CN118564106B - A lateral force-resistant additional corridor for reconstruction of rows of small-section buildings - Google Patents

A lateral force-resistant additional corridor for reconstruction of rows of small-section buildings Download PDF

Info

Publication number
CN118564106B
CN118564106B CN202411049997.XA CN202411049997A CN118564106B CN 118564106 B CN118564106 B CN 118564106B CN 202411049997 A CN202411049997 A CN 202411049997A CN 118564106 B CN118564106 B CN 118564106B
Authority
CN
China
Prior art keywords
building
old
plate
buildings
columns
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202411049997.XA
Other languages
Chinese (zh)
Other versions
CN118564106A (en
Inventor
赵凯
贺宝全
赵来柱
于海阔
刘立军
袁春娟
程杰
李海旭
花京春
李志�
姜世文
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Fourth Construction & Engineering Co ltd
Original Assignee
Beijing Fourth Construction & Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Fourth Construction & Engineering Co ltd filed Critical Beijing Fourth Construction & Engineering Co ltd
Priority to CN202411049997.XA priority Critical patent/CN118564106B/en
Publication of CN118564106A publication Critical patent/CN118564106A/en
Application granted granted Critical
Publication of CN118564106B publication Critical patent/CN118564106B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • E—FIXED CONSTRUCTIONS
    • E04—BUILDING
    • E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G23/00—Working measures on existing buildings
    • E04G23/02—Repairing, e.g. filling cracks; Restoring; Altering; Enlarging
    • E04G23/0266—Enlarging
    • E—FIXED CONSTRUCTIONS
    • E04—BUILDING
    • E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G23/00—Working measures on existing buildings
    • E04G23/02—Repairing, e.g. filling cracks; Restoring; Altering; Enlarging
    • E—FIXED CONSTRUCTIONS
    • E04—BUILDING
    • E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G23/00—Working measures on existing buildings
    • E04G23/02—Repairing, e.g. filling cracks; Restoring; Altering; Enlarging
    • E04G23/0218—Increasing or restoring the load-bearing capacity of building construction elements

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Chemical & Material Sciences (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Electrochemistry (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Working Measures On Existing Buildindgs (AREA)

Abstract

本发明涉及对现有建筑物的施工措施技术领域,公开了一种用于成排小截面建筑改建的抗侧向力附加连廊,本发明中,通过在旧建筑的外墙中植入先期无干涉柱并与框架梁一同构成稳固的立体梁柱网格,在旧建筑外墙上施工完成后把先期无干涉柱水平向外扩大形成板状复合柱,板状复合柱相当于厚度加大且箍筋加密的剪力墙,极大增强了旧建筑对侧向力的承载能力,同时还在外形上起到类似装饰线条的装饰效果;同时,板状复合柱与框架梁一同构成长条状的立体梁柱网格,且板状复合柱一部分是位于建筑外的,可以方便地在板状复合柱上安装挑廊,从而在无需破坏旧建筑之间的连接结构、减少开洞数量且不占用旧建筑内部空间的前提下将各旧建筑连通。

The invention relates to the technical field of construction measures for existing buildings, and discloses an additional corridor for resisting lateral force used for reconstruction of rows of small-section buildings. In the invention, by implanting pre-interference-free columns in the outer wall of the old building and forming a stable three-dimensional beam-column grid together with frame beams, after the construction on the outer wall of the old building is completed, the pre-interference-free columns are horizontally expanded outward to form plate-like composite columns. The plate-like composite columns are equivalent to shear walls with increased thickness and denser stirrups, which greatly enhance the bearing capacity of the old building to lateral force, and also play a decorative effect similar to decorative lines in appearance; at the same time, the plate-like composite columns and frame beams together form a long strip of three-dimensional beam-column grid, and a part of the plate-like composite columns is located outside the building, so that a cantilever corridor can be conveniently installed on the plate-like composite columns, thereby connecting the old buildings without destroying the connection structure between the old buildings, reducing the number of openings and not occupying the internal space of the old buildings.

Description

Lateral force resistant additional corridor for rebuilding row of small-section buildings
Technical Field
The invention relates to the technical field of construction measures of existing buildings, in particular to an additional corridor for reconstructing a row of small-section buildings.
Background
The vast majority of old buildings are left empty for new building construction after being dismantled, but some old buildings with special significance exist, and the purposes of the buildings need to be changed on the premise of keeping the original appearance of the old buildings, so that the deep reconstruction of the buildings is needed.
Considering that the old building itself has undergone serious aging, its structural strength is severely reduced, and its appearance has been very worn out. These problems are difficult to solve without deep modification of the building itself, so modification of the old building is often required to be performed in a form of reassembling after disassembling the building into parts, and in the process of disassembling the building parts, the building parts can be detected and replaced respectively, parts with unqualified strength or serious damage can be replaced, reinforcement treatment can be performed inside or the internal layout of the building can be changed, so that the building is adapted to the change of the use of the building.
But for some row small section buildings this retrofitting method is not applicable. The biggest problem is that such small section buildings in rows are more demanding in terms of stability (because they strike adjacent buildings in the same row if not stable), require high rigidity, require a large number of high rigidity elements such as shear walls, and often choose to integrate adjacent ones of the buildings. At the same time, due to the small cross section, the proportion of high rigidity components in the building structure is high, and the high rigidity components cannot be disassembled.
And even if the strength of the old building is up to standard under the existing standard, a plurality of difficulties exist in modifying the old building. As the use of converting buildings tends to involve major changes in building layout, it is inevitable to involve the breaking of the building stressing elements. Most of the row small-section buildings are closed buildings such as storage tanks, and when the row small-section buildings are modified for other purposes, a plurality of door and window holes are additionally formed in the row small-section buildings. The door and window holes seriously damage the original stress system of the building, so that the safety of the building cannot meet the requirements. The most affected of these is the bearing capacity of the building against horizontal loads (lateral forces) (since the bearing capacity of such buildings against vertical loads tends to be severely superfluous).
Even more deadly, these small section buildings are themselves non-communicating with each other for storing supplies without problems, but if retrofitted to an inside living building, such mutually independent rooms interfere with normal use (e.g., want to reach adjacent rooms, require going down and then up). The space inside the small-section building is relatively tense, the situation of space tense is further aggravated when the building is opened and the corridor is arranged inside, and the upper limit of the allowed maximum building unit is cut into half (the whole building plane can be used as one unit by the original small-section building, but if the corridor is arranged inside the building, the unit can not be bypassed on the corridor, and other rooms can not be reached without passing through the unit).
Taking Beijing Huaiyou science urban and north area Jin Yuxing of the invention as an example, the project is in Xingfu cement factory, which is established in the early 90 s, and contributes a large amount of building materials to Beijing urban construction, which is an important industrial site. Therefore, the construction in this place needs to be modified to a research facility of the applied mathematics institute of Beijing Yan perch lake nearby while retaining the external shape. A large number of cement silos therein need to be modified into expert residential buildings. The cement silos are arranged in rows, each cement silo is a reinforced concrete cylinder, the area of each cement silo is insufficient to meet the requirement of one user, the cement silos are required to be communicated, and a large number of door and window holes are required to be opened on the cement silo in the transformation process, so that the bearing capacity of the cement silo against water load is not up to standard.
Disclosure of Invention
The invention provides an additional corridor for rebuilding a row of small-section buildings, which resists lateral force.
The technical problem to be solved is that in the reconstruction process of the row of small-section buildings, the bearing capacity of the horizontal load is not up to standard due to the opening of the doors and the windows, and meanwhile, the communication of the buildings is difficult.
The invention adopts the following technical scheme that the lateral force resistant additional corridor for rebuilding the row of small-section buildings is used for communicating the row of small-section buildings on the premise of not damaging the connecting structure among the small-section buildings and reducing the number of openings, the small-section buildings are old buildings with cross-section areas which cannot meet the living needs of a user, and the additional corridor comprises plate-shaped composite columns with the long sides of the cross sections perpendicular to the arrangement direction of the old buildings, frame beams for connecting the plate-shaped composite columns into a whole and a cantilever corridor which is cantilevered outwards from the plate-shaped composite columns;
The plate-shaped composite columns in each old building are uniformly distributed in a matrix shape and are respectively fixedly connected with the bearing structures of the old building, the plate-shaped composite columns are reinforced concrete columns formed by connecting earlier-stage noninterference columns constructed in advance and later-stage anti-torsion columns constructed after construction on the outer wall of the old building is completed, the earlier-stage noninterference columns are arranged in the outer wall of the old building or in the old building, and the later-stage anti-torsion columns are arranged in the outer wall of the old building or outside the old building;
The frame beams are arranged in an upper layer and a lower layer between adjacent pre-interference-free columns, and are fixedly connected with the pre-interference-free columns to form a three-dimensional beam column grid, the three-dimensional beam column grid groups old buildings into a whole, and each group of old buildings is marked as a building group;
the picking corridor is outwards overhanging from a platy composite column on one side of the old building, a door which is communicated with the picking corridor is respectively arranged on one side of each old building close to the picking corridor, and the picking corridor is distributed along the whole row of old buildings and communicated with the whole row of old buildings;
the building group takes an anti-overlength seam formed on the frame beam and the picking gallery as a boundary, and the length of each section of the picking gallery and the length of the building group in the arrangement direction of the old building are not overlength.
Further, in the plate-shaped composite columns of each old building, the earlier interference-free columns in the plate-shaped composite columns at the four corners are fused with the load-bearing walls of the old building.
Further, at least one layer of outer wall is completely removed from the bottom layer of the old building, and glass curtain walls are arranged between adjacent plate-shaped composite columns in the removed floor, and the glass curtain walls and the plate-shaped composite columns enclose a glass gallery;
the plate-shaped composite columns are arranged in two rows on two sides of the old building, and the part of the plate-shaped composite columns extending out of the building is used as a decorative line of the building.
Further, the cross section of old building is cylindric, sets up six platy compound posts in every old building, and six platy compound posts divide two to set up in the building both sides, and among three platy compound posts of same row, the platy compound post that is located the middle part extends outward from building interior level, and stretches out the length outside the building and be less than two other.
Further, at the fusion position of the plate-shaped composite column and the bearing wall of the old building, the main ribs of the earlier non-interference column and the later torsion-resistant column are mutually intersected with the main ribs of the bearing wall exposed after chiseling.
Further, the early non-interference column and the later anti-torsion column are both provided with complete reinforcement cages, the stirrups of the later anti-torsion column are outwards extended and anchored into the concrete of the early non-interference column and are intersected with the main bars of the early non-interference column, and the concrete of the later anti-torsion column is outwards extended to wrap the early non-interference column.
Further, fibrous materials, rubber or foamed plastic are filled in the ultra-long seam preventing holes in the picking corridor, the surface of the ultra-long seam preventing holes is plugged by a decorative plate, and the decorative plate is fixedly connected with one side of the ultra-long seam preventing holes and is not connected with the other side of the ultra-long seam preventing holes.
Compared with the prior art, the lateral force resistant additional corridor for rebuilding the row of small-section buildings has the following beneficial effects:
According to the invention, the early non-interference columns are implanted into the outer wall of the old building and form a stable three-dimensional beam column grid together with the frame beams, after the construction on the outer wall of the old building is completed (if the construction on the outer wall of the building is not completed, the plate-shaped composite columns can cause serious interference), the early non-interference columns are horizontally and outwards expanded to form the plate-shaped composite columns, and the plate-shaped composite columns are equivalent to shear walls with increased thickness and hooped reinforcement, so that the bearing capacity of the old building on lateral force is greatly enhanced, and meanwhile, the decoration effect similar to that of decorative lines is also achieved on the appearance;
Meanwhile, the plate-shaped composite column and the frame beam form a strip-shaped three-dimensional beam column grid, part of the plate-shaped composite column is positioned outside the building, the gallery can be conveniently installed on the plate-shaped composite column, the gallery which is externally protruded on the plate-shaped composite column is not born by an old building and does not cross the old building, and therefore the old buildings are communicated on the premise that the connecting structure between the old buildings is not damaged, the number of holes (holes leading to the gallery can be used for ventilation and lighting, and the number of holes used for ventilation and lighting) is reduced, and the inner space of the old buildings is not occupied.
Drawings
FIG. 1 is a plan view of a modified building;
FIG. 2 is a schematic diagram of the connection between the early non-interfering post and the later anti-twist post;
in the figure, 1-old building, 2-plate composite column, 21-early no-interference column, 22-later torsion-resistant column, 3-frame beam, 4-gallery and 5-anti-overlength seam.
Detailed Description
Taking a cement silo of a scientific urban and north area Jin Yuxing of Beijing-Huai-Rou science, as shown in fig. 1, an additional gallery for resisting side force, which is used for rebuilding a row of small-section buildings, is used for communicating the row of small-section buildings on the premise of not damaging a connecting structure among the small-section buildings and reducing the number of openings, the small-section buildings are old buildings 1 (the requirements of communication among the old buildings are small if the cross section of the old buildings 1 is large enough) with the cross section area which cannot meet the living requirements of a user (generally below 80 square meters), and the additional gallery comprises a plate-shaped composite column 2 with the long side of the cross section being perpendicular to the arrangement direction of the old buildings 1, a frame beam 3 for connecting the plate-shaped composite column 2 into a whole, and a cantilever gallery 4 which is outwards cantilevered from the plate-shaped composite column 2;
the plate-like composite column 2 here does not have to extend to the top of the old building 1, but only to meet the strength requirements and to be able to reach all floors requiring a corridor. Note that the catwalk 4 here is a glass catwalk of the usual type, transparent and with openable windows, and is load-bearing by means of steel beams overhanging from the plate-like composite columns 2. The old building 1 is provided with a door and window hole facing one side of the picking corridor 4, and the door and window is communicated with the picking corridor 4 and is ventilated and lighted by virtue of the door and window, so that the number of holes required by ventilation and lighting is reduced (if the old building is provided with a corridor inside the building, the holes cannot play a role in ventilation and lighting at all).
Note that the gallery 4 in the present embodiment can complete the communication of the old building 1 without breaking the original connection structure between the old buildings 1, but since a large number of new connection structures are introduced, the original connection structure between the old buildings 1 is not adversely affected even if broken. The original connection structure between the old buildings 1 is partially removed in the subsequent decoration process.
The plate-shaped composite columns 2 in each old building 1 are uniformly distributed in a matrix shape and are respectively fixedly connected with the bearing structure of the old building 1, the plate-shaped composite columns 2 are reinforced concrete columns formed by connecting a pre-non-interference column 21 which is firstly constructed and a post-torsion-resistant column 22 which is constructed after the construction on the outer wall of the old building 1 is completed into a whole, the pre-non-interference column 21 is arranged in the outer wall of the old building 1 or in the old building 1, and the post-torsion-resistant column 22 is arranged in the outer wall of the old building 1 or outside the old building 1;
the plate-shaped composite column 2 is constructed in two parts because the plate-shaped composite column 2 extends a large section outward from the outer wall of the old building 1, and has serious interference with the scaffold on the outer wall of the old building 1. The structure formed by combining the two parts is similar to a shear wall with thickened and encrypted internal stirrups, and the long side of the cross section is positioned in the torsion direction.
The frame beams 3 are arranged in an upper layer and a lower layer between adjacent pre-interference-free columns 21, and are fixedly connected with the pre-interference-free columns 21 to form a three-dimensional beam column grid, the three-dimensional beam column grid connects old buildings 1 into a whole in groups, and each group of old buildings 1 is marked as a building group;
the picking corridor 4 is outwards cantilevered from the platy composite column 2 at one side of the old building 1, the side, close to the picking corridor 4, of each old building 1 is respectively provided with a door which is communicated with the picking corridor 4, and the picking corridor 4 is distributed along the whole row of old buildings 1 and communicated with the whole row of old buildings 1;
The gallery 4 in this embodiment is not decorated at first, but is an open externally hung construction platform, and a glass curtain wall is wrapped after the internal construction of the subsequent building is completed, so as to form a transparent sealed gallery.
The building group takes the anti-overlength seam 5 formed on the frame beam 3 and the gallery 4 as a boundary, and the length of each section of the gallery 4 and the length of the building group in the arrangement direction of the old building 1 are not overlong.
Here, the old buildings 1 in the same building group can be joined together at tangential positions, and if they are joined together, the overloads preventing slit 5 is provided at positions where they are not joined together. Whether the building is overlong or not is a clear concept, and the building is considered to be overlong when the building is more than 50 meters in general under the corresponding design standard.
In the plate-like composite columns 2 of each old building 1, the early non-interference columns 21 in the plate-like composite columns 2 at four corners are fused with the load-bearing walls of the old building 1.
The pre-interference-free column 21 is constructed first, and needs to bear the structures of the frame beam 3, the newly added floor slab in the old building 1, and the like, so that the structure needs to be ensured to be connected with the old building 1 into a whole and form a complete grid with the frame beam 3 therein. Some newly added floors are also arranged on the frame beams 3 in the embodiment.
Completely removing at least one layer of outer wall at the bottom layer of the old building 1, wherein glass curtain walls are arranged between adjacent plate-shaped composite columns 2 in the removed floor, and the glass curtain walls and the plate-shaped composite columns 2 are enclosed to form a glass gallery;
in this way the entire row of floors of the building is completely open, forming a long and wide indoor corridor, providing a corridor outside the catwalk 4 from the ground to different locations of the building.
The plate-shaped composite columns 2 are arranged in two rows on both sides of the old building 1, and the part of the plate-shaped composite columns 2 extending outside the building is used as a decorative line of the building.
The building outer wall sometimes can be provided with a plurality of vertical aluminum profile decorating lines or overhanging column decorating lines, the length of the outwards extending plate-shaped composite column 2 is adjusted, the overhanging surface of the plate-shaped composite column 2 is distributed according to a specific rule, the effect similar to the decorating lines is achieved, and the influence of a newly added structure on the building appearance is avoided.
In this embodiment, the cross section of the old building 1 is cylindrical, six plate-shaped composite columns 2 are arranged in each old building 1, the six plate-shaped composite columns 2 are arranged on two sides of the building in two rows, and among the three plate-shaped composite columns 2 in the same row, the plate-shaped composite column 2 in the middle extends horizontally outwards from the inside of the building, and the length of the plate-shaped composite column 2 extending out of the building is smaller than that of the other two plate-shaped composite columns. This arrangement allows the overhanging facades of the plate-like composite columns 2 to be staggered, while allowing as much of the earlier interference-free columns 21 to merge with the old building 1 as possible.
At the fusion position of the plate-shaped composite column 2 and the bearing wall of the old building 1, the main ribs of the early non-interference column 21 and the later torsion-resistant column 22 are intersected with the main ribs of the bearing wall exposed after chiseling. Thereby meeting the connection requirements.
As shown in fig. 2, the pre-non-interference post 21 and the post-torsion post 22 are provided with complete reinforcement cages, the stirrups of the post-torsion post 22 are anchored in the concrete of the pre-non-interference post 21 in an outward extending manner and intersect the main bars of the pre-non-interference post 21, and the concrete of the post-torsion post 22 is wrapped around the pre-non-interference post 21 in an outward extending manner.
This is done to ensure that two side-by-side columns are prevented from splitting under the precondition that construction can be performed sequentially. Note that in the construction process of the plate-shaped composite column 2, if the part interfering with the bearing wall of the old building 1 is encountered, the steel bars cannot be broken in the chiseling process.
In this embodiment, the post torsion post 22 has three annular stirrups, and a plurality of stirrups anchored in the concrete of the pre-interference free post 21 and intersecting the main bars of the pre-interference free post 21. One of the annular stirrups encloses the entire pre-interference free column 21.
The anti-overlength seam 5 on the picking gallery 4 is filled with fiber materials, rubber or foamed plastic, the surface of the anti-overlength seam 5 is plugged by a decorative plate, and the decorative plate is fixedly connected with one side of the anti-overlength seam 5 and is not connected with the other side of the anti-overlength seam 5.
The anti-overlength seam 5 is used for avoiding overlength of a building, but articles are easy to drop at the position of the picking gallery 4, so that the seam is required to be plugged on the premise of not transmitting force. In addition, the gallery 4 extends between adjacent old buildings 1, fills the gaps therein, enlarges the active area and omits glass near one side of the building.
The above examples are only illustrative of the preferred embodiments of the present invention and are not intended to limit the scope of the present invention, and various modifications and improvements made by those skilled in the art to the technical solution of the present invention should fall within the scope of protection defined by the claims of the present invention without departing from the spirit of the present invention.

Claims (7)

1. The side force resistant additional corridor for rebuilding the row of small-section buildings is used for communicating the row of small-section buildings on the premise of not damaging the connecting structure among the small-section buildings and reducing the number of openings, and the small-section buildings are old buildings (1) with cross-section areas which cannot meet the living needs of one family, and is characterized by comprising plate-shaped composite columns (2) with long sides of the cross-section sides perpendicular to the arrangement direction of the old buildings (1), frame beams (3) for connecting the plate-shaped composite columns (2) into a whole, and a cantilever corridor (4) overhanging the plate-shaped composite columns (2);
The plate-shaped composite columns (2) in each old building (1) are uniformly distributed in a matrix shape and are fixedly connected with the bearing structure of the old building (1) respectively, the plate-shaped composite columns (2) are reinforced concrete columns formed by connecting a pre-non-interference column (21) which is firstly constructed and a post-torsion-resistant column (22) which is constructed after construction on the outer wall of the old building (1) is completed, the pre-non-interference column (21) is arranged in the outer wall of the old building (1) or in the old building (1), and the post-torsion-resistant column (22) is arranged in the outer wall of the old building (1) or outside the old building (1);
The frame beams (3) are arranged in multiple layers up and down between adjacent pre-interference-free columns (21) and are fixedly connected with the pre-interference-free columns (21) to form a three-dimensional beam column grid, the three-dimensional beam column grid groups old buildings (1) into a whole, and each group of old buildings (1) is marked as a building group;
The picking corridor (4) is outwards cantilevered from a platy composite column (2) at one side of the old building (1), a door which is communicated with the picking corridor (4) is respectively arranged at one side of each old building (1) close to the picking corridor (4), and the picking corridor (4) is distributed along the whole row of old buildings (1) and communicated with the whole row of old buildings (1);
The building group takes an anti-overlength seam (5) formed on the frame beam (3) and the picking gallery (4) as a boundary, and the length of each section of the picking gallery (4) and the length of the building group in the arrangement direction of the old building (1) are not overlength.
2. An additional gallery against lateral forces for the reconstruction of small-section buildings in rows according to claim 1, characterized in that in the plate-like composite columns (2) of each old building (1), the preceding interference-free columns (21) in the plate-like composite columns (2) in the four corners are fused with the load-bearing walls of the old building (1).
3. The lateral force resistant additional gallery for rebuilding a row of small-section buildings according to claim 2, wherein the bottom layer of the old building (1) is completely dismantled with at least one layer of outer wall, and glass curtain walls are arranged between adjacent plate-shaped composite columns (2) in the dismantled floors, and the glass curtain walls and the plate-shaped composite columns (2) are enclosed to form a glass gallery;
the plate-shaped composite columns (2) are arranged in two rows on two sides of the old building (1), and the part of the plate-shaped composite columns (2) extending out of the building is used as a decorative line of the building.
4. A side force resistant additional gallery for rebuilding a row of small section buildings according to claim 3, characterized in that the cross section of the old building (1) is cylindrical, six plate-shaped composite columns (2) are arranged in each old building (1), the six plate-shaped composite columns (2) are arranged at two sides of the building in two rows, the plate-shaped composite columns (2) at the middle part of the three plate-shaped composite columns (2) in the same row extend horizontally outwards from the inside of the building, and the length of the plate-shaped composite columns extending out of the building is smaller than that of the other two.
5. The additional gallery for building reconstruction with small cross section in row according to claim 1, wherein the main ribs of the pre-interference-free column (21) and the post-torsion-resistant column (22) are intersected with the main ribs of the exposed bearing wall after chiseling at the merging position of the plate-shaped composite column (2) and the bearing wall of the old building (1).
6. The lateral force resistant additional gallery for row small section building reconstruction of claim 1 wherein the pre-non-interfering post (21) and the post-anti-twist post (22) are each provided with a complete reinforcement cage, the stirrups of the post-anti-twist post (22) extend outwardly into the concrete of the pre-non-interfering post (21) and intersect the main bars of the pre-non-interfering post (21), and the concrete of the post-anti-twist post (22) extends outwardly wrapping the pre-non-interfering post (21).
7. The lateral force resistant additional gallery for rebuilding a row of small-section buildings according to claim 1, wherein fiber materials, rubber or foam plastic are filled in the ultra-long prevention seams (5) on the gathering gallery (4), the surfaces of the ultra-long prevention seams (5) are plugged by decorative plates, and the decorative plates are fixedly connected with one side of the ultra-long prevention seams (5) and are not connected with the other side of the ultra-long prevention seams (5).
CN202411049997.XA 2024-08-01 2024-08-01 A lateral force-resistant additional corridor for reconstruction of rows of small-section buildings Active CN118564106B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202411049997.XA CN118564106B (en) 2024-08-01 2024-08-01 A lateral force-resistant additional corridor for reconstruction of rows of small-section buildings

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202411049997.XA CN118564106B (en) 2024-08-01 2024-08-01 A lateral force-resistant additional corridor for reconstruction of rows of small-section buildings

Publications (2)

Publication Number Publication Date
CN118564106A CN118564106A (en) 2024-08-30
CN118564106B true CN118564106B (en) 2024-12-06

Family

ID=92466081

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202411049997.XA Active CN118564106B (en) 2024-08-01 2024-08-01 A lateral force-resistant additional corridor for reconstruction of rows of small-section buildings

Country Status (1)

Country Link
CN (1) CN118564106B (en)

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101550768A (en) * 2008-03-31 2009-10-07 贵阳铝镁设计研究院 Improving method of belt porch
CN115613848A (en) * 2022-11-08 2023-01-17 长沙市规划设计院有限责任公司 A construction method for retaining the internal structure of the exterior wall for reinforcement and reconstruction

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN219931714U (en) * 2022-09-27 2023-10-31 北京京能建设集团有限公司 Frame structure of factory building
CN117868556B (en) * 2024-03-13 2024-06-25 北京建工四建工程建设有限公司 Building dismantling and modifying support system taking building as bearing member

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101550768A (en) * 2008-03-31 2009-10-07 贵阳铝镁设计研究院 Improving method of belt porch
CN115613848A (en) * 2022-11-08 2023-01-17 长沙市规划设计院有限责任公司 A construction method for retaining the internal structure of the exterior wall for reinforcement and reconstruction

Also Published As

Publication number Publication date
CN118564106A (en) 2024-08-30

Similar Documents

Publication Publication Date Title
CA1156015A (en) Multi-storey building
EP1733100B9 (en) A transportable modular building and method of constructing thereof
US1886962A (en) Building construction
US2902853A (en) Building construction
EP3347535B1 (en) Building system with a load-resisting frame made of reinforced concrete or steel integrated with wooden infill panels
CN104712055A (en) Wooden building based on concrete frameworks and construction method of wooden building
CN102661051A (en) Construction method for prefabricated perforated type filling module of ribbed cast-in-place concrete floor slab
RU86634U1 (en) BUILDING FRAME MODULE
CN118601374B (en) A method for reconstructing rows of small-section buildings by making full use of old buildings
IT202000018244A1 (en) PREFABRICATED CUSTOMIZED THERMAL COAT, REINFORCED, ANTI-ROLLOVER WITH ANTISEISMIC FIXINGS
CN216840062U (en) Integrative wall assembled building that hangs of steel frame construction
CN118564106A (en) Lateral force resistant additional corridor for rebuilding row of small-section buildings
CN215760640U (en) Short-limb shear wall frame structure for adding floor to existing building
RU127795U1 (en) HIGH BUILDING
CN203394094U (en) Reinforced and reconstructed masonry structure using external gallery bridge and external elevator
RU2849479C1 (en) Method of reinforcing wall reinforced concrete panels
JP3682650B2 (en) Frame structure of apartment house
EA007114B1 (en) High-rise building
CN107143186B (en) With the Chinese style local-style dwelling houses of the hinged optional energy shock insulation of prefabricated components quick-assembling flexible rigid
CN220336164U (en) Prefabricated wallboard connection structure of assembled building
CN118564105B (en) A method for rebuilding a new floor slab when there is interference with the original load-bearing exterior wall
CN110107133A (en) A kind of production method of multi-storied warehouse, multi-storied warehouse wall and multi-storied warehouse wall
WO1995026447A1 (en) Multi-storey building made of precast concrete parts
KR102848181B1 (en) Modular concrete building and construction method therefor
RU2849482C1 (en) Reinforced concrete wall panel

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant