CN118564106A - Lateral force resistant additional corridor for rebuilding row of small-section buildings - Google Patents

Lateral force resistant additional corridor for rebuilding row of small-section buildings Download PDF

Info

Publication number
CN118564106A
CN118564106A CN202411049997.XA CN202411049997A CN118564106A CN 118564106 A CN118564106 A CN 118564106A CN 202411049997 A CN202411049997 A CN 202411049997A CN 118564106 A CN118564106 A CN 118564106A
Authority
CN
China
Prior art keywords
columns
building
plate
old
buildings
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202411049997.XA
Other languages
Chinese (zh)
Other versions
CN118564106B (en
Inventor
赵凯
贺宝全
赵来柱
于海阔
刘立军
袁春娟
程杰
李海旭
花京春
李志�
姜世文
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Fourth Construction & Engineering Co ltd
Original Assignee
Beijing Fourth Construction & Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Fourth Construction & Engineering Co ltd filed Critical Beijing Fourth Construction & Engineering Co ltd
Priority to CN202411049997.XA priority Critical patent/CN118564106B/en
Publication of CN118564106A publication Critical patent/CN118564106A/en
Application granted granted Critical
Publication of CN118564106B publication Critical patent/CN118564106B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • E—FIXED CONSTRUCTIONS
    • E04—BUILDING
    • E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G23/00—Working measures on existing buildings
    • E04G23/02—Repairing, e.g. filling cracks; Restoring; Altering; Enlarging
    • E04G23/0266—Enlarging
    • E—FIXED CONSTRUCTIONS
    • E04—BUILDING
    • E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G23/00—Working measures on existing buildings
    • E04G23/02—Repairing, e.g. filling cracks; Restoring; Altering; Enlarging
    • E—FIXED CONSTRUCTIONS
    • E04—BUILDING
    • E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G23/00—Working measures on existing buildings
    • E04G23/02—Repairing, e.g. filling cracks; Restoring; Altering; Enlarging
    • E04G23/0218—Increasing or restoring the load-bearing capacity of building construction elements

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Chemical & Material Sciences (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Electrochemistry (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Working Measures On Existing Buildindgs (AREA)

Abstract

The invention relates to the technical field of construction measures for the existing building, and discloses an additional gallery for lateral force resistance of reconstruction of a row of small-section buildings, wherein a firm three-dimensional beam column grid is formed by implanting early non-interference columns in the outer wall of an old building and together with frame beams, the early non-interference columns are horizontally and outwards expanded to form a plate-shaped composite column after the construction on the outer wall of the old building is completed, and the plate-shaped composite column is equivalent to a shear wall with increased thickness and hooped reinforcement, so that the bearing capacity of the old building on lateral force is greatly enhanced, and meanwhile, the decorative effect similar to a decorative line is also achieved on the appearance; meanwhile, the plate-shaped composite columns and the frame beams form a strip-shaped three-dimensional beam column grid, and part of the plate-shaped composite columns are positioned outside the building, so that the gallery can be conveniently installed on the plate-shaped composite columns, and each old building is communicated on the premise that the connecting structure between the old buildings is not damaged, the number of holes is reduced and the inner space of the old building is not occupied.

Description

一种用于成排小截面建筑改建的抗侧向力附加连廊A lateral force-resistant additional corridor for reconstruction of rows of small-section buildings

技术领域Technical Field

本发明涉及对现有建筑物的施工措施技术领域,特别是涉及一种用于成排小截面建筑改建的抗侧向力附加连廊。The invention relates to the technical field of construction measures for existing buildings, in particular to an additional corridor for resisting lateral forces used for reconstruction of rows of small-section buildings.

背景技术Background Art

绝大部分旧建筑的归宿是被拆除后腾出空地用于修建新建筑,但存在一些有特殊意义的旧建筑,需要在保留其原貌的前提下改变建筑用途,为此需要对建筑进行深度改造。The fate of most old buildings is to be demolished to make way for the construction of new buildings, but there are some old buildings with special significance that need to be changed in use while retaining their original appearance, which requires in-depth renovation of the buildings.

考虑到旧建筑本身已发生严重的老化,其结构强度严重下降,且外观已非常破旧。这些问题难以在不对建筑本身进行深度改造的前提下解决,因此对旧建筑的改造往往需要采用拆为零件后重新组装的形式进行,拆为零件的过程中可对建筑零件分别进行检测并更换其中强度不达标或破损严重的零件,并在内部进行补强处理或改变建筑内部布局,从而适应建筑用途的变化。Considering that the old building itself has been seriously aged, its structural strength has seriously declined, and its appearance has become very dilapidated. These problems are difficult to solve without deep transformation of the building itself. Therefore, the transformation of old buildings often needs to be carried out in the form of dismantling into parts and reassembling. During the dismantling process, the building parts can be tested separately and the parts that do not meet the strength standards or are seriously damaged can be replaced. The internal reinforcement treatment can be carried out or the internal layout of the building can be changed to adapt to the changes in the use of the building.

但对于一些成排小截面建筑而言,这种改造方法并不适用。最大的问题在于,这种成排的小截面建筑,稳固的要求更高(因为如果不稳固的话,会撞击到同一排中相邻的建筑),对刚度的要求高,需要用到大量诸如剪力墙的高刚度构件,且往往会选择把相邻的几个建筑连为一体。同时由于横截面小,高刚度构件在建筑结构中的比例高,这些高刚度构件不能拆开。However, this renovation method is not applicable to some rows of small-section buildings. The biggest problem is that such rows of small-section buildings have higher requirements for stability (because if they are unstable, they will hit the adjacent buildings in the same row), and high requirements for rigidity. A large number of high-rigidity components such as shear walls are required, and several adjacent buildings are often connected together. At the same time, due to the small cross-section, the proportion of high-rigidity components in the building structure is high, and these high-rigidity components cannot be disassembled.

且即使旧建筑本身强度在现有标准下是达标的,对其进行改造也存在诸多困难。由于转换建筑的用途势必涉及到建筑布局的大改,不可避免地要涉及到对建筑受力构件的破拆。成排小截面建筑多为储罐之类的密闭建筑,改造成其他用途的话,就需要在上面额外开很多门窗洞。这些门窗洞严重破坏了建筑原有的受力体系,使其安全性不能满足要求。其中受影响最大的是建筑抗水平荷载(侧向力)的承载能力(因为这种建筑的抗竖向荷载的承载能力往往严重过剩)。Even if the strength of the old building itself meets the existing standards, there are still many difficulties in renovating it. Since the conversion of the use of the building will inevitably involve a major change in the building layout, it will inevitably involve the demolition of the building's load-bearing components. Rows of small-section buildings are mostly closed buildings such as storage tanks. If they are converted for other purposes, they will need to open many additional door and window holes on them. These door and window holes seriously damage the original force-bearing system of the building, making its safety unable to meet the requirements. The most affected is the building's bearing capacity to resist horizontal loads (lateral forces) (because the bearing capacity of such buildings to resist vertical loads is often seriously excessive).

更为致命的是,这些小截面建筑本身是互不连通的,用来储存物资没有问题,但是如果改造为内部住人的建筑的话,这样相互独立的房间影响正常使用(例如,想要到达相邻的房间,需要先下楼,然后上楼)。小截面建筑本身内部空间比较紧张,打通建筑并在内部设置连廊的话会进一步加重空间紧张的情况,并使允许的最大建筑单间的尺寸上限砍半(本来小截面建筑可以使整个建筑平面都作为一个单间使用的,但如果有设置建筑内部的连廊的话,这样的单间会挡在连廊上无法绕开,无法在不穿过这个单间的情况下到达其他的房间)。What is even more fatal is that these small-section buildings are not interconnected. They can be used to store supplies, but if they are converted into buildings for living, the independent rooms will affect normal use (for example, to reach the adjacent room, you need to go downstairs first and then go upstairs). The internal space of small-section buildings is relatively tight. If the buildings are connected and corridors are set up inside, the space shortage will be further aggravated and the maximum size of a single room in the building will be cut in half (originally, small-section buildings can use the entire building plane as a single room, but if corridors are set up inside the building, such a single room will be blocked by the corridor and cannot be bypassed, and it is impossible to reach other rooms without passing through this single room).

以本发明涉及的北京怀柔科学城北区金隅兴发科技园项目为例,该项目所在地为兴发水泥厂,兴建于90年代初,为北京的城建贡献了大量的建材,是一处重要的工业遗址。因此,该处的建筑需要在保留外形的情况下改造为附近北京雁栖湖应用数学研究院的研究设施。其中的大量水泥筒仓需要改造为专家住宅楼。这些水泥筒仓成排设置,每个水泥筒仓均为钢筋混凝土圆筒,单个筒仓的面积不足以满足一户要求,需要连通起来,同时改造过程中需要在水泥筒仓上大量开门窗洞而使其抗水平荷载的承载能力不达标。Take the Jinyu Xingfa Science Park project in the northern area of Beijing Huairou Science City as an example. The project site is the Xingfa Cement Factory, which was built in the early 1990s and contributed a large amount of building materials to Beijing's urban construction. It is an important industrial heritage site. Therefore, the buildings there need to be transformed into research facilities of the nearby Beijing Yanqi Lake Institute of Applied Mathematics while retaining their appearance. A large number of cement silos need to be transformed into residential buildings for experts. These cement silos are arranged in rows, and each cement silo is a reinforced concrete cylinder. The area of a single silo is not enough to meet the requirements of one household and needs to be connected. At the same time, during the transformation process, a large number of door and window holes need to be opened on the cement silo, which makes its bearing capacity against horizontal loads not up to standard.

发明内容Summary of the invention

本发明提供一种用于成排小截面建筑改建的抗侧向力附加连廊。The invention provides an additional corridor for resisting lateral force used for reconstruction of rows of small-section buildings.

解决的技术问题是:成排小截面建筑改建过程中,由于开门窗洞而导致其抗水平荷载的承载能力不达标,同时建筑的连通存在困难。The technical problem to be solved is: during the reconstruction of a row of small-section buildings, their bearing capacity for horizontal loads does not meet the standards due to the opening of door and window openings, and there are difficulties in connecting the buildings.

为解决上述技术问题,本发明采用如下技术方案:一种用于成排小截面建筑改建的抗侧向力附加连廊,用于在不破坏小截面建筑之间的连接结构并减少开洞数量的前提下,使成排小截面建筑连通,所述小截面建筑为横截面面积无法满足一户人居住需求的旧建筑,所述附加连廊包括横截面长边垂直于旧建筑的排列方向的板状复合柱、将板状复合柱连为一体的框架梁、以及自板状复合柱向外悬挑的挑廊;In order to solve the above technical problems, the present invention adopts the following technical solutions: an additional corridor for resisting lateral force for reconstruction of rows of small-section buildings, which is used to connect rows of small-section buildings without destroying the connection structure between the small-section buildings and reducing the number of openings. The small-section buildings are old buildings whose cross-sectional area cannot meet the living needs of one household. The additional corridor includes a plate-like composite column whose long side of the cross section is perpendicular to the arrangement direction of the old building, a frame beam connecting the plate-like composite columns as a whole, and a cantilevered corridor cantilevered outward from the plate-like composite columns;

每个旧建筑中的各板状复合柱呈矩阵状均匀分布并分别与旧建筑的承重结构固定连接,板状复合柱为由先施工的先期无干涉柱以及在旧建筑外墙上的施工完成后施工的后期抗扭转柱连为一体形成的钢筋混凝土柱,先期无干涉柱设置在旧建筑外墙中或旧建筑内,后期抗扭转柱设置在旧建筑外墙中或旧建筑外;The plate-shaped composite columns in each old building are evenly distributed in a matrix and are respectively fixedly connected to the load-bearing structure of the old building. The plate-shaped composite columns are reinforced concrete columns formed by connecting the pre-constructed non-interference columns and the post-constructed torsion-resistant columns after the construction on the outer wall of the old building is completed. The pre-constructed non-interference columns are arranged in the outer wall of the old building or inside the old building, and the post-construction torsion-resistant columns are arranged in the outer wall of the old building or outside the old building.

所述框架梁在相邻的先期无干涉柱之间设置上下多层,并与先期无干涉柱固定连接为立体梁柱网格,所述立体梁柱网格将旧建筑分组连为一体,每组旧建筑记作一个建筑组;The frame beams are arranged in multiple layers between adjacent pre-interference columns and fixedly connected with the pre-interference columns to form a three-dimensional beam-column grid. The three-dimensional beam-column grid groups the old buildings together, and each group of old buildings is recorded as a building group.

所述挑廊自旧建筑一侧的板状复合柱向外悬挑,各旧建筑靠近挑廊的一侧分别开设有通入挑廊的门,挑廊沿整排旧建筑排布并连通整排旧建筑;The cantilevered corridor is cantilevered outward from the plate-like composite column on one side of the old building, and a door leading to the cantilevered corridor is respectively opened on the side of each old building close to the cantilevered corridor. The cantilevered corridor is arranged along the entire row of old buildings and connects the entire row of old buildings;

所述建筑组以开设在框架梁和挑廊上的防超长缝为分界线,挑廊的每个分段的长度以及建筑组在旧建筑的排列方向上的长度均不超长。The building group is divided by the anti-excess length joints opened on the frame beams and the cantilever corridors, and the length of each segment of the cantilever corridor and the length of the building group in the arrangement direction of the old buildings are not excessive.

进一步,每个旧建筑的板状复合柱中,四角位置的板状复合柱中的先期无干涉柱与旧建筑的承重墙融合。Furthermore, among the plate-like composite columns of each old building, the pre-interference-free columns among the plate-like composite columns at the four corners are integrated with the load-bearing walls of the old building.

进一步,所述旧建筑底层完全拆除至少一层外墙,拆除掉的楼层中,相邻板状复合柱之间设置有玻璃幕墙,所述玻璃幕墙与板状复合柱围合成玻璃长廊;Furthermore, at least one layer of outer wall of the bottom floor of the old building is completely demolished, and in the demolished floor, a glass curtain wall is arranged between adjacent plate-like composite columns, and the glass curtain wall and the plate-like composite columns enclose a glass corridor;

所述板状复合柱在旧建筑两侧排列为两排,板状复合柱延伸到建筑外的部分作为建筑的装饰线条。The plate-like composite columns are arranged in two rows on both sides of the old building, and the parts of the plate-like composite columns extending outside the building serve as decorative lines of the building.

进一步,所述旧建筑的横截面呈圆筒状,每个旧建筑中设置六个板状复合柱,六个板状复合柱分两排设置在建筑两侧,同一排的三个板状复合柱中,位于中部的板状复合柱自建筑内水平向外延伸,且伸出建筑外的长度小于另外两个。Furthermore, the cross-section of the old building is cylindrical, and six plate-like composite columns are arranged in each old building. The six plate-like composite columns are arranged in two rows on both sides of the building. Among the three plate-like composite columns in the same row, the plate-like composite column located in the middle extends horizontally outward from the building, and the length extending outside the building is shorter than that of the other two.

进一步,在板状复合柱与旧建筑的承重墙融合位置,先期无干涉柱和后期抗扭转柱的主筋与剔凿后露出的承重墙主筋相互交叉。Furthermore, at the position where the plate-like composite column merges with the load-bearing wall of the old building, the main reinforcement of the early non-interference column and the later anti-torsion column intersects with the main reinforcement of the load-bearing wall exposed after chiseling.

进一步,所述先期无干涉柱与后期抗扭转柱均带有完整的钢筋笼,后期抗扭转柱的箍筋向外延伸锚入先期无干涉柱的混凝土中并与先期无干涉柱的主筋交叉,且后期抗扭转柱的混凝土向外延伸包裹住先期无干涉柱。Furthermore, both the early non-interference column and the later anti-torsion column are equipped with complete steel cages, the stirrups of the later anti-torsion column extend outward and are anchored in the concrete of the early non-interference column and cross the main reinforcement of the early non-interference column, and the concrete of the later anti-torsion column extends outward and wraps around the early non-interference column.

进一步,所述挑廊上的防超长缝内填充有纤维材料、橡胶或泡沫塑料,防超长缝表面通过装饰板封堵,所述装饰板与防超长缝一侧固定连接,与防超长缝另一侧无连接。Furthermore, the anti-extra-long seam on the cantilever corridor is filled with fiber material, rubber or foam plastic, and the surface of the anti-extra-long seam is blocked by a decorative panel. The decorative panel is fixedly connected to one side of the anti-extra-long seam and has no connection with the other side of the anti-extra-long seam.

本发明一种用于成排小截面建筑改建的抗侧向力附加连廊与现有技术相比,具有如下有益效果:Compared with the prior art, the lateral force-resistant additional corridor for reconstruction of rows of small-section buildings of the present invention has the following beneficial effects:

本发明中,通过在旧建筑的外墙中植入先期无干涉柱并与框架梁一同构成稳固的立体梁柱网格,在旧建筑外墙上施工完成后(不这样做的话,板状复合柱会对建筑外墙上的施工造成严重干涉)把先期无干涉柱水平向外扩大形成板状复合柱,板状复合柱相当于厚度加大且箍筋加密的剪力墙,极大增强了旧建筑对侧向力的承载能力,同时还在外形上起到类似装饰线条的装饰效果;In the present invention, by implanting pre-interference-free columns in the outer wall of the old building and forming a stable three-dimensional beam-column grid together with the frame beams, after the construction on the outer wall of the old building is completed (if not, the plate-shaped composite columns will cause serious interference to the construction on the outer wall of the building), the pre-interference-free columns are horizontally expanded outward to form plate-shaped composite columns. The plate-shaped composite columns are equivalent to shear walls with increased thickness and denser stirrups, which greatly enhances the bearing capacity of the old building against lateral forces, and also has a decorative effect similar to decorative lines in appearance;

同时,板状复合柱与框架梁一同构成长条状的立体梁柱网格,且板状复合柱一部分是位于建筑外的,可以方便地在板状复合柱上安装挑廊,外挑在板状复合柱上的挑廊,不靠旧建筑承载且与旧建筑无任何交叉,从而在无需破坏旧建筑之间的连接结构、减少开洞数量(通向挑廊的洞可以通风采光,从而减少通风采光所用的洞的数量)且不占用旧建筑内部空间的前提下将各旧建筑连通。At the same time, the plate-like composite columns and the frame beams together form a long three-dimensional beam-column grid, and a part of the plate-like composite columns is located outside the building, so it is convenient to install a cantilevered corridor on the plate-like composite columns. The cantilevered corridor on the plate-like composite columns does not rely on the old buildings for support and has no intersection with the old buildings. The old buildings can be connected without destroying the connection structure between the old buildings, reducing the number of openings (the holes leading to the cantilevered corridors can be ventilated and lit, thereby reducing the number of holes used for ventilation and lighting) and without occupying the internal space of the old buildings.

附图说明BRIEF DESCRIPTION OF THE DRAWINGS

图1为拆改后建筑的平面图;Figure 1 is a plan view of the building after demolition and modification;

图2为先期无干涉柱与后期抗扭转柱的连接关系示意图;FIG2 is a schematic diagram showing the connection relationship between the early non-interference column and the later anti-torsion column;

图中,1-旧建筑,2-板状复合柱,21-先期无干涉柱,22-后期抗扭转柱,3-框架梁,4-挑廊,5-防超长缝。In the figure, 1-old building, 2-plate-like composite column, 21-early non-interference column, 22-later torsion-resistant column, 3-frame beam, 4-cantilevered corridor, 5-anti-excessive long seam.

具体实施方式DETAILED DESCRIPTION

以本发明涉及的北京怀柔科学城北区金隅兴发科技园项目的水泥筒仓为例,如图1所示,一种用于成排小截面建筑改建的抗侧向力附加连廊,用于在不破坏小截面建筑之间的连接结构并减少开洞数量的前提下,使成排小截面建筑连通,小截面建筑为横截面面积无法满足一户人居住需求(一般80平米以下)的旧建筑1(如果旧建筑1横截面足够大的话,则相互之间连通的需求就小了),附加连廊包括横截面长边垂直于旧建筑1的排列方向的板状复合柱2、将板状复合柱2连为一体的框架梁3、以及自板状复合柱2向外悬挑的挑廊4;Taking the cement silo of the Jinyuxingfa Science Park project in the northern area of Beijing Huairou Science City involved in the present invention as an example, as shown in FIG1 , an additional corridor for resisting lateral force used for the reconstruction of a row of small-section buildings is used to connect the rows of small-section buildings without destroying the connection structure between the small-section buildings and reducing the number of openings. The small-section building is an old building 1 whose cross-sectional area cannot meet the living needs of one household (generally less than 80 square meters) (if the cross-sectional area of the old building 1 is large enough, the need for mutual connection is small), and the additional corridor includes a plate-like composite column 2 whose long side of the cross-section is perpendicular to the arrangement direction of the old building 1, a frame beam 3 connecting the plate-like composite column 2 as a whole, and a cantilevered corridor 4 cantilevered outward from the plate-like composite column 2;

这里的板状复合柱2不必延伸到旧建筑1的顶部,只需满足强度要求且能触及所有需要连廊的楼层即可。注意这里的挑廊4是常见的那种透明且带有可打开的窗户的玻璃长廊,并靠从板状复合柱2悬挑的钢梁承重。旧建筑1面向挑廊4的一侧设置门窗洞,并藉由这里的门窗与挑廊4连通且通风采光,从而减少通风采光所需的洞的数量(如果是设置在建筑内部的走廊,则开的洞完全无法起到通风采光作用)。The plate-like composite columns 2 here do not need to extend to the top of the old building 1, but only need to meet the strength requirements and reach all floors that need corridors. Note that the cantilevered corridor 4 here is a common transparent glass corridor with openable windows, and is supported by steel beams cantilevered from the plate-like composite columns 2. Door and window holes are set on the side of the old building 1 facing the cantilevered corridor 4, and the doors and windows here are connected to the cantilevered corridor 4 for ventilation and lighting, thereby reducing the number of holes required for ventilation and lighting (if it is set in the corridor inside the building, the holes opened will not be able to play a role in ventilation and lighting).

注意,本实施例中的挑廊4可以在不破坏旧建筑1之间原有的连接结构的情况下完成旧建筑1的连通,但由于引入了大量的新连接结构,即使破坏旧建筑1之间原有的连接结构也不会造成负面影响。后续装修过程中旧建筑1之间原有的连接结构就有部分被拆除。Note that the cantilevered corridor 4 in this embodiment can connect the old buildings 1 without destroying the original connection structure between the old buildings 1, but since a large number of new connection structures are introduced, even if the original connection structure between the old buildings 1 is destroyed, it will not cause negative impact. In the subsequent renovation process, part of the original connection structure between the old buildings 1 is removed.

每个旧建筑1中的各板状复合柱2呈矩阵状均匀分布并分别与旧建筑1的承重结构固定连接,板状复合柱2为由先施工的先期无干涉柱21以及在旧建筑1外墙上的施工完成后施工的后期抗扭转柱22连为一体形成的钢筋混凝土柱,先期无干涉柱21设置在旧建筑1外墙中或旧建筑1内,后期抗扭转柱22设置在旧建筑1外墙中或旧建筑1外;The plate-shaped composite columns 2 in each old building 1 are evenly distributed in a matrix and are respectively fixedly connected to the load-bearing structure of the old building 1. The plate-shaped composite columns 2 are reinforced concrete columns formed by connecting the pre-constructed non-interference columns 21 and the post-constructed torsion-resistant columns 22 after the construction on the outer wall of the old building 1 is completed. The pre-constructed non-interference columns 21 are arranged in the outer wall of the old building 1 or inside the old building 1, and the post-constructed torsion-resistant columns 22 are arranged in the outer wall of the old building 1 or outside the old building 1.

这里之所以板状复合柱2要分两部分进行施工,是因为板状复合柱2从旧建筑1的外墙向外延伸一大截,与旧建筑1外墙上的脚手架存在严重干涉。两部分合并后形成的结构类似于加厚且内部箍筋加密的剪力墙,且横截面的长边位于扭转方向上。The reason why the plate-shaped composite column 2 is constructed in two parts is that the plate-shaped composite column 2 extends a long distance outward from the outer wall of the old building 1, and there is a serious interference with the scaffolding on the outer wall of the old building 1. The structure formed after the two parts are combined is similar to a shear wall with thickened internal stirrups, and the long side of the cross section is located in the torsion direction.

框架梁3在相邻的先期无干涉柱21之间设置上下多层,并与先期无干涉柱21固定连接为立体梁柱网格,立体梁柱网格将旧建筑1分组连为一体,每组旧建筑1记作一个建筑组;The frame beams 3 are arranged in multiple layers between adjacent pre-interference-free columns 21, and are fixedly connected with the pre-interference-free columns 21 to form a three-dimensional beam-column grid. The three-dimensional beam-column grid groups the old buildings 1 into one, and each group of old buildings 1 is recorded as a building group.

挑廊4自旧建筑1一侧的板状复合柱2向外悬挑,各旧建筑1靠近挑廊4的一侧分别开设有通入挑廊4的门,挑廊4沿整排旧建筑1排布并连通整排旧建筑1;The cantilevered corridor 4 is cantilevered outward from the plate-like composite column 2 on one side of the old building 1. A door leading to the cantilevered corridor 4 is respectively opened on one side of each old building 1 close to the cantilevered corridor 4. The cantilevered corridor 4 is arranged along the entire row of old buildings 1 and connects the entire row of old buildings 1.

本实施例中的挑廊4一开始不做装修,而是一个开放的外挂施工平台,后续建筑内部施工完成后再包上玻璃幕墙,形成透明的密封走廊。The cantilever corridor 4 in this embodiment is not decorated at the beginning, but is an open external construction platform. After the subsequent internal construction of the building is completed, it is covered with a glass curtain wall to form a transparent sealed corridor.

建筑组以开设在框架梁3和挑廊4上的防超长缝5为分界线,挑廊4的每个分段的长度以及建筑组在旧建筑1的排列方向上的长度均不超长。The construction group is divided by the anti-excess-length seam 5 opened on the frame beam 3 and the cantilever corridor 4. The length of each segment of the cantilever corridor 4 and the length of the construction group in the arrangement direction of the old buildings 1 are not excessive.

这里同一个建筑组中的各旧建筑1可以在相切的位置连为一体,如果本来就是连为一体的,则防超长缝5设置在没有连为一体的位置。建筑超长与否是一个明确的概念,详见相应的设计标准,通常情况下超过50米即视为超长。Here, the old buildings 1 in the same building group can be connected at the tangent position. If they are originally connected, the anti-excessive length seam 5 is set at the position where they are not connected. Whether a building is too long is a clear concept. Please refer to the corresponding design standards for details. Generally, it is considered to be too long if it exceeds 50 meters.

每个旧建筑1的板状复合柱2中,四角位置的板状复合柱2中的先期无干涉柱21与旧建筑1的承重墙融合。In the plate-shaped composite columns 2 of each old building 1 , the pre-interference-free columns 21 in the plate-shaped composite columns 2 at the four corners are integrated with the load-bearing walls of the old building 1 .

先期无干涉柱21是先施工的,需要承载框架梁3、旧建筑1中新增的楼板等结构,因此需要确保它与旧建筑1连为一体,并与其中的框架梁3构成一个完整的网格。本实施例中的框架梁3上还设置了一些新增的楼板。The early non-interference column 21 is constructed first and needs to bear the frame beam 3, the newly added floor slabs in the old building 1 and other structures, so it is necessary to ensure that it is connected to the old building 1 as a whole and forms a complete grid with the frame beam 3 therein. Some newly added floor slabs are also arranged on the frame beam 3 in this embodiment.

旧建筑1底层完全拆除至少一层外墙,拆除掉的楼层中,相邻板状复合柱2之间设置有玻璃幕墙,玻璃幕墙与板状复合柱2围合成玻璃长廊;At least one layer of exterior wall of the ground floor of the old building 1 is completely demolished, and in the demolished floor, a glass curtain wall is arranged between adjacent plate-shaped composite columns 2, and the glass curtain wall and the plate-shaped composite columns 2 enclose a glass corridor;

这样的话整排建筑底层完全打通,形成一个又长又宽阔的室内走廊,从而在挑廊4之外提供了一个从地面就可以通向建筑不同位置的走廊。In this way, the ground floor of the entire row of buildings is completely connected to form a long and wide indoor corridor, thereby providing a corridor leading to different locations of the building from the ground outside the cantilevered corridor 4.

板状复合柱2在旧建筑1两侧排列为两排,板状复合柱2延伸到建筑外的部分作为建筑的装饰线条。The plate-like composite columns 2 are arranged in two rows on both sides of the old building 1, and the portions of the plate-like composite columns 2 extending outside the building serve as decorative lines of the building.

建筑外墙上有时候会设置一些竖向的铝型材装饰线条或者是外挑柱装饰线条,这里调整板状复合柱2向外伸出的长度,使板状复合柱2外挑的面按特定规律分布,达到一种类似装饰线条的效果,避免这里新增的结构影响建筑外形。Sometimes some vertical aluminum profile decorative lines or cantilever column decorative lines are set on the exterior walls of buildings. Here, the length of the plate-like composite column 2 extending outward is adjusted so that the cantilevered surface of the plate-like composite column 2 is distributed according to a specific pattern, achieving an effect similar to decorative lines, thereby avoiding the newly added structure from affecting the appearance of the building.

本实施例中,旧建筑1的横截面呈圆筒状,每个旧建筑1中设置六个板状复合柱2,六个板状复合柱2分两排设置在建筑两侧,同一排的三个板状复合柱2中,位于中部的板状复合柱2自建筑内水平向外延伸,且伸出建筑外的长度小于另外两个。这种排布方式使得板状复合柱2外伸的立面错落分布,同时又使得先期无干涉柱21尽可能多地与旧建筑1融合。In this embodiment, the cross section of the old building 1 is cylindrical, and six plate-like composite columns 2 are arranged in each old building 1. The six plate-like composite columns 2 are arranged in two rows on both sides of the building. Among the three plate-like composite columns 2 in the same row, the plate-like composite column 2 located in the middle extends horizontally outward from the building, and the length extending out of the building is less than the other two. This arrangement makes the facades of the plate-like composite columns 2 protruding outwards staggered, and at the same time makes the pre-interference-free columns 21 merge with the old building 1 as much as possible.

在板状复合柱2与旧建筑1的承重墙融合位置,先期无干涉柱21和后期抗扭转柱22的主筋与剔凿后露出的承重墙主筋相互交叉。从而满足连接要求。At the fusion position of the plate-like composite column 2 and the load-bearing wall of the old building 1, the main reinforcement of the early non-interference column 21 and the later anti-torsion column 22 crosses with the main reinforcement of the load-bearing wall exposed after chiseling, thereby meeting the connection requirements.

如图2所示,先期无干涉柱21与后期抗扭转柱22均带有完整的钢筋笼,后期抗扭转柱22的箍筋向外延伸锚入先期无干涉柱21的混凝土中并与先期无干涉柱21的主筋交叉,且后期抗扭转柱22的混凝土向外延伸包裹住先期无干涉柱21。As shown in Figure 2, both the early non-interference column 21 and the later anti-torsion column 22 are equipped with complete steel cages. The stirrups of the later anti-torsion column 22 extend outward and are anchored in the concrete of the early non-interference column 21 and cross the main reinforcement of the early non-interference column 21. The concrete of the later anti-torsion column 22 extends outward to wrap around the early non-interference column 21.

这样做是为了确保能够先后施工的前提下,避免两个并排的柱裂开。注意在板状复合柱2施工过程中,如果遇到与旧建筑1承重墙相干涉的部位,剔凿过程中不可打断钢筋。This is done to ensure that the two parallel columns can be constructed one after the other without breaking. Note that during the construction of the plate-shaped composite column 2, if there is a part interfering with the load-bearing wall of the old building 1, the steel bars must not be broken during the chiseling process.

本实施例中,后期抗扭转柱22有三个环状的箍筋,以及若干个锚入先期无干涉柱21的混凝土中并与先期无干涉柱21的主筋交叉的箍筋。环状的箍筋中有一个包住整个先期无干涉柱21。In this embodiment, the later anti-torsion column 22 has three annular stirrups and a plurality of stirrups anchored in the concrete of the earlier non-interference column 21 and crossing the main bars of the earlier non-interference column 21. One of the annular stirrups encloses the entire earlier non-interference column 21.

挑廊4上的防超长缝5内填充有纤维材料、橡胶或泡沫塑料,防超长缝5表面通过装饰板封堵,装饰板与防超长缝5一侧固定连接,与防超长缝5另一侧无连接。The anti-extra-long seam 5 on the cantilever 4 is filled with fiber material, rubber or foam plastic, and the surface of the anti-extra-long seam 5 is blocked by a decorative plate. The decorative plate is fixedly connected to one side of the anti-extra-long seam 5 and has no connection with the other side of the anti-extra-long seam 5.

这里防超长缝5是为了避免建筑超长,但在挑廊4位置又容易导致物品掉落,因此这里需要在不传力的前提下把缝堵上。此外,挑廊4还延伸到相邻旧建筑1之间,把其中的空隙填充,扩大活动面积且省去靠近建筑一侧的玻璃。The anti-overlength gap 5 is to prevent the building from being too long, but it is easy to cause items to fall at the location of the cantilevered corridor 4, so it is necessary to block the gap without transmitting force. In addition, the cantilevered corridor 4 also extends between the adjacent old buildings 1, filling the gap therein, expanding the activity area and eliminating the glass near the side of the building.

以上所述的实施例仅仅是对本发明的优选实施方式进行描述,并非对本发明的范围进行限定,在不脱离本发明设计精神的前提下,本领域普通技术人员对本发明的技术方案作出的各种变形和改进,均应落入本发明权利要求书确定的保护范围内。The embodiments described above are merely descriptions of preferred implementation modes of the present invention and are not intended to limit the scope of the present invention. Without departing from the design spirit of the present invention, various modifications and improvements made to the technical solutions of the present invention by ordinary technicians in this field should all fall within the protection scope determined by the claims of the present invention.

Claims (7)

1.一种用于成排小截面建筑改建的抗侧向力附加连廊,用于在不破坏小截面建筑之间的连接结构并减少开洞数量的前提下,使成排小截面建筑连通,所述小截面建筑为横截面面积无法满足一户人居住需求的旧建筑(1),其特征在于:所述附加连廊包括横截面长边垂直于旧建筑(1)的排列方向的板状复合柱(2)、将板状复合柱(2)连为一体的框架梁(3)、以及自板状复合柱(2)向外悬挑的挑廊(4);1. An additional corridor for resisting lateral forces used for reconstruction of a row of small-section buildings, used to connect the rows of small-section buildings without destroying the connection structure between the small-section buildings and reducing the number of openings, wherein the small-section buildings are old buildings (1) whose cross-sectional area cannot meet the living needs of a household, characterized in that: the additional corridor comprises a plate-like composite column (2) whose long side of the cross section is perpendicular to the arrangement direction of the old building (1), a frame beam (3) connecting the plate-like composite column (2) as a whole, and a cantilevered corridor (4) cantilevered outward from the plate-like composite column (2); 每个旧建筑(1)中的各板状复合柱(2)呈矩阵状均匀分布并分别与旧建筑(1)的承重结构固定连接,板状复合柱(2)为由先施工的先期无干涉柱(21)以及在旧建筑(1)外墙上的施工完成后施工的后期抗扭转柱(22)连为一体形成的钢筋混凝土柱,先期无干涉柱(21)设置在旧建筑(1)外墙中或旧建筑(1)内,后期抗扭转柱(22)设置在旧建筑(1)外墙中或旧建筑(1)外;The plate-shaped composite columns (2) in each old building (1) are evenly distributed in a matrix and are respectively fixedly connected to the load-bearing structure of the old building (1). The plate-shaped composite columns (2) are reinforced concrete columns formed by connecting the pre-constructed non-interference columns (21) and the post-constructed torsion-resistant columns (22) after the construction on the outer wall of the old building (1) is completed. The pre-constructed non-interference columns (21) are arranged in the outer wall of the old building (1) or inside the old building (1), and the post-constructed torsion-resistant columns (22) are arranged in the outer wall of the old building (1) or outside the old building (1). 所述框架梁(3)在相邻的先期无干涉柱(21)之间设置上下多层,并与先期无干涉柱(21)固定连接为立体梁柱网格,所述立体梁柱网格将旧建筑(1)分组连为一体,每组旧建筑(1)记作一个建筑组;The frame beams (3) are arranged in multiple layers between adjacent pre-interference-free columns (21) and are fixedly connected to the pre-interference-free columns (21) to form a three-dimensional beam-column grid. The three-dimensional beam-column grid groups the old buildings (1) into a whole, and each group of old buildings (1) is recorded as a building group. 所述挑廊(4)自旧建筑(1)一侧的板状复合柱(2)向外悬挑,各旧建筑(1)靠近挑廊(4)的一侧分别开设有通入挑廊(4)的门,挑廊(4)沿整排旧建筑(1)排布并连通整排旧建筑(1);The cantilevered corridor (4) is cantilevered outward from the plate-shaped composite column (2) on one side of the old building (1), and a door leading to the cantilevered corridor (4) is respectively opened on the side of each old building (1) close to the cantilevered corridor (4). The cantilevered corridor (4) is arranged along the entire row of old buildings (1) and connects the entire row of old buildings (1); 所述建筑组以开设在框架梁(3)和挑廊(4)上的防超长缝(5)为分界线,挑廊(4)的每个分段的长度以及建筑组在旧建筑(1)的排列方向上的长度均不超长。The building group is divided by an anti-excessive length joint (5) opened on the frame beam (3) and the cantilever corridor (4), and the length of each segment of the cantilever corridor (4) and the length of the building group in the arrangement direction of the old building (1) are not excessive. 2.根据权利要求1所述的一种用于成排小截面建筑改建的抗侧向力附加连廊,其特征在于:每个旧建筑(1)的板状复合柱(2)中,四角位置的板状复合柱(2)中的先期无干涉柱(21)与旧建筑(1)的承重墙融合。2. According to claim 1, an additional corridor for resisting lateral forces for reconstruction of a row of small-section buildings is characterized in that: among the plate-like composite columns (2) of each old building (1), the pre-interference-free columns (21) in the plate-like composite columns (2) at the four corners are integrated with the load-bearing walls of the old building (1). 3.根据权利要求2所述的一种用于成排小截面建筑改建的抗侧向力附加连廊,其特征在于:所述旧建筑(1)底层完全拆除至少一层外墙,拆除掉的楼层中,相邻板状复合柱(2)之间设置有玻璃幕墙,所述玻璃幕墙与板状复合柱(2)围合成玻璃长廊;3. The lateral force-resistant additional corridor for reconstruction of a row of small-section buildings according to claim 2, characterized in that: at least one layer of exterior wall of the bottom floor of the old building (1) is completely demolished, and glass curtain walls are arranged between adjacent plate-like composite columns (2) in the demolished floors, and the glass curtain walls and the plate-like composite columns (2) enclose a glass corridor; 所述板状复合柱(2)在旧建筑(1)两侧排列为两排,板状复合柱(2)延伸到建筑外的部分作为建筑的装饰线条。The plate-like composite columns (2) are arranged in two rows on both sides of the old building (1), and the portions of the plate-like composite columns (2) extending outside the building serve as decorative lines of the building. 4.根据权利要求3所述的一种用于成排小截面建筑改建的抗侧向力附加连廊,其特征在于:所述旧建筑(1)的横截面呈圆筒状,每个旧建筑(1)中设置六个板状复合柱(2),六个板状复合柱(2)分两排设置在建筑两侧,同一排的三个板状复合柱(2)中,位于中部的板状复合柱(2)自建筑内水平向外延伸,且伸出建筑外的长度小于另外两个。4. The lateral force-resistant additional corridor for reconstruction of a row of small-section buildings according to claim 3 is characterized in that: the cross-section of the old building (1) is cylindrical, six plate-like composite columns (2) are arranged in each old building (1), and the six plate-like composite columns (2) are arranged in two rows on both sides of the building. Among the three plate-like composite columns (2) in the same row, the plate-like composite column (2) located in the middle extends horizontally outward from the building, and the length extending outside the building is shorter than that of the other two. 5.根据权利要求1所述的一种用于成排小截面建筑改建的抗侧向力附加连廊,其特征在于:在板状复合柱(2)与旧建筑(1)的承重墙融合位置,先期无干涉柱(21)和后期抗扭转柱(22)的主筋与剔凿后露出的承重墙主筋相互交叉。5. The lateral force-resistant additional corridor for reconstruction of a row of small-section buildings according to claim 1 is characterized in that: at the fusion position of the plate-like composite column (2) and the load-bearing wall of the old building (1), the main reinforcement of the early non-interference column (21) and the later anti-torsion column (22) crosses with the main reinforcement of the load-bearing wall exposed after chiseling. 6.根据权利要求1所述的一种用于成排小截面建筑改建的抗侧向力附加连廊,其特征在于:所述先期无干涉柱(21)与后期抗扭转柱(22)均带有完整的钢筋笼,后期抗扭转柱(22)的箍筋向外延伸锚入先期无干涉柱(21)的混凝土中并与先期无干涉柱(21)的主筋交叉,且后期抗扭转柱(22)的混凝土向外延伸包裹住先期无干涉柱(21)。6. According to claim 1, an additional corridor for resisting lateral forces for reconstruction of rows of small-section buildings is characterized in that: the early non-interference columns (21) and the later anti-torsion columns (22) are both provided with complete steel cages, the stirrups of the later anti-torsion columns (22) extend outwardly and are anchored in the concrete of the early non-interference columns (21) and cross the main bars of the early non-interference columns (21), and the concrete of the later anti-torsion columns (22) extends outwardly to wrap around the early non-interference columns (21). 7.根据权利要求1所述的一种用于成排小截面建筑改建的抗侧向力附加连廊,其特征在于:所述挑廊(4)上的防超长缝(5)内填充有纤维材料、橡胶或泡沫塑料,防超长缝(5)表面通过装饰板封堵,所述装饰板与防超长缝(5)一侧固定连接,与防超长缝(5)另一侧无连接。7. According to claim 1, an additional corridor for resisting lateral forces for reconstruction of a row of small-section buildings is characterized in that: the anti-extra-long seam (5) on the cantilevered corridor (4) is filled with fiber material, rubber or foam plastic, and the surface of the anti-extra-long seam (5) is blocked by a decorative plate, and the decorative plate is fixedly connected to one side of the anti-extra-long seam (5) and has no connection with the other side of the anti-extra-long seam (5).
CN202411049997.XA 2024-08-01 2024-08-01 A lateral force-resistant additional corridor for reconstruction of rows of small-section buildings Active CN118564106B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202411049997.XA CN118564106B (en) 2024-08-01 2024-08-01 A lateral force-resistant additional corridor for reconstruction of rows of small-section buildings

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202411049997.XA CN118564106B (en) 2024-08-01 2024-08-01 A lateral force-resistant additional corridor for reconstruction of rows of small-section buildings

Publications (2)

Publication Number Publication Date
CN118564106A true CN118564106A (en) 2024-08-30
CN118564106B CN118564106B (en) 2024-12-06

Family

ID=92466081

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202411049997.XA Active CN118564106B (en) 2024-08-01 2024-08-01 A lateral force-resistant additional corridor for reconstruction of rows of small-section buildings

Country Status (1)

Country Link
CN (1) CN118564106B (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101550768A (en) * 2008-03-31 2009-10-07 贵阳铝镁设计研究院 Improving method of belt porch
CN115613848A (en) * 2022-11-08 2023-01-17 长沙市规划设计院有限责任公司 A construction method for retaining the internal structure of the exterior wall for reinforcement and reconstruction
CN219931714U (en) * 2022-09-27 2023-10-31 北京京能建设集团有限公司 Frame structure of factory building
CN117868556A (en) * 2024-03-13 2024-04-12 北京建工四建工程建设有限公司 Building dismantling and modifying support system taking building as bearing member

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101550768A (en) * 2008-03-31 2009-10-07 贵阳铝镁设计研究院 Improving method of belt porch
CN219931714U (en) * 2022-09-27 2023-10-31 北京京能建设集团有限公司 Frame structure of factory building
CN115613848A (en) * 2022-11-08 2023-01-17 长沙市规划设计院有限责任公司 A construction method for retaining the internal structure of the exterior wall for reinforcement and reconstruction
CN117868556A (en) * 2024-03-13 2024-04-12 北京建工四建工程建设有限公司 Building dismantling and modifying support system taking building as bearing member

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
HPP ARCHITECTS等: ""金隅兴发科技园"", 《建筑实践》, 31 December 2023 (2023-12-31), pages 170 - 179 *

Also Published As

Publication number Publication date
CN118564106B (en) 2024-12-06

Similar Documents

Publication Publication Date Title
CN103437463B (en) Prefabricated light steel fireproof load-bearing combined wall structure
CN216276295U (en) Assembled lightweight steel-foam concrete load-bearing composite wall
CN103669905A (en) Lightweight composite prefabricated panel combined type house and building method thereof
CN204826308U (en) Structure assembly type structure is pieced together in advance to prefabricated shaped steel concrete shear force wall
CN105625566B (en) Assembly concrete orthogonal-diagonal lattice space lattice box structure tube-in-tube structure
CN118309177B (en) High-rise modular buildings and construction methods combining mega-frames and partitioned infill modules
CN106703197A (en) Longspan multilayer anti-seismic frame structure system and construction method thereof
CN116044002A (en) A box-type connection structure and construction method of connecting column and composite beam steel box under hanging
CN104712055A (en) Wooden building based on concrete frameworks and construction method of wooden building
CN105804232A (en) Space module building
CN111411693A (en) Assembly and pouring integrated shear wall structure building system
CN106245755B (en) Diagonal bracing reinforced steel frame-shear wall prefabricated large space residential system
CN207177329U (en) A kind of prefabricated hollow floor bracing means
CN113898093A (en) An assembled light steel-foam concrete load-bearing composite wall and its construction method
CN115478609A (en) Assembled cast-in-place concrete space box structure system
CN112942898B (en) Modularized integrally assembled building system, building module unit and connecting node
CN108411763B (en) Pre-assembled bridges and construction methods thereof
CN204804176U (en) Three -dimensional light steel frame structure composite wall panel of right angle type
CN203080733U (en) External built-mold and internal masonry building structure system
AU2023471228A1 (en) Integral structure of modular house, and assembly and on-site installation method for modular house
CN212453063U (en) Assembly and pouring integrated shear wall structure building system
CN118564106B (en) A lateral force-resistant additional corridor for reconstruction of rows of small-section buildings
CN205063175U (en) Three -dimensional light steel frame structure composite wall panel of angle type that slits
CN204804178U (en) Compound gable roof truss board of three -dimensional light steel frame structure
CN118601374A (en) A method for reconstructing rows of small-section buildings by making full use of old buildings

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant