the old building 1. Here, a PK brick is used as a plate to simulate the appearance of a plain brick wall.

如果旧建筑1的外墙上贴有瓷砖的话,则可重新贴瓷砖,如果旧建筑1的外墙上贴有石材板的话,则可清洗修补后刷真石漆;如果旧建筑1的外墙上外墙墙面是清水混凝土墙面,则重新涂抹一层清水混凝土;如果旧建筑1的外墙上为石灰抹面的话,则清除后重新抹面。If there are tiles on the exterior wall of the old building 1, you can re-tile it. If there are stone slabs on the exterior wall of the old building 1, you can clean and repair them and then apply real stone paint. If the exterior wall of the old building 1 is a plain concrete wall, re-apply a layer of plain concrete. If the exterior wall of the old building 1 is lime plastered, remove it and re-plaster it.

新建筑2的非顶层为用于集中安装计算机和/或数据中心的机柜的机房,机柜的散热器的进风口及出风口均为侧窗12顶部的百叶窗,安装有百叶窗的侧窗12中,底部为玻璃窗。The non-top floor of the new building 2 is a computer room for centrally installing computer and/or data center cabinets. The air inlet and outlet of the cabinet radiator are both shutters on the top of the side window 12. The bottom of the side window 12 with shutters is a glass window.

这里充分利用了这种嵌套建筑非顶层的内部环境比常规建筑更稳定的特点,而为了确保建筑外表美观,这里选择不额外开百叶窗为散热器通风,而是在侧窗12中选一部分区域作为百叶窗来通风。Here, the characteristic that the internal environment of the non-top floor of the nested building is more stable than that of a conventional building is fully utilized. In order to ensure the beautiful appearance of the building, it is chosen not to open additional shutters for radiator ventilation, but to select a part of the side window 12 as a shutter for ventilation.

以上所述的实施例仅仅是对本发明的优选实施方式进行描述,并非对本发明的范围进行限定,在不脱离本发明设计精神的前提下,本领域普通技术人员对本发明的技术方案作出的各种变形和改进,均应落入本发明权利要求书确定的保护范围内。The embodiments described above are merely descriptions of preferred implementation modes of the present invention and are not intended to limit the scope of the present invention. Without departing from the design spirit of the present invention, various modifications and improvements made to the technical solutions of the present invention by ordinary technicians in this field should all fall within the protection scope determined by the claims of the present invention.

Claims (9)

1.一种保留建筑外形的大尺寸旧建筑改造利用方法,其特征在于:包括以下步骤:1. A method for renovating and utilizing a large-sized old building while retaining its appearance, characterized in that it comprises the following steps: 步骤一:对旧建筑(1)进行加固,使其在后续的外墙开洞过程中及开洞后承载力合格;Step 1: Strengthen the old building (1) so that it has a qualified bearing capacity during and after the subsequent opening of the exterior wall; 步骤二:在旧建筑(1)的外墙上开设幕墙窗(11)的窗洞及侧窗(12)的窗洞;Step 2: Opening window openings for curtain wall windows (11) and side windows (12) on the exterior wall of the old building (1); 所述幕墙窗(11)为在窗洞内安装透明的幕墙形成的窗户,所述幕墙窗(11)的窗洞满足以下条件:The curtain wall window (11) is a window formed by installing a transparent curtain wall in a window opening, and the window opening of the curtain wall window (11) meets the following conditions: 条件2.1:能够通行旧建筑(1)内部施工所需的所有车辆及机械;Condition 2.1: Access to all vehicles and machinery required for construction work inside the old building (1); 条件2.2:设置在旧建筑(1)的向阳面;Condition 2.2: Set up on the sunny side of the old building (1); 条件2.3:窗洞一周的旧建筑(1)构件不发生掉落;Condition 2.3: Old buildings around window openings (1) No components fall off; 所述侧窗(12)的窗洞满足以下条件:The window opening of the side window (12) meets the following conditions: 条件2.4:绕旧建筑(1)外墙一周间隔设置;Condition 2.4: Set at intervals around the exterior wall of the old building (1); 条件2.5:顶部高于旧建筑(1)内部待修建的新建筑(2)的顶层地板,底部低于旧建筑(1)内部待修建的新建筑(2)的低层天花板;Condition 2.5: The top is higher than the top floor of the new building (2) to be built inside the old building (1), and the bottom is lower than the lower ceiling of the new building (2) to be built inside the old building (1); 步骤三:将旧建筑(1)内部施工所需的车辆及机械沿幕墙窗(11)的窗洞开入旧建筑(1),在旧建筑(1)内施工新建筑(2);所述新建筑(2)与旧建筑(1)之间无连接,在新建筑(2)的外墙与旧建筑(1)的外墙之间存在能够供人员通行的间隙,且新建筑(2)的顶层为无屋盖的敞篷结构;Step 3: driving vehicles and machinery required for the internal construction of the old building (1) into the old building (1) along the window opening of the curtain wall window (11), and constructing the new building (2) inside the old building (1); the new building (2) is not connected to the old building (1), there is a gap between the outer wall of the new building (2) and the outer wall of the old building (1) for people to pass, and the top floor of the new building (2) is an open-top structure without a roof; 新建筑(2)施工过程中所需的物料以及混凝土泵管沿离当前施工位置最近的侧窗(12)的窗洞吊入旧建筑(1)内,渣土装车沿幕墙窗(11)的窗洞运出,渣土之外的废料沿离废料最近的侧窗(12)的窗洞吊出;The materials and concrete pump pipes required for the construction of the new building (2) are hoisted into the old building (1) through the window opening of the side window (12) closest to the current construction position, the muck is loaded and transported out through the window opening of the curtain wall window (11), and the waste materials other than the muck are hoisted out through the window opening of the side window (12) closest to the waste materials; 步骤四:在幕墙窗(11)的窗洞内安装幕墙,在侧窗(12)的窗洞内安装玻璃窗扇和/或百叶窗,对旧建筑(1)的外墙进行清洗,然后在旧建筑(1)的外墙上包裹一层用于模仿旧建筑(1)外墙原貌并对旧建筑(1)外墙进行保护的装饰材料。Step 4: Install a curtain wall in the window opening of the curtain wall window (11), install glass window sashes and/or shutters in the window opening of the side window (12), clean the exterior wall of the old building (1), and then wrap the exterior wall of the old building (1) with a layer of decorative material that imitates the original appearance of the exterior wall of the old building (1) and protects the exterior wall of the old building (1). 2.根据权利要求1所述的一种保留建筑外形的大尺寸旧建筑改造利用方法,其特征在于:步骤一中,根据旧建筑(1)外墙结构的不同,对建筑的加固过程分为以下三种工况:2. A method for renovating and utilizing a large-sized old building while retaining its appearance according to claim 1, characterized in that: in step 1, according to the different exterior wall structures of the old building (1), the reinforcement process of the building is divided into the following three working conditions: 工况1:若旧建筑(1)的外墙为非承重墙,则在侧窗(12)的窗洞顶部位置的墙体开槽安装过梁,且幕墙窗(11)的窗洞一直向上延伸到屋盖;Working condition 1: If the exterior wall of the old building (1) is a non-load-bearing wall, a lintel is installed in a groove in the wall at the top of the window opening of the side window (12), and the window opening of the curtain wall window (11) extends upward to the roof; 工况2:若旧建筑(1)的外墙为承重墙且为钢筋混凝土结构,则在旧建筑(1)的外墙中开槽安装暗柱并在幕墙窗(11)的窗洞顶部安装过梁进行加固;Working condition 2: If the outer wall of the old building (1) is a load-bearing wall and is a reinforced concrete structure, grooves are cut in the outer wall of the old building (1) to install concealed columns and lintels are installed at the tops of the window openings of the curtain wall windows (11) for reinforcement; 工况3:若旧建筑(1)的外墙为承重墙且为砌体结构,则在旧建筑(1)的外墙中开槽安装暗柱并在侧窗(12)的窗洞顶部位置的墙体开槽安装过梁进行加固,且幕墙窗(11)的窗洞一直向上延伸到屋盖;Working condition 3: If the outer wall of the old building (1) is a load-bearing wall and is a masonry structure, a groove is made in the outer wall of the old building (1) to install a concealed column, and a groove is made in the wall at the top of the window opening of the side window (12) to install a lintel for reinforcement, and the window opening of the curtain wall window (11) extends upward to the roof; 且在工况1-3中,若在旧建筑(1)的外墙上开洞过程中有梁被打断,则在被打断的梁上方贴靠屋盖安装新的梁。Furthermore, in working condition 1-3, if a beam is broken during the process of drilling a hole in the outer wall of the old building (1), a new beam is installed above the broken beam close to the roof. 3.根据权利要求1所述的一种保留建筑外形的大尺寸旧建筑改造利用方法,其特征在于:所述幕墙窗(11)中的幕墙采用以下方式进行固定:3. A method for renovating and utilizing a large-sized old building while retaining the building appearance according to claim 1, characterized in that the curtain wall in the curtain wall window (11) is fixed in the following manner: 幕墙下方地面埋设钢筋混凝土地梁,幕墙顶部与屋盖相邻的位置设置天梁,幕墙中间隔设置内柱,所述内柱上下两端分别与地梁和天梁固定连接;A reinforced concrete ground beam is buried in the ground below the curtain wall, a sky beam is set at the top of the curtain wall adjacent to the roof, and inner columns are set at intervals in the curtain wall. The upper and lower ends of the inner columns are fixedly connected to the ground beam and the sky beam respectively; 所述地梁上开设有用于固定幕墙底部的镶嵌槽,或锚固有用于固定幕墙底部的支架;The ground beam is provided with an inlay groove for fixing the bottom of the curtain wall, or is anchored with a bracket for fixing the bottom of the curtain wall; 所述幕墙左右两侧与旧建筑(1)的外墙固定连接。The left and right sides of the curtain wall are fixedly connected to the outer wall of the old building (1). 4.根据权利要求3所述的一种保留建筑外形的大尺寸旧建筑改造利用方法,其特征在于:所述幕墙窗(11)的龙骨网格中带有门框,并在门框内安装玻璃门扇作为旧建筑(1)的新门;旧建筑(1)原有的门拆除并更换为玻璃门。4. A method for renovating and utilizing a large-sized old building while retaining its exterior shape according to claim 3, characterized in that: a door frame is provided in the keel grid of the curtain wall window (11), and a glass door leaf is installed in the door frame as a new door of the old building (1); the original door of the old building (1) is removed and replaced with a glass door. 5.根据权利要求1所述的一种保留建筑外形的大尺寸旧建筑改造利用方法,其特征在于:步骤三中,新建筑(2)的楼板水平向外延伸到旧建筑(1)的外墙位置,形成悬空的室内走廊(4),所述室内走廊(4)为挑廊,挑廊的悬挑端与旧建筑(1)的外墙之间的接缝采用柔性的装饰板进行遮挡,所述装饰板与挑廊的悬挑端固定连接,与旧建筑(1)的外墙无连接;5. A method for renovating and utilizing a large-sized old building while retaining its exterior shape according to claim 1, characterized in that: in step 3, the floor slab of the new building (2) is horizontally extended outward to the position of the exterior wall of the old building (1), forming a suspended indoor corridor (4), wherein the indoor corridor (4) is a cantilevered corridor, and the joint between the cantilevered end of the cantilevered corridor and the exterior wall of the old building (1) is shielded by a flexible decorative panel, wherein the decorative panel is fixedly connected to the cantilevered end of the cantilevered corridor and has no connection with the exterior wall of the old building (1); 幕墙窗(11)与新建筑(2)之间的间隙布置为门厅(3)。The gap between the curtain wall window (11) and the new building (2) is arranged as a lobby (3). 6.根据权利要求1所述的一种保留建筑外形的大尺寸旧建筑改造利用方法,其特征在于:若旧建筑(1)为多层建筑,则步骤二中拆除二楼的楼板,步骤三施工过程中,自下而上逐层向上施工新建筑(2),每施工一层新建筑(2),就拆除一层旧建筑(1)的楼板。6. A method for renovating and utilizing a large-sized old building while retaining its appearance according to claim 1, characterized in that: if the old building (1) is a multi-story building, the floor slab of the second floor is demolished in step 2, and during the construction process of step 3, the new building (2) is constructed layer by layer from bottom to top, and each time a layer of the new building (2) is constructed, a layer of the floor slab of the old building (1) is demolished. 7.根据权利要求1所述的一种保留建筑外形的大尺寸旧建筑改造利用方法,其特征在于:所述侧窗(12)的窗洞采用水锯切割的方式开洞并使洞壁光滑平整,侧窗(12)的玻璃窗扇直接顶撑在洞壁上。7. A method for renovating and utilizing a large-sized old building while retaining the building's appearance according to claim 1, characterized in that: the window opening of the side window (12) is opened by cutting with a water saw and the hole wall is made smooth and flat, and the glass window sash of the side window (12) is directly supported on the hole wall. 8.根据权利要求1所述的一种保留建筑外形的大尺寸旧建筑改造利用方法,其特征在于:所述旧建筑(1)的外墙为清水砖墙,步骤四中的装饰材料为贴在旧建筑(1)的外墙上的PK砖。8. A method for renovating and utilizing a large-sized old building while retaining its exterior appearance according to claim 1, characterized in that the exterior wall of the old building (1) is a plain brick wall, and the decorative material in step 4 is a PK brick attached to the exterior wall of the old building (1). 9.根据权利要求1所述的一种保留建筑外形的大尺寸旧建筑改造利用方法,其特征在于:新建筑(2)的非顶层为用于集中安装计算机和/或数据中心的机柜的机房,机柜的散热器的进风口及出风口均为侧窗(12)顶部的百叶窗,安装有百叶窗的侧窗(12)中,底部为玻璃窗。9. A method for renovating and utilizing a large-sized old building while retaining its exterior shape according to claim 1, characterized in that: the non-top floor of the new building (2) is a computer room for centrally installing computer and/or data center cabinets, the air inlet and air outlet of the cabinet radiator are both shutters at the top of the side window (12), and the bottom of the side window (12) with the shutter is a glass window.
CN202411049990.8A 2024-08-01 2024-08-01 A method for renovating and utilizing a large-scale old building while retaining its appearance Active CN118564103B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202411049990.8A CN118564103B (en) 2024-08-01 2024-08-01 A method for renovating and utilizing a large-scale old building while retaining its appearance

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202411049990.8A CN118564103B (en) 2024-08-01 2024-08-01 A method for renovating and utilizing a large-scale old building while retaining its appearance

Publications (2)

Publication Number Publication Date
CN118564103A true CN118564103A (en) 2024-08-30
CN118564103B CN118564103B (en) 2024-12-06

Family

ID=92471538

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202411049990.8A Active CN118564103B (en) 2024-08-01 2024-08-01 A method for renovating and utilizing a large-scale old building while retaining its appearance

Country Status (1)

Country Link
CN (1) CN118564103B (en)

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114673377A (en) * 2022-04-09 2022-06-28 中建八局第三建设有限公司 Reservation of exterior walls of historic buildings and construction methods for interior hollowing out and remaking
CN115387516A (en) * 2022-10-08 2022-11-25 中建八局装饰工程有限公司 Newly-built curtain wall system of existing building and construction method thereof
CN118564104A (en) * 2024-08-01 2024-08-30 北京建工四建工程建设有限公司 New and old building nested composite structure capable of utilizing old and stable in internal environment

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114673377A (en) * 2022-04-09 2022-06-28 中建八局第三建设有限公司 Reservation of exterior walls of historic buildings and construction methods for interior hollowing out and remaking
CN115387516A (en) * 2022-10-08 2022-11-25 中建八局装饰工程有限公司 Newly-built curtain wall system of existing building and construction method thereof
CN118564104A (en) * 2024-08-01 2024-08-30 北京建工四建工程建设有限公司 New and old building nested composite structure capable of utilizing old and stable in internal environment

Also Published As

Publication number Publication date
CN118564103B (en) 2024-12-06

Similar Documents

Publication Publication Date Title
CN204940928U (en) Packaged type aluminium alloys house
CN103821276B (en) A kind of assembled, modular architectural system
CN205712716U (en) A kind of assembled architecture hollow precast concrete member
CN106320521A (en) Pure part plate combined industrialized house assembling structure which can be rapidly erected
CN105089178A (en) Fabricated building of pre-assembling structure of prefabricated section steel concrete shear wall
CN101457552A (en) Composite hollow slab house and building method thereof
CN1263190A (en) Steel structure building method for renovation of old buildings
CN118564104A (en) New and old building nested composite structure capable of utilizing old and stable in internal environment
CN204919801U (en) Aluminum alloy house
CN204919802U (en) Preceding facade system in aluminum alloy house
CN106193685B (en) Prefabricated communication room structure
CN204940537U (en) A kind of packaged type aluminium alloys house
Zanni et al. Application of a wooden prefabricated shell exoskeleton for the integrated and sustainable retrofit of a residential building
CN209958508U (en) Assembled concrete structure and subway ground access & exit structure thereof
CN204940529U (en) The side elevation system in aluminium alloys house
CN118564103B (en) A method for renovating and utilizing a large-scale old building while retaining its appearance
CN111254937A (en) Installation method of fabricated building
CN205153585U (en) Portable aluminum alloy house
CN218757889U (en) Environment-friendly wall assembled building
CN217027477U (en) A modular equipment room with a combination of structure and enclosure
Moga et al. Current Practices in Energy Retrofit of Buildings
CN204919880U (en) Crossbeam and wallboard and door and window connection structure in aluminum alloy house
CN118564105B (en) A method for rebuilding a new floor slab when there is interference with the original load-bearing exterior wall
CN102051983A (en) Method of reconstructing steel rolling workshop into teaching building
CN107130683A (en) A kind of assembled box building and its Modular building module

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant